The document provides details on the design of a two-way slab, beam, lintel beam, sunshade, and plinth beam. For the two-way slab, the main reinforcement is calculated to be 746.09 mm2 for the shorter span and 533.46 mm2 for the longer span. The beam design includes calculating loads, moments, and determining the main reinforcement is 6 nos of 20mm diameter bars. The lintel beam main reinforcement is 2 nos of 20mm diameter bars. The sunshade uses 6mm diameter bars at 180mm c/c spacing as main reinforcement. The plinth beam main reinforcement is 6 nos of 20mm diameter bars.

Uploaded by

nalayathan123
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views

Final Post Off

The document provides details on the design of a two-way slab, beam, lintel beam, sunshade, and plinth beam. For the two-way slab, the main reinforcement is calculated to be 746.09 mm2 for the shorter span and 533.46 mm2 for the longer span. The beam design includes calculating loads, moments, and determining the main reinforcement is 6 nos of 20mm diameter bars. The lintel beam main reinforcement is 2 nos of 20mm diameter bars. The sunshade uses 6mm diameter bars at 180mm c/c spacing as main reinforcement. The plinth beam main reinforcement is 6 nos of 20mm diameter bars.

Uploaded by

nalayathan123
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 49

DESIGN OF TWO WAY SLAB :

GIVEN : fck = 20 N/mm2 fy = 415 N/mm2 Room size = 10.23X8 Support = 230 mm LENGTH AND BREATH RATIO : ly /lx

=10.23 /8 = 1.2 7< 2 ( It is two way slab)

DESIGN CONSTANT : Basic value = 28 Q = 2.76 Modification factor = 1 % Ast = 0.957 EFFECTIVE DEPTH : d = span/ BV x MF = 8230 / 28 x 0.95 = 308.97mm(say 310mm) = 310mm OVER ALL DEPTH : = 310+ 15 + 10/2 = 330 mm(shorter span) d = 310-10 d = 300 mm D = 300 + 15 + 5 D = 320 mm EFFECTIVE SPAN: Effective span = c/c distance b/w the support + clear span S = 8000 + 200 Lex = 8200 mm For longer span D

Ley = 10.230 + 200 Ley = 10.460

LOAD CALCULATION : Consider = 1 m Imposed load = 1 KN/m2 Weathering course = 0.75 KN /m2 Self weight = 1 x b x D x rcc 1 x 1 x 0.33 x 25 = 8.25 KN/m Total load = 10 KN/m Design load = 10x 1.5 = 15 KN/m

MOMENT : = 10460/8230 = 1.27 x = 0.084 y = 0.059 Mx = x wlx2 = 0.084 x 15 x (8.23)2 = 84.72 x 106 N.mm My = y wu ly2 = 0.059 x 15x ( 8.2 )2 = 59.50 x 106 N.mm MAIN REINFORCEMENT : (shorter span ) Mx = 0.87 fy Ast d ( 1- fyAst / fckbd) 6 116.69 x 10 = 0.87 x 415 x Ast x 330 ( 1- 415 x Ast / 20 x 1000 x 294) 7.49 Ast2 119.34 x 103 Ast + 84.72 x 106 = 0 Ast min = 746.09 mm2 LONGER SPAN : My = 0.87 fy Ast d ( 1 fy Ast / bd fck) 59.5x106 = 115.536 x 103 Ast - 7.49 x Ast2 ly/lx

7.49 Ast2 - 115.536 x 103 Ast + 59.50x 106= O Ast min = 533.46 mm2 Ast min = 0.12 / 100 b D = 0.12 /100 x 1000 x 195 = 234 mm2 DEPTH REQUIRED : Mu = Mu max Mu = Qubd2 d = Mu /Qub = 84.72x 106 / 2.76 x 1000 d = 175 mm D = 175+ 15 +5 D = 195 mm d req < d provid = Qubd2 = 2.76 x 1000 x 3302 = 300.584 x 106 N.mm2 Mu < Mu limit Hence under reinforced section. Mu limit

SPACING :

( Shorter span )

Assume 10 mm ast = d2/4 = x 102/4 = 78.54 mm2 S = ast/Ast x b = 78.54/746.9 x 1000 = 110 mm 3d = 3 x 220 = 660mm 300 mm c/c Provide 10 mm bars @ spacing 110 mm c/c distance.

(i)

(ii) (iii)

MAIN REINFORCEMENT (longer span)

Spacing : Assume = 8 mm bar ast = d2/4 = x 82/4 = 50.26 mm (i) 50.26/533.36 x 1000 = 94.37 mm Say 100 mm (ii) 3 x d = 3 x 220 = 660mm (iii) 300 mm Provide 8 mm bar at spacing 100mm c/c

TORISONAL REINFORCEMENT : Assume 6 mm bars ast = d2/4 = 28.27 mm2 size of main = lx/5 = 8300/5 =1660mm Ast of mid span = Astx = x 392.7 = 294.52 mm2 Nos of bars = Ast mid /ast = 294.52/28.27 Provide 6 mm at 4 corners = 11 Nos CURTAILMENT : Alternate bars of middle strip are curtailed at distance of 0.1l

CHECK FOR SHEAR : Nominal shear force Vu = fdxLeff = 15 x 8.2 = 61.5 KN

Nominal shear force c = 0.2552 ( refer IS code 456 2000 , p.no 84) K=1 Kc = 1 x 0.2552 = 0.2552.

