New CC Construction Consultants Co., LTD.: Weekly Report

The weekly report summarizes construction progress at the Technomeiji Factory project. Wall cladding is 80% complete, steel fabrication is complete, and plastering is 95% done. Infrastructure piping is 85% complete. Brick walls for the office area are finished and plastering is 90% done. Fire system pipe installation is 70% complete. The report notes some quality issues and provides recommendations to address cracks in walls and structural connections. It outlines the construction plan for the next week, including additional work on walls, piping, and ground slabs. Equipment and manpower levels are also summarized.

Uploaded by

traisimdo
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views17 pages

New CC Construction Consultants Co., LTD.: Weekly Report

The weekly report summarizes construction progress at the Technomeiji Factory project. Wall cladding is 80% complete, steel fabrication is complete, and plastering is 95% done. Infrastructure piping is 85% complete. Brick walls for the office area are finished and plastering is 90% done. Fire system pipe installation is 70% complete. The report notes some quality issues and provides recommendations to address cracks in walls and structural connections. It outlines the construction plan for the next week, including additional work on walls, piping, and ground slabs. Equipment and manpower levels are also summarized.

Uploaded by

traisimdo
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.

18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

PROJECT: TECHNOMEIJI FACTORY

WEEKLY REPORT
(Week No.xx from xxxx , 2012 xxxx , 2012)
-----------------------------------------------------------------------------------------------------------------

Reported by xxxx Site Manager Sent to: Mr. xxxx xxxx the Emplyer Mr. xxxx xxxx the H/Q CM company Mr. xxxx xxxx- the Contractor

CONTENTS
WORK PROGRESS Work in this week: CONSTRUCTION: Installing wall cladding of factory 80% completed. Fabrication steel structure at work shop 100% completed.. Plastering for factory 95% completed. Infrastructure piping works 85% completed. Brick wall for office area 100% completed. Plastering for office area 90% completed. Brick wall for transformer 70% completed. Crush stone 0x4 for ground floor of factory 100% completed. Crush stone 0x4 for ground floor of factory 5% completed. Putty work for office area 10% completed. M & E: Welding and painting pipe for Fire Fighting 70% completed Installing system pipe Fire Fighting 70% completed Drill hole, installation of hanging rod 50% completed. II. Quality control ID 1 2 3 Task name Concrete Rebar Materials Situation Take concrete sample Take sample for tensile test & bending test Take sample for material testing (sand, stone 1x2, cement, brick) Supervisor inspects all work, every day. Consultants request Remark

Inspection

+ Request the contractor to add more 02 strengthen plate for steel column of factory 01 at the drill holes + Request the contractor to add screw for wall cladding
1/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

2/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

Wall appears some crack

Request the contractor adjust wall purlin, repaint & clean metal sheet of wall before installing wall cladding

3/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

Request the contractor repair bracing beam on the top of the rolling door grid X5-X6/1Y8

