Sector Project Name Location Client Beneficiary Estimates Project Cost Commencement Date Current Status
Food/Water Supply Chouchi Irrigation Project Jimeta-Yola, Adamawa State Petroleum (Special) Trust Fund Adamawa State Government N 2,900,000,000.00 ($ 27,000,000.00 - 1999) November 1998 Ongoing
Project Description The project study covers a total area of 1,700 ha. The project is designed to provide water for a net area of 1,200 ha. The water resources of River Benue are confirmed to be more than sufficient to meet the water demand of the proposed irrigation scheme. The scope of works also includes the construction of services centres, fish ponds and cattle watering ponds. Project Involvement Review of design, tender evaluation, supervision of construction of works in association with PEMA Engineering Consultants. Staff Contribution
Engr. Ahmed Kawu Engr. Danladi Zubairu Muhammad Yusufari Habiba Bashir
. Consulting Engineers
Water Supply Facility Management for Ikoyi, VI & 1004 Waterworks Lagos State Petroleum (Special) Trust Fund Lagos State Government N 20,000,000.00 ($ 188,000.00 - 1999) 12 months Ongoing
Location Client Beneficiary Estimates Project Cost Project duration Current Status
Project Description Rehabilitation of the water system to restore production of three waterworks to their installed capacities. Project Involvement Planning and coordination of facility management Formulating policies on behalf of the clients on facility management including operational framework Preparation, presentation of budgets for facility management services
Staff Contribution
. Consulting Engineers
Sector Project Name Location Client Beneficiary Estimates Project Cost Project duration Current Status
Roads and Infrastructure Infrastructure at Gwarimpa Housing Estate Abuja FCT Federal Capital Development Authority Federal Government of Nigeria N 80,000,000.00 24 months Completed
Project Description Construction of primary, secondary and tertiary sewer lines with the associated sewage treatment plants for the estate Construction of roads and drainage within the estate
Project Involvement Planning and coordination of infrastructures provision such as roads, drains and sewage disposal facilities within the estate
Staff Contribution
. Consulting Engineers
Sector Project Name Project Location Client Beneficiary Estimates Project Cost Project duration Current Status
Katsina State Petroleum (Special) Trust Fund Katsina State Government N 5,212,522,466.35 ($ 54,868,575.54 - 1999) 20 months Ongoing
Project Description Provision of raw water for the irrigation of 12oo ha of land and potable drinking water to the surrounding environs. The Sabke Dam Project consists of the construction of a dam across the Sabke river in Daura LGA of Katsina State. The project as conceived consists of the following: Dam construction (to impound a reservoir of about 32 million cum. per day) Irrigation (1200 ha gross area) Supply of potable water to Daura town and the environs (6 million litres per day) Access and service roads at around the project sites Rehabilitation of four small Earth Dams
Project Involvement Project Management and Co-ordination Review and Design of Tender Documents Construction supervision of four small earth dams
Staff Contribution
Engr. Ahmed Kawu Engr. Danladi Zubairu Engr. John Ijomah Engr. Yusuf Ibrahim Engr. Aminu Sambo Yakubu N. Danje Usman B. A.
. Consulting Engineers
Roads and Infrastructure Provision of Infrastructural Facilities and Roads to Gudu District, Garki II District, Asokoro South/West District, Abuja Federal Capital Territory Federal Capital Development Authority FCT N 3,000,000,000.00 Completed
Project Description Construction of telecommunication duct lines Construction of manholes Storm drains and water supply lines Roadworks and earthworks
Project Involvement Computing of detail point coordinates Computing data for storm drains and plot connections Calculation of detail points and vertical profile Computing quantities of road-works and earthworks
Staff Contribution
. Consulting Engineers
Roads and Infrastructure PTF National Highways and Urban Roads Rehabilitation Programme Nationwide Petroleum (Special) Trust Fund Various State Governments Ongoing
Project Description Design and project management supervision reconstruction/rehabilitation, example: Gamayin - Katagum Layi - Damasak Mokwa - Jebba Wawa - Agwarra - Konkweso Omu Aran - Oro Ago Igbetti - Kishi Abeokuta - Olorunda/ Imeko - Ilara Omuo Ikare - Akungba Ishua Iwaro Owo Sugu - Toungo Abakaliki - Nkomfap Igbogor - Ora - Udo of proposed roads selected for (75km) (24km) (36km) (145km) (31km) (47km) (30km) (43km) (80km) (33km) (50km) (25km)
Project Involvement Supervision of on site surveyors Review of all design drawings Production of design drawings Computing of horizontal alignments and setting out data Computing of Engineers quantities and estimates for all these roads
Staff Contribution
. Consulting Engineers
Energy Supply Power Connection of Afri-Projects Consortium Abuja Office Plot 2198 Wuse Zone 4 Afri-Projects Consortium Completed N 7,000,000.00
Connection of 300 KVA Transformer and 250 KVA Generating Set from 11 KV along Loma-Mansa Street. Project Involvement Load flow analysis of building Computing the preliminary/final cost estimate Material specification; design of the 300 KVA transformer, 250 KVA transformer and the substation design Facility management of the above project after completion
Staff Contribution
. Consulting Engineers
Energy Supply Electrical Engineering Services of Residential Plot Plot 155 Cadastral Zone A3, Abuja Alh. Mohammed Yola Completed N 10,000,000.00
Detailed electrical/mechanical drawings preparation of the bill of quantities/materials specification Design of the TP/N distribution fused board, and the calculations of load balance analysis to ascertain the rating of each cable
Staff Contribution