0% found this document useful (0 votes)
1K views1 page

Drill H3

The document provides instructions for a fire service drill involving removing a length of hose with four men. The drill involves one man giving the order to remove a length, another giving the order to shut off the water flow. Once the water is shut off, two men disconnect the hose length while the third reconnects the branch in its new position. Once ready, water flow is turned back on and the extra hose is returned to the appliance. The goal is to demonstrate correctly removing a hose length from a line.

Uploaded by

Admin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Drill H3

The document provides instructions for a fire service drill involving removing a length of hose with four men. The drill involves one man giving the order to remove a length, another giving the order to shut off the water flow. Once the water is shut off, two men disconnect the hose length while the third reconnects the branch in its new position. Once ready, water flow is turned back on and the extra hose is returned to the appliance. The goal is to demonstrate correctly removing a hose length from a line.

Uploaded by

Admin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 1

HOSE DRILLS

DRILL H3 Aim: Removing one length of hose (Four men)

Learning Outcome: Perform Fire Service Drills Assessment Criteria: Explain Hose Drill H3 Reference: Fire Service Drill Book Practical Learning Objectives: Demonstrate the correct method of: Removing a length from a line of hose.

Preliminary detail: As given in PD1. Note: It will be assumed that hose has been run out as in Drill H 1. Get to work. No. 1 gives the order Remove a length. No. 4 gives No. 2 the order Knock off. Immediately the order is given, No. 4 proceeds to the first coupling behind the branch. When the flow ceases, No. 1 disconnects the branch. No. 4 disconnects the branch. No. 3 assists No. 1 to reconnect the branch at its new position. Having ensured that No. 1 is ready, No. 4 gives the order Water on. No. 4 subsequently returns to the branch, makes up the surplus hose and returns it to the appliance.

Knock off or Knock off and make up. As in Drill H1.

Additional Significant Hazards and Risks None.

Additional Key Control Measures None.

You might also like