The document provides a process flow diagram for an ammonia plant. It shows the key equipment used in various sections like natural gas desulphurization, primary and secondary reforming, CO2 removal, methanation, synthesis gas compression, ammonia synthesis, and refrigeration. The diagram also indicates process streams, temperatures, pressures and utilities used across these sections.

Uploaded by

Saad Khan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
671 views43 pages

Ammonia Equvments Drawing

The document provides a process flow diagram for an ammonia plant. It shows the key equipment used in various sections like natural gas desulphurization, primary and secondary reforming, CO2 removal, methanation, synthesis gas compression, ammonia synthesis, and refrigeration. The diagram also indicates process streams, temperatures, pressures and utilities used across these sections.

Uploaded by

Saad Khan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 43

SH STEAM NET WORK

112 kg/cm2
SB-1 HRSG-1

510 DegC O/S B/L


SB-2 HRSG-2

AMMONIA B/L

BFW QUENCH

RG BOILER

120 Kg/cm2 Saturated Steam

425 degC

PV-78 112 kg/cm2 510 degC HV-141 SUPER HEATER

TO SYN GAS COMPRESSOR

SYN LOOP BOILER

E-1203B

E-1203A

Coils in waste heat section

DM WATER NET WORK

Lean solution cooler 97 degC

E-1303 LP reg OH cooler DMW from off site 85 degC 40 degC/ 5-6 Kg/cm2 500 M3/hr Process gas cooler before CO2 absorber 89 degC

150 M3/hr To offsite Stripper OH cooler 101 degC 119 degC To ammonia 350 M3/hr E-1306 E-1325

E-1308 LP reg OH cooler

88 degC

E-1313

BFW DISTRIBUTION

DM water 1 kg/cm2 SL Steam

B-1601 Deaerator Process gas from LTS O/L Process gas from HTS O/L

126 degC 135 kg/cm2 E-1211 BFW pre heater

176 degC

273 degC To RG Boiler

E-1210 BFW pre heater To Syn loop boiler

BFW Pumps P-1601A/B/C 273 degC Process gas from Syn loop E-1502 BFW pre heater

PROCESS COMPRESSOR AND INSTRUMENT AIR DISTRIBUTIO

Vent Vent Air from atm 4.3 kg/cm2 163 degC CW E-1422 FV-88 Anti surge 46 DegC 1.5 kg/cm2 150degC 12.8 kg/cm2 180 degC 41 degC PIC-01 HV-71 44 degC FV-88

188 degC 35.7 kg/cm2

CW

E-1421

CW

E-1423

Wet air to Offsite

TO UREA

HV-12

TO SYN GAS COMPRESSOR TO PRDS

M3/hr ffsite

119 degC

M3/hr

O/L

o RG Boiler

yn loop boiler

STRIBUTION

PIC-125

air to Offsite

NG DESULPHURISATION

To CO2 Absorber

Vent

To flare 40 Kg/Cm2 NG B/L HV-01 PIC-01 E-1204C1/C2 Vent TRC-16 39.5 Kg/Cm2 30 DegC 129 DegC E-1204B 315 DegC

HV-12

USV-101

E-1204A Recycle H2 395 DegC

HV-11 R-1201 Hydrogenator

37 Kg/Cm2 387 DegC To Pri Reformer R-1202A/B Zno absorbers

PRIMARY AND SECONDARY REFORMER

Vent USV-121B NG from R-1202B Air from E-1202A 33 kg/cm2 31 kg/cm2 527 degC 798 DegC SH Saturated Steam to E-1203B120 kg/cm2 235 te/hr Process gas to HTS 30 kg/cm2 360 DegC

FV-12 374 DegC USV121A FV-14 E-1201 FV-19 507 DegC ID fan

Process Steam

FV-18

988 DegC Stack Fuel NG Purge gas FD Fan Surplus Syn gas Naptha Primary Reformer Sec Reformer and RG boiler

HT AND LT SHIFT CONVERTION

Vent Vent HV-22 To GV reboiler 360 DegC HV-24 PG from RG bolier R-1204 HT Shift converter BFW E-1209 Trim Heater TRC-62 427 DegC 340 DegC HV-45 221 DegC R-1311 I/L gas HV-46 340 DegC 158 DegC R-1205 LT Shift converter E-1210 BFW preheater HV-44 200 DegC B-1302

