ABB Softstarter Handbook
ABB Softstarter Handbook
ABB Softstarter Handbook
Handbook
The purpose of this handbook is to provide guidance for correct selection and maintenance of softstarters in industrial installations to ensure a trouble free operation. This without increasing the overall cost.
FOREWORD
This book is written with the thought of being a general guide for people working with softstarter applications but also for those just interested in learning more about this type of starting method. It doesnt matter if you are an expert or novice, hopefully you will find some interesting and useful information either by reading from cover to cover or just the chapters of interest. The index at the end of the book can be used to simplify your search. The contents of this book is very much based on the 25 years of experience we have within ABB of developing, manufacturing and selling low voltage softstarters. The book is not a complete technical guide or manual for all types of ABB Softstarters that may exist on the market. It is a complement to the technical catalogues and brochures we have for our products and will give a general picture of what to think about when working with softstarters. More information about softstarters as well as other ABB products is available on www.abb.com/lowvoltage All advice given in this book is only general and every single application must be handled as a specific case.
ABB AB, Cewe-Control November 2010 Johan Rees Magnus Kjellberg Sren Kling
ABB will not take any responsibility for any type of faults or damage due to the use of this handbook.
Contents
Standards and approvals Definitions, different voltages About motors Squirrel cage motors Speed Voltage Current Power factor Torque Slipring motors Different load conditions Different starting methods Direct on line (DOL) Star-delta starter Frequency converter Softstarter Comparision between different starting methods General about softstarters Softstarter functionality Torque control Different applications Centrifugal fan Centrifugal pump Compressor Conveyor belt Crusher and Mill
... 1 ... 3 ... ... ... ... ... ... ... ... 4 5 6 7 8 8 9 9
Contents
How to select a softstarter for different applications Ambient temperature Derating when used at high altitudes Starting capacity and overload protection Number of starts per hour Prosoft Different ways of connecting the softstarter Start of several motors Connection of control circuit Connecting a softstarter to a fieldbus system 2-phase control vs 3-phase control Settings Explosive atmospheres Coordination Environmental information Harmonics FAQ (Frequently asked questions) Quantities and units Formulas and conversion factors Glossary Index
... ... ... ... ... ... ... ... ... ...
39 40 41 42 44 45 46 48 50 51
... 52 ... 54 ... 58 ... 60 ... 67 ... 68 ... 69 ... 71 ... 72 ... 76 ... 83
Standards
Specifications in USA and Canada The specifications for the American and Canadian markets are quite similar, but differ a lot from the IEC standards and European specifications. USA - UL Underwriters Laboratories Inc. Canada - CSA Canadian Standards Association There are different types of UL certification, among them UL listed and UL component recognition. UL listing means that UL has tested representative samples of the product and determined that it meets ULs requirements. ULs component recognition service, however, only covers the evaluation of components or materials intended for use in a complete product or system. All ABB softstarters that have UL certification, are UL listed. Softstarters can also be cULus listed, meaning that they are UL listed to US and Canadian safety standards. All the requirements of both UL and CSA are covered by cULus, so the product is then suitable for use in the US and in Canada. CCC (China Compulsory Certification) Since the softstarter standard is listed according to the CCC-regulation in China, it is mandatory to have the product approved and labelled with a CCC-mark to be allowed to be put on the Chinese market. The Chinese GB14048.6-2008 standard is based on the IEC-standard IEC 60947-4-2. Other local approvals based on IEC-standard In addition to IEC and UL standards, many countries have their own local standards. Some of the major ones besides the already mentioned CSA and CCC are listed below: GOST Russia C-tick Australia ANCE Mexico Marine approvals For softstarters used on board ships, maritime insurance companies sometime require different marine certificates of approvals. These can come from BV (Bureau Veritas), GL (Germanisher Lloyd), LR (Lloyds Register EMEA) which are based on the IEC standard, or from ABS (American Bureau of Shipping) which is based on the UL standard or from some other independent certification organisation. Normally, marine approvals have special requirements regarding shock, vibrations and humidity. Used standards Following standards are used or partly used for the softstarters. IEC 60947-1 EN 60947-1 IEC 60947-4-2 EN 60947-4-2 UL 508 CSA C22.2 No. 14 GB14048.6-2008 LR Test specification No. 1
Operational voltage (Ue), is the voltage feeding the motor and also the voltage exposed to the main circuit (thyristors) in the softstarter. 200 - 690 V AC are normal values. Control supply voltage (Us), is the voltage feeding the electronic components inside the softstarter, for example the printed circuit board. A common voltage is 100 - 250 V AC.
Control circuit voltage (Uc), is the voltage for controlling the start and stop command of the softstarter. Common values are 24 V DC or 110 - 240 V AC. On many softstarters, the control voltage can be supplied internally.
About Motors
Modern electrical motors are available in many different forms, such as single phase motors, three-phase motors, brake motors, synchronous motors, asynchronous motors, special customised motors, two speed motors, three speed motors, and so on, all with their own performance and characteristics. For each type of motor there are many different mounting arrangements, for example foot mounting, flange mounting or combined foot and flange mounting. The cooling method can also differ very much, from the simplest motor with free self-circulation of air to a more complex motor with totally enclosed air-water cooling with an interchangeable cassette type of cooler. To ensure a long life for the motor it is important to select it with the correct degree of protection when operating under heavy-duty conditions in a severe environment. The two letters IP (International Protection) state the degree of protection followed by two digits, the first of which indicates the degree of protection against contact and penetration of solid objects, whereas the second states the motors degree of protection against water. The end of the motor is defined in the IEC-standard as follows: The D-end is normally the drive end of the motor. The N-end is normally the non-drive end of the motor. Note that in this handbook we will focus on asynchronous 3-phase electrical motors only.
Terminal box Cooling fan
Drive shaft
D-end
Stator windings Rotor Stator
N-end
Speed
The speed of an AC motor depends on two things: the number of poles of the stator winding and the main frequency. At 50 Hz, a motor will run at a speed related to a constant of 6000 divided by the number of poles and for a 60 Hz motor the constant is 7200. To calculate the speed of a motor, the following formula can be used: n = 2 x f x 60 p n = speed f = net frequency p = number of poles Example: 4-pole motor running at 50 Hz n = 2 x 50 x 60 = 1500 rpm 4 This speed is the synchronous speed and a squirrel-cage or a slip-ring motor can never reach it. At unloaded condition the
speed will be very close to synchronous speed and will then drop slightly when the motor is loaded. The difference between the synchronous and asynchronous speed also named rated speed is the slip and it is possible to calculate this by using the following formula: s= n1 - n n1
s = slip (a normal value is between 1 and 3 %) n1 = synchronous speed n = asynchronous speed (rated speed) Table for synchronous speed at different number of poles and frequency: No. of poles 2 4 6 8 10 12 16 20 50 Hz 3000 1500 1000 750 600 500 375 300 60 Hz 3600 1800 1200 900 720 600 450 360
Voltage
Three-phase single speed motors can normally be connected for two different voltage levels. The three stator windings are connected in star (Y) or delta (D). If the rating plate on a squirrel cage motor indicates voltages for both the star and delta connection, it is possible to use the motor for both 230 V, and 400 V as an example.
The winding is delta connected at 230 V and if the main voltage is 400 V, the Yconnection is used. When changing the main voltage it is important to remember that for the same power rating the rated motor current will change depending on the voltage level. The method for connecting the motor to the terminal blocks for star or delta connection is shown in the picture below.
Picture showing the motor terminal box for a and a Y connected motor
Current
The rated current of the motor, which can be found on the motor nameplate, is the current used by the motor when fully loaded and while up in full speed. An unloaded motor will use far less current and an overloaded motor will use more current. During direct on line start, the current used by the motor is far higher than the nominal current though. Usually between 6-8 times the rated current, but it can be more than 10 times the rated current. This can be clearly seen in a speed-current diagram for the motor, which can be seen below. As the motor accelerates the current will drop and when reaching the rated speed, the current will have dropped to the rated current.
