0% found this document useful (0 votes)
33 views1 page

The Packing Process With An Example

The document provides an example of packing 120 pieces of material into larger containers for shipping or delivery. It describes: 1) Packing 40 pieces of material into 3 cardboard boxes, with each box containing 40 pieces. 2) Placing the 3 cardboard boxes containing the material into a larger pallet for transport. 3) The steps to create the packing and delivery in the system, including selecting the packaging materials and quantities and generating the shipping units.

Uploaded by

praveennbs
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views1 page

The Packing Process With An Example

The document provides an example of packing 120 pieces of material into larger containers for shipping or delivery. It describes: 1) Packing 40 pieces of material into 3 cardboard boxes, with each box containing 40 pieces. 2) Placing the 3 cardboard boxes containing the material into a larger pallet for transport. 3) The steps to create the packing and delivery in the system, including selecting the packaging materials and quantities and generating the shipping units.

Uploaded by

praveennbs
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

The "Packing Process" with an Example

Example: You created a order for a material(R-1160 - hard disks) for a qty - 120 pieces. You need to create a delivery and A)pack 40 pieces each of the material are grouped together into larger cardboard boxes (PK-100 - shipping/packing material) and B)these 3 cardboard boxes are put into pallet (PK-095). Solution: A)Packing 40 pieces each of material (40 x 3 = 120 pieces) 1)Goto [VL02N] to change the delivery, you already created. Or you can do the following steps while you are creating a delivery also. 2)Go to "pack" icon. 3)In the upper section, enter the "packing material" (PK-100) 4)In the lower section, change the "partial quantity" to 40 of material R-1160. 5)Select both the lines of upper section and lower section and click the green ok. It generates a shipping unit/handling unit number. 6)Now, select both lines of upper & lower section & click the button "per part. qty" (New HU per part qty of material) Check: click "General Overview" icon to see whether it packed 40 pieces of material in 3 cartons. B)Packing all 3 cartons in one big carton(PK-095) 1) from above screen, click "pack HUs" (pack shipping unit) 2)enter the packaging material (PK-095) in the upper section and select this line. 3)select 3 lines of PK-100 in lower section since you want to pack them in PK-095. 4)selecting both lines, click "pack" icon. 5)Now all the 3 cartons(PK-100 with 40 pieces each of material) are packed in one big carton (PK-095). Check: "General overview" icon. Then "save" the delivery.

You might also like