A Set-Up Reduction Tool For Continuous Improvement
A Set-Up Reduction Tool For Continuous Improvement
A Lean Manufacturing Tool It supports building products after a customer order is received, not on market forecasts.
Allows
an operation to fully utilize its assets by producing a wide variety of parts. Eliminates or reduces non-value added activities in all types of process setups to quickly change from one product to another. Reduces batch sizes and shortens lead time eliminating the expense of excess inventory.
Definition
Low-cost
More frequent changes Smaller batches Lower inventory Better quality Less waste More Flexibility Less STRESS!!! Improved teamwork
50% Reduction
External
3 Run A 4 Run A
External
STEP 2
STEP 3
STEP 4
xx
Step 1 Application
Pre-Workshop Preparation Document Setup Activities by Performing Dry-Run of the Setup Document the Actual (Live) Setup
Video allows operators to review and explain their activities Record All Events and Times in the Setup Timeline
Provides a time stamp for each event during the setup. The worksheet is used to identify internal and external events.
Tool Carousel
Production Control
Quality Control
"Before and After Setup Timelines will visually compare and illustrate the improvements.
Step 2 of 4
STEP 1 D, M Document the setup and separate events into internal or external
STEP 2
A, I
STEP 3
STEP 4
I, C
xx
Step 2 Application
Convert Internal to External Setup
Convert
any internal setup events to external setup events using focused, engineered methods. Re-examine internal events from Step 1 and verify that they are actually internal.
The most important step in implementing successful Quick Changeover is distinguishing between internal and external Changeover elements.
Step 2 Tools
Part # 432543 Press # P-10 Review Check Table Die 274 Functional Checks Die Location Shelf 4 Retrieve Change Parts
Time 8 9 10 11 12 13 Action Parts Setup A
Setup
Improving transportation
Fact: Significant setup time is lost searching for setup hardware and setup information. Setup Hardware: Tools Fixtures Nuts and Bolts Clamping Devices Measuring Devices Setup Information: Data (Tool and Machine Settings) Procedures
NEW - 15 min
Die preheated Die attached to machine
15 min
Step 3 of 4
STEP 1 D, M Document the setup and separate events into internal or external
STEP 3
STEP 4
I, C
xx
Step 3 Application
Streamline Internal Setup by:
Simplifying Movement
One-touch Single
tools
Reducing Movement
Reduce
Add
Eliminating Movement
Prepare
Replace
Reduce/eliminate need for hand tools Reduce/eliminate nuts and bolts, hex nuts, etc. Replace with quick fastening/releasing devices:
Single
motion securing
U-slot
method
Pear
Snap Method
Use of Cams
Toggle Clamps
Step 4 of 4
STEP 1 D, M Document the setup and separate events into internal or external
STEP 4
I, C
xx
Step 4 Application
Eliminating Adjustments and Trial Runs
Turn
Elimination
Preparation 30%
settings are inexact and do not provide the required precision as data based settings intuition to DATA is the surest way to consistently avoid adjustments and test runs
Converting
Before
Adjustments
After
Fixture
Fixture
Machine Base
After
Place fixture onto base centering using centering ball
1 min
Start production
Make adjustments
Insures projects take on a results orientation that is measurable and positively impacts performance parameters.
Errors in documents Transport of documents Doing unrequested work Waiting fore the next step in the process Process for getting approvals
Too many signature levels Unclear job descriptions Obsolete databases/files/folders Purchase orders not matching quotes / receiving / invoices Errors typos, misspellings, wrong data Waiting for information, at meetings Poor office layout Unnecessary emails
Unnecessary motions
Backlog in work queues Under-utilized employees
Printer Out of ink - Internal time from last printed sheet to next printed sheet Have the next task or project prepared and waiting for you in a folder instead of searching for it and the instructions
Cut-out Waste
An office machine requires multiple settings use a one-touch method Reduce the number of clicks to access information from a computer system
Cleaning an office w/multiple people doing specific tasks Have a team make sales phone calls by using aides to prepare the customer information ahead of the Sales Reps call Surgery preparation for the patient and the actual procedure Catering a dinner with appetizer, entre, salad, and desert teams
Tools
Add RAM to your computer to speed up processing Use multiple monitors instead of flipping through multiple screens Use vacuum cleaners instead of brooms
Setup Reduction (Quick Changeover) is a Lean Tool The term SMED is sometimes used in place of Setup Reduction, but refers to die change improvements Setup reduction is a requirement for batch size and overall lead time reduction. Apply this to the key time traps first. Use the four step method it works Measure It Use it on all types of process (even when you get coffee from a vending machine). A key element is 3C+C. (Communication, Cooperation, Consideration, &+ Commitment (to action)