SP 1075

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 65

HEALTH, SAFETY AND ENVIRONMENT SPECIFICATION Fire and Explosion Risk Management DOCUMENT ID - SP 1075 REVISION - 2.

0 DATE - 15/07/02

HSE SPECIFICATION

Setting Clear Requirements

Authorised for Issue by the HSE IC 15/07/02

Document Authorisation Document Authority dapo Oguntoyinbo Ref. Ind: CSM Date: 15/07/02

Document Custodian Hamad Khalfeen Ref. Ind: CSM/11 Date: 15/07/02

Document Author Hamad Khalfeen Ref. Ind: CSM/11 Date: 15/07/02

The following is a brief summary of the four most recent revisions to this document. Details of all revisions prior to these are held on file by the Document Custodian. Version No. Rev 2.0 Rev 1.0 Rev 0.0 Date Author June 2002 Hamad Khalfeen July 1998 March 1990 Scope / Remarks Editorial changes, new format Updated to Incorporate Fire & Explosion Strategies Original issue as ERD 88-02

User Notes:
The requirements of this document are mandatory. Non-compliance shall only be authorised by CSM through STEPOUT approval. A controlled copy of the current version of this document is on PDO's EDMS. Before making reference to this document, it is the user's responsibility to ensure that any hard copy, or electronic copy, is current. For assistance, contact the Document Custodian. This document is the property of Petroleum Development Oman, LLC. Neither the whole nor any part of this document may be disclosed to others or reproduced, stored in a retrieval system, or transmitted in any form by any means (electronic, mechanical, reprographic recording or otherwise) without prior written consent of the owner. Users are encouraged to participate in the ongoing improvement of this document by providing constructive feedback.

SP-1075

REVISION 2.0

Page ii

HSE SPECIFICATION

Setting Clear Requirements

Contents
1.0 INTRODUCTION.............................................................................................................................5 1.1 PURPOSE.............................................................................................................................................5 1.1.1 Objectives.................................................................................................................................5 1.2 SCOPE.................................................................................................................................................5 1.3 DEFINITION..........................................................................................................................................6 1.4 DELIVERABLES.....................................................................................................................................6 1.5 ROLES AND RESPONSIBILITIES................................................................................................................6 1.6 PERFORMANCE MONITORING..................................................................................................................6 1.7 REVIEW AND IMPROVEMENT...................................................................................................................7 1.8 REPORTING FORMAT............................................................................................................................7 2. PERFORMANCE REQUIREMENTS..............................................................................................8 2.1 BASIS.................................................................................................................................................8 2.2 ROLE OF PRE-FIRE PLANNING IN SYSTEM DESIGN....................................................................................9 2.3 FERM ENGINEERING AND DESIGN PRINCIPLES........................................................................................9 2.4 APPLICATION OF FIRE AND EXPLOSION STRATEGIES DURING DESIGN.........................................................10 2.4.1 Modifications to Existing Facilities........................................................................................10 2.4.2 Green Field Facilities.............................................................................................................10 3.0 DETECTION AND PROTECTION REQUIREMENTS............................................................13 3.1 GENERAL..........................................................................................................................................13 3.1.1 Fire Proofing of Supporting Structures..................................................................................13 3.2 HYDROCARBON HANDLING FACILITIES..................................................................................................13 3.2.1 Wellheads...............................................................................................................................13 3.2.2 Oil/Gas Inlet Manifolds..........................................................................................................13 3.2.3 Gathering, Production Stations & Storage Tanks..................................................................13 3.2.4 Gas Processing Facilities ......................................................................................................21 3.2.5 Booster Stations .....................................................................................................................22 3.3 UTILITY FACILITIES............................................................................................................................23 3.3.1 Power Stations........................................................................................................................23 3.3.2 Control and Auxiliary Rooms.................................................................................................23 3.3.3 Electrical Substations and Switchgear Rooms.......................................................................23 3.4 OFFICE BUILDINGS, RESIDENTIAL AND INDUSTRIAL AREAS......................................................................23 3.4.1 General...................................................................................................................................23 3.4.2 Plans and Procedures.............................................................................................................24 3.4.3 Office Buildings......................................................................................................................24 3.4.4 Residential Areas....................................................................................................................25 3.4.5 Industrial Areas......................................................................................................................25 3.5 AIRSTRIPS ........................................................................................................................................26 3.5.1 Aircraft rescue and fire fighting.............................................................................................26 3.5.2 Mobile Equipment..................................................................................................................26 3.5.3 Air strip buildings...................................................................................................................26 4.0 DETECTION SPECIFICATIONS................................................................................................27 4.1 DETECTION SYSTEMS..........................................................................................................................27 4.2 GAS DETECTION................................................................................................................................27 4.2.1 Flammable Gas Detection Philosophy...................................................................................27 4.3 FIRE DETECTION................................................................................................................................28 4.3.1 Optical Flame Detection........................................................................................................28 4.3.2 Bimetallic Heat Detection......................................................................................................28 4.3.3 Fusible Plug Heat Detection..................................................................................................28 4.3.4 Fusible Link Heat Detection...................................................................................................28 4.3.5 FQB Heat Detection...............................................................................................................29

SP-1075

REVISION 2.0

Page iii

HSE SPECIFICATION

Setting Clear Requirements

4.3.6 Smoke Detection.....................................................................................................................29 4.4 AUDIBLE, VISUAL AND MANUAL ALARM CALL POINTS..........................................................................30 4.4.1 Hydrocarbon Handling and Utility Facilities........................................................................30 5.0 FIRE PROTECTION SYSTEMS..................................................................................................31 5.1 FIRE WATER SYSTEMS........................................................................................................................31 5.1.1 Fire Water Network General...............................................................................................31 5.1.2 Fire Water Storage Tank........................................................................................................32 5.1.3 Fire Water Pumps...................................................................................................................32 5.1.4 Hydrants.................................................................................................................................32 5.1.5 Monitors.................................................................................................................................33 5.2 WATER APPLICATION SYSTEMS............................................................................................................33 5.2.1 Sprinkler Systems....................................................................................................................34 5.2.2 Waterspray (Deluge) Systems.................................................................................................34 5.3 FOAM SYSTEMS.................................................................................................................................35 5.3.1 General...................................................................................................................................35 5.3.2 Foam Concentrate..................................................................................................................35 5.3.3 Foam Proportioning Systems.................................................................................................37 5.3.4 Foam Application Systems/Equipment...................................................................................39 5.3.5 Foam Deluge Systems.............................................................................................................45 5.3.6 Portable Foam Application Equipment..................................................................................45 5.4 FINE WATER SPRAY SYSTEMS.............................................................................................................46 5.5 GASEOUS EXTINGUISHING AGENT SYSTEMS...........................................................................................46 5.6 PORTABLE EXTINGUISHERS..................................................................................................................46 5.6.1 General...................................................................................................................................46 5.6.2 Standards for Portable Fire Extinguishers............................................................................46 6.0 ALARMS AND EXECUTIVE ACTIONS....................................................................................47 6.1 GENERAL..........................................................................................................................................47 6.2 GAS TURBINES..................................................................................................................................47 7.0 ABBREVIATIONS..........................................................................................................................49 8.0 REFERENCES.................................................................................................................................51 APPENDIX A - RELEVANT STANDARDS, SPECIFICATIONS & CODES...............................52 APPENDIX B - ASSESSMENT OF BUSINESS RISK DUE TO FIRE AND EXPLOSION.........56 APPENDIX C - FACILITY GROUP CATEGORIES.......................................................................57 APPENDIX D - TYPICAL ALARMS AND EXECUTIVE ACTIONS............................................59 APPENDIX E - WORKED EXAMPLES ...........................................................................................64

SP-1075

REVISION 2.0

Page iv

HSE SPECIFICATION

Setting Clear Requirements

1.0 Introduction
1.1 Purpose This Specification provides users with a standard specification for the level of fire and explosion mitigation measures that are tailored to typical facilities in PDO.
This document incorporates the latest international standards, DEPs and the EP 950000 guidelines dealing with fire protection. In addition, this Specification incorporates the findings and recommendations from three fire protection related studies, namely: The Halon Phase Out Study (Reference 2) The Fire Protection Study (Reference 3) Review of Emergency Services at PDO Airfields (Reference 5)

The studies established the actual risk from fires and explosions in PDOs facilities and have determined the appropriate level of control to mitigate the consequences in the event of a fire/explosion using QRA and Cost Benefit Analysis. This Specification should be used to assist engineers define the appropriate fire and gas detection and protection equipment, where there is a wide range of size and criticality of equipment (e.g. shipping pumps and cone roofed storage tanks) that deviates from the typical. The Specification describes a simple methodology that is appropriate to the level of business risk of the facility concerned. Reference is made in this Specification to the FERM Facility Plan Guideline, GU 230 (Reference 6), which provides additional information in applying the standards. 1.1.1 Objectives This Specification has the following objectives, to: Establish the appropriate level of protection against fire and explosion hazards which are appropriate to the level of business risk in PDO. Arrive at consistency in risk classification of similar types of facilities Arrive at consistency in equipment Specification for gas/fire detection and fire fighting equipment Focus maintenance and pre-fire planning efforts for the most critical pieces of equipment Provide an auditable approach to fire and explosion risk management of individual facilities, which can be readily adapted when these are modified or when conditions such as production levels or equipment criticality change

1.2

Scope This Specification covers the requirements for fire and gas detection and protection in PDO facilities. These requirements shall be applied when making plant modifications and when designing new facilities.
The Specification covers both green field facilities and modifications to existing plant. Due consideration to cost effectiveness shall be taken into account when applying these standards to existing facilities, particularly over the remaining plant life. The scope of the Specification also includes the preparation of a fire response document

SP-1075

REVISION 2.0

Page 5

HSE SPECIFICATION

Setting Clear Requirements

pertaining to the facility being designed or modified and the incorporation of these in the relevant operational documents. The approach is in line with EP 95-351, Fire Control and Recovery.

1.3

Definition This Specification draws upon a number of relevant international sources to define the requirements for management of fire and explosion risks. Where a user is referred to another standard, the latest edition of the relevant standard shall be used. In the event of discrepancies between sources, the order of precedence shall be:
1. 2. 3. 4. This Specification & other PDO standards referred to in this Specification SIEP DEPs International Standards EP95000 series publications

A reference list of all the standards, specifications and codes used throughout this document is provided in Appendix A. This Specification also relies on the use of a large amount of acronyms and abbreviations that may not be familiar to personnel who dont have experience in fire protection. A glossary of terms is provided in Section 7 of this Specification to aid in the understanding of personnel unfamiliar with any terms used within.

1.4 Deliverables 1.4.1 Records Records produced as a result of the use of this Specification will be incorporated into design documentation and the FERM Facility Plan.
1.4.2 Reports PDO Staff: Any non-compliance with this Specification shall be notified, investigated and reported as per CP 122 HSE Management System Manual, Part 2, Chapter 6.

Contractors: Any non-compliance with this Specification shall be reported to the Contract Holder. 1.5 Roles and Responsibilities Asset Managers Asset Managers are responsible for ensuring that they do accept new or upgraded facilities that re not in compliance with this Specification. Design Engineers Design Engineers are responsible for the implementation of the requirements provided in this Specification. 1.6 Performance Monitoring Compliance with this Specification shall be monitored through workplace supervision, periodic site inspection and design reviews such as hazard and operability (HAZOP) studies.

SP-1075

REVISION 2.0

Page 6

HSE SPECIFICATION

Setting Clear Requirements

1.7

Review and Improvement Any user of this document who encounters a mistake or confusing entry is requested to immediately notify the Document Custodian using the form provided in CP 122 HSE Management System Manual, Part 2, Chapter 3.
This document shall be reviewed as necessary by the Document Custodian, but no less than every four years. Triggers for full or partial review of this Specification are listed in CP 122 HSE Management System Manual, Part 2, Chapter 8.

1.8

Reporting Format There are no routine reporting requirements pertaining to this Specification.

SP-1075

REVISION 2.0

Page 7

HSE SPECIFICATION

Setting Clear Requirements

2. Performance Requirements
2.1 Basis The risks due to fire and explosions of existing typical assets in PDO were assessed using a Risk Matrix (see Appendix B). This was used to rank the relative risk to the various types of facilities and illustrates the rationale of the decisions taken at that time. Based on this evaluation, four different strategy levels for addressing fire and explosion incidents within PDO have been developed. These are defined as:
Strategy 1 Minor Incident Intervention Only Response limited to trained personnel using portable extinguishers or other types of first aid fighting equipment (hand-held or mobile). In addition, in critical areas such as some areas of camps, automatic detection systems may be provided to provide fast alarm and personnel escape. Strategy 2 Dedicated Fixed Fire Protection System Automatic actuation of a self-contained extinguishing system for a specific facility from detection systems. Strategy 3 Systems/Equipment plus Back-Up Dedicated fixed fire protection systems and a firewa6ter network with back up from manual intervention by trained personnel using fire fighting equipment. Strategy 4 Systems/Equipment plus Fire Brigade Similar to Strategy 3 with back up from a professional fire brigade. Using these four strategies, typical PDO facilities can be categorised and grouped together with a common approach for defining fire and gas detection and protection. For a facility group, e.g. a gathering station, the applicable strategy has been determined through consideration of the typical equipment contained within that facility group. Figure 2.1 shows the four basic strategies and the facility groups contained in each strategy. The figure also highlights the risk drivers associated with a facility group. It should be noted that because of the onshore location of PDO facilities, low manning levels at most facilities and the generally unconfined layout, life safety is generally not the dominant risk driver. Although this is a very coarse delineation of required control and recovery systems, it does provide a high level overview. The prime objective is to optimise the level of risk contributed by each type of equipment to meet the FERM requirements. Due to the variation between PDO gathering and production stations these have been categorised into different types, (A, B, C etc.) and have been assigned different strategies. The assigned Facility Group Categories are shown in Appendix C.

