Note Data Data Data Data Data Data Q' = 0.01 Q (100+Qe%) Page 7 Qp1 = 100 Q /V Fig. 10, 9, app. A Eq. 13 or Appendix A z=3 triplex, L = 152 mm N=360 rpm
WATER 90 0.23 0.15 0.99 9.81 120 0 120 94 127.7 152 360 133 3 / / 3 1 0.12 0.05 146 0.020 -0.091 2.909 27.868 12 24 0.12 0.11 0.1 0.05 0.380 3.136 20 0.627 0.000 18.139 2.909 15.230 153.84 154.00 88 93 59.21 71.57 76.96 21.83 2.40
V
L N
Qp1
194 9
146 50
Appendix A Data Data Data (minus if bellow pump elevation) Data See note 1) Data See note 1) App. A Eq. 1 and 2 See note 1) = 0.1 SG.H1 - Loss in line 25&26 - HV Eq. 1 to 3 Eq. 8 Data Data Data Data See note 1) Data Data = total of line no. 36 up to 39 = DP2 + 0.1(H2)(SG) If require pulsation dampener. If not fill with 0 Eq. 18 If does not require pulsation dampener use eq. 15 PD = P2+0.1(H2)(SG)+DP2 = line 22 DP=PD-PS H=10(DP)/SG Page 7 Page 7 Eq. 9 and 10 Eq. 11 Eq. 12 Eq. 20 =0.1 NPSHR.SG + PV - DPt1
VELOCITY HEAD AT SUCTION kg/cm2 2 SUCTION HEAD kg/cm 2 PUMP SUCTION PRESSURE kg/cm A m NPSH AVAILABLE DISCHARGE PRESSURE AT EQUIPMENT kg/cm2A m STATIC HEAD PRESSURE DROP AT : PIPE (include fittings & valves) kg/cm2 Equipment 1 (. kg/cm2 Equipment 2(.. kg/cm2 Equipment 3 (. kg/cm2 2 DISCHARGE PRESSURE DROP kg/cm 2 DISCHARGE HEAD kg/cm ORIFICE PRESS. DROP RATIO % ORIFICE PRESS. DROP ACCELERATION HEAD PUMP DISCHARGE PRESSURE PUMP SUCTION PRESSURE PUMP DIFF. PRESSURE TOTAL HEAD (CALCULATED) TOTAL HEAD (TAKE) MECHANICAL EFFICIENCY GEAR EFFICIENCY LIQUID HORSE POWER PUMP BHP DRIVER BHP ESTIMATED NPSH R MINIMUM SUCTION EQP. PRESS. NOTES :
kg/cm2 kg/cm2 kg/cm2A kg/cm A kg/cm m m % % kW kW kW m kg/cm2A
2 2
ID HV DPt1 PS NPSHA P2 H2
DP2 DPt2
DPOR PD PS DP H H
M GEAR
LHP BHPPUMP BHPDRIVER NPSHR P1MIN
1) THIS PRESSURE DROP SHALL HAS BEEN MULTIPLIED FROM CONTINOUS FLOW PRESS. DROP CALCULATION BY
10 times for simplex 2.6 times for duplex 1.2 times for triplex Note 2). Pulsation dampener vol. = (25 Lt x 18/11.2)/22 = 1.8 Lt Value of 25 Lt provided from fig. 13
(
MADE CHKD APVD DATE
DATE
Preliminary
C cP
Recalculation
Note Data Data Data Data Data Data Q' = 0.01 Q (100+Qe%) Page 7 Qp1 = 100 Q /V Fig. 10, 9, app. A Eq. 13 or Appendix A z=3 triplex, L = 80 mm N=130 rpm 5 lt/min
Hydrazine 32 0.23 0.45 0.98 9.81 0.32 0 0.32 94 0.34 35 160 20 3 19 / 8 / 1.013 2 0.05 0 19 0.0005 0.146 1.159 7.230 24 12 0.1 0.06 0 0 0.160 1.496 20 0.299 0.00 26.971 1.159 25.813 263.39 264.00 88 93 0.23 0.28
19 25
Appendix A Data Data Data (minus if bellow pump elevation) Data See note 1) Data See note 1) App. A Eq. 1 and 2 See note 1) = 0.1 SG.H1 - Loss in line 25&26 - HV Eq. 1 to 3 Eq. 8 Data Data Data Data See note 1) Data Data = total of line no. 36 up to 39 = DP2 + 0.1(H2)(SG) If require pulsation dampener. If not fill with 0 Eq. 18 If does not require pulsation dampener use eq. 15 PD = P2+0.1(H2)(SG)+DP2 = line 22 DP=PD-PS H=10(DP)/SG Page 7 Page 7 Eq. 9 and 10 Eq. 11
VELOCITY HEAD AT SUCTION kg/cm2 2 SUCTION HEAD kg/cm PUMP SUCTION PRESSURE kg/cm2A m NPSH AVAILABLE DISCHARGE PRESSURE AT EQUIPMENT kg/cm2A m STATIC HEAD PRESSURE DROP AT : PIPE (include fittings & valves) kg/cm2 Equipment 1 (. kg/cm2 Equipment 2(.. Equipment 3 (. DISCHARGE PRESSURE DROP DISCHARGE HEAD ORIFICE PRESS. DROP RATIO ORIFICE PRESS. DROP ACCELERATION HEAD PUMP DISCHARGE PRESSURE PUMP SUCTION PRESSURE PUMP DIFF. PRESSURE TOTAL HEAD (CALCULATED) TOTAL HEAD (TAKE) MECHANICAL EFFICIENCY GEAR EFFICIENCY LIQUID HORSE POWER PUMP BHP
kg/cm2 kg/cm2 kg/cm
2 2
kg/cm %
kW DRIVER BHP Eq. 12 0.31 m ESTIMATED NPSH R Eq. 20 2.99 2 MINIMUM SUCTION EQP. PRESS. =0.1 NPSHR.SG + PV - DPt1 0.59 kg/cm A IS NPSHA IS ADEQUATE ? See note 2) YES NOTES : 1) This value shall has been multiplied from continous flow pressure drop calculation by :