Power factor
A motor always consumes active power, which it converts into mechanical action. Reactive power is also required for the magnetisation of the motor but it doesnt perform any action. In the diagram below the active and reactive power is represented by P and Q, which together give the apperent power S. The ratio between the active power P (kW) and the apperent power S (kVA) is known as the power factor, and is often designated as the cos . A normal value is between 0.7 and 0.9, when running where the lower value is for small or low loaded motors and the higher for large ones.
6 - 8* In
In
Q
Current/Speed curve
rpm
Torque
The starting torque for a motor differs significantly depending on the size of the motor. A small motor, e.g. 30 kW, normally has a value of between 1.5 and 2.5 times the rated torque, and for a medium size motor, say up to 250 kW. A typical value is between 2 to 3 times the rated torque. Really big motors have a tendency to have a very low starting torque, sometimes even lower than the rated torque. It is not possible to start such a motor fully loaded, not even at DOL start. The rated torque of a motor can be calculated using the following formula: Tn = 9550 x Pr nr
Slip-ring motors
In some cases when a DOL start is not permitted due to the high starting current, or when starting with a star-delta starter will give too low starting torque, a special slip-ring motor can be used. This special motor is started by changing the rotor resistance. When speeding up, the resistance is gradually disconnected until the rated speed is reached and the motor is working at the equivalent rate of a standard squirrel-cage motor. The advantage of a slip-ring motor is that the starting current will be lower and it is possible to adjust the starting torque up to the maximum torque. But the usage of this starting method is very limited today as both this special motor as well as the rotor starter equipment is very expensive.
Tn = Rated torque (Nm) Pr = Rated motor power (kW) nr = Rated motor speed (rpm)
In general, if a softstarter is going to be used for this application you also need to replace the motor.
rpm
rpm
Braking load torque This is a direct braking force on the motor shaft. To be able to accelerate, the motor has to be stronger than the load. The accelerating torque is the difference between the available motor torque and the load toque. Many starting methods will reduce the torque of the motor and
thereby reducing the accelerating torque which will give a longer starting time. Accelerating torque = Available motor torque Braking load torque. The load curve can have different characteristic depending on the application. Some of the common load types can be seen below.
Many applications are usually started unloaded, and the load is applied first when the motor has reached the rated speed. This will reduce the load torque to about 10-50% of the load torque of a loaded start.
Moment of inertia The involved moment of inertia or flywheel mass is the size of the flywheel, connected to the motor axis. An application with a small moment of inertia is usually called a normal start while an application with a big moment of inertia is called a heavy duty start. Normal start Small moment of inertia, short starting time, normally OL class 10 is used. Examples of applications are pumps, compressors, bow thrusters and short conveyor belts.
Heavy duty start Heavy duty Big moment of inertia, long starting time, normally OL class 30 is required. Examples of applications are fans, crushers, mills and long conveyor belts.
A bigger moment of inertia will require a longer starting time for the same motor and the same breaking load torque. The table below gives an indication of normal starting times for different load conditions using 3 different starting methods. Approximate starting times Direct on line Motor without load Motor connected to application with small flywheel (normal start) Motor connected to application with large flywheel (heavy duty start) 0.2 0.5 sec 2 4 sec Star delta starter 0.4 sec 3 6 sec Softstarter (ramp time 10 sec) 1 sec 6 sec
6 8 sec
8 12 sec
8 12 sec
Star-delta start
Frequency converter
Softstarter
KM 1
FR 1
M
DOL starter with contactor and O/L relay Single line diagram for a DOL starter
rpm
Star-delta start
A star delta starter usually consists of three contactors, an overload relay and a timer. This starting method can only be used with a motor that is delta connected during continuous run. The basic idea behind a star-delta starter is that during the first part of the acceleration, the motor windings are connected in star, giving a reduced current. After a preset time, the connection will change to delta which will give the full current and also the full torque. When used in delta, the voltage across each motor winding is same as the network voltage. The motor current will split between two parallel windings with the factor 1/3 compared to the line current. If the impedance in each motor winding is Z, then the sum of impedance for the parallel windings is Z/3. When the motor is star connected (Y- connected) the motor windings become serial connected. The resulting impedance
KM 2 KM 3 KM 1
will then be 3*Z, resulting in an impedance which is ((3*Z)/( Z/3) = 3), 3 times the impedance when delta connected. As the voltage level is the same, the resulting current when Y-connected will be 1/3 of the current when delta connected. So when starting using Star-Delta start, the star connection results in a current of 33% compared to a delta connected motor. As the main voltage is the same the motor feels a star connection as a voltage reduction, as because the voltage across each motor windings will be 1/3 of the main voltage. This lower voltage will also result in a torque reduction. The torque will be reduced with the square of the voltage, [(1/3)* (1/3) 0,33] ending up being 33% of the toque available when delta connected. However, this is only a theoretical value. A more true value is 25% as there are additional losses as well as other efficiency data valid when used star connected. This works well in an unloaded or very light loaded start, but it will not be possible to start heavier applications.
400 V
230 V KM 1 FR 1 KM 2 KM 3
FR 1 KT
KM 1 KM 2 KM 3 FR 1 KT Main contactor Delta contactor Star contactor Overload relay Timer
M
Star-delta starter with contactors and O/L relay
A big problem with star-delta starters appears when starting for instance pumps. The motor will accelerate to about 8085% of the rated speed before the load torque is equal to the motor torque and the acceleration ceases. To reach the rated speed, a switch over to delta position is necessary, and this switch over will very
often result in high transition and current peaks. In some cases the current peak can reach a value that is even higher than for a DOL start. Also, just as with a DOL start, the only way to stop when using a star-delta starter is to make a direct stop.
With star-delta starter, the current will initially be reduced, when the load is light
When starting a pump, huge transmission peaks might occur Softstarter Handbook 1SFC132060M0201 | 14 15
Frequency converter
The frequency converter is sometimes also called VSD (Variable Speed Drive), VFD (Variable Frequency Drive) or simply Drives. The drive consists primarily of two parts, one which converts AC (50 or 60 Hz) to DC and a second part which converts the DC back to AC, but now with a variable frequency of 0-250 Hz. By controlling the frequency, the drive can control the speed of the motor. During start, the drive increases the frequency from 0 Hz up to the network frequency (50 or 60 Hz). By gradually increasing the frequency like this, the motor can be considered running at its rated speed for that frequency. Also, since the motor can be considered running at its rated speed, the rated motor torque is available already from start and the current will be around the nominal current. Usually, the drive trips if the current reaches 1.5 times the rated current. When using a drive to control the motor it is possible to perform a soft stop. This is especially useful when stopping pumps in order to avoid water hammering but it can also be useful for conveyor belts.
In
rpm A Frequency converter operates at nominal current and torque even during start.
rpm
In many applications it is required to continuously regulate the speed of the motor, and a drive is then a very good solution. However, in many applications a drive is used only for starting and stopping the motor, even though there is no need for continuous speed regulation. This will create an unnecessarily expensive solution if comparing with, for instance a softstarter.
Comparing a softstarter and a drive, the drive has a much bigger physical size and requires more space. The drive is also much heavier than a softstarter making it a less desirable solution on, for instance ships where weight is important. Finally, since the drive changes the frequency and actually creates the sinus wave, a drive will cause harmonics on the network. Additional filters as well as shielded cables are used to reduce these problems but the harmonics will typically not be totally eliminated.
