This booklet provides information on the most common and critical deficiencies reported during port state inspections. This information is based on recent statistics and experience gained from DNV vessels that have been detained by Port State Control. It is intented as a quick reference guide and may be used by the crew prior to arriving at a port. This guide is not a substitute for the vessels own maintenance system. However, it can be used as a supplement in an effort to reduce the risk of detention. More guidance and detailed check lists can be found within the DNV PSC Tool Kit. In addition to the listed deficiencies, a number of operational deficiencies related to the ISM Code have been increasingly recorded by PSC officers. An effective Safety Management System onboard, well supported by company resources, will significantly reduce the likelihood of the ship being detained. Special national Port State requirements should also be referenced before arriving at each port. Due focus should also be given to concentrated inspection campaigns and new regulations as they come into force. If the vessel is detained by Port State Control, DNV is to be notified immediately and requested for attendance onboard. The DNV surveyor will facilitate rectification of deficiencies, verify compliance with the applicable requirements and expedite release of the vessel. The chart on the following page shows the percentage of detention deficiencies sorted by main category group found by PSC on DNV classed ships during the period of 2006 to 2008, sorted by main category group. For ordering additional copies of this guide and also the complete DNV PSC Tool Kit, please contact your local DNV office or one of our Maritime Service Centres.
Be better prepared!
control in place
Code
On board maintenance, procedures, drills and companys availability 24/7 to be properly documented
n Life
detention items
Life-saving appliances
Lifeboat
Example
PSC Finding: Starboard lifeboats motor could not be started. Crew took over twenty minutes to start engine. A second attempt to start also failed (ground for detention).
Repaired: The injector of the engine has been cleaned and overhauled. Upon completion proper starting of the engine was demonstrated by the crew.
Life-saving appliances
Launching arrangements
Example
PSC Finding: Port & Starboard Lifeboat Davit winch foundation found heavily corroded and wasted. Starboard found more corroded than port foundation (ground for detention).
n Wires & hooks n Remote control n Recovering gear n On-Load and Off-load release n Guide rollers n Manual brakes n Limit switches n Periodical inspection n Instructions of maintenance & service
Rectification: Starboard winch foundation previously renewed. Port lifeboat winch foundation renewed and on survey found in order, winch assembly refitted with new bolts and lock washers.
Example
PSC Finding: Emergency fire pump failed to start after blackout. During testing of the emergency fire pump by the PSC Officer, the pump failed to pick up suction after 20 minutes (ground for detention).
Rectification: The fire pump remote sea suction valve was found closed due to lack of hydraulic operating pressure. The hydraulic pressure was restored and the fire pump was re-tested and found in order.
Example
PSC Finding: Fire line in engine room leaked. Wastage on fire main and deck foam line was observed (ground for detention).
n Hydrants valves moving freely n Nozzles in place and in good working condition n Pressure tested
Repaired: The leaked fire line was permanently repaired. The pipe replaced. UTM from fire main & deck foam line was taken and wasted length partly renewed. Pressure test was carried out and no leakage observed.
Example
PSC Finding: Several fire flaps not operable; corroded and seized closing device (ground for detention).
Rectification: A number of fire flaps were found in very poor condition or not operable at all. The ducts containing the actual fans (and supports for electric motors) were found holed and thin. These ducts were now temporary repaired by doubler plates, but need to be renewed; condition of class issued. Several accommodation and galley fire dampers were found without operating cable attached. This was all rectified.
Example
PSC Finding: Doors within main vertical zone malfunctioning closing device for door in Engine room (ground for detention).
sides
n Hinges n Gaskets and sills
Rectification: The closing device was repaired and tested. Found in order.
Example
PSC Finding: Excessive oil leaking from the ships service diesel generators and the main engine. The oil has coated the machinery, collected in the surrounding bilges, saturated the lagging in the associated piping, and has covered the engine room deck plates. The condition of the engine room presents a significant fire and safety hazard to the vessel and crew (ground for detention).
n Bilges and drip trays are clean n Oily rags and waste disposed in special container n Platforms and ladders not slippery n Safe access - no obstruction by buckets, drums etc.
Rectification: Excessive oil in engine room cleaned as much as possible, oil leaks from main and auxiliary engines brought under control and some of the damaged/oil permeated lagging of pipes changed. Condition of class given for further examination of main and aux. engine; in the meantime ER to be continuously manned (E0 notation suspended).
MARPOL Annex I
Oil filtering equipment & 15 ppm alarm
Example
PSC Finding: After 45 min of trying the chief engineer was not able to prove proper operation of OWS. He also could not provide manufacturers manualoverboard discharge valve was found to be seized in closed position and inoperablePSC verified 3 separate ways of by passing the OWS and discharge oil directly to sea. An ISM audit to be carried out.
n ppm alarm arrangements 15 n Calibrated correctly n unauthorized connection overboard No n Spare parts available n Crew members trained to operate n Posted operating instructions
Rectification: A new pump was installed. OWS was tested and found in good working condition. 15 ppm alarm and 3 way valve tested and confirmed in operation. Overboard valve tested and found operational. OWS manual (photocopy) was found on board and reviewed. Existing bolted end flange attached to existing pipe work located in between the OWS and 3 way valve was now removed and blanked off. An ISM audit was carried out before departure.
Load Line
Vent heads, air pipes, goose necks
Example
PSC Finding: Numerous water ballast tank air vent closing devices were found defective; wasted top sealing surfaces (ground for detention).
n Flame screen n Closing devices moving freely n Sealing of cover n Locking arrangement
Rectification: All ballast tank air vent heads were opened and checked. Total 33 pieces of vent head inner rings were repaired by workshop.
Radio Communication
GMDSS radio station
Example
PSC Finding: MF/HF DSC not connected to reserve source of energy (ground for detention).
n Antennas
Rectification: The defective cable supplying power from emergency batteries has been replaced.
Det Norske Veritas AS, its affiliates and subsidiaries and their respective directors, officers, employees or agents (individually and collectively referred to as DNV in this clause) does not warrant or assume any kind of liability for the up-to-date nature, accuracy, completeness or quality of the information provided and any use of this information is at the users sole risk. DNV expressly exclude any and all liability arising out of or in connection with loss or damage or expenses caused by the reliance, use or non-use of the provided information.