v < kc 0.119< 0.255 safe in the shear) CHECK FOR DEFLECTION : drovid = Eff.span / BV x MF % of steel = Ast/bd x 100 = 392.7 /1000 x 220 x 100 = 0.1785 % fs = 0.58 x fy = 0.58 x 415 = 240.7 M.F = 1.6 d provide = span/BV x MF =6100/32 x 1.6 = 119.14 d req < d provid 120< 220 ( Deflection is safe )

DESIGN OF SIMPLY SUPPORTED BEAM Leff=10.2m Impose load=15KN/M B=230mm deff=300mm fy=415n/mm2 fck=20n/mm2 Design constant Q=2.76 %Ast=0.957

EFFECTIVE DEPTH d=l/12=10200/12 d=850mm assume 20mm dia OVERALL DEPTH D=850+25+20/2 =885mm FACTORD LOAD Self weight of beam=b x D x 25 =0.23x 0.885x 25 =5KN/M Impose load = 15KN/M Total load Factord load =25 x 1.5 Fd=37.5KN/M FACTORD MOMENT Mu=( Fd xleff^2)/8= (37.5 10.2^2)/8 =15+5=25 KN/M

Mu=487.68 10^6 N.mm

TYPE OF SECTION Mu lim=Qu b d^2=2.76 230850^2 Mu lim=458.6510^6 N.mm Mu lim >Mu Hence under reinforced section REINFORECEMENT Mu=0.87 fy Ast (d-fy Ast/fckb) 487.6810^6=0.87415Ast x 850 (1-415Ast/20230 x 850) 32.57 AST2-306.89X 103AST+487.68X 106=0 Ast=2023mm2 NO of BARS ast=20^2/4 =314.16 mm2 Nos=2023/314.16 =7 nos Ast pro=ast x nos=314.167 =2200 mm2 Provide 6 nos of 20mm dia bars MINIMUM REINFORCEMENT Astmin=0.85bd/Fy =0.85 x 230 x 850/415 Astmin=400mm2 Ast For hanger bar=20% of Ast =20/100 x2200 =440mm^2 Ast negative reinforcement of top of the support 35% of Ast

=35/100 X 2200 =770 CURTAILMENT 0.08 XLEFT=0.08 X 10200 =816mm of the bars are to be curtailed at 130 mm from the face of support CHECK FOR SHEAR Fs=0.85FyAstreq/Ast pro =0.85 x 415 x 2023/2200 Fs=325 %Ast=Ast/bd x100 = 7x/4x20^2/230x850 x100 %Ast=1.125 Modification factor1 Req.Eff depth = Eff span /BV X MF =10200/20 x 1 =510mm 850>510mm , safe

DESIGN OF SUNSHADE Effective projection=0.6m Impose load=0.75N/mm^2 DESIGN CONSTANT Qu=2.76 BV=7 MF=1.5 EFFECTIVE DEPTH D=span/BV X MF =600/7 X 1.5 =60MM Assume the dia of main bar 8mm Clear cover is 15mm D=60+15+8/2 =79MM LOADING Consider 1m width of sunshade Impose load=1 x 0.6 x 0.75 =0.45 KN S.wt of beam=1 x 0.6 x 0.079 x 25 =1.185 KN Total load=1.635 KN Factored load=1.635 x 1.5 =2.4523 KN

FACTORED MOMENT Mu=Fd x Leff/2=2.4523 x 0.6/2 =0.736 KN.M Mu=0.736 x 10^6 n.mm DEPTH REQUIRED d=0.736 x 10^6/2.76 x 1000 =16.32 say 20mm dreq<deff Assume clear cover 15mm and 6mm dia D=20+15+6/2 =38mm Adopted greater value D=79mm d=60mm For further design TYPE OF SECTION Mulim=Qu x b d^2 =2.76 x 1000 x 60^2 Mulim=9.936 x 10^6N.mm Mulim>Mu It is u.r.s MAIN REINFORCEMENT Mu=0.87 Fy Ast (d-Fy Ast/Fck b) 7.49Ast^2-21.66 x 10^3Ast+0.736 x 10^6=0 Ast=34.39 mm^2 SPACING I)s=ast/Ast x b

= x 6^2/4/34.39 x 1000 S=820mm c/c ii)s=3d=3 x 60=180mm iii)300mm Provide 6mm dia @180mm c/c DISTRIBUTORS Astmin=0.12/100 x 1000 x 79 =94.8 mm^2 SPACING I)s=ast/Ast x b = x 6^2/4/94.8x 1000 S=295mm c/c ii)s=5d=5 x 60=300mm iii)450 mm Provide 6mm dia @295mm c/c CHECK FOR SHEAR Vu=W x l/2=2.45 x 0.6/2 Vu=0.735 x 10^3 N v=Vu/bd=0.735 x 10^3/1000 x 60 v=0.01 N/mm^2 %Ast=100 x Ast/bd=100 x 34.39/1000 x 60 %Ast=0.05% c=0.28 N/mm^2 K=1.3 Kc=1.3 x 0.28=0.364 N/mm^2

cmax/2=2.8/2=1.4 n/mm^2 v<Kc<cmax/2 Shear is safe DEVELOPMENT LENTH Ld=0.87 Fy d/4 bd=0.87 x 415 x 6/4 x 1.2 Ld=450mm CHECK FOR DEFLECTION Stiffness requirement need not be checked for sunshade

DESIGN OF LINTEL BEAM Leff=1.8m B=230mm D=150mm fy=415N/mm2 fck=20N/mm2 Design constant Q=2.76 FACTORD LOAD Self weight of beam=b x D x 25 =0.23x 0.15x 25 =0.86KN/M Impose load=1.8 x 0.23 x 1=0.414KN/M Sunshade load=1.635 KN/M Total load =0.86+0.414+1.635=1.27 KN/M %Ast=0.957

