The document reports on tests of a Capstone microturbine generator conducted on October 25, 2000. It includes 13 figures showing power output, shaft speed, turbine exit temperature, and DC bus voltage measurements taken during load step changes, shutdown, and startup tests of the microturbine operating in both stand-alone and grid-connected modes. The tests measured the microturbine's response to varying power demands and changes in operating conditions.

Uploaded by

Voicu Stanese
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views14 pages

Appendix B

The document reports on tests of a Capstone microturbine generator conducted on October 25, 2000. It includes 13 figures showing power output, shaft speed, turbine exit temperature, and DC bus voltage measurements taken during load step changes, shutdown, and startup tests of the microturbine operating in both stand-alone and grid-connected modes. The tests measured the microturbine's response to varying power demands and changes in operating conditions.

Uploaded by

Voicu Stanese
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 14

Appendix B

Capstone Low Pressure Grid-connect Tests


10/25/2000

Capstone LP Stand-alone Tests


10/25/2001
35000
Power Demand (W)

100000

Output Power (W)


30000

Engine Speed (rpm)


80000

60000

15000
40000
10000
20000
5000

0
Seconds

Figure B-1: Power and Shaft Speed 10 kW Steps

Shaft Speed (RPM)

20000

0
10
20
30
40
50
0
10
20
30
40
50
60
0
10
20
30
40
50
60
70
80
90
0
10
20
30
40
50
60
70
80
0
10
20
30
40
50
60
70
0
10
20
30
40
50
60
70

Output Power (W)

25000

Capstone LP Stand-alone Tests


10/25/2000
35000

700
Power Demand (W)
Output Power (W)

30000

680

660

20000

640

15000

620

10000

600

5000

580

560
Seconds

Figure B-2: Power and Turbine Exit Temperature 10 kW Steps

Turbine Exit Temp (deg C)

25000

0
10
20
30
40
50
0
10
20
30
40
50
60
0
10
20
30
40
50
60
70
80
90
0
10
20
30
40
50
60
70
80
0
10
20
30
40
50
60
70
0
10
20
30
40
50
60
70

Output Power (W)

Turbine Exit Temp (C)

764

30000

762

25000

760

20000

758

15000

756

10000

754
Power Demand (W)

5000

Output Power (W)

752

DC Bus Volts (Vdc)


0

750
Seconds

Figure B-3: Power and DC Bus Voltage 10 kW Steps

DC Bus Voltage (V)

35000

0
10
20
30
40
50
0
10
20
30
40
50
60
0
10
20
30
40
50
60
70
80
90
0
10
20
30
40
50
60
70
80
0
10
20
30
40
50
60
70
0
10
20
30
40
50
60
70

Output Power (W)

Capstone LP Stand-alone Tests


10/22/2000

Capstone LP Stand-alone Tests


10/25/2000
35000
100000
30000
80000

60000

15000
40000
10000
Power Demand (W)
20000

Output Power (W)


5000

Engine Speed
(rpm)

Seconds

Figure B-4: Power and Shaft Speed 15 kW Tests

60

50

40

30

20

10

70

60

50

40

30

20

10

80

70

60

50

40

30

20

10

60

50

40

30

20

0
10

Shaft Speed (RPM)

20000

Output Power (W)

25000

Capstone LP Stand-alone Tests


10/25/2000
35000

700
Power Demand (W)
Output Power (W)

30000

680

Seconds

Figure B-5: Power and Turbine Exit Temperature 15 kW Steps

60

50

40

30

20

10

70

60

50

40

30

20

10

80

70

60

50

Turbine Exit Temp (deg C)

560
40

0
30

580

20

5000

10

600

10000

60

620

50

15000

40

640

30

20000

20

660

10

25000

Output Power (W)

Turbine Exit Temp (C)

764

30000

762

25000

760

20000

758

15000

756

10000

754
Power Demand (W)
Output Power (W)
DC Bus Volts (Vdc)

5000

752

Seconds

Figure B-6: Power and DC Bus Voltage 15 kW Steps

60

50

40

30

20

10

70

60

50

40

30

20

10

80

70

60

50

40

30

20

10

60

50

40

30

20

750
10

DC Bus Voltage (V)

