0% found this document useful (0 votes)
221 views

Project Scope Management 02

This document provides a scope management plan that outlines the inputs, tools and techniques, and outputs for various scope management activities including scope planning, definition, verification, and control. These scope management activities will utilize templates, standards, expert judgement, a project scope management plan, and work breakdown structures. The resulting deliverables will be inspected and changes will be controlled through an approved change request process.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
221 views

Project Scope Management 02

This document provides a scope management plan that outlines the inputs, tools and techniques, and outputs for various scope management activities including scope planning, definition, verification, and control. These scope management activities will utilize templates, standards, expert judgement, a project scope management plan, and work breakdown structures. The resulting deliverables will be inspected and changes will be controlled through an approved change request process.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 1

Project Scope Management Plan - sheet 02

Compiled by :bvpyvm
SP SD CWBS SV SC
S No Identity Abbrevation I/P T&T O/P I/P T&T O/P I/P T&T O/P I/P T&T O/P I/P T&T O/P
1 EEF Enterprise Environmental Factors `
2 OPA Organizational Process Assets ` U
3 PC Project Charter `
4 PPSS Preliminary Project Scope Statement
5 PjMP Project Management Plan U
6 EJ Expert Judgement
7 TFS Templates, Forms, Standards `
8 PjSMP Project Scope Management Plan ` U U
9 ACR Approved Change Requests
10 Pdt An Product Analysis
11 AI Alternate Identification
12 SHA Share Holder Analysis
13 PjSS Project Scope Statement U U
14 RC Requested Changes
15 WBR WorkBreak Down Requests Legend for Above
16 WBST WorkBreak Down Structure Templates SP: Scope Planning
17 DC Decomposition SD: Scope Definition
18 WBS Work Break Down Structure CWBS: Create WBS U
19 WBSD WBS Dictionary SV: Scope Verification U
20 Sc BL Scope Baseline SC: Scope Control U
21 DLVBLS Deliverables I/P: Input
22 INS Inspection T&T: Tools & Techniques
23 ADLVBLS Accepted Deliverables O/P:Output
24 RCA Recommended Corrective Actions
25 PeRe Performance Reports Example: S.No 1,2,3,4&5 are the inputs for
26 WPIns Work Performance Inspection Scope planning
27 CCS Change Control System
28 VA Variance Analysis Request to readers: The above information was compiled
29 RP Replanning for personal reading. I hope this may be useful for easy
30 CMS Configuration Management System reference

You might also like