Factord load = 2.9x 1.5 Fd=4.36KN/M FACTORD MOMENT Mu=( Fd xleff^2)/8= (4.36 1.8^2)/8 Mu=1.76KNM MU=1.76 10^6 N.mm

TYPE OF SECTION Mu lim=Qu b d2=2.7 x 6 2301152 Mu lim=8.3910^6 N.mm (150-25-20/2=115)

Mu lim >Mu Hence under reinforced section REINFORECEMENT Mu=0.87 fy Ast (d-fy Ast/fckb) 1.7610^6=0.87415Ast(115-415Ast/20230) 32.57 AST2 41.52 X 103AST+1.76 X 106=0 Ast=43.9mm2 NO of BARS ast=20^2/4 =314.16 mm2 Nos=43.9/314.16 =2 nos Ast pro=ast x nos=314.162 =628.32 mm2 Provide 2 nos of 20mm dia bars MINIMUM REINFORCEMENT Astmin=0.85bd/Fy =0.85 x 230 X 115/415 Astmin=54.17mm2 Ast For hanger bar=20% of Ast =20/100 x 628.32 =125.66mm^2 Ast negative reinforcement of top of the support 35% of Ast =35/100 X 628.32 =219.91mm^2 These bars provided 0.25 =0.25 x 1800 =450mm

CURTAILMENT 0.08 XLEFT=0.08 X 1800 =144mm from the face of support CHECK FOR SHEAR Vu= Fdleff/2 =4.36 x 1.800/2 =3.92KN Nominal shear stress v =3.92x 103/230 x 115 v =0.14N/mm2 AST at support=Astpr/2=628.32/2 =317.16 mm2 % Ast = 100Ast/bd
=

100 x 317.16/230 x 115

=1.2%

c =0.42 N/mm2 v< c safe in shear

DESIGN SIMPLY SUPPORTED PLINTH BEAM

Leff=10.2m B=230mm deff=300mm fy=415n/mm2 fck=20n/mm2 Design constant Q=2.76 %Ast=0.957

EFFECTIVE DEPTH d=l/10=10200/12 d=850mm assume 20mm dia bar OVERALL DEPTH D=850+25+20/2 =885 FACTORD LOAD Self weight of beam=b x D x 25 =0.23x 0.885x 25 =5 KN/M Self weight of wall = 0.23x3.048x19=13.4 Total load Factord load =18.4 x 1.5 Fd=27.5KN/M FACTORD MOMENT Mu=( Fd xleff^2)/8= (27.5 10.2^2)/8 =13.4+5=18.4 KN/M

Mu=357.63 kN.m

TYPE OF SECTION Mu lim=Qu b d^2=2.76 230850^2 Mu lim=458.610^6 N.mm Mu lim >Mu Hence under reinforced section REINFORECEMENT Mu=0.87 fy Ast (d-fy Ast/fckb) 353.6x10^6=0.87415Astx850( 1-415Ast/20850x230) 32.57AST2-306.9X 103AST+353.6 x 10 ^6=0 Ast=1343.82mm2 NO of BARS ast=20^2/4 =314.16 mm2 Nos=1343.82/314.16 = 4.27 say 6 nos Ast pro=ast x nos=314.166 =1885mm2 Provide 6 nos of 20mm dia bars MINIMUM REINFORCEMENT Astmin=0.85bd/Fy =0.85 x 850 x 230/415 Astmin=400mm2 Ast For hanger bar=20% of Ast =20/100 x 1885 =377 mm^2 Ast negative reinforcement of top of the support 35% of Ast

=35/100 X 1885 =660 mm^2 These bars provided 0.25

CURTAILMENT 0.08 XLEFT=0.08 X 10200 =816mm of the bars are to be curtailed at 130 mm from the face of support CHECK FOR SHEAR Fs=0.85FyAstreq/Ast pro =0.85 x 415 x 1343.82/1885 Fs=250 %Ast=Ast/bd x100 = 6x/4x20^2/230x850 x100 %Ast=0.989 say 1% Modification factor=1 Req.Eff depth = Eff span /BV X MF =10200/20 x 1 =510mm 850 mm > 510mm Hence it is safe..

DESIGN OF RECTANGULAR COLUMN Fck=20N/mm^2 Fy=415N/mm^2 LOAD CALCULATION Self weight of column (1x0.23x3.048 x 25) TOTAL load for beam TOTAL PLINTH LOAD =17.4KN =37.5KN =25.7 KN

Parapet load = 0.23 x 0.6x19=2.6KN

Total load

P=83.2KN

DESING LOAD Pu= 83.2x 1.5=125KN

SIZE OF COLUMN Pu=0.4 fck Ac + 0.67 fy Asc 125000=0.4 x20 x 0.99Ag + 0.67 x415 x 0.001 Ag =7.92 Ag + 2.7805 Ag =10.7005 Ag Ag=125000/10.7005=11681.7mm2 Since it is rectangular column Size of the column=sqrt of Ag = bxD (since D=1.5b) =1.5b2 11681.7=1.5 b2

b=sqrt of 11681.7/1.5=88.2 say 90mm D=1.5x 90=135mm Actual Ag= 90x135=12150mm2 Let us Assume 1% of steeL Asc= 0.01 Ag Ac= 0.99 Ag Longitudinal Reinfocement Asc=0.01Ag =0.01 x 12150=1215mm^2 Ac=0.99 Ag Ac=0.99 x 12150=12028.5mm2 Pu=0.4 fck Ac + 0.67 fy Asc 125000=0.4 x20 x (Ag-Asc) + 0.67 x415 x Asc 125000=8Ag-8Asc+278.05Asc Asc=(125000-(8x12150)/270.08) Asc=103mm2 % Asc = Asc/Ag x 100 =103/12150 x100 =0.8% COVER Cover=40mm Clear cover=40mm Dia=16mm Spacing S=(135-(40+40+16/2+16/2))/2 S=19.5 SAY 20mm Hence ok