BFW E-1207 CG boiler E-1211 BFW preheater

CO2 REMOVAL SECTION

E-1309 275 M3/hr CO2 to E-1308 LP regenerator F-1302 65 DegC CO2 to E-1313 0.1 kg/Cm2 98 DegC Rich Solution FV-01 104 Deg C 1.04 Kg/cm2

PG to B-1306 65 degC

106 DegC 1464 M3/hr

FV-20

FV-21

106 DegC 720 M3/hr 124 DegC 761 M3/hr

158 DegC PG from B-1302

F-1303 CO2 Absorber

F-1301 HP Regenerator

P-1301A/B/C S.Lean Sol Pumps 109 Deg C 85 DegC

LV-01 S.Lean Solution DMW LV-02

E-1301 GV reboiler 132 Deg C

LV-25 E-1303 Lean Solution 127 DegC 268 M3/hr E-1302 LP Boiler SL Steam Hydraulic Turbine DMW 120 DegC 102 DegC

107 DegC

P-1302A/B Lean Sol Pumps

F-1301 HP regenerator

B-1301 DMW

To Process condensate Stripper

CO2 REMOVAL OVER HEAD SYSTEM

PV-12

CO2 Vent CO2 to Urea 0.77 Kg/cm2 40 DegC E-1308

E-1304 E-1305 88 DegC CW 81 DegC CO2 From HP reg 104 DegC DMW E-1313 B-1304 LV-20 P-1304 A/B CW B-1303 B-1305

CO2 from LP Reg 98 DegC

DMW LV-11 PV-10

LV-17 K-1301 CO2 Booster B-1307 40 DegC To process condensate stripper

LV-12 P-1305 A/B

METHANATION SECTION

TV-30/2 Vent Surplus gas PV-30 E-1311

Vent

HV-33

USV-111 Process gas from F-1303 B-1306 Vent to E-1210 TV-30/1 E-1312 To Syn gas compressor suction CW B-1311 Methanator R-1311 E-1207 PG from HTS

To Process Condensate stripper

SYN GAS COMPRESSOR

Vent PV-17 38 degC 26 kg/cm2 CW E-1432 PG From B-1311 38 degC HV-01 118 degC 69 kg/cm2 B-1432 II HV-07 IV III 138 kg/cm2 151 degC 209 kg/cm2 CW 38 degC 48 degC HV-06 203.8kg/cm2 108 degC CW Recycle HV-09 HV-10 198 kg/cm2 39 degC HV-05 Syn gas from E-1505

I B-1312

44 kg/cm2 104 degC CW Recycle H2 HV-02

38 degC

HV-04 Syn gas to E-1503 38 degC HV-03 Syn gas to E-1514 HV-08 Vent

E-1433 E-1431 B-1431 B-1433

E-1434

B-1434

FV-18

AMMONIA SYNTHESIS

HV-01 244 DegC

R-1501 NH3 converter 350 DegC 455 DegC E-1501 Syn boiler

E-1502

E-1503 Hot heat exchanger

E-1505 Cold heat Exchanger 30 DegC

273 DegC BFW preheater

63 DegC

TV-12

39 DegC E-1504 Condensor Purge

12 DegC B-1501 NH3 Seperator H-1501 Start up Heater Recycle

23 DegC

E-1507 II NH3 chiller

E-1506 I NH3 Chiller 23 degC

to L/D Vessel

IV

E-1514 M/U Chiller

From III discharge 43 DegC

AMMONIA REFRIGERATION

E-1511 0.05 kg/cm2 Purge gas chiller From B-1501 12 DegC L/D Vessel B-1502 E-1508 L/D gas Chiller B-1504 B-1503 Flash vessel Ammonia booster K-1441/42

7.5 kg/cm2

LV-13

E-1514 M/U chiller CW

E-1506 I NH3 Chiller

4.5 kg/cm2

LV-28/2 LV-28/1 13.8DegC To Urea 25 Kg/cm2 LV-23 To Ammonia Storage -33 degC 5 kg/Cm2 LV-29 P-1501A/B Ammonia pumps E-1507 II NH3 Chiller FV-30