SP-1075

REVISION 2.0

Page 8

HSE SPECIFICATION

Setting Clear Requirements

Figure 2.1: FERM Facility Group/Strategy Matrix STRATEGY


STRATEGY 1 MINOR INCIDENT INTERVENTION ONLY STRATEGY 2 DEDICATED FIXED FIRE PROTECTION SYSTEMS STRATEGY 3 SYSTEMS/EQPT PLUS BACK-UP STRATEGY 4 SYSTEMS/EQPT PLUS BRIGADE
Airstrips LIFE SAFETY ENVIRONMENT BUSINESS ASSET REPUATION

Remote manifolds Gathering stations Type A Camps Gathering stations Type B Production stations Type A Power stations Booster stations Camps

Governement gas plant Production stations Type B & C

Mina Al Fahal

Airstrips

2.2

Role of Pre-Fire Planning in System Design Pre-fire planning addresses the nature of contribution from human intervention and systems as a recovery measure. For the purposes of PDO these shall be in the form of a FERM facility plan. FERM facility plans pertaining to the facilities shall be prepared (or updated for existing assets) as part of the project. Such a plan shall describe the appropriate fire and explosion strategy, identify the main risk drivers, identify the station category type (if applicable) and prepare scenario based pre-fire plans for inclusion in the emergency response documentation pertaining to the facility.
The content and guidance in the preparation of such plans can be found in GU 230 FERM Facility Plan Guideline.

2.3

FERM Engineering and Design Principles The business risk due to fire and explosions in PDO shall be determined by a combination of the following risk drivers:
Life safety Damage to the environment Lost and deferred production Loss of assets (facility) Reputation

SP-1075

REVISION 2.0

Page 9

HSE SPECIFICATION

Setting Clear Requirements

Fire and explosion risk reduction measures shall be prioritised in the following order: 1. Prevention and probability reduction by process selection and design 2. Detection of gas and fire incidents and alarm to personnel 3. Mitigating measures to prevent escalation of the incident by shutdown, plant design and layout 4. Damage mitigation by passive protection 5. Damage mitigation by automatic fire protection systems 6. Damage mitigation by manually operated fire protection systems 7. Damage mitigation by manual fire fighting response.

2.4
2.4.1

Application of Fire and Explosion Strategies During Design


Modifications to Existing Facilities The impact of the planned modifications on the current fire and explosion strategy shall be determined during the conceptual design phase of the particular facility modification project. In the event that such modifications include the addition or removal of equipment which changes the fire and explosion risk significantly, the requirement to up or down grade the current station category type and strategy shall be determined. If a change of category type or strategy is warranted, the impact of the revised strategy shall be determined on the whole facility. In the event of uncertainty, the appropriate category type or strategy shall be determined by QRA studies in accordance with EP95-0352, Quantitative Risk Assessment. The resulting hardware changes to existing fire protection equipment, future operational fire response requirements, and documentation shall be addressed as part of the project and the FERM Facility Plan amended as required. A flowchart of the methodology for modifications is provided in Figure 2.4.1.

2.4.2

Green Field Facilities The appropriate fire and explosion station category type and strategy pertaining to the facilities shall be determined during the conceptual design phase of the project. In the event that none of the existing category types or strategies above are applicable, a new strategy shall be developed and approved as a variation to this Specification, in accordance with the technical authorities system, ERD-00-02. The new strategy shall be supported by QRA studies in accordance with EP 95-0352, Quantitative Risk Assessment. A flowchart of the methodology for green field facilities is provided in Figure 2.4.2.

SP-1075

REVISION 2.0

Page 10

HSE SPECIFICATION

Setting Clear Requirements

FIGURE 2.4.1 F FIRE PROTECTION STRATEGY F MODIFICATIONS

Conceptual design

Assess impact on existing fire and explosion strategy

yes

Do the modifications change the existing strategy?

no

Up or down grade the FERM strategy


Do the mofications change the station category?

no

No Change

Asses the impact of revised strategy on whole facility (use QRA if appropriate)

yes

Amend FERM Facility Plan

SP-1075

REVISION 2.0

Page 11

HSE SPECIFICATION

Setting Clear Requirements

FIGURE 2.4.2 F FIRE PROTECTION STRATEGY F GREEN FIELD FACILITIES

Conceptual design

assess fire risks

Develop fire scenarios

FERM Facility Plan

QRA

Incorporate into emergency procedures Determine strategy level

Is strategy level covered by specification?

Proceed with design of fire protection system

Obtain approval from CSM for new strategy level

SP-1075

REVISION 2.0

Page 12

HSE SPECIFICATION

Setting Clear Requirements

3.0 Detection and Protection Requirements


3.1 General This section identifies the requirements for the various types of fire and gas detection and protection equipment for each of the major types of location and production facilities.
Appendix D Typical Alarms and Executive Actions, summarises the general levels of detection and protection for generic equipment types that are required to meet the fire and explosion strategies for typical facilities. These tables provide an overview only and the engineer shall determine the applicability of the standard protection levels proposed in this Specification when the facilities being designed deviate significantly from other common PDO facilities. Specific engineering & design details for the detection and protection systems are given in Sections 4 and 5 of this Specification. 3.1.1 Fire Proofing of Supporting Structures In the event that the design involves elevated process equipment, fire proofing of supporting structures shall be provided in accordance with DEP 34.19.20.11, General Fire Hazards and Fire Proofing. Fire proofing shall not be considered as a replacement for active fire protection requirements nor lead to a relaxation of normal design requirements. The costs for fire proofing can be significant and therefore each case should be considered for the assessment of the likely maximum fire duration and possible escalation.

3.2
3.2.1

Hydrocarbon Handling Facilities


Wellheads Generally, no fire or gas detection shall be provided for wellheads. However, heat detection shall be provided on wellheads fitted with actuated ESD valves, SSVs, SCSSVs and ESPs and upon fire detection, the valves shall close or pumps shutdown.

3.2.2

Oil/Gas Inlet Manifolds The overall strategy for both remote and on-plot production manifolds is level 1 minor incident only. Generally no fire or gas detection shall be provided for manifolds.

3.2.3

Gathering, Production Stations & Storage Tanks The categories for existing production and gathering stations have been defined in Appendix C, and have been based on the combination of facilities present at a particular site. Figure 3.2.3 (a) defines the strategy levels. Gathering stations are generally either level 1 or 2, and production stations are typically level 2 or 3. The equipment in these facilities includes: compressors, gas turbine drivers, pressure vessels, fuel gas skids, fired furnaces, cone and floating roofed tanks, and pumps. The following sections give the general protection requirements for such equipment. For strategy 3 facilities, consideration shall be given to the installation of flame detection.

SP-1075

REVISION 2.0

Page 13

HSE SPECIFICATION

Setting Clear Requirements

Production and Test Separators Generally no detection is required for crude oil separators, gas separators and compressor surge vessels. They shall however, be provided with relief and blowdown systems in accordance with the applicable pressure vessel standards. Gas Turbine Drivers Gas turbines shall be fitted with acoustic enclosures generally referred to as hoods. They shall be designed to provide an H class barrier to fire and smoke egress to give an equivalent fire rating of H15.
The majority of gas turbines operating in PDO facilities are single fuel, gas driven. A few are dual fuel, such as those in power stations. The required detection systems differ slightly depending on the fuel type(s). Fire and gas detection and protection systems for turbine hoods shall include: Flammable gas detection on the combustion and ventilation air inlet if gas ingestion is possible. Gas detection on the ventilation outlet and/or oil mist vapour detection (depending on type of fuel). Heat detection. Flame detection. Fine water spray or CO2 extinguishing system. It is possible for flammable gas concentrations up to the LEL (Lower Explosive Limit) to exist in a non-hazardous area by definition of the limits of classified areas. An example is a large flammable gas cloud in the vicinity of the combustion air intake and/or ventilation air intake. If such a possibility exists, then three flammable gas detectors shall be installed. There is also the possibility for flammable gas to exist within the turbine hood from a release from the fuel distribution piping. Gas from such a release should be detected at the ventilation outlet. For this purpose three flammable gas detectors shall be installed to monitor the ventilation outlet airflow. Heat detectors of the bimetallic type shall be installed over bearings. They shall be used in combination with flame detectors. A minimum of four flame detectors shall be installed, and at least one heat detector. In large turbines, e.g. Frame 5 equivalent, additional detectors may be required and in such cases the turbine manufacturers recommendations shall be followed. If IR flame detectors are used, then to prevent false alarms due to IR detectors responding to hot turbine shafts rotating at certain speeds, the design shall ensure that the view of any rotating shaft by a detector is obscured by a casing shield. The gas turbine manufacturer should be consulted regarding maximum ambient operating temperatures.

SP-1075

REVISION 2.0

Page 14

HSE SPECIFICATION

Setting Clear Requirements

Electric Drivers Heat detection of the windings in accordance with DEP 33.66.05.31, Electric Motors Cage Induction and Synchronous Type, shall be provided as an integral part of the electric motor design. Floating Roof Storage Tanks The tanks shall be bunded in accordance with ERD 09-02, Spacing of Tanks and Tank Bunding Requirements.
Basic process protection from primary safety features, such as tank level measurement with level alarms, an independent high level alarm and trip and automatic ESD inlet and outlet valves shall be installed in accordance with ERD 0811, Isolation of Process Equipment. Further fire risk reducing measures consist of: Fire retardant rim seals in accordance with EP 92-1820 Rim seal fire detection Local self activating one shot foam system to rim sections Facilities to allow pump out under emergency conditions Foam distribution headers to tanks with fixed external delivery piping Fixed fire water supply, ring main and hydrants Tank top aspirating foam pourers for connection by a mobile fire appliance at a safe distance (applicable for those locations which do not have complete fixed foam systems already installed) Portable foam appliances for use by fire responders Fixed cooling water monitors (where fire water supply is readily available).

Cone (Fixed) Roofed Tanks The tanks shall be bunded in accordance with ERD 0902, Spacing of Tanks and Tank Bunding Requirements.
Basic process protection from primary safety features, such as tank level measurement with level alarms and independent high level alarm and trip and automatic ESD inlet and outlet valves shall be installed in accordance with ERD 0811, Isolation of Process Equipment. Further fire risk reducing measures consists of: Fusible plug fire detection and ESD Tank contents pump out Base foam injection (top foam injection for heavy crudes) and internal floaters Fire water ring main with hydrants Fire water ring main with monitors. The appropriate level of protection shall be determined on a case by case basis. Based on detailed QRA on a range of fixed roof tanks in PDO a methodology has been developed to screen the economic justification of each risk reducing option (ref. Quantitative Risk Assessment for Coned Roof Tanks and Shipping Pumps, Report no. EWE 63273, 1997). Worked examples are provided in Appendix E.

SP-1075

REVISION 2.0

Page 15

HSE SPECIFICATION

Setting Clear Requirements

The relative risk reduction of each option has been plotted as a histogram in Figure 3.2.3 (a). Each bar of the histogram shows the distribution of damage, which covers 3 damage categories: months months loss of 2 tanks causing the loss of 12 months oil production. loss of 1 tank causing 7 days of total shutdown followed by 12 of reduced production rates at 70%. fire damage to a tank causing 4 days of total shutdown followed by 3 of reduced production rates at 70%.

The Y axis gives the risk index, which can be used to determine the differential risk reduction factor introduced by the various mitigation methods. It can be seen that as the various mitigation methods are introduced not only is there a reduction in overall risk but that the damage distribution changes to give less severe consequences. Figure 3.2.3 (a)
100 100%

R is k H is t o g r a m f o r C o n e R o o f e d T a n k s in P D O F a c ilit ie s

90

80

F ir e D a m a g e
71% 66%

71 66

70

Loss of 1 Tank Loss of 2 Tanks

60

RISK INDEX

50

Loss of 1 Ta nk

Loss of 2 Tanks

40

36 33 29
30

36% 33% 29%

20

F ir e D a m a g e

F ir e D a m a g e

F ir e D a m a g e

10 0.05
0.09 0.22

0 .5

0 .5

0 .7 8

0 .7 1

0 .2

0.08

0 .6

0 .3 2

0 .6

0 .3 5

0 .6 8

0 .2 8

B ase C ase

+ H e a t D e te c ti o n

+ H e a t D e t 'n & P u m p - o u t

+ H e a t D e t 'n & B a s e F oam

+ H e a t D e t 'n & B a s e F o a m & C W M o n ito r s

+ H e a t D e t'n /B a s e F o a m / P o rt a b le F o a m & C W M o n ito r s

Worked examples are provided in Appendix E. The relevance of the active risk reducing options for any particular location, in terms of the amount of capital that can be justified on break even cost-benefit grounds, can be determined by entering the relevant values into Table 3.1. From this Table, calculate the present value of the base case cost of damage for any particular installation which equates to 100 on the risk histogram (Figure 3.2.1). The methodology described below is suitable for screening the cost benefits of fire protection to within 25% (50/50). In the event the economic justification is marginal, other factors such as loss of reputation shall be considered. Alternatively a detailed QRA and cost benefit analysis may be performed to arrive at the appropriate level of protection.
SP-1075 REVISION 2.0 Page 16

0.04

HSE SPECIFICATION

Setting Clear Requirements

TABLE 3.1 BASE CASE COST OF DAMAGE CALCULATION PRO-FORMA System Constant based on frequency of damage x days lost:

0.18225

(3.75x10

-4

x 486 =)

Cost of Deferred Oil = 2US$ per barrel Net Oil Production per pair of tanks in BPD (e.g. for 5 tanks divide the total production by 2.5) For an installation with a single tank multiply the total production by 1.39 (to compensate for the loss of total production given the loss of a single tank) = Base Case Annual Cost of Damage per Tank = x Number of tanks covered by Protection = Base Case Annual Cost of Damage for Installation = x Design Life of the Installation = Undiscounted Design Cost of Damage for Installation = Discount Factor takes into account the design life of the fire protection facilities together with the average discount rate. The undiscounted value should be multiplied by the value at discount rate taken from the following table below. Value at Discount Rate Years 5% 8% 10% 10 0.772 0.671 0.617 20 0.621 0.490 0.426 25 0.564 0.427 0.362 30 0.512 0.376 0.313 Base Case PV of Cost of Damage for Installation

2 x

$ $ $

Note 1: The value may be updated from time to time and users shall check the latest value with the Company's Corporate Economics and Production Planning Department The risk differential values (in US$) (justified project cost of mitigation) may be found by multiplying the percentage difference in risk, taken from the histogram, by the PV base case cost of damage to give the amount which can be spent on that mitigation system.

