Our Wind Installation Vessel is 30% faster than traditional jack-up vessels, but how exactly? The key to its efficiency lies in the fact that the Wind Installation Vessel stays on-site for assembly while only the tugs and barges shuttle back and forth with the turbine components. There are four steps to the new methodology: 1. The Barge docks at our new on-location Wind Installation Vessel; 2. The locking system engages to stabilise the barge; 3. Tray with turbine components is elevated off the barge, and the locking system retracts, releasing the barge; 4. The tower, nacelle and blades are assembled using a standard method. Learn more about how we're supporting the offshore wind industry here: https://ow.ly/9Mff50PZEre #offshorewind #offshoreindustry #energytransition

  • No alternative text description for this image
Mahmoud Etemaddar

Floater Design Group Manager - Concept & Study Department - Offshore Wind

8mo

I can see why ! its flying like a hovercraft, no wave drag. smart solution.

Jacob H. Thygesen

CEO & Partner | Experienced maritime executive & shipping geek

8mo

Congrats Maersk Supply Service and thanks for your support - we in OSK Design are very proud to be partners in this project and especially to have played a big part in the development of the barge concept.

Rene Dyring-Andersen

Operations Manager Onshore

8mo

Might be faster as the Jack up is not going back and forward, however what is the business case in time saved VS the extra cost of having multible vessels and what happens if the barge cannot go back and forward due to weather ? There could be a chance if the IV had the components with it, it could continue installation on the next TP, as I see it, the IV is more independent with the components on it

Like
Reply
Kristian Sorgenfri Hansen

Maritime Advisor / Ship Broker - Sale & Purchase, New Building & Marine Heavy Transport Specialist

8mo

I am still baffled how you ended up choosing this solution over the WMXL design by Danish designer Logima which also features a barge feeder system where the WIV stays on-site, however with much greater cargo flexibility and volume per barge from what I can gather. Will be interesting seeing it in operation and if all interfaces work as anticipated.

Best of Luck in the design build and use of the systems - knowing how wild barges can act alongside pipe lay vessels it won’t take much to create a whole load of damage to vessel or barge or turbine parts

Like
Reply
Kåre Olesen-Nørklit

Project Manager, Jack-up & Heavy Lifting Solutions, Operations hos Ørsted

8mo

Interesting concept - the weather parameters for the barges transporting the components/racks to the installation vessel are they above 2mHs or less?

What’s the weather peramaters for the transition between barge and Jack up ??

Hidde Scheepstra

Rig Mover at Saudi Aramco

8mo

Amazing there are still companies' governments and people who believe there is a great future for offshore windfarms...

Like
Reply
See more comments

To view or add a comment, sign in

Explore topics