4.5 kg/cm2 LV-36

E-1451 K-1451 Ammonia compressor cw E-1510A/B Ammonia condensor

E-1509 Inert gas chiller 42 degC 16 kg/cm2

B-1510 Ammonia accumulator

LV-10

PURGEGAS RECOVERY UNIT

To flare PIC-102-11B DM water Break tank DV-102-2 1500 M3/hr SL steam DV-102-3 40 degC PIC-102-11A

P-202A/B -14 degC 120 kg/cm2

C-201 Scrubber

FV-101-1 209 kg/cm2 -25 degC Purge gas 16000 Nm3/hr B-1512 Prism Seperators SL steam LIC-201-1 DV-102-1 Ammonical Water to F-1521 28 Kg/cm2 Product Hydogen 7100 Nm3/hr

PROCESS CONDENSATE STRIPPER

E-1322 vent 136 degC F-1322 CO2 stripper 119 degC E-1325

E-1324 B-1321 Reflux Drum

119 degC

DMW 131 degC LV-46 P-1321A/B Reflux pump

CW

B-1322

Ammonical water to Urea F-1321 Process condensate Stripper Process Condensate to DM plant 2.6 kg/cm2

27.4 kg/cm2 118 degC Condensate from B-1301/1302& B-1311

139 degC Condensate from CO2 removal 40 DegC 8 kg/cm2 Comb.air 122 DegC E-1321 LV-43

123 degC

85 degC

40 degC

E-1217

E-1323 P-1322A/B cw

AMMONIA BOOSTER COMPRESSOR

PV-01

4.5 kg/cm2

To Ammonia compresso USV-101 USV-102 From B-1503 Ammonia Booster Compressor K-1441 B-1504 Capacity control CW

E-1441 Secondary seperator

To Compressor suction

USV-108

USV-109

Primary Seperator

TV-05B TV-05A

USV-107 E-1443 CW

NG DESULPHURISATION

Y AND SECONDARY REFORMER

Process gas to HTS 30 kg/cm2

HT AND LT SHIFT CONVERTION

PV-61

To Process Condensate Stripper

CO2 REMOVAL SECTION

F-1303 CO2 Absorber

2 REMOVAL OVER HEAD SYSTEM

CO2 from LP Reg

Make up/ Condensate stripper

Vent

METHANATION SECTION

SYN GAS COMPRESSOR

Syn gas to E-1514

AMMONIA SYNTHESIS

AMMONIA REFRIGERATION

PURGEGAS RECOVERY UNIT

PIC-102-11A To fuel header 120 kg/cm2

Prism Seperators

28 Kg/cm2 Product Hydogen 7100 Nm3/hr

ROCESS CONDENSATE STRIPPER

NIA BOOSTER COMPRESSOR

To Ammonia compressor

GV FILTRATION & AERATION SYSTEM

GV Solution From LP Regenerator

Solution from Sump/Tank DM Water A-1301 GV PRE FILTER COOLER E-1303 FILTRATION PUMP P-1307 To Absorber To F-1301 bottom To GV Tank A-1302 ACTIVATED CARBON FILTER

A-1303 POST FILTER

LEAN SOLUTION PUMP P-1302 Instrument Air T-1304 AERATION TANK

DM Water

FV-23 CW AERATION COOLER E-1310 To Lean Pump Suction

AERATION PUMP P-1309A/B

MIXED FUEL FIRING FOR PRIMARY REFORMER PV-62A/B To Flare 8 Kg/Cm2 Naphtha LV-90 USV140 4.2 Kg/Cm2 Seperator CW FV-53 To Primary Reformer 2.55 Kg/Cm2 220 DegC

FV-54

Naphtha Transfer Pump HV-50 Natural Gas FV-51 Purge Gas Naphtha return pump Naphtha Deaerator FV-31 Naphtha vaporizer 3.4 Kg/Cm2 Natural Gas FV-32 USV-143 Steam Surplus Gas FV-36 HE-2 Steam Fuel gas heater 220 DegC HE-1 A/B Fuel Naphtha K.O. Drum 220 DegC LV-93 Naphtha Condenser USV-145