Operational Excellence
Six Sigma
Six Sigma: DMAIC; Y=f(x)
Is it a Goal, a Measure, a Process, a Tool or an expletive deleted?
By Lee Olson Presentation to INFORMS
D efine
M easure A nalyze I mprove C ontrol
D efine
Objectives
M A I C
easure nalyze mprove
ontrol
Understand the Basics of the Six Sigma Program Understand How Six Sigma Relates to Lean, TOC, TQM
(Theory Of Constraints; Total Quality Management)
Ability to Define a Strategy and Roadmap for Success
Operational Excellence Training
D efine
Define
M A I C
easure nalyze mprove
ontrol
Is it a Goal, a Measure, a Process, a Tool or an expletive deleted?
Yes
Operational Excellence Training
D efine
Define
Six Sigma Is a management methodology
Customer focused Data driven decisions Breakthrough performance gains Validated bottom line results
M A I C
easure nalyze mprove
ontrol
Operational Excellence Training
D efine
Customer Focused
ON TIME DELIVERY (sample)
M A I C
easure nalyze mprove
ontrol
The percentage of sales order line items that ship complete on or before the original customer promise date, for all line items shipped in the month.
Our Performance Compared to Competitors Importance to Customers Complete Quality OTD High
On-Time Delivery
100% 90% 80% 70% 60% 50% 40%
Pareto of Drivers
100%
% Impact
75% 50% 25% 0%
Orders on Credit Hold Engineering Change Orders
Current Due Date
Late Supplier Deliveries
xyz Cell Always Late
Unrealistic Promise Date
20% 10% 0% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Target
Reason
Top 5 Action Items
Driver Action Description Status Status Description Ow ner Original Due Date
Late Supplier Deliveries
Monthly reporting to suppliers on delivery & quality metrics.
On track
Report Cards Implemented.
Adam
Low Yield on part abc
30%
5/21
5/21
Late Supplier Deliveries
Arrange face to face meetings with top offenders. Review and approve supplier's corrective action plan. Kaizen Event to focus on improving throughput by 40% and improve labor efficiency by 35% Focus on custom products to provide realistic ATP based on inventory and leadtime of components.
On track
Meetings Complete with top 10 Suppliers.
Beth
6/15
6/15
Late Supplier Deliveries
Caution Corrective Action Plan in Place for 2 major Suppliers On track Event held 5/1. 25% throughput improvement in May. Labor Efficiency Increase of 30%
Carlos
7/15
9/15
xyz Cell Always Late
Doreen
5/21
5/21
Unrealistic Promise Date
Problem Continued lack of progress. Restructured and focused team. Developing detailed plan.
Earnest
6/15
8/15
Training
Shared Goals Price Complaints Moderateto-Low
Were Better
Theyre Better
Operational Excellence Training
D efine
Data Driven Decisions
M A I C
easure nalyze mprove
ontrol
Y= f (X)
To get results, should we focus our behavior on the Y or X ?
Y Dependent Output Effect Symptom Monitor Response
X1 . . . XN Independent Input-Process Cause Problem Control Factor
Why should we test or inspect Y, if we know this relationship? Operational Excellence Training
D efine
Breakthrough performance gains
(Distribution Shifted 1.5)
M A I C
easure nalyze mprove
ontrol
2 3 4 5 6
Process Capability
PPM 308,537 66,807 6,210 233 3.4
Defects per Million Opportunities
Sigma is a statistical unit of measure which reflects process capability. The sigma scale of measure is perfectly correlated to such characteristics as defects-per-unit, parts-per million defective, and the probability of a failure/error.
