0% found this document useful (0 votes)
43 views

Countywide Transit Corridors Functional Master Plan

The document outlines the schedule and objectives for the Countywide Transit Corridors Functional Master Plan. It will identify right of way requirements for proposed bus rapid transit corridors through reviewing prior studies, ridership forecasts, and corridor evaluations. Major issues to be addressed include the size and type of priority treatment for the transit network through 2040 based on preliminary ridership forecasts. Draft maps show the overall proposed transit network and first phase segments not already included in existing master plans.

Uploaded by

Planning Docs
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views

Countywide Transit Corridors Functional Master Plan

The document outlines the schedule and objectives for the Countywide Transit Corridors Functional Master Plan. It will identify right of way requirements for proposed bus rapid transit corridors through reviewing prior studies, ridership forecasts, and corridor evaluations. Major issues to be addressed include the size and type of priority treatment for the transit network through 2040 based on preliminary ridership forecasts. Draft maps show the overall proposed transit network and first phase segments not already included in existing master plans.

Uploaded by

Planning Docs
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Countywide Transit Corridors Functional Master Plan

Great Seneca Science Corridor Master Plan Implementation Advisory Committee October 9, 2012

Schedule
This Year November 8th Planning Board Reviews Staff Draft Recommendations November 13th 15th Public Meetings Next Year

January 7th - Planning Board Considers Approving a Public Hearing Draft Plan February 14th First Public Hearing February 21st - Second Public Hearing February and March Worksessions May 9th Planning Board Considers Approving a Planning Board Draft Plan

Countywide Transit Corridors Functional Master Plan

Objective Identify Right of Way Requirements Associated with Bus Rapid Transit Corridors

What is Involved
Review Prior Studies Update Ridership Forecasts Confirm Corridor(s) Inclusion in Network Confirm Corridor Type and Potential Station (Stop) Locations Evaluate Median Operation Evaluate Lane Repurposing Potential Evaluate Potential Impacts Recommend Approach and Phase for Specific Corridors Develop Recommendations for MARC Finalize Recommendations for Bike Pedestrian Priority Areas Public Outreach and Agency Coordination

Countywide Transit Corridors Functional Master Plan

Major Issues
Size of Network Type of Priority Treatment in Response to Forecast Ridership Horizon Year 2040 or beyond? Concept Network Based On Preliminary Look At Forecast Ridership First Map - Overall Network Where Priority Treatment May Be Warranted. Many Segments are in Existing Master Plans. Second Map - Segments Not In Existing Master Plans Where Additional Right of Way May Be Warranted. Phase 1 Refers to Sequencing of Inclusion of Right of Way Requirements in Master Plans and Not Implementation Phasing.

Countywide Transit Corridors Functional Master Plan

Draft BRT network, plus Red Line,

Purple Line, and CCT

Countywide Transit Corridors Functional Master Plan

Phase 1 BRT network not already in Master

Plan, plus Red Line, Purple Line, and CCT

Countywide Transit Corridors Functional Master Plan

THANK YOU

You might also like