DESIGN OF LATERAL TIES Diameter 1/4dia=1/4 x 16=6mm Nod less than 5mm Pitch LLD=300MM 16X 16=256MM say 250mm 300MM Provide 16mm dia bars of laterals@ 250mmc/c

DESIGN OF ISOLATED FOOTING Size of column=90 x 135mm Column load=125 KN Safe bearing capacity=150KN/M^2 Use M20&Fe415 SIZE OF FOOTING Design load=125 x 1.5=187.5 KN Assume the self wt of footing as10%of the column load W1=10/100 x 187.5 =18.75KN Total load on soil=p+w1=206.25 KN Aera of footingrequired=w1+p/sbc 206.25/150 =1.35m^2 Since it is a rectangular column The size of rectangular footing having the side ratio of 1.5 B x d=1.35 m^2 D=1.5 B B X 1.5B=1.35M^2 1.5B^2=1.35= B^2=1.35/1.5 B=0.95m Area of footing=0.95 x 1.42=1.35 m^2 NET UPWARD DESIGN PRESSURE Fo=206.25 x1.5/1.35 =226.4 Kn/m^2

PROGECTION OF FOOTING In long direction=1420-135/2=1285mm Short direction=950-90/2=860mm FACTORD MOMENT Maximum factord moment occurs on the face of column for design purpose consider over hang on both sides Long direction Mu1=226.4 x 1.420 x 1.285 x 1.285/2 =265.42knm Short direction Mu2=226.4 x 0.95 x 0.86 x 0.86/2 =79.53knm DEPTH REQUIRED FOR FOOTING dreq=Mumax/Qub = 265.42x 10^6/2.76 x 1000 Dreq=310mm Considering the effect of shear provide an effective depth of 620mm(practically the effective depth of 310mm may not sufficient to take care of shear, hence let us increase the depth two times) d=620mm Provide 50mm as effective cover D=620+50 D =670mm TENSION REINFOTCEMENT Mu1=0.87 FyAst (d-FyAst/Fckb) 5.28Ast^2-223.85 x 10^3Ast+265.42 x 10^6=0

Mu1=1220 mm^2 asc=x 16^2/4=201.06mm^2 NOS=Ast/asc=1223/201.06 =7nos Astprov=7 x 201.06=1408 mm^2 IN SHOTRED DIRECTION Mu2=0.87 FyAst (d-FyAst/Fckb) 7.89Ast^2-223.85 x 10^3Ast+79.53 x 10^6=0 Ast2=359.85 mm^2 asc=201.06mm^2 NOS=359.85/201.06=1.79nos NOS=2nos Provide 2nos of 16mm dia bars in shorter direction DISTRIBUTOR Short Astmin=0.12/100 bD =0.12/100 x 1420 x 670 Astmin=1141.68mm^2 Longer Astmin=0.12/100 bD =0.12/100 x 950 x 670 Astmin=763.8 mm^2 Area of steel to be provided in the central band of 0.95m width in short direction Ast=(0.95/1.5+1) x 763.8

=290.25mm^2 Remainder of steel to be provided in edge bond =763.8-290.25/2 =473.55 mm^2 edge bond EDEG asc= x 12^2/4=113.10mm^2 NOS=290.25/113.10=2.56 say 3nos CENTRAL REMAINTER Asc= x 16^2/4=201.06mm^2 NOS=473.55/201.06=3nos Astprov=3 x 113.10+(3 x 201.06) =942.48 mm^2 CHECK FOR DEVELOPMENT LENTH Ld=0.87 Fy /4bd=0.87 x 415 x 16/4 x 1.2 Ld=1203.5mm Length of bars beyond the face of column in long direction 1285-50=1235>1203.5 Short direction 860-50=810< 1203.5 It is found in sufficient Hooks are provided CHECK FOR SHEAR i)Long direction Vu=226.4 x 1.42 x 0.665 =213.78kn

v=Vu/bd=213.78x 10^3/1420 x 620 v=0.24 N/mm^2 PERMISSIBLE SHEAR STRSS D=670mm K=1 %Ast=100Ast/bd=100 x 1408/1420 x 620 =0.15% c=0.28 N/mm^2 KC=1 X 0.28=0.28N/mm^2 v<cK Shear is safe ii)shorter direction Vu=226.4 x 0.95 x 0.24 =51.62kn v=Vu/bd=51.62x 10^3/950 x 620 v=0.08 N/mm^2 PERMISSIBLE SHEAR STRSS K=1 %Ast=100Ast/bd=100 x 339.29/950 x 620 =0.05% c=0.28 N/mm^2 KC=1 X 0.28=0.23N/mm^2 v<cK Shear is safe CHECK FOR PUNCING SHEAR The critical section for puncing shear is at a distance of d/2=620/2=310mm