AC
Q1
DC AC
DC
M
Frequency converter Single line diagram for a frequency converter
Softstarter
A softstarter does not change the frequency or the speed like a drive. Instead it ramps up the voltage applied to the motor from the initial voltage to the full voltage. Initially, the voltage to the motor is so low that it is only able to adjust the play between the gear wheels or stretching driving belts etc to avoid sudden jerks during the start. Gradually, the voltage and the torque increase so that the machinery starts to accelerate. One of the benefits with this starting method is the possibility to adjust the torque to the exact need, whether the application is loaded or not. Using a softstarter will reduce the starting current and thereby avoid voltage drops in the network. It will also reduce the starting torque and mechanical stress on the equipment, resulting in reduced need for service and maintenance. Just as for a drive, the softstarter can perform a soft stop, eliminating water hammering and pressure surges in pumping systems and avoiding damage to fragile material on conveyor belts.
KM 1
FR 1
Q1
M
Single line diagram for a softstarter. The line contactor is not required and sometimes the overload is built-in.*
Softstarter
Low load
High load
rpm
Torque and current curves when starting a low loaded motor and fully loaded motor using a softstarter.
Problem prevented Type of problem Slipping belts and heavy wear on bearings High inrush current Heavy wear and tear on gear boxes Damaged goods / products during stop Water hammering in pipe system when stopping Type of starting method Direct on line No Star-Delta start Medium Drives Yes Softstarter Yes
No No No No
Yes Yes Yes Yes (Eliminated with Torque control Reduced with voltage ramp) Yes 6
No 1
No 3
Yes > 12
Housing
Thyristor
PCBA
Heat sink
Fan
Housing
Softstarter functionality
A softstarter consists of a number of anti-parallel thyristors; two in each phase. These thyristors are semiconductor components which normally are isolating but by sending a firing signal, they can start to conduct, allowing the voltage and the current to pass through. When performing a soft start, a firing signal is sent to the thyristors so that only the last part of each half period of the voltage sinus curve passes through. Then during the start, the firing signal is send earlier and earlier allowing a bigger and bigger part of the voltage to pass through the thyristors. Eventually, the firing signal is sent exactly after passing zero, allowing 100% of the voltage to pass through. By allowing more and more of the voltage to pass through the thyristors, this can be seen as a ramping up of the voltage from something called the initial voltage to the full voltage. When performing a soft stop, the opposite happens. At first, the full voltage is allowed to pass through the thyristors and as the stop proceeds, the firing signal is sent later and later allowing less and less of the voltage to pass through until the end voltage is reached. Then no more voltage is applied to the motor and the motor stops.
Zero crosses
Firing angle
Start: The thyristors let part of the voltage through at the beginning and then increase it, according to the set ramp time for the start. Stop: The thyristors are fully conducting and when soft stopping, they decrease the voltage according to the set ramp time for stop.
U 100%
time
Since the voltage to the motor is reduced during the start, both the current and the torque will also be decreased. In fact, if the voltage is decreased to 50% of the full voltage, the current will be decreased to about 50% of the maximum current at that speed and the torque will be decreased to about 25% of the maximum torque. These are the main benefits of using a softstarter: The inrush current is reduced so that voltage drops on the network are avoided. The torque is reduced which will decrease the mechanical stresses on the equipment and lead to a reduced need for service and maintenance and also to a longer life of the equipment. Finally, by using a stop ramp, water hammering is avoided in pump systems, which will further reduce the stress on the equipment.
U 100%
U = 50%
time
Torque Control
Normally, a softstarter performs a start and a stop by ramping up or down the voltage linearly. However, a linear change of the voltage does not necessarily give a linear change of the torque or of the speed. This is where torque control comes in. With a torque ramp, it is not the voltage that is ramped up or down linearly, it is the torque. This is done by using a regulation loop where the torque is calculated by measuring both the voltage and the current. This torque is then compared to the required torque and the voltage is adjusted so that the torque is changed in the required way. Torque control is especially useful for stopping pumps where a sudden decrease of the speed may lead to water hammering and pressure surges that can cause tremendous mechanical wear on the pump, the valves and the pipe system. When performing a stop with a normal voltage ramp, the voltage starts to decrease as soon as the stop command is given. However, as the voltage decreases the current will instead increase. This is because the motor will try to remain in its current state. Since the torque depends on both the voltage and the current, it will remain more or less unchanged. Then after some time when the voltage has dropped enough, there will be a sudden drop in the current and the torque and the motor will stop suddenly. This stop will still be far better than a direct stop but in many pump systems this is not good enough, so another solution must be found.
With torque control, it is not the voltage that is ramped down it is the torque. This will force the motor to slow down immediately and perform a controlled deceleration all the way until it comes to a complete stop, see figure to the right. Being able to have a good control of the torque of the motor is crucial to being able to prevent water hammering. However, this is not enough. What is also needed is a torque curve that has been designed in such a way that the water hammering is avoided. In fact, a linear decrease of the torque is not a very good way to stop a pump. This is why ABB for a long time has worked closely together with pump manufacturers in order to gain knowledge about how to best stop pumps. After more than a thousand different tests and simulations with different combinations of pumps and motors ABB has developed the optimal stopping curve the perfect way to stop the pump.
Torque control will ensure a more direct effect and a more linear decrease of the speed during stop.
Different applications
All motors are used for starting and running different applications. This chapter covers some of the most common ones fans, pumps, compressors, conveyor belts, crushers and mills. The different applications will result in different load conditions for the motor as described on pages 10-11.
Centrifugal fan
Fans usually have a big moment of inertia due to the big flywheel. Some fans can be started with reduced load torque, with a closed damper. This is called an unloaded start and will make the start easier (shorter) but cause of the high moment of inertia, the starting time might still be quite long.
Direct on line start The high moment of inertia of fans will lead to a longer starting time. With the high starting current of a direct on line start, this might lead to severe voltage drops in the network, disturbing other equipment. Centrifugal fans are very often driven by one or more drive belts. During a DOL start these belts have a tendency to slip. The belts slip because the starting torque from the motor is too high during the start and the belts are not able to transfer these forces. This typical problem gives high maintenance costs but also production losses when you need to stop production to change belts and bearings.
Star-delta starter (Y-D) The star-delta starter gives lower starting torque. However, depending on the fact that the load torque increases with the square of the speed, the motor torque will not be high enough in the star position to accelerate the fan to the rated speed. When switching over to delta position it will be both a high transmission and current peak, often equal or even higher than values when making a DOL start, with a slipping belt as a result. It is possible to reduce the slip by stretching the belts very hard. But this gives high mechanical stresses on bearings both in the motor and the fan with high maintenance costs as result.
Centrifugal fan
Softstarter The key to solve the problems with slipping belts is to reduce the starting torque of the motor during start. By using an ABB softstarter the voltage is reduced to a low value at the beginning of the start. Then gradually the voltage is increased in order to start up the fan. The softstarter provides the ability to adjust the settings to fit any starting condition, both unloaded and fully loaded starts. Using a softstarter will also greatly reduce the high inrush current when starting the motor, and thereby avoid voltage drops in the network. Some softstarters have built-in underload protection which will detect the reduced current caused by a broken belt, and stop the motor to prevent damage. Selection of a suitable Softstarter A fan usually has a big flywheel with a big moment of inertia making it a heavy duty start. Select a softstarter one size larger than the motor kW size. Since the big flywheel of a fan will cause a long slow down period before the fan stops, a stop ramp should never be used for this kind of application. Recommended basic settings: Start ramp: 10 sec. Stop ramp: 0 sec. Initial voltage: 30 % Current limit: 4 * Ie
Centrifugal pump
There are a lot of different types of pumps like piston pumps, centrifugal pumps, screw pumps etc. The most common version is the centrifugal pump and this is the one focused on here.
Direct on line start Starting up a pump is normally not a big problem electrically. The problem is the wear and tear caused by pressure waves in the pipe system created when the motor starts but especially when it stops too quickly. Due to the small flywheel mass and the high breaking torque of a pump, a direct stop will cause a very sudden stop of
the pump creating water hammering and pressure surges. During a single stop this is merely an inconvenience but when performing several starts and stops per hour day in and day out, the whole pump system will soon be worn out. This will creat a big need for service and maintenance and even worse unplanned shutdowns.