SP-1075

REVISION 2.0

Page 17

HSE SPECIFICATION

Setting Clear Requirements

Shipping Pumps The installation of shipping pumps shall include basic process protection from primary safety features, such as dual seals with primary seal failure detection, vibration monitoring and high temperature detection. Automatic suction and discharge ESD isolation valves shall be installed in accordance with ERD-08-11, Isolation of Process Equipment. The design shall include a defined route for crude oil spill run off such that the ground surface slopes away from equipment that has the potential to cause escalation. The direction of the slope shall also consider fire spread and damage to protection systems and equipment.
Further fire risk reducing measures consist of: Crude oil vapour detection Heat switch fire detection Foam/water sprinkler system The appropriate level of protection shall be determined on a case by case basis. Based on detailed QRA on a range of shipping pumps in PDO, a methodology has been developed to screen the economic justification of each risk reducing option (ref. Quantitative Risk Assessment for Coned-Roof Tanks and Shipping Pumps, Report no. EWE 63273, 1997). A worked example is provided in Appendix E. The relative risk reduction of each option has been plotted in the following histogram Figure 3.2.3 (b).

SP-1075

REVISION 2.0

Page 18

HSE SPECIFICATION

Setting Clear Requirements

Figure 3.2.3 (b)


100 100%

R is k H is t o g r a m f o r S h ip p in g P u m p S e t s in P D O F a c ilit ie s

90

80

N o D am age
70

M in o r Dam age

F ir e D a m a g e

M a jo r P la n t D am age

60 F ir e D am ag e M a jo r Dam age

50

RISK INDEX

40

33 27 23 21
20 30

3 3 .1 % 2 7 .3 % 2 3 .4 %
Minor Damage Minor Damage Minor Damage F ir e D a m a g e F ir e Dam age

2 1 .5 %
F ir e D am age

Minor Damage

No Damage

No Damage

5 .6 4 .7 4 .3

0.083 0.096 0.004

0 .5

0 .5

0 .2 8

0 .6 9

0 .8 1

0 .2 8 0 .4 5 1

0.002

0 .5 2 4

0 .8 1 6

0 . 2 9 0 .2

0 .4 8 6

0 .8 6

0 .2 9

0 .3 2

0 .4 8 6

0.017

0.02

4 .7 %

0.04 0.097 0.004

4 .3 %
0 .8 6

0.021

0.03

Base C ase

+ F ir e D e t e c t io n

+ F i r e D e t 'n & V a p o u r D e t 'n

+ F ir e D e t'n & S p r i n k le r s

+ F i r e D e t 'n & V a p o u r D e t 'n & S p r i n k le r s

D a y M a n n in g + F i r e D e t 'n

D a y M a n n in g + F i r e D e t 'n & V a p o u r D e t 'n

D a y M a n n in g + F i r e D e t 'n & S p r i n k le r s

D a y M a n n in g + F i r e D e t 'n & V a p o u r D e t 'n & S p r i n k le r s

SP-1075

REVISION 2.0

Page 19

0.064 0.074 0.003

0.005

7 .2 %

5 .6 %

Fire Damage

0.052 0.127 0.012

10

Minor Damage

HSE SPECIFICATION

Setting Clear Requirements

Each bar of the above histogram shows the distribution of damage that covers 4 damage categories and includes the no damage category: Major plant damage causing the loss of 2 months total oil production followed by 3 months at 50% production. Fire damage to a pump causing the loss of 5 days total oil production followed by 3 months at 83% production. Minor damage to a pump causing the loss of 3 days production followed by 2 months of reduced production rates at 83%. The Y axis gives the risk index that can be used to determine the differential risk reduction factor introduced by the various mitigation methods. It can be seen that as the various mitigation methods are introduced not only is there a significant reduction in overall risk but that the damage distribution changes to give less severe consequences. The no damage category does exist for the base case but is not shown for clarity since it represents a part of the damage distribution common to all the above conditions. The sections of the bars above shown as no damage are purely attributable to the introduction of mitigation. It can be seen that vapour detection and manning give a significant benefit by increasing the no damage allocation. This is because both can provide leak detection prior to ignition that results in spill damage, which is considered insignificant in comparison to fire damage. The relevance of the active risk reducing options for any particular location, in terms of the amount of capital which can be justified on break even cost benefit grounds, can be determined by entering the relevant values in the Table 3.2. This can be used to calculate the present value of the base case cost of damage per pump set for any particular installation which equates to 100 on the previous risk histogram (Figure 3.2.3 (b)). The methodology described below is suitable for screening the cost benefits of fire protection to within 25% (50/50). In the event the economic justification is marginal, other factors such as loss of reputation shall be considered. Alternatively a detailed QRA and cost benefit analysis may be performed to arrive at the appropriate level of protection. A worked example is given in Appendix E.

SP-1075

REVISION 2.0

Page 20

HSE SPECIFICATION

Setting Clear Requirements

TABLE 3.2 BASE CASE COST OF DAMAGE CALCULATION PRO-FORMA System Constant based on frequency of damage x days lost for 3 pumps:

0.12402

(3.18x10 x 130 x 3 = ) Pump Type for centrifugal/axial or screw pumps use x 1 for reciprocating pumps use x 10 Number of Pumps in Set for 2 pumps use x 0.6 for 3 pumps use x 1.0 for 4 pumps use x 1.46 for 5 pumps use x 2.0
Cost of Deferred Oil = 2US$ per barrel Net Oil Production for Pump Set in BPD = Base Case Annual Cost of Damage per Pump Set = x Design Life of the Pump Set = Undiscounted Design Cost of Damage for Pump Set = Discount Factor takes into account the design life of the fire protection facilities together with the average discount rate. The undiscounted value should be multiplied by the value at discount rate taken from the following table below. Value at Discount Rate Years 5% 8% 10% 10 0.772 0.671 0.617 20 0.621 0.490 0.426 25 0.564 0.427 0.362 30 0.512 0.376 0.313 Base Case PV of Cost of Damage for Installation
1

-4

x x

2 X $ $

Note 1: The value may be updated from time to time and users shall check the latest value with the Company's Corporate Economics and Production Planning Department. The risk differential values (in US$) (justified project cost of mitigation) may be found by multiplying the percentage difference in risk, taken from the histogram, by the PV base case cost of damage to give the amount which can be spent on that mitigation system. 3.2.4 Gas Processing Facilities

Fuel Gas Treatment Skids Consideration shall be given to the installation of fixed gas detection, however the effectiveness of such units in generally open type facilities should be included in the evaluation. In the event that fixed detection is not effective, a programme for regular gas testing by the operator is required. Gas Fired Heaters Fire and gas detection for gas fired heaters shall be determined on a case by case basis. Consideration shall be given to the installation of gas detection, however the effectiveness of such units in generally open type facilities should be included in the evaluation.

SP-1075

REVISION 2.0

Page 21

HSE SPECIFICATION

Setting Clear Requirements

Compression Facilities Generally, no detection is required for gas separators and compressor surge vessels. They shall however, be provided with relief and blowdown systems in accordance with the applicable pressure vessel standards. Centrifugal Compressors Centrifugal compressors shall be equipped with heat detectors above each bearing with a seal or gland. They are intended to detect both gas fires and lube oil fires. Reciprocating Compressors Fire and gas detection for reciprocating compressors shall be determined on a case by case basis. As a minimum they shall be equipped with heat detectors above each bearing with a seal or gland as per centrifugal compressors. LNG/LPG Vessels Fire and gas detection for LNG/LPG vessels shall be in accordance with DEP 80.47.10.30 Gen. Section 5.5.1, Pressurised Storage Vessels.
LPG vessels shall be provided with a sloping drain such that the slope is not directed to protective systems or potential escalation areas. Use of fixed cooling water spray systems is justified where an existing fire water system is in place. Where blocking is a problem for water nozzles, provision of passive fire protection may be considered.

LPG Loading Facilities Fire and gas detection/protection for LPG loading facilities shall be in accordance with DEP 80.47.10.30 Gen. Section 5.7.2, Road Car Loading Facilities.
3.2.5 Booster Stations The overall strategy for pipeline booster stations is level 2. The fire protection specifications of the individual equipment in such facilities are similar to equipment in production and gathering stations.

SP-1075

REVISION 2.0

Page 22

HSE SPECIFICATION

Setting Clear Requirements

3.3
3.3.1

Utility Facilities
Power Stations

Turbine Driven Generation Sets The overall strategy is level 2 fixed fire systems for the turbine driver only (see 3.2.3, Gas Turbine Drivers).
Generators shall be provided with heat detection and UV flame detection over the main areas.

Auxiliary Diesel Generator The overall strategy is level 2 fixed fire systems.
Auxiliary diesel generators shall be provided with heat detection and an automatic extinguishing system, typically a self-contained dry powder system, or a fine water spray system. Installation of such systems generally require that the engine is enclosed and not subject to any local air movement, which should be the case when the engine has tripped and the mechanically driven cooling fan has stopped. 3.3.2 Control and Auxiliary Rooms Conventional smoke detection shall be installed. Generally these shall be ceiling mounted. Location of detectors below the floor or above the ceiling should be avoided. Additionally, detectors should be provided where cables are located in voids. 3.3.3 Electrical Substations and Switchgear Rooms Conventional smoke detection using a combination of optical and ionisation detectors shall be installed. At least one of each type of detector shall be used in each location. The detectors should be connected into two zones such that any incident is likely to activate at least one detector from each zone (to avoid common mode failures). Voting logic shall be determined by IPF classification and implementation methodology. Note: For critical control and switchgear rooms, containing sophisticated computerised systems, consideration should be given to the installation of an incipient smoke detection system which would only be used for very early alarm purposes.

3.4
3.4.1

Office Buildings, Residential And Industrial Areas


General The overall strategy for buildings in which people are generally present is level 1 with some level 2 exceptions as further specified below. The primary protection for people is to provide fire/smoke detection, alarm and adequate escape routes. Smoke detection and Manual Alarm Call (MAC) points connected to a general audible alarm shall be installed in accordance with ERD 17-02 Building Services Construction Specifications, Section (D), Fire Detection and Alarm Installation.

No Smoking signs No smoking signs shall be clearly displayed in all areas where smoking is prohibited.
SP-1075 REVISION 2.0 Page 23

HSE SPECIFICATION

Setting Clear Requirements

Visual alarms The main visual alarm interface shall be the fire detection panel. This shall be located at the main entrance to the building. The panel shall clearly highlight which detection circuit has been activated and the area of the building affected. Audible Alarm In residential areas the audible alarm shall be in the form of a horn or bell. Escape Routes All escape routes and exit doorways shall be provided with emergency lighting where required. They shall be marked with luminous or illuminated signs Fire Wardens Fire Wardens signs shall be clearly displayed in all critical areas Fire Extinguishers A suitable number of hand-held extinguishers shall be provided at strategic locations. If a fire water system is installed then hose reels shall also be provided at strategic locations. Manual Alarm Call-points Manual Alarm Call (MAC) points shall be installed at the main exits, at all emergency exits and along corridors at intervals not exceeding 100m. The design of MACs shall conform to BS 5839 Part 2, and may either be of the hammer/break glass or push/break glass type.
3.4.2 Plans and Procedures Plans and procedures shall be put in place for: Building evacuation and muster points Fire fighting Maintenance and testing of fire protection equipment

Guidance in the preparation of such plans can be found in GU 230 FERM Facility Plan Guideline. 3.4.3 Office Buildings All flammable liquids, including photocopier toners, cleaning solvents and draughtsmans sprays shall be stored in metal cabinets away from sources of ignition such as heat or naked flame. For locations containing critical computer equipment, consideration should also be given to the installation of an incipient smoke detection system which would only be used for very early alarm purposes. Materials storage areas shall be provided with fire detection applicable to the type of material being stored. In areas where the stored materials give off flammable vapours, e.g. seismic tape stores, the electrical installation shall be suitable for zone 2.