From the face of column around Side of section=(135+310+310) x (90+310+310) =755 x 710 PUNCING SHEAR ACROSS SECTION V=226.4 X (1.42 X 0.95 -0.755 X 0.71) V=184 X 10^3 NOMINAL SHEAR STRESS v=184 x 10^3/755+710 x 620 =0.2N/mm^2 PERMISSIBLE SHEAR STRESS IN CONCRETE c=Kc B=90/135=0.65 K=0.29+0.65=0.94 LIMITED FOR 1 c=0.2520 c= 1.12 N/mm^2 Kc=0.94 X 1.12=1.052 N/mm^2 v<Kc safe Check for bearing stress Size of the base of frotum of pyramid=(90+4 x 620)x(135+4 x 620) Size=2570mm x 2615mm But limited=2300 x 2615mm Supporting area A1=2300 x 2615=4.97 m^2 Hoacled area 2=0.090 x 0.135=0.012m^2 4.97/0.012=20.22 but restricted to 2 Permissible bearing stress=0.45 x 20 x 2

=18 N/mm^2 Actual bearing stress=185.25/(0.090 x 0.135) =15246.9 KN/m^2 15.24 N/MM^2<18 HENCE SAFE CHECK FOR SBC OF SOIL Column load=123.5KN Weight of footing=1.42x0.95x0.67 x 25=22.59KN Total load on soil=146.09KN Pressure on soil=146.09/1.42x0.95=99.13KN/m^2 108.299<150Kn/m^2 Hence safe

PREPARATION OF DATA CEMENT MORTER 1:2 MIX/CUM DESCRIPTION CEMENT SAND MIX CHARGE

SUB DATA

QUANTITY/unit 720 KG 1 m3 1 m3

RATE 4.7 360 30 rate for

PER KG m3 1m3 1m3

AMOUNT 3384 360 30 3774

CEMENT MORTOR 1:3 MIX/CUM QUANTITY 480 1 1 DESCRIPTION CEMENT SAND MIX CHARGE RATE 4.7 360 30 rate for PER KG m3 1m3 1m3

KG m3 m3

2256 360 30 2646

CEMENT MORTER 1:4 MIX/CUM QUANTITY 360 1 1 DESCRIPTION CEMENT SAND MIX CHARGE RATE 4.7 360 30 rate for PER KG m3 1m3 1m3

KG m3 m3

1692 360 30 2082

CEMENT MORTER 1:5 MIX/CUM QUANTITY 288 1 1 DESCRIPTION CEMENT SAND MIX CHARGE RATE 4.7 360 30 rate for PER KG m3 1m3 1m3

KG m3 m3

1354 360 30 1743.6

SL N O

ITEM

NO

DIMENSION L (M) B(M)

QTY D(M)

TOTAL QTY

EARTH WORK 1 EXCAVATION COLOUMN C1 2 P.C.C 1:4:6 COLUMN C1 R.C.C 1:1/2:3 IN 3 FOOTING AND PLINTH BEAM COLUMN FOOTING C1 LEVEL BASE

20

0.95

1.42

80.94 80.94

20

0.95

1.42

0.435

11.7363 11.7363

20

0.09

0.135

0.435

0.105705

COLUMN C1 PLINTH BEAM1 PLINTH BEAM2 PLINTH BEAM3 BEAM 1 BEAM 2 BEAM 3 4 I CLASS BRICK WORK IN C.M 1:6 IN BASEMENT

20 1 6 6 1 6 6

0.09 66.84 5 4 66.84 5 4

0.135 0.59 0.59 0.59 0.59 0.59 0.59

0.135 0.885 0.885 0.885 0.885 0.885 0.885

0.032805 34.900506 15.6645 1.1025 1.6875 15.6645 12.5316

81.68962

1 6 6

66.84 5 4

0.45 0.45 0.45

0.45 0.45 0.45

13.5351 6.075 4.86 55.566

5 FLOORING CONCRETE C.C 1:1/2:3 130MM ALL ROOMS 6 MOSIC FLOOR FINISH 20MM TK ALL ROOM 7 I CLASS BRICK WORK

18.15

14.92

0.13

35.20374 35.20374

18.15

14.92

270.798 270.798

IN C.M 1:6 MAIN WALL FOR ALL ROOMS (LONG) (SHORT) WALL1 WALL2

2 2 6 6

18.15 14.92 5 4

0.23 0.23 0.23 0.23

4.023 3.048 3.048 3.048

33.588027 20.919034 21.0312 16.82496 92.36322

DEDUCTION
DOOR D1 VENTILATORS WINDOW W1 OPENING O BEAM 1 BEAM 2 BEAM 3 COLUMN 8 SAND FILLING IN BASEMENT ALL ROOMS 9 R.C.C 1:1/2:3 BEAMS ROOF BEAM B1 LINTEL BEAM L1 COLUMN C1 10 R.C.C 1:1/2:3 FOR ROOF SLAB ALL ROOMS 11 R.C.C SUNSHADE 1:1/2:3,600MM WIDE 79MM THICK WINDOW W1 WEATHERING 12 COURSE IN BRICK JELLY LIME CONCREATE 13 CEILING PLASTERING 8 2 13 1 1 6 6 20 1.5 0.5 1.5 1.5 66.84 5 4 0.09 0.23 0.23 0.23 0.23 0.59 0.59 0.59 0.135 2 0.5 1.2 1 0.885 0.885 0.885 0.135 5.52 0.115 5.382 0.345 34.900506 15.6645 12.5316 0.032805