Centrifugal pump
Star-delta starter (Y-D) By using a star-delta starter it is possible to reduce the starting torque. However, the motor does not have enough torque in the star position to be able to complete the start and reach the rated speed. The quadratic load torque will become too high for the motor when reaching approx. 80-85% of the rated speed. To continue to accelerate to full speed, a switch over to the delta connection is needed. When switching to the delta connection, the star contactor is opened and the delta contactor is closed. However, to prevent a short circuit there needs to be a time delay of 50 ms between opening the star contactor and closing the delta contactor. This is enough time for the arc to disappear. Unfortunately, due to the high breaking torque of the pump, the motor will slow down during this period. There will still be a magnetic field in the motor and when the delta contactor closes the difference in potential between the network and the motor might be twice that of the network voltage, reacting up to 800V in an 400V network. These 800V will create a huge current spike, possibly even higher than the magnetization peak of a DOL start. There will also be a huge torque peak that after several starts might even damage the connections between the motor axis and the load. In addition, the only possible method of stopping the pump is to perform a direct stop and this will create the same problem with water hammering and pressure surges as for a DOL start.
rpm
rpm
Softstarter By using an ABB softstarter the voltage is reduced during the start sequence with the result that the motor torque is reduced. During the start sequence the softstarter increases the voltage so that the motor will be strong enough to accelerate the pump to the nominal speed without any torque or current peaks. Also during the stop sequence the softstarter is the solution. A softstarter using a normal voltage ramp will for sure reduce the problems with water hammering but in many pump systems this is still not good enough. The solution is to use a softstarter with torque control in order to reduce the torque and stop the motor in the most optimal way in order to totally avoid water hammering.
In addition, some softstarters are equipped with underload protection to detect pumps running dry, with kick start to start blocked pumps and with locked rotor protection to prevent damage caused by pumps being jammed while running. Selection of a suitable softstarter A pump usually has a very small pumpwheel with a low moment of inertia. This makes the pump a normal start so the softstarter can be selected according to the kW rating. If more than 10 starts per hour are performed it is however recommended to upsize the softstarter one size. Recommended basic settings: Start ramp: 10 sec. Stop ramp: 10 - 20 sec. Initial voltage: 30 % Stop mode: Torque control Current limit: 3.5 * Ie
Compressor
Smaller compressors are often of the piston type and the load torque increases linearly with the speed. Screw compressors are often used when there is a bigger need for air flow and this type has a load torque increasing with the square of the speed. Drive belts are often used between motor and compressor but direct connections via some type of toothed couplings are also common. Most compressors are started unloaded. Direct on line start (DOL) Compressors started direct on line are exposed to high mechanical stresses on the compressor itself, but also on drive belts and couplings. The result is shortened endurance. In cases where the drive belts are used the belts very often slip during the start. The source of these problems is the high starting torque occurring with the DOL method. Star-delta starter (Y-D) Star-delta start gives a lower starting torque and starting current but the motor is too weak during the start up to be able to accelerate the motor up to nominal speed. When switching to the delta position both current and torque peaks will occur with high mechanical stresses as a result.
Softstarter By using an ABB softstarter it is possible to limit the starting torque to a level suitable for all different applications. The result is less stress on couplings, bearings and no slipping belts during start. The maintenance cost will be reduced to a minimum. When using a softstarter the starting current received is approx. 3 to 4 times the rated motor current.
Selection of a suitable softstarter A compressor is usually a normal start and then the softstarter can be selected according to the motor kW size. If the compressor is a heavy duty start, the softstarter should be upsized one size. The same applies if more than 10 starts per hour are performed, upsize one size. Recommended basic settings: Start ramp: 5 sec. Stop ramp: 0 sec. Initial voltage: 30 % (piston compressor) 40 % (screw compressor) Current limit: 3.5 * Ie
Conveyor belt
Conveyor belts can have a lot of different characteristics. The length can vary from only a few meters up to several kilometres and the belt can be horizontal or inclining. Typically, the conveyor belt has a constant load torque with low to high braking torque depending on the load.
Direct on line start (DOL) Conveyor belts often need a starting torque very near or just above the rated torque of the motor. A direct on line start with a normal squirrel cage motor gives approx. 1.5 to 2.5 times rated torque of the motor depending on motor size, type etc. When making a direct on line start there is a very high risk of slipping between the belt and the driving role de-
pending on this high starting torque. Gearboxes and couplings are also exposed to high mechanical stresses. This result is considerable wear and tear and often high maintenance costs. Sometimes fluid couplings are used to reduce the transferred torque. This method is expensive and requires a lot of maintenance.
rpm
Torque/speed curve at DOL start Torque/speed curve at DOL start
rpm
Star-delta start Since the start delta starter will reduce the torque in the star connection, it is not possible to use this starting method when the load torque is close to the rated motor torque during start. A star delta starter can only be used successfully with a very lightly loaded conveyor belt. Low braking torque High braking torque
rpm
rpm
Conveyor belt
Softstarter By using an ABB softstarter the starting torque can be reduced to a minimum value and still be able to start up the conveyor belt. The setting feature of the softstarter makes it possible to adjust the torque to exactly the level that is necessary for the start. The result is the least possible stress on gearboxes and couplings and no slipping belts during the start. This will reduce the maintenance cost to a minimum. When using a softstarter you will receive approx. 3 to 4 times rated motor current during the start. In addition, some softstarters are equipped with phase reversal protection to detect conveyor belts running in the wrong direction. Softstarters may also have under- or overload protection to detect if the load is too low or too high, and then kick-start to be able to start jammed belts. Selection of a suitable softstarter A conveyor belt can be both a normal start and a heavy duty start depending on the characteristics. For a normal start, select the softstarter according to the motor kW rating. For a heavy duty start, select one size bigger. If more than 10 starts per hour are done, select one size bigger softstarter. Recommended basic settings: Start ramp: 10 sec. Stop ramp: 0 sec. (If fragile material use 10 seconds) Initial voltage: 40 % Current limit: 4 * Ie
Direct on line start (DOL) When starting direct on line there will be high mechanical stresses leading to a shortened life length for all parts of the drive chain. In addition, the inrush current will be high and as a result of this in combination with the long starting times, there might be big disturbances in the network.
Star-delta starter (Y-D) Applications such as these are often started unloaded, and it will then be possible to start with a star delta starter. Loaded starts on the other hand will require a high torque of the motor, so such starts are not possible with a star delta starter. Even though these applications normally are started unloaded, there may be occasional loaded starts, for instance if an emergency stop has been performed on a crusher. The material is then still in the crusher and it must be started with the load already applied. Under such circumstances, a star-delta starter may not be a feasible option.
Selection Select one size larger softstarter compared to the rated motor power. For units with built-in overload, select trip class 30.
Typical applications Bow thruster Compressor Elevator Centrifugal pump Conveyor belt (short) Escalator Centrifugal fan Crusher Mixer If more than 10 starts/h Select one size larger than the standard selection Conveyor belt (long) Mill Stirrer
Ambient temperature
The ambient temperature is the average surrounding temperature of the softstarter over a period of 24 hours. For most types of softstarter the temperature may not exceed 40 oC without derating the operational current for the unit. The maximum ambient temperature during operation differs from one type of softstarter to another and must be checked individually according to the manufacturers specification. When using an ABB softstarter with an ambient temperature of above 40 oC, the following formula can be used to calculate the operational current:
Ie derated = Ie - ( T x Ie x 0.008) Ie derated Ie T 0.008 = maximum operational current after derating = rated current of the softstarter = temperature difference = derating factor Example 2 Rated current: 300 A Ambient temperature: 46 oC Derating with 0.8 % per oC above 40 oC (PST(B)30 ... 1050) T = 46-40 oC = 6 oC New current = Ie - ( T x Ie x 0.008) = 300 - (6 x 300 x 0.008) = 285.6 A This means that a PST300 can only be used for 285.6 A. For a 300 A motor, a larger PSTB needs to be used.
