0% found this document useful (0 votes)
65 views2 pages

Problem Resolution Form

This document is a change control register for a project that tracks problems, performance levels that were not met, acceptance criteria, targeted dates to resolve issues, actual dates issues were resolved, and metrics used to determine compliance thresholds. It contains proprietary information and is labeled as draft version 1.0.

Uploaded by

decon3
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as ODT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views2 pages

Problem Resolution Form

This document is a change control register for a project that tracks problems, performance levels that were not met, acceptance criteria, targeted dates to resolve issues, actual dates issues were resolved, and metrics used to determine compliance thresholds. It contains proprietary information and is labeled as draft version 1.0.

Uploaded by

decon3
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as ODT, PDF, TXT or read online on Scribd
You are on page 1/ 2

<PROJECT NAME>

Change Control Register

<project>

Problem Resolution Register

<year> <month>

Problem

Performance Level Unmet The need, concern, or requirement that is being affected by the issue.

Criteria

Acceptable Performance Level

Targeted Compliance Date Date on which acceptance performance level is expected to be achieved.

Actual Compliance Date Date on which the problem is solved; or problem is determined to be unresolvable.

Metric being Specific threshold that should be used to met. (Possibly captured as a determine minimum/maximum level) compliance with the performance level

Version: Draft 1.0