90% found this document useful (10 votes)
7K views4 pages

Fault Level Calcn in 11KV & 415V

This document contains calculations of fault levels at different voltage levels of a 8 MW captive power plant in Tadipatri, India. The key details are: 1. The power plant includes an 8.6MVA transformer operating at 11kV/33kV, and an 8MW generator. 2. Fault calculations show a fault level of 162MVA and 8.5kA at the 11kV bus. 3. Further calculations determine a fault level of 24.3MVA and 32.4kA at the 415V bus, with a total motor end fault of 40.4kA.

Uploaded by

vaithy2011
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
90% found this document useful (10 votes)
7K views4 pages

Fault Level Calcn in 11KV & 415V

This document contains calculations of fault levels at different voltage levels of a 8 MW captive power plant in Tadipatri, India. The key details are: 1. The power plant includes an 8.6MVA transformer operating at 11kV/33kV, and an 8MW generator. 2. Fault calculations show a fault level of 162MVA and 8.5kA at the 11kV bus. 3. Further calculations determine a fault level of 24.3MVA and 32.4kA at the 415V bus, with a total motor end fault of 40.4kA.

Uploaded by

vaithy2011
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

SAI SINDHU SPONGE IRON PVT LTD

8 MW CAPTIVE POWER PLANT AT TADIPATRI

FAULT LEVEL CALCULATION G

11 KV bus

11KV XLPE cable D Y 33 KV bus

Isolater

ACSR,O/H line 33Kv Grid SS

DETAILS: 1. Transformer - 8.6MVA, 11/33 KV, 8.5% 2. Generator - 8.0MW, 10.0 MVA

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

SAI SINDHU SPONGE IRON PVT LTD


8 MW CAPTIVE POWER PLANT AT TADIPATRI

FAULT LEVEL CALCULATION IN 11KV BUS BAR I. Fault level at 33 KV: Fault level at 33KV Bus Let the base MVA % Impedance of the system at source II. Fault level at 8.6MVA Transformer Transformer KVA Voltage rating Impedance of the transformer = = = 8600KVA 33KV/11KV 10% = 0.1 P.U =Z2 = = = 1000 MVA (considered) 8.6 MVA 8.6/1000 = 0.0086 P.U = Z1

III. Fault level at 10.0 MVA Generator Sub transient Reactance of the Generator Generator MVA Base MVA for generator Impedance of the Generator = 0.12X (8.6 / 10) = 0.1032 P.U = Z3 Z2 Z1 = = = 12. % (Considered) 10.0 MVA 8.6 MVA

Z3 TOTAL FAULT IN 11KV BUS: Z1 and Z2 are in series Total P.U in Transformer end (Z0) = Z1 +Z2
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

SAI SINDHU SPONGE IRON PVT LTD


8 MW CAPTIVE POWER PLANT AT TADIPATRI

= 0.0086 + 0.1 = 0.1086 P.U in 11KV Bus = Z0 XZ3 /Z0+Z3 = (0.1086 X 0.1032) / (0.1086 + 0.1032) = 0.0529 P.U Fault MVA in 11KV End = 8.6/0.0529 = 162 MVA Fault Current = 162/(1.732X11) = 8.5 KA FAULT LEVEL CALCULATION IN 415V BUS BAR IV. Fault level at 11 KV: Actual fault level at 11KV Bus Let the base MVA % Impedance of the system at source V. Fault level at 2.5MVA Transformer Transformer KVA Voltage rating Impedance of the transformer = = = = TOTAL FAULT IN 415V BUS: Z4 and Z5 are in series Total P.U in Transformer end (Z0) = Z4+Z5 = 0.0123 + 0.07
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

= = =

162 MVA 2.0 MVA 2.0/162 = 0.0123 P.U =Z4

2000KVA 11KV/0.433KV 7% 0.07 P.U =Z5

SAI SINDHU SPONGE IRON PVT LTD


8 MW CAPTIVE POWER PLANT AT TADIPATRI

= 0.0823 Fault MVA in 415V End = 2.0/0.0823 = 24.3 MVA Fault Current = 24.3/(1.732X0.433) = 32.4 KA Fault in motor end Total Fault in 415V end = 8 KA = 40.4 KA