Example 1 Rated current: 105 A Ambient temperature: 48 oC Derating with 0.8 % per oC above 40 oC (PST(B)30 ... 1050) T = 48-40 oC = 8 oC New current = Ie - ( T x Ie x 0.008) = 105 - (8 x 105 x 0.008) = 98.2 A This means that a PST105 can only be used for 98.2 A. For a 105 A motor, a larger PST needs to be used.
% of Ie = 100 -
= 100 -
1500 = 90 150
Ie = 300 x 0.9 = 270 A This means that a PST300 can only be used for 270 A. For a 300 A motor, a larger PSTB needs to be used.
90 %
80 %
1000
100
10
100
200
300
400
Starting current
Starting capacity when using overload protection The overload protection for the motor (thermal or electronic) will very often set the limit of the starting capacity. These overload protections have different tripping classes, describing how fast they are tripping for a specific current. A class 10 relay is used for normal starts in general
while a class 30 relay is used for heavyduty starts where the start usually is longer. In some applications where the overload protection is by-passed (other protection active) during a start to achieve a longer available starting time, it is particularly important to check the softstarter starting capacity since this will be the limitation.
Time
b a
a) Tripping curve for overload protection b) Max starting capacity for a softstarter (This will limit the starting time / current if the overload is by-passed during start)
Starting current
Intemittens factor The intermittens factor is a figure indicating how long the softstarter has been running for (starting time and running time) compared with the total cycle time. It is important to define the intermittens factor when talking about the number of starts/hour since the OFF time is the cooling time for the softstarter. A high starting current and a long starting time require a longer OFF time than a low starting current and short time to maintain the same number of starts/hour.
Examples: If a softstarter has been running for 5 minutes of a total duty cycle of 10 minutes then the intermittens factor is 50 % ON time and 50 % OFF time. If a softstarter has been running for 45 minutes of a duty cycle of 60 minutes then the intermittens factor is 75 % ON time and 25 % OFF time.
Prosoft
The selection of a softstarter can be done according to the softstarter main catalog. This will work fine in the majority of cases but by using the softstarter selection tool ProSoft, a more optimized selection will be achieved. Especially in extremely heavy duty applications with several minutes starting time, the use of ProSoft is recommended. When using ProSoft, the selection is done in 3 steps, which can be seen as 3 different tabs in the program: 1. Input tab Type in the general data and information about the motor and about the load. Try to use as accurate data as possible to get the most accurate results.
2. Calculation tab Here it is possible to see how long the start will be depending on how high the current is. This tab will indicate which settings should be used and it might affect the selection.
3. The selection tab Select which of the suggested softstarters to use. Here it is also possible to generate a report containing all information about the selection.
In-line connection This is the most common and also the easiest way to connect the softstarter. All three phases are connected in series with the overload relay, the main contactor and other devices used just like the diagram below. The selected devices for Inline connection must be chosen to cope with the full rated motor current. The motor itself can either be star connected or delta connected Example: 100 A motor requires a 100 A softstarter, 100 A main contactor etc.
Inside Delta connection The Inside Delta connection makes it possible to place the softstarter in the delta circuit and allows for a very easy replacement of existing star delta starters. When the softstarter is Inside Delta it will only be exposed to 58% (1/3) of the Inline current. Therefore it is possible to downsize the devices in order to achieve a more cost-effective solution. All functionality will be identical regardless if connecting in line or inside delta. However, with the inside delta connection, 6 cables are required between the softstarter and the motor, and if this distance is long, an in line connection might be a more cost efficient solution. Example: A 100 A motor requires a 58 A softstarter, a 58 A main contactor if placed in the delta circuit, etc. A motor used for an Inside Delta connection must be able to delta-connect during a continuous run. In the USA and some other countries a special six-wire motor has to be ordered for this type of connection. A softstarter controlling the voltage in only two of the three phases can not be used inside the motor delta.
Note: In the PSE and PST(B) softstarters the overload protection is built-in.
Location of the main contactor When using the softstarter Inside Delta, there are two options for the main contactor; inside the delta circuit or outside. Both locations will stop the motor but in alternative A, the motor is still considered to be under tension. In alternative B, the main contactor must be chosen according to the rated current of the motor, while the contactor in alternative A can be chosen according to 58% (1/3) of the rated current.
Regardless of where the main contactor is placed, it should be AC-3 rated for that current, to be able to break the current and stop the motor in an emergency.
Note: In the PSE and PST(B) softstarters the overload protection is built-in.
Parallel start of motors If a softstarter is going to be used for starting several motors at the same time (parallel start), there are two important parameters to check: 1. The softstarter must be able to cope with the rated current for all motors together. 2. The softstarter must be able to cope with the starting current for all motors together until rated speed is achieved. Note! If a by-pass contactor is used for the softstarter, only point 2 above has to be taken into consideration. Example: Start of two motors with Ie = 100 A and relative starting current 4 x Ie. Starting time is 10 seconds. Total starting current is 100 x 4 x 2 = 800 A for 10 seconds. Check the softstarter starting capacity graph to verify the selected size. Make sure that you are using separate overload relays, one for each motor.
KM 1
Q1
FR 1
FR 2
Sequential start of motors If a softstarter is going to be used for starting several motors one by one (sequential start), it is important to check that the softstarter is able to cope with the starting current for each motor during the whole starting sequence. Example: Start of three motors with Ie=100 A and relative starting current 4 x Ie. Starting time for the motors is: Motor 1 = 5 seconds Motor 2 = 10 seconds Motor 3 = 8 seconds
The starting current for the motors is 100 x 4 = 400 A and the total starting time is 5 + 10 + 8 = 23 seconds. Check the softstarter starting capacity graph to verify the selected size.
Note! It is not possible to add the starting time for each motor if the rated current is different from one motor to another. A separate calculation has to be made for those applications. Some softstarters, like the PST(B) range, have the possibility to use different parameter sets for the different motors. This is needed to achieve a good start if the motor sizes are different or if the applications are different. Most softstarters can not softstop more than the latest started motor. Usually, separate protections need to be used for each of the motors.
KM 1
Q1
K 26
K 28
K 30
K 25 FR 1
K 27 FR 2
K 29 FR 3
Run
Closes as soon as a start signal is given and remains closed all the time when the softstarter is feeding voltage to the motor. Usually used to control a line contactor. Closes when the softstarter reaches top of ramp (full voltage fed to the motor) and remains closed until a stop signal is given. Usually used to control an external by-pass contactor. This relay will close (or open) when any fault or protection occurs. Can be used to signal an error or to open a line contactor.
TOR / By-pass
Event
Made in Sweden
Made in Sweden
Key-Pad
PTC
Fieldbus
Key-Pad
PTC
Fieldbus
Versions The latest version of the gsd-file supports all softstarter versions. Same file supports both DP/V0 and DP/V1 The version of the software file must match the version of the softstarter. The version of the software file must match the version of the softstarter.