Operational Excellence Training
Pr ic e In cr ea se Vo lu m e In c. w ith Le ve ra g e lC os ts at er ia M
Impact on Bottom Line
M an uf ac tu r in g
Vo lu m e In c. No Le ve ra g Ta e SG &A
Operational Excellence Training
G en
Assuming a 10% change in the factor
Validated bottom line results
Factors
W er al -5 % La or ki n Pr ic e g Ca p Re d
xe
bo
ita uc tio
n
D efine
M A I C
ontrol
nalyze easure mprove
D efine
Define
Methodology Define Measure Analyze Improve Control
M A I C
easure nalyze mprove
ontrol
Operational Excellence Training
Roadmap
Example
Next Project Celebrate Project $
D efine
M A I C
easure nalyze mprove
ontrol
Define
Customers, Value, Problem Statement Scope, Timeline, Team Primary/Secondary & OpEx Metrics Current Value Stream Map Voice Of Customer (QFD)
Validate Project $
Measure
Assess specification / Demand Measurement Capability (Gage R&R) Correct the measurement system Process map, Spaghetti, Time obs. Measure OVs & IVs / Queues
Control
Document process (WIs, Std Work) Mistake proof, TT sheet, CI List Analyze change in metrics Value Stream Review Prepare final report
Validate Project $ Validate Project $
Improve
Optimize KPOVs & test the KPIVs Redesign process, set pacemaker 5S, Cell design, MRS Visual controls Value Stream Plan
Analyze (and fix the obvious)
Validate Project $
Root Cause (Pareto, C&E, brainstorm) Find all KPOVs & KPIVs FMEA, DOE, critical Xs, VA/NVA Graphical Analysis, ANOVA Future Value Stream Map
Operational Excellence Training
Operational Excellence Methodology
Plan
Execute Strategic Link to Business Plan defined in Project Selection Process Defined Business Impact with Op Ex Champion support Structured Brainstorming at all organizational levels Cause and Effect Diagrams identifying critical factors Primary and Secondary Metrics defined and charted Multi-Level Pareto Charts to confirm project focus
Identify Problem
Practical Problem
Develop a focused Problem Statement and Objective Develop a Process Map and/or FMEA Develop a Current State Map Identify the response variable(s) and how to measure them Analyze measurement system capability Assess the specification (Is one in place? Is it the right one?)
Problem Definition
Characterize the response, look at the raw data Abnormal? Other Clues? Mean or Variance problem? Time Observation Spaghetti Diagram Takt Time Future State Maps Percent Loading Standard Work Combination Use Graphical Analysis, Multi-Vari, ANOVA and basic statistical tools to identify the likely families of variability
Identify the likely Xs 5S Set Up Time Reduction (SMED) Material Replenishment Systems Level Loading / Line Leveling Cell Design Visual Controls Use Design of Experiments to find the critical few Xs Move the distribution; Shrink the spread; Confirm the results
Problem Solution
Problem Control
Execute Plan
Mistake Proof the process (Poka-Yoke) Tolerance the process Measure the final capability Place appropriate process controls on the critical Xs Document the effort and results Standard Work TPM
Problem Solving
What do you want to know? How do you want to see what it is that you need
to know?
What type of tool will generate what it is that you
need to see?
What type of data is required of the selected tool? Where can you get the required type of data?
Crane Co. Op. Ex. Methodology Originated by MBBs; D. Braasch, J. Davis, R. Duggins, J. OCallaghan, R. Underwood, I. Wilson
Based in part on Six Sigma Methodology developed by GE Medical Systems and Six Sigma Academy, Inc.
Define
Key Items
D efine
M A I C
easure nalyze mprove
ontrol
Customers, Value, Problem Statement Scope, Timeline, Team Primary/Secondary & OpEx Metrics Current Value Stream Map Voice Of Customer (QFD)
(Quality Function Deployment)
Operational Excellence Training
Project Selection
Impact
D efine
M A I C
easure nalyze mprove
ontrol
Business Impact
Revenue Growth Cost Reduction Capital Reduction Key Business Objectives On Time Delivery Lead Time Quality Customer Satisfaction
Impact on Operational Excellence Metrics
Operational Excellence Training
Evaluate and Rank Suggestions
Effort and Risk
D efine
M A I C
easure nalyze mprove
ontrol
Effort required
People Resources Capital Resources Duration of Project
Probability of success
Technical Risk
Data available Knowledge of process
Management Risk
Aligned with objectives Support by value stream manager
Impact vs. Risk vs. Effort
Assess ROI (Return On Investment) Assign priorities to projects
Operational Excellence Training
D efine
Evaluate and Rank Suggestions
Project Information Impact Effort
M A I C
easure nalyze mprove
ontrol
Risk
Duration of Project