SP-1075

REVISION 2.0

Page 24

HSE SPECIFICATION

Setting Clear Requirements

Where the contents of a building are particularly valuable or critical, such as some archives and data stores, a total flood system may be justified in order to minimise the potential loss. Cost Benefit Analysis should be applied in order to provide the justification. The type of extinguishant used for total flood systems shall provide minimum environmental impact and health risk, and shall be approved by the Custodian of this Specification (CSM). 3.4.4 Residential Areas

Kitchens In all kitchens serving a residential camp CO2 or foam extinguishers and a fire blanket shall be provided. Fire blankets shall be woven glass fibre tested to BS 476 Parts 4 and 7.
Heat detection shall be installed in the kitchen hood. Activation of the detector shall: shutdown kitchen hood ventilation fan shut off gas supply to the kitchen initiate audible alarm shutdown air conditioning system.

On line gas bottles for use in kitchens shall be located outside. If the bottles are closer than 5 metres from combustible materials a block work separation wall shall be constructed. Any enclosure for gas bottles shall be freely ventilated. 3.4.5 Industrial Areas

Laboratories Fire protection in laboratories shall be designed in accordance with DEP 34.17.10.31. On line gas bottles for use in laboratories shall be located outside. If the bottles are closer than 5 metres from combustible materials a block work separation wall shall be constructed. Any enclosure for gas bottles shall be freely ventilated. Workshops In workshops free of dust and vapours, smoke detection shall be provided. In workshops areas where smoke detectors may become quickly contaminated due to dust and vapours, heat detection shall be provided instead of smoke detection. The location of such heat detectors is critical as a fire can become well established before activating a heat detector.

SP-1075

REVISION 2.0

Page 25

HSE SPECIFICATION

Setting Clear Requirements

3.5
3.5.1

Airstrips
Aircraft rescue and fire fighting The overall strategy is level 4. Fire fighting facilities at permanent airstrips associated with locations in the interior shall meet the requirements of the applicable ICAO Cat 4/5 specifications within the Airport Services Manual, including publications ICAO9137P1, Rescue and Fire Fighting, and ICAO-9137P7, Airport Emergency Planning.

3.5.2

Mobile Equipment The principle requirement is rapid response such that in the event of a crash on landing or take-off a fire engine could reach the plane before ignition of any spilt aviation fuel, hence the need for four-wheel drive. For mobile fire fighting equipment reference should be made to DEP 80.47.10.32, General and for fire fighting vehicles, DEP 80.47.10.33.

3.5.3

Air strip buildings The general specifications as defined in Section 3.4.1 above shall be applied.

SP-1075

REVISION 2.0

Page 26

HSE SPECIFICATION

Setting Clear Requirements

4.0 Detection Specifications


4.1 Detection Systems The design of fire and gas detection systems for green-field sites shall be in accordance with DEP 32.80.10.10, General, and if a PLC based system is used, DEP 32.80.10.30, General. For brown-field sites, the existing system design philosophy should be followed. Determination of revealed and unrevealed failure robustness shall be in accordance with DEP 32.80.10.10, General.
The power supply to the system shall be provided with a battery back up giving 8 hours duration, 7.75 hours at normal load and 0.25 hours at alarm load.

4.2
4.2.1

Gas Detection
Flammable Gas Detection Philosophy It is important that the detectors used are suitable for the type of gas that they are intended to detect and that the test gas used is as close as possible to the process gas. Point type gas detectors shall be used. The use of open path gas detectors may be considered only when used in conjunction with point type detectors. Flammable gas detection shall initiate alarms at alert and danger levels. Executive actions shall only be initiated from danger level detection. The location and number of detectors required is a function of the particular equipment design and layout, however they shall be located over obvious potential leak points e.g. seals. It is recommended that the following settings be adopted as a sensible balance between sensitivity and reliability in terms of avoiding unnecessary activation. TABLE 4.2 Location General process areas Areas where greater sensitivity is desirable and any trip action does not cause a major plant shutdown Alert Level 20%LEL 10%LEL Danger Level 50%LEL 20%LEL

SP-1075

REVISION 2.0

Page 27

HSE SPECIFICATION

Setting Clear Requirements

4.3
4.3.1

Fire Detection
Optical Flame Detection Infra-Red (IR) flame detectors are the preferred type for flame detection as they are not susceptible to spurious trips, they can detect flames from smoky fires and they can tolerate considerable dirt on the lens. They shall be solar blind and flicker frequency sensitive for hydrocarbon fires. Detectors should generally be located in elevated positions and aligned downwards to gain maximum benefit from the fixed angle of sensitivity. The use of Ultra Violet detectors in areas where arc welding, flash photography and NDT X-Ray testing shall be carefully considered. Detectors should be located in elevated positions looking downwards. Consideration should be given to the possibility of smoke accumulation preventing the detector from seeing a flame. UV detectors shall provide an alarm signal to alert operators when the window is dirty. Flame detection shall initiate alarms and executive actions.

4.3.2

Bimetallic Heat Detection Bimetallic heat detectors shall be of the fixed type. They shall have a set point approximately 25 C higher than the maximum ambient temperature (to be taken as 55 C). For outside locations the ambient conditions are defined in ERD 10-04. For inside locations the maximum ambient temperatures must be determined.

4.3.3

Fusible Plug Heat Detection Fusible plugs shall be selected to melt at approximately 25 C higher than the maximum ambient temperature (to be taken as 55 C). For outside locations the ambient conditions are defined in ERD 10-04. For inside locations the maximum ambient temperatures must be determined. The configuration of fusible plug systems is given in ERD 30-03. Low-pressure initiator monitoring of air pressure in the system shall be used for fire detection.

4.3.4

Fusible Link Heat Detection Fusible links shall be selected to melt at approximately 25 C higher than the maximum ambient temperature (to be taken as 55 C. For outside locations, the ambient conditions are defined in ERD 10-04. For inside locations, the maximum ambient temperatures must be determined. They should generally only be used when they form part of a vendor detection/protection package.

SP-1075

REVISION 2.0

Page 28

HSE SPECIFICATION

Setting Clear Requirements

4.3.5

FQB Heat Detection Frangible quartzoid bulbs shall be selected to break at approximately 25 C higher than the maximum ambient temperature (to be taken as 55 C). For outside locations the ambient conditions are defined in ERD 10-04. For inside locations the maximum ambient temperatures must be determined. They should generally only be used when they form part of a vendor detection/protection package. This type of heat detection is preferred for congested process plant areas unless the equipment is subject to periodic removal.

4.3.6

Smoke Detection

Smoke Detection Smoke detectors shall be of the optical type or ionisation type. Where smoke detection is provided, at least one of each type shall be installed at each location. The optimum locations for conventional smoke detectors will be a function of the preferential air flow patterns.
Activation of a single smoke detector shall initiate alarms and executive actions. Note: According to BS 5839 Part 1 false alarms from smoke detectors may be caused by fumes, dusts or condensation. Some types of ionisation chamber type smoke detectors are highly sensitive to high air speeds and may give false alarms. Ionisation type detectors shall be provided with a warning that label highlights them as a radioactive source.

Incipient Smoke Detection The use of incipient smoke detection systems (also called VESDA - Very Early Smoke Detection Alarm) systems) shall be considered for facilities containing critical control monitoring systems such as control rooms, equipment panels and substations.
This type of system is capable of detecting fire at the incipient stage up to 4 hours before flame breaks out. The extremely high sensitivity of these systems may tend to cause alarms occasionally under transient conditions. They should only therefore be used to initiate alarms, not executive actions. Note: None of these devices are suitable for fume contaminated areas typically including vehicle exhausts or cigarette smoke, and clearly have limited applicability in inherently dirty or dusty environments.

SP-1075

REVISION 2.0

Page 29

HSE SPECIFICATION

Setting Clear Requirements

4.4
4.4.1

Audible, Visual and Manual Alarm Call Points


Hydrocarbon Handling and Utility Facilities

Audible Alarms Audible alarms shall be installed on the outside of the control building as a minimum. Different alarm sounds shall be used for fire, combustible gas, toxic gas and all clear. These shall be in accordance with DEP.32.30.20.11, General. Additional audible alarms shall be located on top of noisy machinery e.g. gas turbines. Visual alarms The main visual alarm interface shall be the mimic. This shall either be a dedicated display on the control system or a graphic mimic panel. The mimic layout shall be based on the station fire and gas detector layout drawings. It shall clearly highlight which detection circuit has been activated and the area of the plant affected. Design of the mimic shall be in accordance with DEP.32.30.20.11, General.
When H2S detection is provided, visual beacons shall be installed in accordance with ERD 08-04.

Manual Alarm Call-points Manual Alarm Call (MAC) points shall conform to BS 5839 Part 2, and may be either of the hammer/break glass or push/break glass type. They shall be installed at all plant escape gates, at the plant main gate and at the control building entrance. If escape routes are clearly defined (i.e. signs are installed) then they shall be located along them at intervals not exceeding 100m. They are not required for off plot facilities such as remote manifolds.

SP-1075

REVISION 2.0

Page 30

HSE SPECIFICATION

Setting Clear Requirements

5.0 Fire Protection Systems


5.1 Fire Water Systems A fire water network consists of a water supply (usually a dedicated tank), pumps and a piping distribution network. The network outlets can be hydrants (for use, generally with hand-held or mobile equipment), fixed systems such as base foam injection, deluge systems etc. or fixed monitors.
It is however acceptable to take the firewater supply from a process system (eg. water injection system) provided that pressure and flow can be maintained under emergency conditions. Fire water systems are required for facilities where FERM strategies 3 and 4 have been justified. 5.1.1 Fire Water Network General Where the FES dictates the need for a fire water system (strategy 3 and 4) the design shall comply with DEP 80.47.10.31. The fire water network shall be designed to supply the calculated water demand at the required discharge points and pressure (reference shall be made to preplanning documentation for required flow rates). The pumps should discharge into a ring main with hydrants, fixed monitors and feeds to fixed foam systems and sprinkler systems. The fire water distribution piping shall be a ringmain, with adequate loops and block valves to ensure that a single line break can be isolated safely with minimum loss of fire protection. Single branch lines shall be avoided. The piping material may be steel for above or below ground and GRE (in accordance with ERD 38-12) where mechanical damage is unlikely. Steel pipe shall be cement lined in accordance with DEP 30.48.30.31, General. When above ground, the pipe shall be protected by physical barriers where necessary to reduce the possibility of impact by vehicles. All valves in the system shall be clearly identified with their function and normal status. System pipework shall be routed such that wherever possible it is not exposed to excessive radiation from a fire for which it may be required. In particular, the following guidelines shall be applied: Fire water pipework shall not pass through tank bund areas. Fire water pipework shall not pass through areas where product spills can accumulate underneath them. Fire water pipework shall be at least 15m from process facilities. System isolation valves shall be located such that radiation (based on FRED calculations) from fires for which they are intended will be a maximum of 5 kW/m 2 under any anticipated design conditions. If the system is such that its user is likely to remain in the area for extended periods (greater than 10 minutes), then screening shall be provided to ensure that radiation levels do not exceed 1.5 kW/m2.

SP-1075

REVISION 2.0

Page 31

HSE SPECIFICATION

Setting Clear Requirements

5.1.2

Fire Water Storage Tank The capacity of the water storage tank shall be in accordance with the worst case design demand (reference shall be made to pre-planning documents to assist in determination of total water demands). A minimum of 6 hours supply shall be provided unless it can be clearly shown that incident duration will be less than this (e.g. by shutdown and isolation). It may be necessary to consider the installation of two tanks depending on size and the location characteristics. The fire water tank internal lining shall be in accordance with ERD 48-01 to obviate the generation of corrosion products which could affect the performance of downstream systems. A system would typically include a water storage tank (in accordance with NFPA 22) for those areas without a suitable natural source of water. The tank may be filled with formation water provided the quality is compatible with available foam concentrates. Since the majority of the tank(s) fill is likely to stand for considerable periods of time consideration shall be given to batch dosing foam compatible corrosion inhibitor and bactericide. Where required due to the type of pumps being used, tanks shall be elevated to provide positive suction when the operating pressure is low.

5.1.3

Fire Water Pumps Pumps and drivers shall comply with DEP 31.29.02.11, General, DEP 31.29.02.30, General, and NFPA 20, Installation of Centrifugal Fire Pumps. Generally two 100% fire water pumps, one electric and one diesel driven, shall be installed to ensure a reliable supply under all circumstances. The electric driven pump would normally be selected to start first, either from a confirmed fire signal as a precursor to fire water demand or due to a fall in pressure in the ringmain. The diesel driven pump would start automatically on low ring main pressure after a pre-set time or on failure of the electric pump. A jockey pump shall be installed to maintain pressure in the system (typically 3 barg). Fire water pumps shall be started weekly and performance tested annually. The annual performance tests shall incorporate flow tests for the ringmain itself. Flow and pressure tests shall be performed on the fire water system to ensure that water demand for the identified scenarios can be achieved. Pumps shall be selected and installed in accordance with DEP 31.29.02.11, General, DEP 31.29.02.30, General and NFPA 20.

5.1.4

Hydrants Hydrants in process areas shall generally have 4 x 65mm instantaneous coupling outlets in accordance with BS 336. Hydrants at offices, residential and industrial areas shall generally have 2 x 65mm outlets.

SP-1075

REVISION 2.0

Page 32

HSE SPECIFICATION

Setting Clear Requirements

Fire Hoses All hoses for fire fighting purposes shall conform to the requirements of DEP 80.47.10.32, General, Section 3.2.
5.1.5 Monitors Fixed, manually operated water monitors shall be provided for strategy 3 facilities for specific cooling requirements, i.e. storage tanks and congested areas as justified by risk analysis.

