0% found this document useful (0 votes)
51 views1 page

Effect of High Ground Water Table On Bored Cast-In Situ Piling

Bored cast-in-situ piles are often used for structures built on marshy or agricultural lands with high groundwater tables. For piling operations in these conditions, it is important to maintain at least 1.5-2 meters of bentonite above the groundwater level to prevent necking of the pile and reduce extra concrete consumption. While providing the additional bentonite head requires raising the working ground level initially through filling, this additional cost is offset by ensuring better quality piles and material savings.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views1 page

Effect of High Ground Water Table On Bored Cast-In Situ Piling

Bored cast-in-situ piles are often used for structures built on marshy or agricultural lands with high groundwater tables. For piling operations in these conditions, it is important to maintain at least 1.5-2 meters of bentonite above the groundwater level to prevent necking of the pile and reduce extra concrete consumption. While providing the additional bentonite head requires raising the working ground level initially through filling, this additional cost is offset by ensuring better quality piles and material savings.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

EFFECT OF HIGH GROUND WATER TABLE ON BORED CAST-IN SITU PILING

Bored cast-in-situ piles are generally preferred for most of the industrial structures coming up on marshy or agricultural lands where the ground water table is high and top layers of soil offer very low load carrying capacity. Under such conditions, bored cast-in-situ piles enable the loads to be transferred to hard stratum available at greater depths. However, to carry out proper piling either by rotary or percussion method, existing ground water level can have a detrimental effect on piling process if proper precautions are not followed. The most fundamental precaution that is often ignored during piling is to provide adequate bentonite head of at least 1.5-2m above the existing ground water level. Maintaining proper bentonite head during piling operation Avoids necking of pile as the collapse of soils on the sides is prevented Reduces the extra consumption of concrete

Moreover, to provide the additional head the working ground level has to be increased by around 2m using gravelly soils. Such a raise in working platform may reflect additional cost of filling and excavation of soil initially. However, it must be remembered that the cost offsets can be recovered in material savings and by ensuring a much better quality of pile while providing a better working platform devoid of marshy soils.

You might also like