74.49141 17.87181

18.15

14.92

0.3

81.2394 81.2394

13 13 20

75.84 1.8 4.023

0.59 0.23 0.09

0.885 0.15 0.135

514.79813 0.8073 0.977589 516.583

18.15

14.92

0.15

40.6197

13

1.8

0.6

0.079

1.10916 1.10916

18.15

14.92

0.075

20.30985 20.30985

C.M 1:3 ALL ROOMS

18.15

14.92

270.798 270.798 270.798

14 PLASTERING WITH C.M 1:4, 12MM THICK INNER SIDE WALL LONG WALL SHORT WALL INTERIOR LONG WALL SHORT WALL PARAPET TOP LONGER SIDE SHORT SIDE OUTTER SIDE

2 2 6 6

18.15 14.92 5 4

4.023 4.023 3.048 3.048

1 1 1 1

146.0349 120.04632 91.44 73.152

2 2 2 2

18.15 14.92 18.15 14.92 3.758

0.83 0.83 3.678 3.678 0.679

1 1 1 1 1

30.129 24.7672 133.5114 109.75152 33.171866 762.0042

SUNSHADE WINDOW W1 DEDUCTION DOOR D1 VENTILATORS WINDOW W1 OPENING O

13

8 2 13 1

1.5 0.5 1.5 1.5

0.23 0.23 0.23 0.23

2 0.5 1.2 1

5.52 0.115 5.382 0.345 11.017 750.9872

PAINTING OF DOORS AND WINDOWS TWO COATS OVER ONE 15 COAT OF PRIMING DOOR D1 WINDOW W1

8 13

1.5 1.5

1 1

2 1.2

24 23.4 47.4

16 WHITE WASH STEEL 17 REINFORCEMENT

AS PER PLASTERING INCLUDING CEILING

1021.785

WORK FOOTING (40KG) COLUMN(120KG) BEAM&LINTEL(80KG) SUNSHADE(40KG) ADD 5% WASTAGE CENTRING FOR R.C.C 18 WORK FOOTING ISOLATED FOOTING COLUMN COLUMN C1 ROOF SLAB ALL ROOM LINTEL L1 ROOF BEAM BEAM SUNSHADE WINDOW 1 40.9 13.82 47.76 1.29 40 120 80 40

1 1 1

1 1 1

1657.92 3821.04 51.6 500 6030.56

20 20 1 13 13 13

1.42 0.135 18.15 1.8 75.84 1.8

1 0.09 14.92 1 1 1

0.95 6.043 0.25 0.15 0.885 0.079

3.22 84.602 0.25 0.3 6.825 1.027 96.224

1)EARTH WORK EXCAVATING AND DEPOSITING ON BANK INTIAL LEAD 10m & MAIN DATA INTIAL LIFT OF 2m IN SAND , SILT OR OTHER LOOSE SOIL , WET SAND

OR SILT NOT UNDER WATER LIGHT BLACK COTTON SOIL , SANDY LOAM AND ORDINARY SOIL INCLUDING EXCAVATED EARTH SS.20.B AS PER SL.NO.50 42 2)CEMENT 1:5:10 MIX USING 40mm iss HBG METAL FOR FOUNDATION INCLUDING COST AND CONVEYENCE OF ALL MATERIAL TO SITE AND LABOUR CHARGE FOR CURING ETC, COMPLETE QUANTITY DESCRIPTION RATE 9 m3 40mm stone 560 4.5 m3 CEMENT MORTAR 1:5 1743.6 1.8 nos MASON II CLASS 175 17.7 nos MASZDOOR I CLASS 123 14.1 nos MASZDOOR IICLASS 111 RATE/10m3 RATE/10m3 3) FILLING IN BASEMENT WITH EXCAVATED EARTH OTHER THAN SAND CONSOLIDATION AND LAYERS NOT MORE THAN 15CM THICK.INCHANGING COMPACTION CHARGES ETC.COMPLYING WITH STANDARD SPECIFICATION. AS PER SL.NO.85 4) RANDOM RUBBLE MASONARY IN CEMENT MORTER 1:5 MIX QUANTITY DESCRIPTION 10 m3 ROUGH STONE 1 m3 BOAND STONE 3.4 m3 CEMENT MORTER 1:5 7.1 nos MASON I CLASS 21*2=44

PER m3 m3 nos nos nos

AMOUNT 5040 7846.2 315 2177.1 1565.1 16943.4 10150.74

RS

80

/m3

RATE 262 360 1743.6 175

PER m3 m3 m3 nos

AMOUNT 2620 360 5928.24 1242.5 10150.74

5) MOSIC FLOORING USING HYDRAULIC PRESSED MOSIC TILES 200mm x 200mm x 20mm size with CEMENT MORTER 1:3,20mm THICK AND POINTING WITH THE SAME COLOUR CEMENT INCLUDINGPOLISHING 10m3

QUANTITY 250 0.21 22 1.1 1.1 2.2 2.2 1.6 0.5 1.1 1.1 2.2

m3 kg nos nos nos nos nos nos nos nos nos

DESCRIPTION MOSIC TILES 200mm x 200mm x 20mm CEMENT MORTER 1:3 COLOUR CEMENT LABOUR FOR PAVING TILES: MASON I CLASS MASON IICLASS MASZDOOR I CLASS MASZDOOR II CLASS LABOUR FOR POINTING MASON IICLASS MASZDOOR I CLASS MASZDOOR II CLASS LABOUR FOR POLISHING POLISHER MASZDOOR II CLASS RATE FOR 10 M2