35000

Output Power (W)

Capstone LP Stand-alone Tests


10/25/2000

Capstone LP Grid-connect Tests


10/25/2000
35000
100000
30000
80000

60000

15000
Power Demand (W)

40000

Output Power (W)


10000

Engine Speed
20000

5000

Seconds

Figure B-7: Power and Shaft Speed Full Load Steps

100

90

80

70

60

50

40

30

20

10

60

50

40

30

20

0
10

Shaft Speed (RPM)

20000

Output Power (W)

25000

700

30000

680

25000

660
Power Demand (W)

20000

640

Output Power (W)


Turbine Exit Temp (C)

Seconds

Figure B-8: Power and Turbine Exit Temperature Full Load Steps

100

90

80

70

60

50

40

30

20

10

560
0

0
60

580

50

5000

40

600

30

10000

20

620

10

15000

Turbine Exit Temp (deg C)

35000

Output Power (W)

Capstone LP Grid-connect Tests


10/25/2000

764

30000

762

25000

760

20000

758

15000

756

Power Demand (W)

10000

754

Output Power (W)


DC Bus Volts (Vdc)

Seconds

Figure B-9: Power and DC Bus Voltage Full Power Steps

100

90

80

70

60

50

40

30

20

10

60

50

40

750
30

0
20

752

10

5000

DC Bus Voltage (V)

35000

Output Power (W)

Capstone LP Grid-connect Tests


10/25/2000

Capstone LP Grid-connect Tests


10/25/2000
100000

800
Engine Speed (rpm)
Output Power (W)

700

600
60000
500
40000
400
20000
300

200

Seconds

Figure B-10: Power, Shaft Speed and Turbine Exit Temperature During MTG Shutdown

640

620

600

580

560

540

520

500

480

460

440

420

400

380

360

340

320

300

280

260

240

220

200

180

160

140

120

100

80

60

40

100
20

-20000

Turbine Exit Temp (deg C)

Turbine Exit Temp


(C)

Output Power (W) & Shaft Speed (RPM)

80000

Capstone LP Grid-connect Tests


10/25/2000
100000

767
Engine Speed (rpm)
Output Power (W)
DC Bus Volts (Vdc)

Seconds

Figure B-11: Power, Shaft Speed and DC Bus Voltage During MTG Shutdown

640

620

600

580

560

540

520

500

480

460

440

420

400

380

360

340

320

300

280

260

240

220

200

180

755
160

-20000
140

757

120

100

759

80

20000

60

761

40

40000

20

763
DC Bus Voltage (V)

765

60000

Output Power (W) & Shaft Speed (RPM)

80000

Capstone LP Grid-connect Tests


10/25/2000
100000

800

700

60000
500

40000

400

300
20000
200

Engine Speed (rpm)


Output Power (W)

Turbine Exit Temp (C)

100

Seconds

Figure B-12: Power, Shaft Speed and Turbine Exit Temperature During MTG Start

310

300

290

280

270

260

250

240

230

220

210

200

190

180

170

160

150

140

130

120

110

100

90

80

70

60

50

40

30

20

0
10

-20000

Turbine Exit Temp (deg C)

600

Output Power (W) & Shaft Speed (RPM)

80000

Capstone LP Grid-connect Tests


10/25/2000
100000

767
Engine Speed (rpm)
Output Power (W)
DC Bus Volts (Vdc)

Seconds

Figure B-13: Power, Shaft Speed and DC Bus Voltage During MTG Start

310

300

290

280

270

260

250

240

230

220

210

200

190

180

170

160

150

140

130

120

110

100

90

755
80

-20000
70

757

60

50

759

40

20000

30

761

20

40000

10

763
DC Bus Voltage (V)

765

60000

Output Power (W) & Shaft Speed (RPM)

80000

You might also like