Capital Resources
People Resources
Management Risk
4 2 2 3 4 5 1 1 1
Capital Reduction
On Time Delivery
Revenue Growth
Cost Reduction
Technical Risk
Total Impact
Key Business Objective
Total Effort
Customer Satisfaction
Mfg (M) or Admin # (A)
1 2 3 4 5 A M A M A
Project Description Variable weightings
Customer Billing Errors Warranty scrap warranty vs sales Vendor Delivery Performance On Time Shipping Performance Hiring and Retention 20% - 24% Turnover New Product Development Cycle Time
20% 0 0 0 2 0
15% 2 2 2 1 3
10% 0 0 2 2 0
15% 4 1 2 4 2
20% 4 1 5 5 1
5% 2 0 4 0 0
5% 2 3 3 1 3
10% 100% 50% 5 3 0 5 2 2.4 1.1 2.2 2.9 1.3 2 4 1 4 3
20% 1 4 1 1 2
30% 100% 40% 3 5 3 2 4 2.1 4.3 1.6 2.8 3.1 1 4 1 1 1
60% 100% 2.8 2.8 1.6 2.2 2.8
6 7 8 9
A M A M Manufacturing Maintenance Tooling Maintenance Day Sales Outstanding (DSO) FTY of 65% on product 123
3 0 0 4
4 3 0 4
2 0 4 2
5 1 2 5
3 2 0 4
3 3 0 4
4 1 0 5
5 0 0 5
3.6 1.2 0.7 4.1
5 1 1 2
3 4 0 1
5 1 2 1
4.6 1.6 1.1 1.5
5 1 1 2
5.0 1.0 1.0 1.4
Example tool to rank projects
0106-01 Project Rating.xls
Operational Excellence Training
Total Risk
Lead Time
Quality
Example chart to rank projects 0106-01 Project Rating.xls
D efine
Measure
M A I C
easure nalyze mprove
ontrol
Establish measurement capability
Validate the database (transactional) Gage R&R (Repeatability & Reproducibility) Calibration is not enough Many (or most) measurement systems are not capable How good is the data you are using to make decisions?
Fix the measurement system
Enables calculation of process capability Enables calculation of alpha & beta risks This step is often skipped
Operational Excellence Training
Analyze
(and fix the obvious)
D efine
M A I C
easure nalyze mprove
ontrol
Find all KPOVs & KPIVs
(Key Process Output Variables; Key Process Input Variables)
FMEA, DOE, critical Xs, VA/NVA
(Failure Modes Effects Analysis; Design Of Experiment)
Graphical Analysis, ANOVA
(Analysis Of Variance)
Future Value Stream Map
Operational Excellence Training
D efine
Improve
M A I C
easure nalyze mprove
ontrol
Optimize KPOVs & test the KPIVs
(Key Process Output Variables; Key Process Input Variables)
Redesign process, set pacemaker 5S, Cell design, MRS
(Material Replenishment System)
Visual controls Value Stream Plan
Operational Excellence Training
D efine
Control
M A I C
easure nalyze mprove
ontrol
Management of Change
Owned by project champion and value stream manager Critical to long term success of project Physical and cultural changes
Measurement controls
On-going metrics
Visual Controls
Enable workers to self-manage the process
Operational Excellence Training
Basic Implementation
Roadmap
Identify Customer Requirements
D efine
M A I C
easure nalyze mprove
ontrol
Understand and Define Entire Value Streams Vision (Strategic Business Plan) Deploy Key Business Objectives
- Measure and target (metrics)
- Align and involve all employees - Develop and motivate
Continuous Improvement (DMAIC)
Define, Measure, Analyze, Improve
Identify root causes, prioritize, eliminate waste, make things flow and pulled by customers
Control
-Sustain Improvement -Drive Towards Perfection
Operational Excellence Training
3.1
3.2
3.0
2.1 2.2
Improve Customer Focus Educate/Get Everyone Involved
1.1 1.2
2.0 1.0
8 7 6 5 4 3 2 1 1 2 3 4 5 6
Improve the Metrics
Your Manager's 1-Year Breakthrough Objectives
Train functional leaders as LGBs Improve On Time Delivery to 98% Establish tracking of OTD in every cell
Conduct interviews with top 10 customers
Train leadership team as Lean Green Belts (LGB)
Train workers in how our products are used by our major customers
Your Annual Breakthrough
Indicator's and Goals
Complete 1 Leadership LGB training course
Objectives
Benefits
100% Completion of LGB Projects Leaders have ability to map a value stream
Metrics module in all appropriate training sequences Training projects demonstrate flowdown of metics to operational level
Operational Excellence Training
4 4 4 4 4
Develop culture of teams
Trainees participate in customer survey Complete 3 functional LGB training courses Bring reps from top 10 customers in for plant tours Implement lean concepts in top 3 volume lines establish pareto of drivers for OTD
Type in --> 4
Key:
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4
4 Impact
IT Operations Quality Engineering Maintenance Marketing Training
Hoshin
Owner
l
m m m m m m m m m m m m m m m
Resource
m Support
m
D efine
M A I C
ontrol
nalyze easure mprove
ON TIME DELIVERY (sample)
The percentage of sales order line items that ship complete on or before the original customer promise date, for all line items shipped in the month.
