Start End: Company Name Project Lead: Today's Date: Start Date: ##### (Mon)

This document contains a work breakdown structure (WBS) and schedule for a project. It lists over 20 specific tasks related to fabricating parts of a lathe machine, developing error models, taking measurements, and reporting results. Key tasks include fabricating spindle and flexure parts, developing error models for different lathe components, training on measurement equipment, taking measurements of spindle, slide, and carriage errors, creating a report outline and draft, and maintaining design notebooks. Dates are assigned for the start and end of each task, with durations ranging from 7 to 93 days. Progress is tracked through percentage and number of days completed for each task. The project is scheduled from February to January of the following year.

Uploaded by

Murugan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views1 page

Start End: Company Name Project Lead: Today's Date: Start Date: ##### (Mon)

This document contains a work breakdown structure (WBS) and schedule for a project. It lists over 20 specific tasks related to fabricating parts of a lathe machine, developing error models, taking measurements, and reporting results. Key tasks include fabricating spindle and flexure parts, developing error models for different lathe components, training on measurement equipment, taking measurements of spindle, slide, and carriage errors, creating a report outline and draft, and maintaining design notebooks. Dates are assigned for the start and end of each task, with durations ranging from 7 to 93 days. Progress is tracked through percentage and number of days completed for each task. The project is scheduled from February to January of the following year.

Uploaded by

Murugan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

2.

7
Company Name
Project Lead:
Today's Date:

(vertical red line)

End

Days Remaining

2/11/08
2/11/08
2/25/08
2/25/08
3/17/08
3/17/08
2/11/08
2/11/08
2/11/08
2/11/08
3/03/08
3/03/08
3/10/08
3/31/08
3/31/08
3/31/08
2/11/08
3/07/08
3/07/08
3/07/08
3/19/08
4/07/08

4/11/08
2/25/08
3/07/08
3/07/08
4/01/08
4/11/08
5/14/08
2/25/08
3/10/08
5/14/08
3/17/08
3/17/08
4/07/08
4/07/08
4/28/08
4/28/08
5/14/08
4/28/08
3/21/08
3/17/08
4/07/08
4/28/08

60
14
11
11
15
25
93
14
28
93
14
14
28
7
28
28
93
52
14
10
19
21

20%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

12
14
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

48
0
11
11
15
25
93
14
28
93
14
14
28
7
28
28
93
52
14
10
19
21

2/11/08

4/28/08

93

0%

93

3/31/08
2/11/08
3/10/08
4/07/08
2/28/08
2/11/08

4/07/08
4/30/08
4/30/08
4/30/08
5/14/08
5/14/08

7
79
51
23
76
93

0%
0%
0%
0%
0%
0%

0
0
0
0
0
0

7
79
51
23
76
93

1
1.1
1.2
1.3
1.4
1.5
2
2.1
2.2
2.3
2.4
2.1
2.2
2.3
2.4
2.5
2.6
3
3.1
3.2
3.3
3.4

Fabrication
Spindle shaft
housing
housing end caps
cross-feed flexure
lead screw flexure
Error model task
list of spindle error sources
model individual spindle errors
finish full spindle error sources
list of flexure error sources
model individual flexure errors
finish full flexure error model
list of drive error sources
model individual drive error
finish full drive error model
HTM-based lathe error model
Measurement task dates
CMM training
Spindle error motions
Cross Slide error motions
Carriage error motions

John

Report results and Conclusions


Outline (text, table & figure
placeholders)
images
tables
1st draft in separate modules
integrated, final draft
design notebooks

Bill

4.1
4.2
4.3
4.4
4.5
4.6

Jane

Bill

2 / 11 / 08
2 / 18 / 08
2 / 25 / 08
3 / 3 / 08
3 / 10 / 08
3 / 17 / 08
3 / 24 / 08
3 / 31 / 08
4 / 7 / 08
4 / 14 / 08
4 / 21 / 08
4 / 28 / 08
5 / 5 / 08
5 / 12 / 08
5 / 19 / 08
5 / 26 / 08
6 / 2 / 08
6 / 9 / 08
6 / 16 / 08
6 / 23 / 08
6 / 30 / 08
7 / 7 / 08
7 / 14 / 08
7 / 21 / 08
7 / 28 / 08
8 / 4 / 08
8 / 11 / 08
8 / 18 / 08
8 / 25 / 08
9 / 1 / 08
9 / 8 / 08
9 / 15 / 08
9 / 22 / 08
9 / 29 / 08
10 / 6 / 08
10 / 13 / 08
10 / 20 / 08
10 / 27 / 08
11 / 3 / 08
11 / 10 / 08
11 / 17 / 08
11 / 24 / 08
12 / 1 / 08
12 / 8 / 08
12 / 15 / 08
12 / 22 / 08
12 / 29 / 08
1 / 5 / 09

Task Lead Start

Days Complete

Tasks

% Complete

WBS

(Mon)
Duration (Days)

Start Date: #####

You might also like