RATE 7.03 2646 22 195 175 123 111 175 123 111 151 111

PER 1nos m3 kg nos nos nos nos nos nos nos nos nos

AMOUNT 1757.5 555.66 484 0 214.5 192.5 270.6 244.2 0 280 61.5 122.1 0 166.1 244.2 4592.86

6)weathering coarse brick jelly with SLAKED LIME QUANTITY 1.8 5 1.8 17.7 14.1 DESCRIPTION BRICK JELLY 20mm SLAKED LIME MASON ICLASS MASZDOOR I CLASS MASZDOOR II CLASS RATE FOR 10 M3 RATE 335 890 195 123 111 PER m3 m3 nos nos nos AMOUNT 603 4450 351 2177.1 1565.1 9146.2

m3 m3 nos nos nos

7)BRICK WORK IN C.M1:5 MIX USING NEW GOOD QUALITY BRICKS INCLUDING COST AND CONVEYENCE OF ALL MATERIAL TO SITE AND LABOUR CHARGE FOR CURING ETC, COMPLETE QUANTITY 1700 DESCRIPTION COUNTRY BRICKS RATE 1830 PER AMOUNT 1000nos 3111000

nos

0.793 1 2 2 4

m3 nos nos nos nos

CEMENT MORTER 1:5 MASON I CLASS MASON IICLASS MASZDOOR I CLASS MASZDOOR II CLASS RATE FOR 1 M3

1743.6 195 175 123 111

m3 nos nos nos nos

1382.6748 195 350 246 444 3113618

8) PCC 1:2:4 MIX USING 20mmISS CRUSHER METAL OF SIZE INCLUDING COST AND CONVEYENCE OF ALL MATERIAL TO SITE AND LABOUR CHARGE FOR CURING ETC, COMPLETE QUANTITY 9 4.5 1.8 17.7 14.1 DESCRIPTION 20mm ISS METAL CEMENT MORTER 1:2 MASON IICLASS MASZDOOR I CLASS MASZDOOR II CLASS RATE FOR 1 M3 9) POINTING WITH C.M 1:3-10M2 QUANTITY 0.04 0.0384 2.2 0.5 1.1 DESCRIPTION CEMENT MORTER 1:3 WATER PROOFING COMPOUND MASON IICLASS MASZDOOR I CLASS MASZDOOR II CLASS RATE FOR 10 M2 RATE 2646 35 175 123 111 PER m3 kg nos nos nos AMOUNT 105.84 1.344 385 61.5 122.1 675.784 RATE 780 3774 175 123 111 PER m3 m3 nos nos nos AMOUNT 7020 16983 315 2177.1 1565.1 28060.2

m3 m3 nos nos nos

m3

nos nos nos

10)CELING PLASTERING 1:3 20mm QUANTITY 0.22 m3 2.112 kg 2.2 nos

DESCRIPTION CEMENT MORTER 1:3 WATER PROOFING COMPOUND MASON ICLASS

RATE 2646 35 195

PER m3 nos

AMOUNT 582.12 73.92 429

0.5 3.2

nos nos

MASZDOOR I CLASS MASZDOOR II CLASS RATE FOR 10 M2

123 111

nos nos

61.5 355.2 1501.74

11) R.C.C. CEMENT CONCREATE 1:1 1/2:3 MIX USING CRUSHER METAL OF SIZE ] INCLUDING COST AND CONVEYENCE OF ALL MATERIAL TO SITE AND LABOUR CHARGE FOR CURING ETC, COMPLETE QUANTITY 9 3231 4.5 3.5 21.2 35.3 DESCRIPTION 20mm ISS METAL CEMENT SAND MASON IICLASS MASZDOOR I CLASS MASZDOOR II CLASS RATE FOR 10 M3 RATE 780 4.7 360 175 123 111 PER m3 kg m3 nos nos nos AMOUNT 7020 15185.7 1620 612.5 2607.6 3918.3 30964.1

m3 kg m3 nos nos nos

12) SUPPLING AND FABRICATION OF STEEL FOR US AS REINFORCEMENT INCLUDING COST AND CONVEYENCE OF ALL MATERIAL TO SITE AND LABOUR CHARGE FOR CURING ETC, COMPLETE QUANTITY 0.1 1 3.5 DESCRIPTION STEEL BINDING FITTER I CLASS RATE / MT RATE 36000 38.5 172 PER M.T kg nos AMOUNT 3600 38.5 602 4240.5

M.T kg nos

13)WALL PLASTERING WITH CEMENT MORTER 1:5 MIX TO 12mm THICK. INCLUDING COST AND CONVEYENCE OF ALL MATERIAL TO SITE AND LABOUR CHARGE FOR CURING ETC, COMPLETE QUANTITY DESCRIPTION RATE PER AMOUNT

0.14 1.1 0.5 1.1

m3 nos nos nos

CEMENT MORTER 1:5 MASON ICLASS MASZDOOR I CLASS MASZDOOR II CLASS RATE FOR 1/sqm

1743.6 195 123 111

m3 nos nos nos

244.104 214.5 61.5 122.1 642.204

14)PLASTERING WITH CEMENT MORTER 1:5 MIX TO 10mm THICK. INCLUDING COST AND CONVEYENCE OF ALL MATERIAL TO SITE AND LABOUR CHARGE FOR CURING ETC, COMPLETE QUANTITY 0.1 1.1 1.1 1.1 DESCRIPTION CEMENT MORTER 1:3 MASON IICLASS MASZDOOR I CLASS MASZDOOR II CLASS RATE FOR 10/sqm RATE FOR 1/sqm RATE 2646 175 123 111 PER m3 nos nos nos AMOUNT 264.6 192.5 135.3 122.1 714.5

