0% found this document useful (0 votes)
108 views1 page

Trainning For CNC Shop: Safety Instruction Self& Machine

1. The document provides safety instructions and guidelines for housekeeping, forging inspection, machine maintenance, and component inspection for a CNC shop. 2. Operators are instructed to follow safety procedures like keeping machines doors closed while running and switching off all machines during lunch. Housekeeping guidelines require keeping work areas clean and organized. 3. Forging inspection steps like checking for cracks and flashes are listed before CNC machining. Machine maintenance tasks like lubricant, coolant and hydraulic level checks are outlined. Component inspection procedures by operators and inspectors are specified.

Uploaded by

Ravi Agarwal
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views1 page

Trainning For CNC Shop: Safety Instruction Self& Machine

1. The document provides safety instructions and guidelines for housekeeping, forging inspection, machine maintenance, and component inspection for a CNC shop. 2. Operators are instructed to follow safety procedures like keeping machines doors closed while running and switching off all machines during lunch. Housekeeping guidelines require keeping work areas clean and organized. 3. Forging inspection steps like checking for cracks and flashes are listed before CNC machining. Machine maintenance tasks like lubricant, coolant and hydraulic level checks are outlined. Component inspection procedures by operators and inspectors are specified.

Uploaded by

Ravi Agarwal
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

TRAINNING FOR CNC SHOP

DATE :- 13/4/12

S.NO. A
1 2 3 4 B 1 2 3 4 5

SAFETY INSTRUCTION SELF& MACHINE:Do not wear sandle when working at working place. Do not put unnecessary part on machine. Machine door close before machine running. Do all machine switch off in lunch time. ABOUT HOUSE KEEPING:All machine should be neat &clean after per shift end. All tray should be clean which is in use. Rejection tray should be define &rejection component put in this tray. Finished component tray should be put at proper place . Working shop floor should be neat& clean without oilness.

C
1 2 3 4

ABOUT FORGING :Crack check on forging dia before cnc machining. Flash check on hex dia before cnc maching. Forging die pin broken check on second side before cnc machining. Jaws resetting if forging die changed.

D
1 2 3 4 5 6 7 8 9 10 11 E 1 2

ABOUT MACHINE:Lubricant level check before machine running per shift. Coolant level check before machine running per shift. Hydraulic tank level check per day. Oil No-32 drop for lubrication(in mazak) GreeseNo-000 drop for lubrication(in Gedee wheiler) Oil No-68 drop in hydraulic tank. GreeseNo-265 use for chuck greesing. If abnormal sound in machine , push emergency button and inform to supervisor. If power cut without operation compleate inform to supervisor/setter. Chuck greeesing should be every week. Chuck pressure should be (18-22)kg/cm. INSPECTION:Operator inspect component hourly by their specified gauges. Inspector inspect component after two hours of every machine with report.