Carpentry Works Installation Flow Chart

This flowchart outlines the process for completing various construction works, beginning with plastering work and sequentially checking the installation of a ceiling, perforated work, parquet flooring, and wooden doors before obtaining final consultant approval.

Uploaded by

Joe_Average
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Carpentry Works Installation Flow Chart

This flowchart outlines the process for completing various construction works, beginning with plastering work and sequentially checking the installation of a ceiling, perforated work, parquet flooring, and wooden doors before obtaining final consultant approval.

Uploaded by

Joe_Average
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

5.

FLOWCHART WORK (General)

Completion of other works: 1. Plastering work

NO

Checking
YES

Installation of ceiling

NO

Checking
YES

Installation of perforated

NO

Checking
YES

Installation of parquet floor

NO

Inspection
YES

Installation of wooden door

NO

Inspection
YES

Consultant Approval

-6-