Softstarter Handbook 1SFC132060M0201 | 50 51
Softstarter
SCR SCR Motor
Slightly unbalanced currents during start When using a 3-phase controlled softstarter, the starting current will be balanced between the three phases. When using a 2-phase controlled softstarter, however, the current will be higher in the phase that is not controlled and lower in the other two phases. This has the effect that the maximum current (in one phase) is higher with a 2-phase controlled softstarter compared with a 3-phase controlled softstarter. This unbalance will only appear during the short time of the start and the stop. During continuous run, the currents will be balanced. When is 2-phase controlled softstarter a good solution? A 2-phase controlled softstarter A 3-phase controlled softstarter is works good: preferred when: - In most normal applications - The absolutely lowest starting current - In all different segments is required - When torque control is required - Inside delta connection is required - Normal start or heavy duty start - The unbalanced currents during start - When a compact and cost efficient and stop is a problem solution is required
Settings
This section includes a short description of some of the most important setting parameters available on softstarters. Not all of these settings are available on all softstarters and other settings may be available depending on the type of softstarter and manufacturer. The settings can be done either by adjusting potentiometers, changing dip switches, using a key pad, a computer or similar. Start ramp is the time from were the softstarter starts its ramp (initial voltage) until full voltage is reached. The ramp time should not be too long, as this will only result in unnecessary heating of the motor and a risk of the overload relay tripping. A common misunderstanding is that this parameter sets the start time, that is the time for the motor to reach full speed. This is not true. The start ramp parameter only sets the time until the softstarter applies full voltage to the motor. If the motor is unloaded, the start time for the motor will probably become shorter than the set ramp time. And if the motor is heavily loaded, the start time will probably become longer. Stop ramp is used when a soft stopping of the motor is required, for example, a pump or a conveyor belt. The stop ramp is the time from full voltage until end voltage is reached. If the ramp time is set to zero the stop will be like a direct stop. Torque control is a function that will control the torque of the motor instead of the voltage. This is especially useful when stopping pumps in order to avoid water hammering. On softstarters with torque control it is possible to select between a torque ramp or a voltage ramp both during start and stop. These parameters are called start mode and stop mode.
Ue
Stop ramp
Initial voltage is sometimes named pedestal voltage. This is the point from where the softstarter starts to ramp up. The torque of the motor will drop with the square of the voltage and if the voltage is set too low, for example 20 %, the starting torque will become 0.22 = 0.04 = 4 % only, and the motor will not start from the very beginning. Therefore, it is very important to find a level that is just high enough to make the motor take off directly to avoid unnecessary heating. End voltage is the voltage level that the softstarter ramps down to during the set ramp time of a stop ramp. At this point the motor shall already have stopped and the softstarter will break the current to the motor in order to avoid unnecessary motor heating.
Adjustable rated motor current makes it possible to set the motor rated current on the softstarter for the used motor. This setting will affect other values as well, such as the trip level of the electronic overload protection and other protections, but also the level of the current limit function.
Settings
Current limit can be used in applications where a limited starting current is required, or at a heavy-duty start when it is difficult to achieve a perfect start with the setting of the initial voltage and the start ramp only. When the current limit is reached, the softstarter will temporarily stop increasing the voltage until the current drops below the set limit, and then continues ramping up to full voltage. Since the maximum current (DOL-current) is decreasing as the speed increases, the voltage can be gradually increased without exceeding the set current limit
Holding the voltage at a fixed level will keep the current on the set level
Current limit function in a softstarter limits the current to the pre-set level
Time
rpm
The current and voltage needs to be reduced more in the beginning of the start.
Recommended settings
The required settings for the softstarter will differ from one application to another depending on the type of load, motor characteristics, how much the motor is loaded, etc. The settings on these pages are only general recommendations so for each installed softstarter the settings should be checked individually. When using a 2-phase controlled softstarter, the initial voltage and current limit might need to be set slightly higher.
Axial fan Band saw Bow Truster Centrifugal fan Centrifugal pump Circular saw Compressor Conveyor belt Crusher Cutter Escalator Grinder
Example: Electrical apparatus for explosive atmospheres - oil immersion o shall be recognised as Exo
operation and if it does occur it will exist for a short period only. Equipment permitted in zones 0 and 1 may of course be used. Under certain conditions the equipment, motors for example, need not to be of explosion-protected design.
3m 3m r4.5 m
Surface of liquid
ATEX
ATEX means ATmosphere EXplosible and describes what equipment and work environment is allowed in an environment with an explosive atmosphere. It consists of two EU directives: the ATEX 95 equipment directive 94/9/ EC, Equipment and protective systems intended for use in potentially explosive atmospheres. the ATEX 137 workplace directive 99/92/ EC, Minimum requirements for improving the safety and health protection of workers potentially at risk from explosive atmospheres.
Location and selection of softstarter for Ex environments If a softstarter is going to be used for an Ex application it is normally located in a separate enclosure outside any of the hazardous zones. The overload relay used shall be of a special version designed for Ex motors, for example TA25DU ... V1000 to T900DU/SU...V1000. As well as a special version of the product UMC. This type of relay has a more accurate tripping curve compared with the standard relay. Special attention has to be paid to this. The softstarter type and size and other devices used in the circuit is suitably selected according to type 2 coordination.
Note! If any electrical equipment is going to be used in any of the hazardous zones, a special enclosure must be used. This type of enclosure (steel box or similar) must be able to withstand an inside explosion caused by any of the components without letting anything out to the surroundings. This solution is in general very unusual.
Coordination
By coordination we mean a selected combination of electrical apparatus which are safe for the surroundings and personnel, even if an overload or a fault should occur in the system. The coordinated group must ensure the following four essential functions: Protection against overloads. A protection, which guards all components, cables and the motor from overheating, active for all currents up to, locked rotor current. This device will send a trip signal to a disconnection mean, which is normally a contactor used for the motor control. Motor control. This function is commonly carried out by a contactor. Protection against short-circuits, which takes care of all currents above the locked rotor current - i.e. all fault currents. Isolation. Ensure an isolating air-gap when opened for personnel safety.
The coordinations for the ABB softstarters are done according to IEC 60947-4-2 AC semiconductor motor controllers and starters and EN 60947-4-2. The provisions of IEC 60947-1, General Rules, are applicable to IEC 60947-4-2 where specifically called for. The standard IEC 60947-4-2 defines two types of coordination according to the expected level of service continuity. Type 1: Coordination requires that, under shortcircuit conditions, the device shall cause no danger to persons or installation and may not be suitable for further service without repair and replacement of parts. Type 2: Coordination requires that, under shortcircuit conditions, the device shall cause no danger to persons or installation and shall be suitable for further use. For hybrid controllers and starters, the risk of contact welding is recognized, in which case the manufacturer shall indicate the measures to be taken as regards the maintenance of the equipment. Note! When using a softstarter in a type 2 coordination, replacing the fuses and restart has to be accepted after a short-circuit. Only semi-conductor fuses can be used to achieve a type 2 coordination for a softstarter.
Utilization Categories
Some utilization categories are stated in the standard IEC 60947-4-2, AC semiconductor motor controllers and starters. The one used for ABB Low Voltage softstarters is AC-53, since this is about controlling squirrel cage motors. This is the category stated in the header of the coordination tables for softstarter.
Typical application Control of squirrel cage motors: 8 h duty with on-load currents for start, acceleration, run
Remark Softstarter designed for use without external by-pass contactor Softstarter designed for use with external by-pass contactor.
AC-53b
Note! Some ABB softstarters have built-in by-pass while others do not have this. However, it is never required to add an external by-pass contactor, since all ABB softstarters are designed according to AC-53a utilization category.
Types of protections
There are several different types of protection for electrical devices used on the market. They all have different functions and characteristics. One type cannot in general replace another type without checking the other protection devices in the circuit. If replacing a 100 A fuse with another 100 A fuse (same rating) without checking the type then there is a risk of losing protection. The first type may be a type with both short-circuit protection and thermal protection while the replacement fuse is a type with only short-circuit protection. gL/gG fuses have a combination of short circuit protection and thermal overload protection (5s > 3,5 x In) for cables. Type 1 coordination can be achieved if using these types of fuses together with a softstarter. For type 2 coordination, semiconductor fuses must be used. aM fuses only have a short-circuit protection (5s > 9 x In). For thermal overload protection, a separate protection device is required. Type 1 coordination can be achieved if using these types of fuses together with a softstarter. For type 2 coordination, semiconductor fuses must be used. MCCB means Moulded Case Circuit Breaker and is a breaker usually providing both thermal overload protection and short circuit protection. Using a MCCB, type 1 coordination can be achieved. For type 2 coordination, semiconductor fuses must be used. MMS means Manual Motor Starter and is a device consisting of isolation function, thermal overload protection and short circuit protection. Manual motor starters are available up to about 100 A. Using a MMS, type 1 coordination can be achieved. For type 2 coordination, semiconductor fuses must be used. Semi-conductor fuses (High speed fuses) are the only type of fuses that are fast enough to achieve a fully type 2 coordination when using a softstarter. A separate overload relay for the motor protection is always required in combination with this type of fuse. If replacing the semi-conductor fuses with an MCCB, MMS or similar, type 1 coordination will be achieved instead.