On-Time Delivery
100% 90% 80% 70% 60% 50% 40%
Pareto of Drivers
100%
% Impact
75% 50% 25% 0%
Orders on Credit Hold Engineering Change Orders
Current Due Date
Late Supplier Deliveries
xyz Cell Always Late
Unrealistic Promise Date
20% 10% 0% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Target
Reason
Top 5 Action Items
Driver Action Description Status Status Description Ow ner Original Due Date
Late Supplier Deliveries
Monthly reporting to suppliers on delivery & quality metrics.
On track
Report Cards Implemented.
Adam
Low Yield on part abc
30%
5/21
5/21
Late Supplier Deliveries
Arrange face to face meetings with top offenders. Review and approve supplier's corrective action plan. Kaizen Event to focus on improving throughput by 40% and improve labor efficiency by 35% Focus on custom products to provide realistic ATP based on inventory and leadtime of components.
On track
Meetings Complete with top 10 Suppliers.
Beth
6/15
6/15
Late Supplier Deliveries
Caution Corrective Action Plan in Place for 2 major Suppliers On track Event held 5/1. 25% throughput improvement in May. Labor Efficiency Increase of 30%
Carlos
7/15
9/15
xyz Cell Always Late
Doreen
5/21
5/21
Unrealistic Promise Date
Problem Continued lack of progress. Restructured and focused team. Developing detailed plan.
Earnest
6/15
8/15
D efine
Does it work?.
The top companies in Customer Satisfaction grow MVA at nearly twice the rate of their poor-performing counterparts.
M A I C
easure nalyze mprove
ontrol
Market Value Added
50 40 30 20 10 0
In Billions $
$42
1999 73 companies Ralston Purina Quaker Oats Hilton Hotels Coca-Cola Unilever etc.
$23
Low
High
Customer Satisfaction Index Score
Source: American Customer Satisfaction Index, U Michigan, HBR, 2001
Operational Excellence Training
D efine
What about Lean, TOC, TQM
M A I C
easure nalyze mprove
ontrol
Six Sigma
Remove defects, minimize variance
Lean
Remove waste, shorten the flow
TOC
Remove and manage constraints
TQM
Continuous Improvement
Operational Excellence Training
Value Stream Map - Current State
6 WEEK Forecast
Suppliers
Production Control
90/60/30 day Forecasts
Customer
MRP
Order Entry
Orders/day = 36 Queue = 1.5 Days Demand = 45 per day 2 shifts Takt Time = 18.2 Minutes Competitive Lead Time = 3 Days
Lead Time - 34 Days WEEKLY SCHEDULE
1X Daily I
Coils 5 days
Stamping
S. Weld # 1
Assembly I
Test I
Shipping I
342 CT=1sec Co=1 hr. Uptime=85% 1 shift 5 days 1 sec CT=3 min Co=10 min. Uptime=70% 1 shift 7.6 days 3 min
81 CT= 15 min Co=0 min. Uptime=100% 2 shifts 1.8 days 15 min
122 CT= 67 min Co= 23 min FTY = 67% 2 shifts
202 CT= 4 min Co=0 Uptime=100% 2 shifts
90 Lead Time =23.6 days Touch Time = 89 min 2 days 4 min
2.7 days 67 min
4.5 days
Demand = 45/day Takt Time = 18.2 min
6 WEEK Forecast Production Control
Customer Data
On-Time Delivery
90/60/30 day Forecasts Customer
Competitive LT = 3 days
Suppliers
MRP
Order Entry