m3 nos nos nos

15)WHITE WASHING TWO COATS WITH GOOD QUALITY OF SHELL LIME INCLUDING COST AND CONVEYENCE OF ALL MATERIAL TO SITE COMPLETE QUANTITY 0.7 1.6 0.5 2.7 DESCRIPTION SHELL LIME MASON IICLASS MASZDOOR I CLASS MASZDOOR II CLASS RATE FOR 100/sqm RATE FOR 1/sqm RATE 890 175 123 111 PER M3 nos nos nos AMOUNT 623 280 61.5 299.7 1264.2 12.642

m3 nos nos nos

16)PAINTING TWO COATS OVER STEEL DOOR AND WINDOW INCLUDING COST AND CONVEYENCE OF ALL MATERIAL TO SITE COMPLETE QUANTITY DESCRIPTION RATE 2.2 LITER COST OF PAINT 160

PER LITER

AMOUNT

1.1

nos

PAINTER I CLASS

157

nos 317 31.7

SL.NO 1

QUANTITY 80.94

ABSTRACT ESTIMATE DESCRIPTION EARTH EXCAVATION FOR FOUNDATION FOOTING

RATE 42

PER M3

AMOUNT 3399.48

2 3 4 5 6 7

11.7363 81.2394 35.20374 74.491411

96.224 8

750.987206 9 270.798 10 20.30985 11 270.798 12 13 14 15 16 6030.56 LS LS LS LS 47.4

P.C.C 1:4:8 FOUNDATION USING 40mm BROKEN STONE SAND FILLING FOR BASEMENT WITH RIVER SAND FLOORING CONGRETE 1:5:10 MIX USING 40mm METALS BRICK WORK C.M 1:5 USING I CLASS BRICK FOR SUPER STRUCTURE CENTRING FOR ALL R.C.C WORK R.C.C WORK1:1 (1/2):3FOR SLAB,ROOF BEAM,LINTEL, SUNSHADE,GRADE BEAM, COLUMN AND FOORING PLASTERING FOR WALL C.M 1:4 AND 12mm THICK CELING PLASTERING C.M 1:3 18mm THICK WEATHERING COARSE IN BRICK BATS IN LIME CONCRETE 1:5 MIX MOSIC TILE OVER WEATHERING COARSE 200 X 200 X 20mm

28060.2 80 10150.74

M3 M3 M3

329322.93 6499.152 357344.01 231937774

3113617.67 M3

30964.1

M3

2979489.6

642.204

M2

482286.99

1501.74

M2

406668.19

9146.2

M2

185757.95

4592.86

M2

1243737.3

1021.785206 WHITE WASHING TWO COATS PAINTING DOORS AND WINDOW WITH THE COATS STEEL IN R.C.C WORKED PROVISION FOR ELECTRIFICATION 75% WATER SUPPLY ARRANGEMENT 75% SANITARY ARRANGEMENT 75% PROVISION FOR BOREWELL TOTAL AMOUNT

12.642 31.7

M2

12917.409 1502.58

4240.5 10000 10000 10000 10000

25572590 10000 10000 10000 10000 263559289

NOTATIONS

NOTATIONS
The following letter symbols have the meaning indicated against each Which is used in this project book?

B D D FCK Fy K Lex Ley SV V Vu W Wu cbc max BV Mf

= = = = = = = = = = = = = = = = =

Breadth of the beam or slab. Overall depth of beam or slab. Effective depth of beam or slab. Characteristicstrength of the concrete. Characteristicstrength of the steel. Constant of co-efficient of factor. Effective length of shorter side of slab. Effective length of longer side of slab. Spacing of stirrups. Shear force. Design Shear force. total load. Factored load. Compressive bending stress in concrete. Maximum shear stress in concrete with shear. Basicvalue. Modification factor.

FU Le Ast Asc ACC ASV F.F.L D.L C.C C.M R.C.C P L M.R C/C S.F M MBM C.C W.S N.C

= = = = = = = = = = = = = = = = = = = = =

Factoredliveload. Effective length. Area of tension steel Area of compression steel Area of concrete Total cross sectional area of stripes Floor finish load Dead load Cement concrete Cement mortar Reinforced cement concrete Axial load clear span Moment of resistance Center to center distance Shear force Modular ratio Maximum bending moment Clear cover Width of support Nominal cover

v c max c QU Ag Astreq Astprov # SC Ss

= = = = = = = = = =

Actual shear stress Maximum shear stress Permissible shear stress Moment of resistance co-efficient Gross sectional area of column Area of tension steel required Area of tension steel provided Diameter of bars Stress in concrete Stress in steel

DRAWING DETAILS

BIBLIOGRAPHY

BIBLIOGRAPHY

The following books are referred for the design purpose for completion of our project work. TEXT BOOKS: Structural engineering Quantity surveying Structural drawing Estimate and costing Principles of architecture A.P.ARULMANIKAM N.MURALIKRRISHNAIYA MURUGESAN B.N.DUTTA G.MUTHU, SHOBA, MOHAN

CODE BOOKS: Concrete code Steel code IS 456 2000 IS 800:2007

CONCLUSION
Through our project we conclude that application of software in civil industry plays important role in our study. In our project POST OFFICE BUILDING we adopt limit state method for analysis and design of our structure. Time taken for doing this project is very less due to the application of the software. We bring extra accuracy in dimension and analysis part thru our project. Hence we conclude that application software in our filed is quite good and comprehensive for further study of structural par meter.