Coordination tables
The coordination tables for softstarters can be found on internet page www.abb. com/lowvoltage by clicking Online Product Selection Tools and Coordination tables for motor protection. When opening up the coordination tables, the following screen will appear:
To find the correct coordination tables, simply make the selections in the top part of the screen. The selections that are relevant for softstarters are described below: Protection devices Fuses (standard or semiconductor) MCCB MMS Starting type Voltage (V) Iq (kA) Coordination type Motor kW Softstarter Normal Start In Line Softstarter Normal Start Inside Delta Rated operational voltage for the application Short circuit current rating Type 1 or Type 2 Rated motor power range
Motor
Indicates the rated output of the motor and maximum current. If this does not correspond fully to the actual motor, select according to the maximum current. Indicates suitable softstarter type and size for this motor. Indicates the type and magnetic tripping current for the MCCB. Indicates the rated current and type of the fuses as well as the suitable switch fuse for those fuses. Indicates the type of manual motorstarter, the magnetic tripping current and the current setting range. Indicates the type and setting range for external or built-in overload protection. Indicates suitable line (main) contactor for the motor. This contactor is given with AC-3 rating. Indicates suitable by-pass contactor. The by-pass contactor is however not required for the coordination. This contactor is given with AC-1 rating. Indicates the maximum allowed temperature for the coordination.
Softstarter Moulded Case Circuit Breaker Switch fuse Manual Motor Starter Overload protection device Line contactor By-pass contactor
Coordinations
Starter and fuses In-line The coordinations with the devices In-line are based on this circuit diagram. Starter Inside Delta and fuses In-line The coordinations with the softstarter Inside Delta are based on this circuit diagram.
Note that the by-pass contactor is not required for the coordination.
Note that the by-pass contactor is not required for the coordination.
Line contactor
Softstarter
By-pass contactor
Softstarter
O/L relay
M
Starter and fuses In-line Line contactor AC-3 By-pass contactor AC-1
Motor
M
Starter inside delta and fuses In-line Line contactor AC-3 By-pass contactor AC-1 Line contactor and by-pass contactor Inside Delta connected
When using PSTB softstarters, the fuses are placed inside the delta. Contact ABB for more information.
Environmental information
How a product affects the environment is a matter that is becoming more and more important when designing new products today but also when updating existing product ranges. ABB puts big efforts into reducing the environmental impact from all ABB products.
RoHS (Restriction of Hazardous Substances) RoHS is a directive that specifies which substances are not allowed to be used in certain products. The RoHS directive mainly concerns consumer products, and softstarters are not covered by this legislation. Despite this, many of the ABB softstarters do comply with the RoHS directive.
Harmonics
Harmonics are unwanted voltages and currents existing in almost every electrical system today and are always a multiple of the rated frequency. Typical harmonics are 3rd, 5th, 7th, 9th etc. The harmonics contribute to the unnecessary heating of motors, cables and other equipment and may shorten the life of these devices if exposed for a long period of time. It can sometimes also disturb functions in electronics and systems. The harmonic contents and the level naturally depend on the source but also on several other parameters such as the impedance in the feeding network, the motor, capacitors and other devices used in the system altogether - in other words a quite complex phenomenon. Harmonic content and softstarters The question of harmonic content for softstarter applications is actually in general not relevant at all. These reflections usually come from variable speed drive applications where harmonics are generated continuously and a filter is always required in public networks and very often used also in industrial networks. With our softstarters we fulfil the EMC directive concerning emission and immunity and there is no need for any particular actions regarding this matter at all.
Ohms Law U I= R I= U= R=
R=
U I
U=IxR
Flywheel mass mD2 or GD2 (mD2 ~ GD2) mD2 = GD2 = Flywheel mass, kpm2 Flywheel mass, kgm2
Rated motor torque Mr = Mr = Pr = nr = 9550 x Pr nr Rated torque, Nm Rated motor power, kW Rated motor speed, rpm
Relation Moment of inertia and Flywheel mass 1 1 J= GD2 = mD2 4 4 J= Moment of inertia, kgm2 mD2 = Flywheel mass, kpm2 GD2 = Flywheel mass, kgm2
Moment of inertia m(R2 + r2) J= 2 J= m= R= r= Moment of inertia , kgm2 Mass for the flywheel, kg Outer radius, m Inner radius, m
Moment of inertia on load shaft recalculating to the motor shaft Jb x nb2 Jb = n2 Moment of inertia recalculated to Jb = the motor shaft, kgm2 Jb = nb = nr = Moment of inertia for the load, kgm2 Speed of the load, rpm Speed of the motor, rpm
Loaded torque on load shaft recalculated to the motor shaft Mb = Mb = Mb = nb = nr = Mb x nb nr Load torque recalculated to the motor shaft, Nm Load torque, Nm Speed of the load, rpm Speed of the motor, rpm
Electrical Power P= P= P= U x I x PF 1000 U x I x PF x 2 1000 U x I x PF x 3 1000 Power in kW Power Factor (1-phase) (2-phase) (3-phase)
P= PF =
Conversion factors
Length 1 mile 1 yd 1 ft 1 in Velocity 1 knot 1 mile/h 1 m/s = = = 1.852 km/h 1.61 km/h 3.6 km/h 1 km/h 1 km/h 1 km/h = = = 0.540 knot 0.622 mile/h 0.278 m/s = = = = 1.609344 km 0.9144 m 0.3048 m 25.4 mm 1 km 1m 1m 1 mm = = = = 0.621 mile 1.09 yd 3.28 ft 0.039 in
Area 1 acre 1 ft2 1 in2 Volume 1 ft3 1 in3 1 gallon 1 gallon 1 pint Mass 1 lb 1 oz = = 0.454 kg 28.3 g 1 kg 1g = = 2.20 lb 0.0352 oz = = = 0.405 ha 0.0929 m2 6.45 cm2 1 ha 1 m2 1 cm2 = = = 2.471 acre 10.8 ft2 0.155 in2
= = = = =
1 m3 1 cm3 1l 1l 1l
= = = = =
35.3 ft3 0.0610 in3 0.220 gallon (UK) 0.264 gallon (US) 1.76 pint
Moment of Inertia 1 Nm2 = 2 1 kgm = 1 oz.-in2 Force 1 kp 1 lbf Energy 1 kpm 1 cal 1 kWh Power 1 hp 1 hp 1 kcal/h Temperature 0 oC oC 0 oF oF = = = = = = = = =
= = =
9.80665 N 4.45 N
1N 1N
= =
1J 1J 1 MJ
= = =
1 kW 1 kW 1W
= = =
= = = =
Glossary
AC Active power Ambient temperature Alternating current. The power consumed by the motor which is converted into mechanical action. Ambient temperature is the temperature of water, air or surrounding medium where the equipment is used or stored. The total power consumed by the motor. Consists of both the active power and the reactive power. The speed of an AC induction motor at full load and full voltage, also defined as the rated speed. A component used to reduce the friction and wear between rotating devices. A by-pass contactor is used to by-pass another device, for example a softstarter to reduce the power loss. The voltage that supplies, for example, the softstarter. The voltage used to control (start/stop) the softstarter. See power factor. Canadian Standard Association. An electronic method to limit the starting current to the motor during start up. It is normally possible to adjust the function so that the motor torque will be high enough to take off. A sequence of operations that is repeated regularly or the time it takes to complete one operation. The end that is normally the drive end of an electrical motor. Direct current. Defined and stated as IP (International Protection) class indicating the degree of protection against contact and penetration of solid objects and water.