Orders/day = 36 Queue = 1.5 Days Demand = 45 per day 2 shifts Takt Time = 18.2 Minutes Competitive Lead Time = 3 Days
Lead Time - 34 Days WEEKLY SCHEDULE
1X Daily I
Coils 5 days
Stamping
S. Weld # 1
Assembly I
Test I
Shipping I
342 CT=1sec Co=1 hr. Uptime=85% 1 shift 5 days 1 sec CT=3 min Co=10 min. Uptime=70% 1 shift 7.6 days 3 min
81 CT= 15 min Co=0 min. Uptime=100% 2 shifts 1.8 days 15 min
122 CT= 67 min Co= 23 min FTY = 67% 2 shifts
202 CT= 4 min Co=0 Uptime=100% 2 shifts
90 Lead Time =23.6 days Touch Time = 89 min 2 days 4 min
2.7 days 67 min
4.5 days
Raw = 5 days WIP = 12.1 days FG = 6.5 days
Suppliers
Inventory
6 WEEK Forecast Production Control 90/60/30 day Forecasts Customer
MRP
Order Entry
Orders/day = 36 Queue = 1.5 Days Demand = 45 per day 2 shifts Takt Time = 18.2 Minutes Competitive Lead Time = 3 Days
Lead Time - 34 Days WEEKLY SCHEDULE
1X Daily I
Coils 5 days
Stamping
S. Weld # 1
Assembly I
Test I
Shipping I
342 CT=1sec Co=1 hr. Uptime=85% 1 shift 5 days 1 sec CT=3 min Co=10 min. Uptime=70% 1 shift 7.6 days 3 min
81 CT= 15 min Co=0 min. Uptime=100% 2 shifts 1.8 days 15 min
122 CT= 67 min Co= 23 min FTY = 67% 2 shifts
202 CT= 4 min Co=0 Uptime=100% 2 shifts
90 Lead Time =23.6 days Touch Time = 89 min 2 days 4 min
2.7 days 67 min
4.5 days
Lead Time = 23.6 days Touch Time = 89 min
6 WEEK Forecast
Suppliers
Flow of Value
Lead Time
Production Control 90/60/30 day Forecasts Customer
MRP
Order Entry
Orders/day = 36 Queue = 1.5 Days Demand = 45 per day 2 shifts Takt Time = 18.2 Minutes Competitive Lead Time = 3 Days
Lead Time - 34 Days WEEKLY SCHEDULE
1X Daily I
Coils 5 days
Stamping
S. Weld # 1
Assembly I
Test I
Shipping I
342 CT=1sec Co=1 hr. Uptime=85% 1 shift 5 days 1 sec CT=3 min Co=10 min. Uptime=70% 1 shift 7.6 days 3 min
81 CT= 15 min Co=0 min. Uptime=100% 2 shifts 1.8 days 15 min
122 CT= 67 min Co= 23 min FTY = 67% 2 shifts
202 CT= 4 min Co=0 Uptime=100% 2 shifts
90 Lead Time =23.6 days Touch Time = 89 min 2 days 4 min
2.7 days 67 min
4.5 days
Max Wip = 7.6 days CT (67) > Takt Time (18)
6 WEEK Forecast
Suppliers
Constraints
OTD, Lead Time
Production Control 90/60/30 day Forecasts Customer
MRP
Order Entry
Orders/day = 36 Queue = 1.5 Days Demand = 45 per day 2 shifts Takt Time = 18.2 Minutes Competitive Lead Time = 3 Days
Lead Time - 34 Days WEEKLY SCHEDULE
1X Daily I
Coils 5 days
Stamping
S. Weld # 1
Assembly I
Test I
Shipping I
342 CT=1sec Co=1 hr. Uptime=85% 1 shift 5 days 1 sec CT=3 min Co=10 min. Uptime=70% 1 shift 7.6 days 3 min
81 CT= 15 min Co=0 min. Uptime=100% 2 shifts 1.8 days 15 min
122 CT= 67 min Co= 23 min FTY = 67% 2 shifts
202 CT= 4 min Co=0 Uptime=100% 2 shifts
90 Lead Time =23.6 days Touch Time = 89 min 2 days 4 min
2.7 days 67 min
4.5 days
CO = 1 hour CO = 23 min CO =
Suppliers
Setup Times
OP Margin, Lead Time
Production Control 90/60/30 day Forecasts Customer
6 WEEK Forecast Changeover
MRP
Order Entry
Orders/day = 36 Queue = 1.5 Days Demand = 45 per day 2 shifts Takt Time = 18.2 Minutes Competitive Lead Time = 3 Days