Self Oscillating Type Monitors Self oscillating type monitors should be considered where identified as advantageous. Monitors shall be located outside storage tank bund walls. They shall not be located inside or on top of the bund. Fixed Monitors Fixed monitors shall be chosen to provide the stream range required to cool the equipment for which they are provided at the design operating pressure. The flow rate shall not be less than 2000 lpm at the design operating pressure.
Access during a fire should be taken into account where locating fixed monitors. The effects on firefighters from radiant heat during a storage tank fire also need to be considered. Monitors shall be located such that radiation (based on FRED calculations) from fires for which they are intended will be a maximum of 5 kW/m 2 under any anticipated design conditions. If the system is such that its user is likely to remain in the area for extended periods (greater than 10 minutes), then screening shall be provided to ensure that radiation levels do not exceed 1.5 kW/m2. DEP 80.47.10.32, General, gives information regarding the requirements for fixed monitors, and DEP 80.47.10.30, General, provides information on water flow rates. The design of portable water monitors shall be in accordance with DEP 80.47.10.32, General.

5.2

Water Application Systems Water application systems can be used to control fire spread or to provide cooling of radiation exposed facilities and, in certain circumstances, can extinguish fires.
Water application systems will not generally extinguish fires caused by hydrocarbon flammable liquids with flash points below ambient temperature or flammable liquids heated above their flash points. Foam systems are required for this application. Water application systems consist of a valve in a take-off from the fire water network, distribution pipework and discharge nozzles.

SP-1075

REVISION 2.0

Page 33

HSE SPECIFICATION

Setting Clear Requirements

There are two basic types of discharge nozzle: (i) Sprinkler nozzles - where each nozzle has a frangible bulb or fusible link preventing water flow through the nozzle. At a preset temperature the bulb or link breaks and releases water. Thus, only the nozzles subjected to heat discharge water. Typical applications of sprinkler systems include offices and hazardous material warehouses. They should not normally be used in computer rooms or electrical equipment rooms. Waterspray (deluge) nozzles - where all nozzles are open and, on opening of the valve, will all discharge simultaneously. Deluge systems can be automatic or manually operated according to specific hazard requirements.

(ii)

5.2.1

Sprinkler Systems Reference shall be made to DEP 80.47.10.31, Section 2.3. Sprinkler systems shall be designed in accordance with NFPA 13 or BS 5306, Part 2. Sprinkler system hydraulic calculations shall be carried out using approved software rather than by manual calculations. Sprinkler systems shall normally be of the wet pipe type. Where the protected area contains critical equipment and water damage from sprinkler nozzle leakage would have major consequences, consideration may be given to the installation of a pre action system, typically consisting of dry pipe, requiring confirmation of fire from another source before the valve is opened. All system sprinkler valves and nozzles shall be approved by the Loss Prevention Council (LPC), Underwriters Laboratories (UL) or Factory Mutual (FM). Sprinkler system inspection and testing shall be in accordance with NFPA 25 or BS 5306, Part 2.

5.2.2

Waterspray (Deluge) Systems Waterspray systems shall be designed in accordance with DEP 80.47.10.31, Section 2.2 and NFPA 15. Automatic deluge valves and nozzles shall be approved by Loss Prevention Council (LPC), Underwriters Laboratories (UL) or Factory Mutual (FM). Deluge system valves shall be located such that radiant heat levels from the incident for which they are provided shall be located such that radiation (based on FRED calculations) from fires for which they are intended will be a maximum of 5 kW/m 2 under any anticipated design conditions. If the system is such that its user is likely to remain in the area for extended periods (greater than 10 minutes) then screening shall be provided to ensure that radiation levels do not exceed 1.5 kW/m2. Automatic deluge valves shall be actuated by the relevant detection system but shall also include a manual operation capability. The preferred method of operation of automatic deluge valves is by fusible plug detectors. Water deluge valves in pipe work shall be locked in the open position. Special consideration shall be given to the locking of ball valves such that they cannot be closed with the lock in place. Ideally, the valves should be purchased with a lock as part of the design.

SP-1075

REVISION 2.0

Page 34

HSE SPECIFICATION

Setting Clear Requirements

Testing and inspection of deluge systems shall be in accordance with NFPA 25. Regular maintenance of the system shall be performed, and in particular the deluge nozzles shall be checked for blockage. Regular flushing of the nozzles shall be performed.

5.3
5.3.1

Foam Systems
General Foam systems consist of 3 basic parts: (i) (ii) (iii) Foam concentrate - the liquid used to foam Foam concentrate proportioning system - where the foam concentrate is mixed, at a specific proportion, with water to make foam solution. Foam maker (foam generator, foam application device) where air is mixed with foam solution to make foam.

Foam makers can be further subdivided into aspirating types which use a venturi nozzle system to draw air into the foam solution and non-aspirating devices which rely on impinging jets of foam solution or turbulence as the foam solution leaves the nozzle to generate bubbles of foam. In any system, it is important to ensure that the right combination of foam concentrate, proportioning system and foam generating devices are selected for the particular application. The following sections deal with specific requirements for these components for PDO facilities. Reference shall be made to the following standards for relevant aspects of foam system design and foam concentrate specification: DEP 80.47.10.31 - Gen., June 1992, Section 2.4 DEP 80.47.10.10 - Gen., March 1991, Section 2.1 DEP 80.47.10.33 - Gen., Fire Fighting Vehicles and Fire Stations, June1993 NFPA 11 - Standard for Low Expansion Systems NFPA 16 - Deluge Foam - Water Sprinkler and Foam Water Spray Systems, 1995 ISO 7203 - 1 Fire Extinguishing Media, Foam Concentrates, 1995 UL 162, Seventh Edition - Foam Equipment and Liquid Concentrates, 1994 For airport applications, reference shall be made to ICAO, CAP 168 - Licensing of Aerodromes, 1990. 5.3.2 Foam Concentrate Wherever possible, the number of different foam concentrates on site shall be limited to one. If this is not possible, measures shall be in place to minimise the possibility of mixing the different types. All foam concentrates used shall be 3% grade (i.e. to be used at 3% concentration in proportioning systems). The foam concentrate for hydrocarbon flammable liquids (e.g. crude or condensate) shall be either fluoroprotein, film-forming fluoroprotein or multipurpose (alcohol
SP-1075 REVISION 2.0 Page 35

HSE SPECIFICATION

Setting Clear Requirements

resistant) fluoroprotein or synthetic based type and shall conform to the requirements of Underwriters Laboratories UL 162 7th Edition test requirements, or ISO 7203-1 Class IIA or higher. The foam concentrate for water soluble flammable liquids (e.g. methanol) shall be a multipurpose type and shall conform to the requirements of Underwriters Laboratories UL 162 7th Edition test requirements or ISO 7203-1 Class IIA or higher. The foam concentrate for airstrip use shall be AFFF (Aqueous Film Forming Foam), FFFP (Film Forming Fluoroprotein) or a fluoroprotein type conforming to the requirements for level B type foams of CAP 168 (multipurpose types of the same generic type are permissible). Foam concentrates whether in systems, drums or vehicles shall be stored such that they are not exposed to direct sunlight. Calculations shall be performed in order to establish the minimum quantity of foam required for each application. In addition, and in accordance with NFPA, 100% of the calculated quantity shall be available within 24 hours. For foam concentrate at airstrips, certification shall be available on site demonstrating full conformity with CAP 168. This shall include results of the extinguishing test on the original foam concentrate batch as well as the following physical properties with measurement tolerances: Specific gravity @ 20C pH @ 20C Sediment Viscosity @ 20C

For foam concentrate for use at facilities other than airstrips, manufacturers type certification shall be available on site demonstrating full conformity with either UL 162 or ISO 7203-1, Class IIA or higher. This shall also tolerances: include information on the following physical properties with measured Specific gravity @ 20C pH @ 20C Sediment

Foam Concentrate Testing Representative samples of all foam concentrates used at PDO facilities shall be subjected to the following tests to determine whether or not they continue to conform to original manufacturers specifications. The test can either be carried out by the original manufacturer or on-site to written procedures.
(i) On an annual basis, the following physical properties shall be measured:
SP-1075

Specific gravity @ 20C pH @ 20C Viscosity @ 20C (for foam concentrate used at airstrips) Sediment
Page 36

REVISION 2.0

HSE SPECIFICATION

Setting Clear Requirements

(ii)

Every 10 years, the foam concentrate used at airstrips shall be subjected to a fire test in accordance with CAP 168 to ensure continuing conformity with level B type fire fighting performance.

5.3.3

Foam Proportioning Systems The foam proportioner is the device that is used to inject foam concentrate into the water line to make foam solution. It is vital that the proportioner is such that it ensures that the foam solution has the correct amount of foam concentrate in it (nominally 3%) under all system operating conditions and flow requirements, including potential blockage of one or more outlets. Various types of proportioner are available as described in NFPA 11. This section defines the type that shall be used for different applications at PDO facilities.

General All foam proportioning systems shall be capable of providing acceptable concentrate proportioning (3-3.6%) under all operating conditions of the equipment, including blockage of some outlets.
Foam concentrate tanks shall be high-density polyethylene, GRP or stainless steel 316L construction, approved for use by the concentrate manufacturer. Internal tank linings shall not be used in foam concentrate tanks.

Proportioning Systems for Fixed Foam Systems Foam application systems as described in 4.6.4 can be either fixed or semi-fixed. In the case of fixed systems, the proportioner and foam concentrate tank are permanently connected to the fire water ring main so that no additional connection of foam concentrate supply is required for system operation.
FERM strategy 3 sites and strategy 4 sites shall have fully fixed systems. Semi-fixed systems may be added at sites with a professional fire response nearby. In such a case the fire responders shall be trained and regularly practice the use of such equipment (see Proportioning Systems for Semi-Fixed Foam Systems below). All proportioning stations shall be provided with a clear indication of the facilities to which they relate and clear operating instructions including identification of valves. Minimum and maximum operating pressures shall also be clearly identified. All proportioning stations shall be located in safe locations (i.e. areas not having hazardous area classification). All proportioning stations shall be located such that radiation (based on FRED calculations) from fires for which they are intended will be a maximum of 5 kW/m 2 under any anticipated design conditions. If the system is such that its user is likely to remain in the area for extended periods (greater than 10 minutes), then screening shall be provided to ensure that radiation levels do not exceed 1.5 kW/m2. Standard inductors (line proportioners, eductors) shall not be used. Fixed proportioning systems shall be of the balanced pressure type (See NFPA 11). The preferred type is one having a foam concentrate pump although diaphragm tank
SP-1075 REVISION 2.0 Page 37

HSE SPECIFICATION

Setting Clear Requirements

(bag tank, bladder tank) types are acceptable where the quantity of foam concentrate in them does not exceed 1500 litres. For pumped balanced pressure proportioning systems, the pump can be water, electric or diesel driven. In all cases the pump shall be of the positive displacement type (i.e. not centrifugal). All proportioning stations shall be provided with isolation valves and pressure gauges at their inlet and outlet. In the case of pumped balanced pressure proportioning systems, pressure gauges will also be provided in the foam concentrate line downstream of the foam pump prior to the proportioner. Gauges shall be provided to demonstrate that foam concentrate pressure and water pressure are balanced at the point of concentrate injection. The flow range of the proportioner and operating pressure range shall be clearly marked on the proportioner. Pumped balanced pressure proportioning systems shall be provided with the facility to test the foam concentrate and circulate foam concentrate back to the concentrate tank without discharging concentrate into the foam solution discharge line. Valves in the system specifically provided to allow this function shall be provided with a lock so that they can be locked during normal status. Pumped balanced pressure proportioners shall have manual over ride capability to be used in the event of failure of the automatic balancing system. All foam concentrate tanks shall be provided with a sight glass with isolation valves. In the case of diaphragm tanks the isolation valves will be provided with locks. In areas where specialist fire vehicles are available (strategy 4 in FERM), a pumping in connection shall be provided downstream of the proportioning skid to allow back up of a fixed proportioning system by use of the proportioning system on the vehicle. In the case that hand held equipment outlets are served by the proportioning station as well as fixed systems, the outlets shall be such that pressure is limited to a maximum of 7 barg.

Proportioning Systems for Semi-Fixed Foam Systems Semi-fixed foam application systems are those that require connection of a mobile proportioning system (usually on a fire truck). They are, therefore, only applicable where strategy 4 of FERM is adopted.
The foam system shall conform to the requirements of DEP 80.47.10.33, General. Proportioning systems on specialist vehicles shall be pumped balanced pressure type. The system shall be such that each vehicle outlet can provide foam solution or water as required (i.e. the system must not be such that when foam solution is being produced at some outlets, it is not possible to have water only at others). The flow rate capability of the proportioning system shall take due account of other items, such as foam monitors or hand lines, which may be fed from it.

SP-1075

REVISION 2.0

Page 38

HSE SPECIFICATION

Setting Clear Requirements

The proportioning system shall have the manual over ride, drain and return to tank facilities as described for the pumped proportioning systems for fixed systems in the previous section. Note: The above comments should not be regarded as a detailed specification for foam systems for fire trucks. They cover only the necessary requirements to serve semi-fixed systems at PDO facilities.

Proportioners for Hand Held Foam Nozzles Standard line proportioners (eductors, inductors) shall be used for providing foam solution to hand held nozzles which are not fed from a specialist fire vehicle (see Proportioning Systems for Semi-Fixed Foam Systems) or a fixed proportioning system. Proportioners for hand held nozzles shall conform to the following requirements:
The proportioner setting shall be fixed at 3%. The proportioner shall be provided with a translucent pick up tube. The line proportioner shall incorporate a non-return valve to prevent back flow of water into the foam concentrate supply.

