Project Prioritization Matrix
Project Prioritization Matrix
Instructions
1 2 3 4 5 Input strategies I1, I2.etc. and their importance rating between 1 to 10. Input importance rating of strategies between 1 to 10. List out projects P1,P2.etc. Enter association scores between 1 to 9 Weighted score is calculated in the last column.
Projects
Strategy-> P1 P2 P3 P4 P5 P6 P7
n.
I1
I2
I3
I4
I5
I6
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
I7
Weighted Score 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6
Reduce COPQ
6
Reduce Inventory 3 3 3 3 1 1 1 9 3 1 3 0 0 0 0
10
Improve Market Share 3 1 9 1 1 0 3 1 0 3 0 0 0 0 0
Projects
Strategy/Initiative-> Reduce Attrition rate Reduce casting rejection Reduce product development time Improve Training Effectiveness Reduce Test Defects per Unit (DPU) Eliminate rework at pump assembly Reduce pump Failures Improve accuracy of bill of materials Reduce Set-up time on bottleneck machine Reduce time to make engineering changes Improve stores accuracy Reduce time to recruit Reduce transmission defects at testing Reduce time to fix field problems Reduce energy consumption and cost
3 9 1 3 9 9 9 0 0 1 1 0 0 3 1
zation Matrix
7
Improve Productivity 3 9 1 3 9 9 1 3 9 1 3 3 3 0 1 Weighted Score 159 145 145 139 133 123 121 85 81 49 45 45 21 18 13
Retain Talent 9 0 3 9 0 0 3 0 0 0 0 3 0 0 0