Worksheet 4 1
Worksheet 4 1
xls
1. Historical Maximum-Day Delivery (in MGD): 2. Historical Maximum Annual System Delivery (in MG) 3. Number of Customers on the date of the Maximum-Day: 4. Number of Customer during year of Maximum System Delivery Table 1 -- Demand / Supply Projection Projected Projected System Maximum Day Delivery Capacity (in Projected Annual Demand (in MGD) Supply (in MG) MGD) 0.65 104 0.57 0.65 104 0.59 0.65 104 0.61 0.65 104 0.62 0.65 104 0.63 0.65 104 0.64 0.65 104 0.65 0.65 104 0.65 0.65 104 0.65 0.65 104 0.68
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Notes:
Projected Customer Base 260 270 280 283 291 294 299 300 300 310
Projected Annual Demand (in MG) 93.5 97.1 100.7 101.8 104.7 105.8 107.6 107.9 107.9 111.5
Projected Customer Based should be projected from consultation withCity/County Planning Department Projected System Delivery Capacity is caluculated with largest unit of production equipment out-of-service Projected Annual Supply is actual volume of water physically and legally available to the water system
Million Gallons