Proportioners for One Shot Foam Systems for Floating Roof Tank Rimseal Fires Proportioners for one-shot foam systems for floating roof tank rimseal fires are considered to be an integral part of a package unit (see previous section). Testing of Proportioning Equipment On an annual basis all proportioning systems and equipment shall be tested under credible operational flow conditions to check that the percentage of foam concentrate being proportioned is within the range 3-3.6%.
At 6 monthly intervals, foam concentrate tanks shall be inspected for signs of sediment. 5.3.4 Foam Application Systems/Equipment

Base Injection Systems Reference should be made to DEP 80.47.10.31, General, Paragraph 2.4.1.1.
Base injection (sub-surface) systems are used to protect cone roof (fixed roof) atmospheric storage tanks that do not have an internal floating cover. They are designed to inject foam at the base of a tank above any water and allow the foam to float to the fuel surface. Base injection foam systems are not suitable for watersoluble fuels such as methanol. A variation of this system, known as semi-subsurface, includes a flexible tube that is released into the product on system actuation. Foam flows up the tube so that it does not actually come into contact with the product. Semi-subsurface can be used for water soluble fuels or for crudes with a very high water content where the water base in a tank can be very high and base injection is not practical. Base injection systems shall be designed in accordance with NFPA 11 in terms of application rate, running times, foam discharge velocities and number of foam application points. Base foam injection is limited for use with hydrocarbons that have

SP-1075

REVISION 2.0

Page 39

HSE SPECIFICATION

Setting Clear Requirements

a viscosity less than 440 centistokes at the minimum storage temperature. Above this, top entry for the foam should be used. Base injection systems shall be used in preference to semi-subsurface systems wherever possible. At manned facilities, actuation of a base foam injection shall be manual. At unattended facilities where manual actuation would result in a delay of more than 30 minutes following confirmation of a fire alarm, actuation of base foam systems shall be automatic. Each tank nozzle associated with a base injection system shall be provided with a normally locked open shut off valve and a non-return valve. Bursting discs shall be provided upstream of the non return valve in the foam discharge line to act as a positive seal preventing product entering the foam line under normal operations. The bursting discs shall be of the differential pressure type, rated and located such that where there is more than one disc in a system, the bursting of one disc will not relieve pressure throughout the system and prevent the bursting of all other discs. Valved test connections shall be provided in a base injection system on each system outlet. These shall be of the same diameter as the system foam outlets in order to be representative of the actual system. The valve of the test connection outlet shall be normally locked closed. Normally locked open valves shall be provided as necessary in the foam discharge outlets. These valves shall be closed during testing to prevent bursting discs being subjected to high pressure. Foam generators for the base injection system shall be of the type that can generate foam of the required expansion and drainage time properties (see NFPA 11) against backpressure caused by product head and downstream frictional losses. The preferred type is one that can operate against at least 40% backpressure. The generators shall be provided with pressure gauges showing upstream and downstream pressures so that operating conditions can be checked during testing. The generators shall incorporate a non-return valve in the air inlet to prevent backflow of product through the inlet after system shutdown. All foam generators shall be located outside the bund wall. In the case of semi-fixed systems requiring connection to a firefighting vehicle, any valves or controls needed for system actuation shall be outside the bund and such that radiation levels during credible scenarios meet the radiation level limits described for fixed proportioning systems as detailed above. In semi-fixed systems, the foam solution inlets shall be clearly marked with their purpose, the tank numbers to which they relate, the minimum operating pressure and flow rate. Each foam generator shall be clearly labelled with its minimum operating pressure and the flow rate at this pressure. The foam outlet inside the tank shall be such that it does not become easily clogged by sediment. In crude tanks this means that the end of the outlet pipe should be cut at an angle so that any sediment in the crude does not accumulate in the pipe.

SP-1075

REVISION 2.0

Page 40

HSE SPECIFICATION

Setting Clear Requirements

All foam systems shall be discharge tested on an annual basis. The tests shall include proportioning accuracy (see Testing of Proportioning Equipment), foam expansion and drainage time. Results shall be compared with system specification and manufacturers' data.

Top Pourer Systems - Cone Roof Tanks and Internal Floating Roof Tanks Top pourer systems are foam systems that consist of one or more foam generator/pourer assemblies positioned around the tank just below the roof to shell seam. On system actuation foam is fed through the generator to the inside of the tank shell to flow onto the fuel surface. They can be regarded as an alternative to base injection systems for cone roof tanks but are not the preferred option because there is a high probability that the equipment will be damaged prior to system actuation.
They are, however, the system of choice for internal floating roof tanks and may be considered for cone roof tanks where base injection or semi-subsurface (see Base Injection Systems) are not considered practical. Top pourer foam systems shall be designed in accordance with NFPA 11 in terms of application rate, running times, foam discharge velocities and number of foam application points. Top pourer foam systems for internal floating roof tanks shall be designed to cover the complete fuel surface at application rates for standard cone roof tanks unless it can be shown that the internal floating roof will maintain its integrity in a fire incident. Each foam pourer assembly will comprise a foam generator, a vapour seal (to prevent vapours from the tank migrating through the foam system pipework) and a pourer assembly inside the tank to direct foam against the inside wall of the tank. The foam pourer assembly shall be designed such that a full flow foam discharge test can be carried out without breaking the vapour seal and without discharging foam into the tank. A separate foam solution riser shall feed every foam pourer assembly. Every foam pourer assembly shall be clearly marked with operating pressure and flow rate. Foam solution system pipework shall incorporate valves such that individual risers to foam pourer assemblies can be isolated in the event of damage to an assembly. The valves shall be located such that radiant heat levels as predicted by FRED, do not exceed 5 kW/m2 under credible fire scenarios (nb. full surface fires in internal floating roof tanks are not generally considered credible scenarios - fires burn at the vents only). The foam solution pipework shall be provided with pressure gauges at convenient locations to check operating pressures. The minimum operating pressure required shall be clearly identified at the pressure gauge. The system shall be fully fixed for FERM strategy 3 & 4 facilities. They can be supplemented by semi-fixed. In the case of semi-fixed systems the inlets shall be positioned such that the radiation level limits given for proportioning systems for fixed foam systems are met.

SP-1075

REVISION 2.0

Page 41

HSE SPECIFICATION

Setting Clear Requirements

In semi-fixed systems, the foam solution inlets shall be clearly marked with their purpose, the tank number to which they relate, the minimum operating pressure and flow rate. All foam systems shall be discharge tested on an annual basis. The tests shall include proportioning accuracy, foam expansion and drainage time. Results shall be compared with system specification and manufacturers' data.

Extended Discharge Foam Systems for Protection of Rimseal Areas on Floating Roof Tanks Reference should be made to DEP 80.47.10.31, General, Paragraph 2.4.1.3.
In this case, the term extended discharge refers to a system having a discharge time in accordance with a recognised standard such as NFPA 11 (i.e. it is not a one shot system providing a short duration application of foam as provided in the following section). The extended discharge system shall be considered as the primary protection system even when a one shot system is also in place. Thus a one shot system is not considered to be an alternative to the extended discharge system. The system shall comply with the requirements of NFPA 11 in terms of foam solution application rate, run time and number of foam application points. The systems shall not be automatically actuated from a detection system. The system shall be designed such that it can be actuated manually, either locally or remotely, within 10 minutes of a confirmed fire. If this cannot be achieved, a oneshot foam system shall also be provided as detailed in the following section. For new facilities, the system application devices shall be of the top pourer type because it allows easy inspection and testing. The system consists of a number of foam generators and pourers mounted around the top of the tank fed with foam solution from the proportioning unit. Each pourer assembly shall be provided with a foam generator (i.e. a single foam generator feeding several pourers shall not be permitted). The alternative of a "Coflexip" system, consisting of a number of foam generators mounted on the roof fed from an array of pipework that includes a flexible pipe internal to the tank, may be maintained if already installed on existing plant. The primary systems shall be fully fixed but may be supplemented by semi-fixed systems when there is ready access to a professional fire brigade. When semi-fixed systems are installed, the system inlets shall be outside the bund and clearly marked with their purpose, the tank to which they relate and minimum operating pressure and flow rate. All foam generators shall be clearly marked with their minimum operating pressure and the flow rate at that pressure. A foam dam shall be installed on the tank to contain the foam over the seal area. This dam shall be designed and provided with drain holes in accordance with NFPA 11. The fitting of the foam dam to the roof shall be such that leakage of foam or

SP-1075

REVISION 2.0

Page 42

HSE SPECIFICATION

Setting Clear Requirements

foam solution cannot occur except at the designated drainage points (i.e. there will be a dam tank roof seal or continuous weld except at drainage points). Hydrant outlets fed with foam solution shall be provided at the top of the tank at wind girder level to allow use of foam hand lines to supplement the fixed system. The maximum distance between foam solution hydrants shall be 60m around the walkway. A pressure gauge shall be provided on the foam system pipework along with clear identification of the minimum operating pressure at this point. A cabinet including 2 x 20m x 65mm hoses and a 450 lpm foam nozzle shall be provided at each hydrant outlet on the walkway. Foam application devices shall be of the aspirating type. Drain facilities shall be provided in the system to allow the complete system to be drained after operation. Foam application devices shall be designed or provided with screens so as to minimise the possibility of blockage from external sources such as birds nesting. Foam pourers shall be designed and mounted on the tank shell so that foam is directed to flow down the inside wall of the tank without disruption from the tank structure or fittings. All foam systems shall be discharge tested on an annual basis. The tests shall include proportioning accuracy (see 4.6.3.6), foam expansion and drainage time. Results shall be compared with system specification and manufacturers' data.

One Shot Foam Systems for Floating Roof Tank Rimseals A one-shot foam system for floating roof rimseals is a self contained detection and protection system intended to provide a fast response to rimseal fires by early detection and automatic discharge of foam into the rimseal area. It must be emphasised that one-shot systems are regarded as a first strike system that should detect and extinguish a rimseal fire before it spreads significantly around the tank circumference. They should not be regarded as an alternative to the extended discharge system described in the previous section, which should be regarded as the primary protection method.
One shot systems shall be a totally integrated package comprising linear heat detection, alarm/control facilities, foam concentrate storage, water storage (or premix storage - see below), foam solution discharge pipework and discharge nozzles. The detector system shall comprise a continuous heat detector mounted around the entire circumference of the tank at a distance of 50mm maximum from the top of the seal assembly. Each foam solution module shall have its own dedicated detector in the segment it protects. The heat detector shall be either of the fusible plastic tube type (see DEP 32.30.20.11 - General, November 1995, Paragraph 3.9.4.2) or digital electrical cable

SP-1075

REVISION 2.0

Page 43

HSE SPECIFICATION

Setting Clear Requirements

type. Frangible bulbs mounted on a ring of pressurised pipework shall not be acceptable. On detection of the fire, a dedicated alarm will sound in a permanently manned location and at the tank area. Visual alarms shall be clearly identified with the number of the tank to which they refer (all detectors from individual modules on a tank can be connected to a common alarm). All electrical components shall be suitable for the classification of the area in which they operate, recognising that the roof area should be regarded as Zone 1. Foam solution application rate shall be 20 lpm/m 2 around the seal area and shall be discharged for a minimum period of 30 seconds. Foam application nozzles shall be positioned such that the areas of the rimseal affected are blanketed with foam within a period of 15 seconds from the system actuation. Aspirated foam nozzles are preferred in order to provide a more effective blanket than non-aspirating nozzles. The circumference of the tank shall be split into segments of approximately 40m. The foam application nozzles in each segment shall be fed with foam solution from a dedicated supply module. The discharge pipework and detector for neighbouring modules shall overlap by at least one nozzle spacing distance. Foam solution discharge pipework shall be stainless steel or other material that reduces maintenance requirements on the tank roof. The foam solution shall be supplied from modules which contain either premix (i.e. foam concentrate and water already mixed) in a pressure vessel or a separate foam concentrate and water storage. On actuation of the detector, automatic discharge of the relevant tank segment module shall automatically occur by pressurisation of the unit. The pressurisation cylinder shall be external to the premix (or water) vessel for easy inspection and maintenance. A sunshade to prevent direct exposure to sunlight shall protect each storage module. In cases where the foam concentrate and water are stored in separate vessels, the proportioner shall be of a type that can still function correctly with 3 nozzles blocked. All foam systems shall be discharge tested on an annual basis. The tests shall include proportioning accuracy, foam expansion and drainage time. Results shall be compared with system specification and manufacturers' data. In addition, rimseals on the system shall be fully discharged and replenished on an annual basis.

SP-1075

REVISION 2.0

Page 44

HSE SPECIFICATION

Setting Clear Requirements

5.3.5

Foam Deluge Systems Foam deluge systems comprise an array of open headed discharge nozzles located around or above the hazard. They are all operated simultaneously and fed from a fixed proportioning system. Semi-fixed systems are not practicable because the intention of a foam deluge system is to provide very rapid response to contained spill fire situations and develop a foam blanket to prevent re-ignition. Connection of a proportioning system at the time of the fire would give unacceptable delays. Foam deluge systems shall be designed in accordance with NFPA 16 using an area foam solution application rate of 6.5 lpm/m2 and a minimum of 10 minutes application time, followed by water for a total time of 60 minutes at an application rate of 6.5 litres/m2/min. With an increased application rate the operating time may be reduced proportionally, but not less than 7 minutes. Foam deluge systems shall be fed with foam solution from a fixed proportioning system. Foam deluge system nozzles shall be of the aspirating type. The foam deluge system nozzle shall be such that following foam application, continuing water application for a period of 20 minutes will provide a cooling spray capability without significant damage to the foam blanket.