Control supply voltage Control circuit voltage Cos phi CSA Current limit
The connection type of a motor where the windings are connected in a delta. When a device has to be operated with reduced ratings (normally the current) due to high ambient temperature or high altitude. Direct on line. A common starting method. The total cycle from one start to the next, including ramp time for start and stop, operation and pause time, if any. The ratio between mechanical output and electrical input. The percentage given indicates how effective the motor is at converting electrical energy to mechanical energy. Electromotive Force, another term for voltage or potential difference, for example, the voltage generated by a motor. Environmental Product Declaration, a description of how a specific product affects the environment. Electro Static Discharge. Any malfunction that occurs and interferes with normal operation. FieldBusPlug Using the FieldBusPlug it is possible to select between several different fieldbus protocols. The total mass (mD2 or GD2) of a rotating body normally given in kpm2 or kgm2. The value of the flywheel mass is 4 times the moment of inertia. The number of periodic cycles per unit of time. The control element of a SCR (thyristor). When giving a small positive voltage to the SCR it will start conducting.
Efficiency
EMF
Frequency Gate
Glossary
Heatsink A component often made of aluminium used to get rid of the heat inside an electrical device generated by the current. A start with a load that has a high or very high moment of inertia. A starting time DOL of more then 5 seconds can be defined as a heavy-duty start. International Electrotechnical Commission which is part of the International Standard Organisation. A measure of a bodys resistance to change in velocity whether the body is moving at a constant speed or is at rest. The velocity can be rotational or linear. An AC motor with a primary winding (usually the stator) connected to the power supply and a secondary winding (usually the rotor) carrying the induced current. A connection type where the devices in the main supply are connected in series with each other. A connection type where the devices are connected inside the motor delta circuit. The current is reduced to 1/3 = 58% compared with the line current. A small electronic unit that can consist of thousands of transistors usually mounted on a PCB. The relation between how long a machinery is working (ON time) and how long it is resting (OFF time) in a cycle. Momentary moving of the motor by repetitive closure of a circuit using a contact element or a pushbutton. Life Cycle Assessment, an analysis of how a product affects the environment from cradle to grave. Liquid Crystal Display, a readout interface used in digital watches, laptop computers and some softstarters.
IEC Inertia
Induction motor
Light-emitting diode. The braking torque on the motor shaft caused by the load. If the braking torque is equal or nearly equal to the rated motor torque it can be defined as high load torque. The current taken from the line when a rotor is at a standstill at rated voltage and frequency. It is the line current when starting the motor direct. This is normally measured in megohms using full voltage with low current and is used to measure the resistance in an insulation system. It can be used for checking the thyristors, for example. A central processing unit utilising large-scale integration technology. Moulded Case Circuit Breaker Manual Motor Starter The end that is normally the non-drive end of an electrical motor. The National Electrical Manufacturers Association (USA) A number of nodes connected to each other with some type of communication medium. A network can be of single link type or multiple link type. Unwanted disturbances in a communication medium that tend to obscure the data content. The nominal current is the current drawn by a fully loaded motor at its specified nominal speed. See asyncronous speed. The torque of the motor when running at nominal speed.
Megger Test
Glossary
Normally Closed Contact (NC) Normally Open Contact (NO) Normal Start A contact or set of contacts that are closed when the relay or switch is de-energised. The contact(s) open when a relay or switch is energised. A contact or set of contacts that are open when the relay or switch is de-energised. The contact(s) close when the relay or switch is energised. A start with a load that has small or medium high moment of inertia. A starting time DOL of less than 5 seconds can be defined as normal start. The voltage that is fed to the motor, usually 3-phase. A device used to avoid overheating of the motor. Can be of electronic or thermal type. Parallel start of motors is normally when two or more motors are started at the same time with the same starting equipment. Printed Circuit Board Assembly are the circuit boards inside the softstarter. Programmable Logic Controller, consists of a central processor, input/output interfaces and a memory designed as an industrial control system. A PLC system is used for the storage of instructions, timing, counting, report generation, I/O control and more. Work done per unit of time measured in horsepower (hp), watt (W) or more commonly kW. The phase difference measured between the voltage and the current in an AC circuit represented by the cosine angle. A set of conventions governing the format and timing of data between communication devices. See nominal current. See asynchronous speed.
PCBA PLC
See nominal torque. The power consumed by the motor which is used for the magnetization of the motor. Changing of the rotation direction of the rotor or motor armature. Silicon Controlled Rectifier often referred to as a thyristor. See thyristor. A special type of high-speed fuse used as thyristor protection since normal (gG/gL or aM) fuses are not fast enough. Sequential start of motors is normally when two or more motors are started one by one in a sequence with the same starting equipment. The way of transmitting data in a network between different nodes, using some type of protocol. The difference (usually expressed in percentage) between the synchronous speed and the rotor speed of an AC induction motor. The connection type where each winding in a polyphase circuit is connected at one end to a common point. The speed of the rotating magnetic field on an AC induction motor determined by the frequency and the number of magnetic poles in each phase of the stator windings. A solid-state switch that has an anode, cathode and a control element called the gate, which makes it possible to turn it on at will. It can rapidly switch large currents at high voltages. The tripping class defines the starting time at a specific current before tripping occurs. Different classes exist, for example 10, 20, 30 etc. where class 30 allows the longest starting time.
Sequential start
Serial Communication
Slip
Thyristor
Tripping class
Glossary
Torque control Uc Ue Us UL Y connection A way for a softstarter to control the motor torque instead of the voltage. Control circuit voltage Operational voltage Control supply voltage Underwriters Laboratories (an approval agency). See Star connection.
Index
2-phase control A Accelerating torque Adjustable rated motor current Ambient temperature Analog output Applications Approvals ATEX B Breaking load torque By-pass C CANopen CCC standards CE marking Centrifugal fan Centrifugal pump Compressor Connection Control circuit Control circuit voltage Control supply voltage Conversion factors Conveyor belt Coordination Coordination tables Crusher CSA specifications Current Current limit 52 10 55 40 50 26 1 59 10 21, 50 65, 66 51 2 1
See fan See pump
D DC-component Delta connection D-end DeviceNet Direct on line start (DOL) Drives E Efficiency class Electronic overload relay (EOL) End voltage Environmental information Explosive atmospheres (Ex) F Fan Fieldbus system Firing angle Formula and conversion factors Frequency converter Frequently asked questions (FAQ) Functional earth Fuses G Glossary H Harmonics Heavy duty start High altitudes, derating
32 46, 50 50 3, 50 3, 50 74 34 60, 66 64 37 2 8 56
Index
I Initial voltage In-line connection Inside delta connection Intermittens factor L Line contactor Load conditions M Main contactor Marine approvals MCCB Mill MMS Modbus Moment of inertia Motors Current Efficiency class Power factor Slip-ring motors Speed Squirrel cage Torque Voltage N N-end Normal start O Operational voltage Output signal relays Overload protection
55 46 46 44 47 10 47 2 62 37 62 51 11 4 8 5 8 9 6 5 9 7 4 11
P Parallel start Power factor Printed Circuit Board Assembly (PCBA) Profibus Prosoft Protections Pump Q Quantities and units R Recommended settings RoHS S Selection of softstarter Semi-conductor fuses Sequential start
Settings Adjustable rated motor current Current limot End voltage Initial voltage Recommended settings Start ramp Stop ramp Torque control Slip-ring motors Softstarter
Start ramp Starting capacity Starting methods Starts per hour Stop ramp T Thyristor Torque Torque control U UL specifications Units Utilization categories V Variable speed drive Voltage Voltage definitions Y Y-connection
Ambient temperature By-pass Functionality High altitude Selection Quickguide Starting capacity Starts per hour Speed Squirrel cage motors