Lead Time - 34 Days WEEKLY SCHEDULE
1X Daily I
Coils 5 days
Stamping
S. Weld # 1
Assembly I
Test I
Shipping I
342 CT=1sec Co=1 hr. Uptime=85% 1 shift 5 days 1 sec CT=3 min Co=10 min. Uptime=70% 1 shift 7.6 days 3 min
81 CT= 15 min Co=0 min. Uptime=100% 2 shifts 1.8 days 15 min
122 CT= 67 min Co= 23 min FTY = 67% 2 shifts
202 CT= 4 min Co=0 Uptime=100% 2 shifts
90 Lead Time =23.6 days Touch Time = 89 min 2 days 4 min
2.7 days 67 min
4.5 days
Uptime = 70%
6 WEEK Forecast
Suppliers
Maintenance
OTD, Lead Time
Production Control 90/60/30 day Forecasts Customer
MRP
Order Entry
Orders/day = 36 Queue = 1.5 Days Demand = 45 per day 2 shifts Takt Time = 18.2 Minutes Competitive Lead Time = 3 Days
Lead Time - 34 Days WEEKLY SCHEDULE
1X Daily I
Coils 5 days
Stamping
S. Weld # 1
Assembly I
Test I
Shipping I
342 CT=1sec Co=1 hr. Uptime=85% 1 shift 5 days 1 sec CT=3 min Co=10 min. Uptime=70% 1 shift 7.6 days 3 min
81 CT= 15 min Co=0 min. Uptime=100% 2 shifts 1.8 days 15 min
122 CT= 67 min Co= 23 min FTY = 67% 2 shifts
202 CT= 4 min Co=0 Uptime=100% 2 shifts
90 Lead Time =23.6 days Touch Time = 89 min 2 days 4 min
2.7 days 67 min
4.5 days
FTY = 67%
6 WEEK Forecast
Suppliers
Quality
Production Control 90/60/30 day Forecasts Customer
MRP
Order Entry
Orders/day = 36 Queue = 1.5 Days Demand = 45 per day 2 shifts Takt Time = 18.2 Minutes Competitive Lead Time = 3 Days
Lead Time - 34 Days WEEKLY SCHEDULE
1X Daily I
Coils 5 days
Stamping
S. Weld # 1
Assembly I
Test I
Shipping I
342 CT=1sec Co=1 hr. Uptime=85% 1 shift 5 days 1 sec CT=3 min Co=10 min. Uptime=70% 1 shift 7.6 days 3 min
81 CT= 15 min Co=0 min. Uptime=100% 2 shifts 1.8 days 15 min
122 CT= 67 min Co= 23 min FTY = 67% 2 shifts
202 CT= 4 min Co=0 Uptime=100% 2 shifts
90 Lead Time =23.6 days Touch Time = 89 min 2 days 4 min
2.7 days 67 min
4.5 days
Who is setting the pace? What is the pitch time?
6 WEEK Forecast
Suppliers
Flow of Value
OTD, Lead Time
Production Control 90/60/30 day Forecasts Customer
MRP
Order Entry
Orders/day = 36 Queue = 1.5 Days Demand = 45 per day 2 shifts Takt Time = 18.2 Minutes Competitive Lead Time = 3 Days
Lead Time - 34 Days WEEKLY SCHEDULE
1X Daily I
Coils 5 days
Stamping
S. Weld # 1
Assembly I
Test I
Shipping I
342 CT=1sec Co=1 hr. Uptime=85% 1 shift 5 days 1 sec CT=3 min Co=10 min. Uptime=70% 1 shift 7.6 days 3 min
81 CT= 15 min Co=0 min. Uptime=100% 2 shifts 1.8 days 15 min
122 CT= 67 min Co= 23 min FTY = 67% 2 shifts
202 CT= 4 min Co=0 Uptime=100% 2 shifts
90 Lead Time =23.6 days Touch Time = 89 min 2 days 4 min
2.7 days 67 min
4.5 days
D efine
Making it happen
Three major roles Implementer
Learns the tools Works the process Solves day to day problems
M A I C
easure nalyze mprove
ontrol
Manager
Learns the methodology Manages a value stream Reviews project teams
Where do you need to focus?
Leader
Establishes the vision for the future Sets priorities Encourages
Operational Excellence Training