5.3.6

Portable Foam Application Equipment Hand held foam nozzles shall be aspirating nozzles of the type requiring foam solution to be fed to them (i.e. they shall not be the type that incorporates a proportioner). Foam nozzles for use on small spill fires (e.g. minor bund incidents) at FERM strategy 3 facilities shall have approximately 200-250 lpm throughput at 7 barg inlet pressure. Their throughput shall be matched to that of the proportioners used with them (see Proportioners for Hand Held Foam Nozzles). Foam nozzles for use at FERM strategy 4 facilities shall have a throughput up to 1000 lpm at 7 barg inlet pressure. Hand held foam application equipment shall be provided in fire cabinets at strategic locations adjacent to hydrants at FERM strategy 3 and 4 facilities. The number and location of fire cabinets shall be determined from hazard identification and pre-fire planning studies for minor incidents taking into account manning levels. Each fire cabinet shall contain 1 x foam nozzle (200-250 lpm), 1 x water nozzle (450 lpm at 7 barg jet/spray type) 2 x 20m x 65mm hose lengths and 6 x 20 litre drums of foam concentrate. FERM strategy 3 and 4 facilities shall be provided with portable foam monitors for use by the fire fighters for larger spill incidents and supplementing fixed systems. The number of units shall be based on the requirements of any tanks that are not protected by a fixed or semi-fixed system. In the event that all tanks are provided with a system, a single unit shall be provided.

SP-1075

REVISION 2.0

Page 45

HSE SPECIFICATION

Setting Clear Requirements

Each foam monitor shall have a throughput of at least 2500 lpm at 7 barg inlet pressure. Monitors shall be provided with a self-inducing proportioning capability but in general shall actually be operated from a specialist vehicle proportioning system.

5.4

Fine Water Spray Systems These systems shall be designed in accordance with NFPA 750. Gaseous Extinguishing Agent Systems The design of and type of extinguishant used in these systems requires the approval of the custodian of this specification. Halon shall not be used. Reference should be made to DEP 80.47.10.10, General, and NFPA 2001. Portable Extinguishers
General Portable extinguishers shall be suitable for the type of fuel involved in accordance with BS EN 2. There are four classes of fire, namely Class A involving solid materials, Class B involving liquids, Class C involving gases and Class D involving metals.

5.5

5.6
5.6.1

5.6.2

Standards for Portable Fire Extinguishers All fire extinguishers shall be manufactured, tested and certified to conform to BS 5423 or equivalent (such as CEN-EN 3.1/2/3/4/5, NFPA 10, Din 14406). Additionally, the extinguisher body, filling nozzle and cap shall be made from material having rigidity, durability and resistance to electrochemical corrosive effects of the extinguishing media. Non metallic materials are not acceptable for these parts or the moveable nozzle. Fire extinguishers shall be selected, installed and maintained in accordance with BS 5306 Part 3.

SP-1075

REVISION 2.0

Page 46

HSE SPECIFICATION

Setting Clear Requirements

6.0 Alarms and Executive Actions


6.1 General The table in Appendix D gives typical alarm and executive action requirements for the different types of detection and facilities. This table provides only an overview and the engineer shall fully review the requirements of this specification to define specifics for any piece of equipment. Gas Turbines The required shut down logic associated with turbine hoods is dictated by the sequence of a limited number of possible events:
Given the ingestion of gas into the combustion or ventilation air intakes, the turbine shall be tripped and the hood ventilation system shall be shutdown. Given a sufficiently large release of flammable gas under the hood, the turbine shall be tripped together with a remote fuel gas ESDV, but the hood ventilation system shall be allowed to run to minimise the possibility of gas concentration build up and result in a possible explosion or flash fire. Given a confirmed flame detected under the hood, the turbine and ventilation system fans will be tripped together with closure of fire damper(s).

6.2

SP-1075

REVISION 2.0

Page 47

HSE SPECIFICATION

Setting Clear Requirements

FIGURE 6.2 A generic cause and effect diagram follows:

(& local panel if applicable) Remote Alarm in Control Centre

Trip Turbine

De-energise non-explosion proof electrical accessories

Trip turbine lube oil / seal oil systems

Inhibit re-start of Turbine

Hood ventilation Fan Trip

CAUSE Gas Detection


(per compartment under-hood)

Flammable >=1 at ALERT Flammable any 1 at DANGER Flammable >= 2 at DANGER Gas Detection Flammable >=1 at ALERT (at Air Intakes if Flammable any 1 at DANGER HL gas possible) Flammable >= 2 at DANGER Fire Detection >= 1 Heat activated Any 1 UV/IR activated >= 2 UV/IR activated Loss of Hood Ventilation Air Flow* Loss of Hood Ventilation Air Flow>= 20 secs*

X X X X X X X X X X X

X X X X

X X X X

X X X

X X

X X

X X

X X X X X

Notes: 1. Alert and danger are defined in section 4.2 2. HL refers to high level

SP-1075

REVISION 2.0

Page 48

installed)Disable Trip from Heat Switches (if total flood system

Remote Field Gas ESDV Closure

EFFECT

Close Ventilation Dampers

HSE SPECIFICATION

Setting Clear Requirements

7.0 Abbreviations
AFFF AFP API BPD BS CBA CFDH CSN DEP EN EP ESD ESDV FES FERM FFFP FM FQB FRED FWS GRP HSE ISO ICAO IPF IR LEL LFL LNG LPC LPG MAC NDT Aqueous Film Forming Foam Active Fire Protection American Petroleum Institute Barrels Per Day British Standard Cost Benefit Analysis Corporate Functional Discipline Head Committee European de Normalisation (for Standardisation) Design Engineering Practice Europaische Norm Engineering Practice Emergency Shutdown Emergency Shutdown Valve Fire and Explosion Strategy Fire & Explosion Risk Management Film Forming FluoroProtein Factory Mutual (Certifying Authority in USA) Frangible Quartzoid Bulbs Fire, Release, Explosion and Dispersion Fine Water Spray Glass reinforced Plastic Health, Safety and Environment International Organisation for Standardisation International Civil Aviation Organisation Instrumented Protective Function Infra Red (the frequency of light used for fire detection and gas detection) Lower Explosive Limit (Synonymous with LFL) Lower Flammable Limit (Synonymous with LEL) Liquefied Natural Gas Loss Prevention Council Liquefied Petroleum Gas Manual Alarm Callpoint Non Destructive Testing

SP-1075

REVISION 2.0

Page 49

HSE SPECIFICATION

Setting Clear Requirements

NFPA PDO PLC ppm PV QRA SIEP SSV SCSSV UEL UFL UL UV VESDA

Nation Fire Protection Association Petroleum Development Oman Process Logic Controller parts per million (a ratio by volume or mass of one substance in another) Present Value (some future value discounted to todays value) Quantified (or Quantitative) Risk Analysis Shell International Exploration and Production Sub Surface Valve Surface Controlled Subsurface Safety Valve Upper explosive Limit (synonymous with UFL) Upper Flammable Limit (synonymous with UEL) Underwriters Laboratories Incorporated Ultra Violet (the frequency of light used for fire detection) Very Early Smoke Detection Apparatus (VESDA is a trade name)

SP-1075

REVISION 2.0

Page 50

HSE SPECIFICATION

Setting Clear Requirements

8.0 References
1. Report No. HSE/97/07 (1997) Fire and Explosion Risk Management (FERM) Summary Report. Petroleum Development Oman 2. Report No. EWE-28107.1 (1996) Halon Phase-out Studies, Quantified Risk Assessment & Cost-benefit Analysis. Electrowatt Engineering 3. Report No. EWE-63273.1/1 (1997) Quantified Risk Assessment for Shipping Pumps and Cone roofed Tanks. Electrowatt Engineering 4. Fire Protection Study Report. Resource Protection International 5. Review of Emergency Services at PDO Airfields, TSE/R/01, 1995 6. FERM Facility Plan Guideline, GU230, 2002.

SP-1075

REVISION 2.0

Page 51

HSE SPECIFICATION

Setting Clear Requirements

APPENDIX A - Relevant Standards, Specifications & Codes


The following standards, specifications and codes can provide further information if required. PDO Standards ERD 00-01 ERD 00-02 ERD 08-04 ERD 08-11 Title PDO Guide to Technical Standards and Procedures Technical Authorities System Safety Aspects of Plant Design for Sour Service Isolation Process Equipment Referred to in Section General 2.4.2 4.4.1 3.2.3 3.2.3 3.2.3 3.2.3 3.2.3 4.3.2 4.3.3 4.3.4 4.3.6 3.4.1 4.3.3 5.1.1 5.1.2

ERD 09-02 ERD 10-04

Spacing of Tanks & Tank Bunding Requirements General Specification for Detail Design and Engineering of Oil & Gas Facilities

ERD ERD ERD ERD

17-02 30-03 38-12 48-01

Fire Detection and Alarm Installation Instrumentation Standard Drawings Requirements - GRE Pipes/fittings Painting and Coating Systems

SP-1075

REVISION 2.0

Page 52

HSE SPECIFICATION

Setting Clear Requirements

Relevant Standards, Specifications & Codes (continued)


SIEP Standards DEP 30.48.30.31-Gen DEP 31.29.02.11-Gen DEP 31.29.02.30-Gen Title Cement Linings in New Pipelines (1990) MFEC/1 Pumps - Selection, Testing and Installation (1983) MFEE/1 Centrifugal Pumps (Amendments/Supplements to API Std. 610) (1990) MFEE/1 Fire, Gas and Smoke Detection Systems MFTX/51 Classification and Implementation of Instrumented Protected Functions PLC Based Instrumented Protective Systems Electric Motors-Cage Induction and Synchronous Type (1995) MFEE/3 Laboratories (1983) MFEC/1 Fire-fighting Agents (1991) MFEO/1 Assessment of the Fire Safety of Onshore Installations (1995) MFEO/1 Active Fire Protection Systems and Equipment for Onshore Facilities (1992) MFEO/1 Referred to in Section 5.1.1 5.1.3 5.1.3

DEP 32.30.20.11-Gen DEP 32.80.10.10-Gen DEP 32.80.10.30-Gen DEP 33.66.05.31-Gen DEP 34.17.10.31-Gen DEP 80.47.10.10-Gen DEP 80.47.10.30-Gen

5.3.4 4.1 4.1 3.2.3 3.4.5 5.3.1 5.5 3.2.4 3.2.4 5.1.5 5.1.1 5.2.1 5.2.2 5.3.1 5.3.4 5.3.4 3.5.2 5.1.4 5.1.5 5.3.1 5.3.3 3.2.3

DEP 80.47.10.31-Gen

DEP 80.47.10.32-Gen

Movable Fire Fighting Equipment for Onshore Applications (1997) MFEO/1 Fire-fighting Vehicles and Fire Stations (1993) MFEO/1 Shell Report: Fire Retardant Rim Seal Materials for Floating Roof Tanks. SIEP EPO/61 HSE Manual: Quantitative Risk Assessment SIEP

DEP 80.47.10.33-Gen EP92-1820

EP95-0352

2.5.1

SP-1075

REVISION 2.0

Page 53

HSE SPECIFICATION

Setting Clear Requirements

Relevant Standards, Specifications & Codes (continued)


International Standards BS 336 BS 476 Parts 4 BS 476 Part 7 Title British Standards:1989: Specification for Fire Hose Couplings and Ancillary Equipment. BSI Publication British Standards:1984: Non-combustible test for materials. BSI Publication British Standards:1993: Method for classification of the surface spread of flame of products. BSI Publication British Standards:1990: Specification for Sprinkler Systems British Standards:1985: Code of Practice for the Selection, Installation and Maintenance of Portable Extinguishers. BSI Publication British Standards:1995: Specification of Portable Fire Extinguishers. BSI Publication British Standards:1988: Fire Detection and Alarm Systems for Buildings. Part 1 Code of Practice for System Design, Installation and Servicing. BSI Publication British Standards:1983: Specification for Manual Alarm Call Points. BSI Publication British Standards:1992: Classification of Fires (replaces Code of Practice for Classification of Fires:1972) BSI Publication National Fire Codes: Portable Fire extinguishers. Vol.1. National Fire Protection Association. National Fire Codes: Standard for Low-Expansion Foam. Vol.1. National Fire Protection Association. Referred to in Section 5.1.4 3.4.4 3.4.4

BS 5306 Part 2 BS 5306 Part 3

5.2.1 5.6.2

BS 5423 BS 5839 Part 1

5.6.2 4.3.7

BS 5839 Part 2 BS EN 2

3.4.1 4.4.1 5.6.1

NFPA 10 NFPA 11

5.6.2 5.3.1 5.3.3 5.3.3 5.3.4 5.3.4 5.3.4 5.2.1

NFPA 13

NFPA 15

NFPA 16

NFPA 20

NFPA 22

National Fire Codes: Standard for the Installation of Sprinkler Systems. Vol.1. National Fire Protection Association National Fire Codes: Standard for Waterspray Fixed Systems for Fire Protection. Vol.1. National Fire Protection Association National Fire Codes: Standard on Deluge FoamWater Sprinkler and Foam-Water Spray Systems. Vol.1. National Fire Protection Association National Fire Codes: Standard for the Installation of Centrifugal Fire Pumps. Vol.1. National Fire Protection Association National Fire Codes: Standard for Water Tanks for Private Fire Protection. Vol.1. National Fire Protection Association