4/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

Request contractor touch up painting and clear for steel structure

5/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

To add some nuts & connection bolt for bracing beam and purlin

6/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

Insulation air bubble is broken

III. Safety and environmental ID STT Task name Situation Schedule Remark

1 2

Safety Cleaning work

No Safety

Inform in Next week

IV. Weather TUE


11 12 1 10 9 8 7 5 2 3 4 10 9 8 7 5

WED
11 12 1 2 3 4 10 9 8

THU
11 12 1 2 3 4 7 5 10 9 8 7

FRI
11 12 1 2 3 4 5 10 9 8

SAT
11 12 1 2 3 4 7 5 10 9 8 7

SUN
11 12 1 2 3 4 5 10 9 8 7

MON
11 12 1 2 3 4 5

xxx Off day

xxx

xxx

xxx xxx MARCH 2012 Rainy chart

xxx Raining

xxx

Note: Red day is non-working day


7/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

Plan of next week Civil works * Factory + Fabrication of steel frame at workshop: 100% + Lower soil and sub-grading / 100% + Plastering for factory / 100% + Infrastructure piping / 100%. + Concrete for man hole bottom / 100%. + Crush stone base course for ground slab of factory 02 / 100% completed. + Installing wall cladding of factory 02 & factory 03 / 80% completed. + Crush stone base course for ground slab of factory 03: 50% completed. * Office + Putty on wall / 100% completed. + Brick wall / 100% completed. + Compacted soil for ground slab / 100% completed. + Plastering for office area / 100% completed. * Transformer + Concrete for roof floor / 100% completed. + Brick wall / 100% completed. * Motor cycle parking + Lower soil & subgrading / 100% completed. + Installing anchor bolt & casting concrete for column / * M&E (cng tc lp t): + Welding and paiting pipe fire fighting/ PCC: 100%. + Installation the pipe for Fire Fighting / 100%. + Drill hole, installing of hanging rod / 100%

Man Power Tue (xx) 1 3 1 1 55 61 Wed (xx) 1 3 1 1 50 56 Thu (xx) 1 3 1 1 65 71 xxx-xxx Fri (xx) 1 3 1 1 65 71 Sat (xx) 1 3 1 1 50 56 Sun (xx) 1 3 1 1 12 18 Mon (xx) 1 3 1 1 60 66

No. 1 2 3 4 6 7

Title Site manager Site Eng. Surveyor Staff Foreman Worker Total

8/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

Equipments: MACHINE AND EQUIPMENT REPORT xxxx xxxx Fri Sat (xx) (xx) 1 1 1 1 1 1 1 1 0 1 1 1 2 3 1 0 14 1 1 0 1 1 1 2 3 1 0 14

No. Title 1 Bulldozer 2 Truck 3 Excavator 4 5 6 7 8 9 10 11 12 13 14 Grader Theodolite Water pump Bar cropper Roller Bending machine Vibrator Road roller Backfill compactor Crane Total

Tue (xx) 1 0 1 1 1 0 1 1 1 2 3 1 0 13

Wed (xx) 1 1 1 1 1 0 1 1 1 2 3 1 0 14

Thu (xx) 1 1 1 1 1 0 1 1 1 2 3 1 0 14

Sun (xx) 1 0 1 1 1 0 1 1 1 2 3 1 0 13

Mon (xx) 1 0 1 1 1 0 1 1 1 2 3 1 0 13

V. Tracking progress: Please see attached work tracking. VI. Others: - Request the contractor to speech up office finishing work -Request the contractor to submit detail connection for purlin grid X3 with office area, the drawing brick wall grid X1/2Y1-2Y3 - Request the contractor to deliver structure frame to site - Construction work at site is very slow, next week plan of the contractor was delayed in particular : plaster for office area, putty work, concrete of ground slab of factory 02, install anchor bolt for bike park, compacting ground slab of office area. -Request the contractor to improve and to overcome to catch schedule. Site pictures

9/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

Brick wall & plastering for office area

Putty work

10/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

Waterproof & cement mortar work of office roof slab

Leveling for ground slab of office area

Installing support of roof frame of forklift way

11/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

Installing wall cladding for factory 02 & factory 03

Compaction crush stone 0x4 for ground slab of the factory 02

12/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

Checking level of stone 0x4 of factory 02

Checking level of ground base of factory 03

Testing field density of factory 02 & factory 03

13/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

Constructing crush stone 0x4 for ground slab of the factory 03

Fabrication structure frame

14/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

Tensile & bending testing of wire mesh

TRANSFORMER

Installing steel bar, formwork for roof floor

Checking slump of concrete

15/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

Casting concrete for roof floor

Getting concrete sample MOTORCYCLE PARKING

Backfilling for foundation

16/17

NEW CC CONSTRUCTION CONSULTANTS Co., Ltd.


18B Road N.02 Lu Gia Resident Area- Dist 11- HCMC Tel: 08-8641262 Email: [email protected] fax: 08-8641258

M&E:

Installing pipe Fire Fighting

17/17