0% found this document useful (0 votes)
465 views0 pages

Production Schedule

This document outlines the production schedule for the film "Final Status" to be shot in February-March 2013. It details the equipment to be used, including cameras and accessories. The schedule lists the activities and scenes to be shot over three days at different locations - Zack's house on day 1, a school on day 2, and a warehouse on day 3. It provides the start and end times for setup, filming, and breakdown each day. The production team is listed, headed by director Zack Turofsky and director of photography Andrew Roth.

Uploaded by

armedia12
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
465 views0 pages

Production Schedule

This document outlines the production schedule for the film "Final Status" to be shot in February-March 2013. It details the equipment to be used, including cameras and accessories. The schedule lists the activities and scenes to be shot over three days at different locations - Zack's house on day 1, a school on day 2, and a warehouse on day 3. It provides the start and end times for setup, filming, and breakdown each day. The production team is listed, headed by director Zack Turofsky and director of photography Andrew Roth.

Uploaded by

armedia12
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 0

Production Schedule

Title: Final Status


Dates: February-March 2013








Equipment:
Canon XL1-H1a, Tripod, dolly, red head light, secondary
camera (Canon 550D)

Shooting schedule day 1- Zacks House
Time Scene Number Activity
9:00 N/A Arrival
9:00-9:30 N/A Unload equipment and preparation before
set up
9:30-10:30 N/A Set design
10:30-10:40 N/A Set up equipment
10:40-11:00 N/A Break
11:00-11:10 N/A Run through of scene with actor
11:10-11:30 1 Completed opening scene in bedroom
11:30-12:00 2 Completed scene 2
12:00-12:30 N/A Pack up equipment and Lunch
Production Team:
Title:
Director/location
scout

Zack Turofsky
Director of
Photography
Andrew Roth
Screenwriter Sam Simmons



Time Scene Number Activity
8:30 N/A Arrival
12:00-12:20 N/A Unload equipment and preparation before
set up
12:20-12:40 N/A Scene set up
12:40-1:00 N/A Set up equipment
1:00- 1:20 N/A Break
1:20-1:30 N/A Run through of scene with actor
1:30-1:50 3 Completed scene 3
1:50-2:10 N/A Pack up equipment and Lunch

Shooting day 3-warehouse

Time Scene Number Activity
9:00 N/A Arrival
9:00-9:30 N/A Unload equipment and preparation before
set up
9:30-10:00 N/A Set design
10:00-10:20 N/A Set up equipment
10:20-10:30 N/A Break
10:30-10:40 N/A Run through of scene with actor
10:40-11:00 4 First section of scene 4
11:00-11:20 4 Second section of scene 4
11:20-11:40 4 Third section of scene 4
11:40-12:10 4 Final section of scene 4
12:10-12:30 4 Filler Shots
12:30-1:00 N/A Pack up equipment and leave warehouse