5.2.2

5.3.1 5.3.5 5.1.3

5.1.2

SP-1075

REVISION 2.0

Page 54

HSE SPECIFICATION

Setting Clear Requirements

NFPA 750

NFPA 2001

ICAO-9137 Part 1 ICAO-9137 Part 7

ISO 7203-1 UL 162

National Fire Codes: Standard on water mist fire suppression systems. National Fire Protection Association National Fire Codes: Standard on Clean Agent Fire Extinguishing Systems. National Fire Protection Association Airport Services Manual, Rescue and Fire Fighting. ICAO (International Civil Aviation Authority) Airport Services Manual, Airport Emergency Planning. ICAO (International Civil Aviation Authority) Fire Extinguishing Media, Foam Concentrates Foam Equipment and Liquid Concentrates, 7th edition

5.4

5.5

3.5.1 3.5.1

5.3.1 5.3.2 5.3.1 5.3.2

SP-1075

REVISION 2.0

Page 55

HSE SPECIFICATION

Setting Clear Requirements

APPENDIX B - Assessment of Business Risk Due To Fire and Explosion


The risks due to fire and explosions of existing typical assets in PDO have been assessed and plotted onto a Risk Matrix as shown below. This matrix gives an overview of the risk level of typical equipment to provide an indication of the level of protection that may be justified in the form of a fire and explosion strategy. The individual equipment risks are positioned to denote the worst case frequency and consequences. Some equipment appears twice, e.g. a floating roof tank fire has occurred in SIEP with minor (rating 2) consequences but elsewhere in the industry with very serious (rating 5) consequences.
Probability of Occurrence Consequence A B C D E

incident has occurred in E&P industry

incident happens several times a year in SIEP

not heard of but could occur in E&P industry

0 1 2 3 4 5

No injury

No Damaage

No Effect

No Impact

No Effect

Slight injury

Slight Damage

Slight Effect

Slight Impact

Slight Effect

9 2 4 2 4 5 3 6 7 8 6 7

Minor injury

Minor Damage

Minor Effect

Limited Effect

Minor Local Effect

Major injury

Local Damage

Localised Effect

Considerable Impact

Major Local Effect

Single Fatality

Major Damage

Major Effect

National Impact

Massive Effect

Multiple Fatality

Extensive Damage

Massive Effect

International Impact

Total Extended Effect

Incident: 1. 2. 3. 4. 5. Small Incidents Pump Seals Compressors Turbine Enclosures Pressure Vessels 6. 7. 8. 9. Cone Roof Tanks Floating Roof Tanks Aircraft Camps

Strategy: Strategy 1 Strategy 1/2 Strategy 2 Strategy 3 Strategy 4 Strategy 3/4

SP-1075

REVISION 2.0

Page 56

incident happens several times a year at location 1

Environment

Reputation

Production

incident has occurred in SIEP

Ratings

People

Assets

HSE SPECIFICATION

Setting Clear Requirements

APPENDIX C - Facility Group Categories


Production and gathering stations have been categorised according to the facilities and level of risk as follows:. Production Stations Category A: Typical facilities include: Manifolds Small cone roof tanks Compressors and turbine enclosures Pumps Substation Control room

Specific hazard fire protection is to be provided at Category A production stations without a firewater network (strategy level 2). Category B: Typical facilities include those on Category A stations but also have larger cone roof tanks and pressure vessels. Specific hazard fire protection is to be provided at Category B production stations with a firewater network (strategy level 3). Category C: roof tanks. Typical facilities include those on Category B stations but also have floating

Specific hazard fire protection is to be provided at Category C production stations with a fire water network (strategy level 3). CATEGORY B C C C B A B B A A A A AREA Lekhwair Yibal Fahud Qarn Alam Rima PS Sayyala PS Nimr PS Marmul Anzauz Suwaihat Zauliyah Ghubar

SP-1075

REVISION 2.0

Page 57

HSE SPECIFICATION

Setting Clear Requirements

Gathering Stations Category A: Typical facilities include: Manifolds Separators Pumps Small cone roof tanks Substation Control Room

First aid fire protection is only to be provided at Category A stations (strategy level 1). Category B: Typical facilities include those on Category A stations but also compressors and turbine enclosures. Specific hazard fire protection is to be provided at Category B stations without a fire water network (strategy level 2). CATEGORY B A B B A B B B B B B B A A B A B B AREA Al Huwaisah Lekhwair B Yibal B Yibal C Yibal D Fahud B Fahud C Fahud D Fahud E Fahud F Natih Qarn Alam Barik Burhaan Ghaba North Qarat Al Milh Saih Rawl Bahja CATEGORY B A A B A B A A A A B A A A A B A By passed AREA Marmul A Marmul B Marmul C Marmul D Marmul E Marmul G Qaharir Rahab Thamoud Thuleilat Birba Nimr C Nimr B Nimr A Amal Saih Nihayda Sadad Hasirah

SP-1075

REVISION 2.0

Page 58

HSE SPECIFICATION

Setting Clear Requirements

APPENDIX D - Typical Alarms and Executive Actions


Hazard Type of Detector Equipment Type Gath Station Fire Heat Crude oil/ condensate shipping pumps Compressors Fixed roof tanks Floating of tanks Turbine enclosures Diesel generator Fuel gas skid Fired heater skids Crude pumps Compressors Turbine enclosures Control rooms Auxiliary rooms Electrical rooms Computer rooms Turbine hall Offices Turbine enclosure (air intake) Gas compressors Fuel gas skid X X X N/A X N/A X X X X X X X N/A N/A X X X X Prod Station X X X X X N/A X X X X X X X N/A N/A X X X X Facility Type Booster Station X N/A N/A N/A X X X N/A N/A X X X X N/A N/A X X N/A X Power Station N/A N/A N/A N/A X X X X N/A X X X X N/A X X X N/A X MAF X N/A X X N/A N/A X X N/A N/A X X X X N/A X N/A N/A N/A GGP X X N/A N/A X Alarm & ESD Alarm & ESD X X X X X X N/A N/A X X X X

Flame

Smoke

Gas

Comb Gas

SP-1075

REVISION 1.0

Page 59

HSE SPECIFICATION

Setting Clear Requirements

Typical Alarms and Executive Actions (continued)


Type of Detection Alarm/Action Gath Station X Note 2 X X X X X X X X Note 2 X X X X X X X Prod Station X Note 2 X X X X X Note 1 X X X Note 2 X X X X X Note 1 X X Facility Type Booster Station X Note 2 X X X X X X X X Note 2 X X X X X X X Power Station X Note 2 X X X X X Note 1 X X X Note 2 X X X X X Note 1 X X MAF X Note 2 X X X X GGP X Note 2 X X X X

Heat

GFS panel alarm Mimic panel alarm Area sirens/bells ESD associated equipment Blowdown associated equipment (Note 4) Station ESD Initiate AFP (Note 3) Alarm to SCADA Alarm to fire brigade GFS panel alarm Mimic panel alarm Area sirens/bells ESD associated equipment Blowdown associated equipment (Note 4) Station ESD Initiate AFP (Note 3) Alarm to SCADA Alarm to fire brigade

Flame

X X X X Note 2 X X X X

X X X Note 2 X X X X

X X X

X X

SP-1075

REVISION 1.0

Page 60

HSE SPECIFICATION

Setting Clear Requirements

Smoke

GFS panel alarm Mimic panel alarm Area sirens/bells Isolate associated non essential power supplies Alarm to SCADA Alarm to fire brigade Associated AC trip

X Note 2 X X X X X

X Note 2 X X X X X

X Note 2 X X X X X

X Note 2 X X X X X

X Note 2 X X X X X

X Note 2 X X X X X

SP-1075

REVISION 1.0

Page 61

HSE SPECIFICATION

Setting Clear Requirements

Typical alarms and executive actions (continued)


Type of Detection Comb Gas Alert Alarm/Action Gath Station X Note 2 X Prod Station X Note 2 X Facility Type Booster Station X Note 2 X Power Station X Note 2 X MAF X Note 2 X GGP X Note 2 X

GFS panel alarm Mimic panel alarm Area sirens/bells ESD associated equipment Blowdown associated equipment (Note 4) Station ESD Alarm to SCADA Alarm to fire brigade GFS panel alarm Mimic panel alarm Area sirens/bells ESD associated equipment Blowdown associated equipment (Note 4) Station ESD Isolate non essential power supplies Alarm to SCADA Alarm to fire brigade GFS panel alarm Mimic panel alarm Area sirens/bells

X X Note 2 X X X

X X Note 2 X X X

X X Note 2 X X X

X X Note 2 X X X

X X Note 2 X X X

X X Note 2 X X X

Comb Gas Danger

X X X

X Note 1 X X

X X X

X Note 1 X X

X X

X X

Toxic (H2S)

X X

X X

X X

X X

SP-1075

REVISION 1.0

Page 62

HSE SPECIFICATION

Setting Clear Requirements

Alarm to SCADA Manual call Point GFS panel alarm Mimic panel alarm Area sirens/bells Station ESD GFS panel alarm Mimic panel alarm Alarm to SCADA Notes 1. 2. 3. 4.

X X Note 2 X X X X Note 2 X X

X X Note 2 X X X Note 1 X Note 2 X X

X X Note 2 X X X X Note 2 X X

X X Note 2 X X X Note 1 X Note 2 X X X Note 2 X X X Note 2 X X

AFP activated

X Note 2 X X

X Note 2 X X

Station ESD not required if station is permanently manned. Alarm required on GFS panel if no mimic provided, typically for control/auxiliary buildings. Initiate AFP on relevant equipment where installed. Where blowdown facility is provided.

SP-1075

REVISION 1.0

Page 63

HSE SPECIFICATION

Setting Clear Requirements

Appendix E - Worked Examples


The Specification provides a methodology for determining the levels of fire and explosion protection for what are seen as critical items of equipment, ie. cone roofed tanks and shipping pumps. This approach is based on a detailed QRA (Reference 3) which was performed, and enables the user to apply a cost benefit analysis in order to justify the protection level specified. Some worked examples are provided below.

Cone Roofed Tanks Suppose we are installing 2 new oil storage tanks at Marmul, and wish to establish what levels of fire protection can be justified. The production rate for Marmul is 63000 BPD, and using the pro-forma on page 18 of this Specification:
BASE CASE COST OF DAMAGE CALCULATION PRO-FORMA System Constant 0.18225 based on frequency of damage x days lost:

(3.75x10

-4

x 486 =)

Cost of Deferred Oil = 2US$ per barrel Net Oil Production per pair of tanks in BPD (e.g. for 5 tanks divide the total production by 2.5) For an installation with a single tank multiply the total production by 1.39 (to compensate for the loss of total production given the loss of a single tank) = Base Case Annual Cost of Damage per Tank = x Number of tanks covered by Protection = Base Case Annual Cost of Damage for Installation = x Design Life of the Installation = Undiscounted Design Cost of Damage for Installation = Discount Factor takes into account the design life of the fire protection facilities together with the average discount rate. The undiscounted value should be multiplied by the value at discount rate taken from the following table below. Value at Discount Rate Years 5% 8% 10% 10 0.772 0.671 0.617 20 0.621 0.490 0.426 25 0.564 0.427 0.362 30 0.512 0.376 0.313 Base Case PV of Cost of Damage for Installation

2 x 63000

$ 22964 2 $ 45927 20 $ 918540

0.490 $ 450085

The risk reduction by installing heat detection and base foam injection is provided on the risk histogram (Figure 3.2.3), and works out as 64% (ie, 100-36). Therefore, 0.64 x 450085 = US$288054 can be spent installing heat detection and base foam. If the cost of installing the fire protection is less that US$288054, then installation is justified.

SP-1075

REVISION 1.0

Page 64

HSE SPECIFICATION

Setting Clear Requirements

Shipping Pumps Suppose we are installing 3 additional centrifugal shipping pumps at Yibal A and wish to establish the levels of fire protection that can be justified. Assuming that the 3 pumps have a combined capacity of 23000 BPD, and using the pro-forma on page 18 of this Specification:
BASE CASE COST OF DAMAGE CALCULATION PRO-FORMA System Constant based on frequency of damage x days lost for 3 pumps: -4 (3.18x10 x 130 x 3 = ) Pump Type for centrifugal/axial or screw pumps use x 1 for reciprocating pumps use x 10 Number of Pumps in Set for 2 pumps use x 0.6 for 3 pumps use x 1.0 for 4 pumps use x 1.46 for 5 pumps use x 2.0 1 Cost of Deferred Oil = 2US$ per barrel Net Oil Production for Pump Set in BPD = Base Case Annual Cost of Damage per Pump Set = x Design Life of the Pump Set = Undiscounted Design Cost of Damage for Pump Set = Discount Factor takes into account the design life of the fire protection facilities together with the average discount rate. The undiscounted value should be multiplied by the value at discount rate taken from the following table below. Value at Discount Rate Years 5% 8% 10% 10 0.772 0.671 0.617 20 0.621 0.490 0.426 25 0.564 0.427 0.362 30 0.512 0.376 0.313 Base Case PV of Cost of Damage for Installation 0.12402

x1 x1

2 x 23000 $ 5705 20 $ 114098

0.490 $ 55908

The risk reduction by installing fire detection is provided on the risk histogram (figure 3.2.3) and works out as 67% (ie. 100-33). Therefore, 0.67 x 55908 = US$37459 can be spent installing fire detection. If the cost of installing the fire protection is less than US$ 37459, then installation is justified.

SP-1075

REVISION 1.0

Page 65

You might also like