UNLIMITED

Australian Model Railway Magazine

Australian track work

When research started on the next layout project, there was a desire to replicate a couple of things:

• The see-through effect of the sleepers on the Light River Bridge at Hamley Bridge, see Photo 1.
• Replicate ‘fake’ broad gauge track.

The release of PECO’s

You’re reading a preview, subscribe to read more.

More from Australian Model Railway Magazine

Australian Model Railway Magazine3 min read
Building A Layout For Therapy
In July 2021 the Caloundra and District Model Railway Association Inc received a joint request from Estia Health and Dementia Support Australia to build a model railway layout suitable for dementia-affected people. As it happened of their patients wa
Australian Model Railway Magazine4 min read
Adding Operational Variety To Your Layout
Building and operation of a layout is a very rewarding experience. Operating your layout in a prototypical manner can further add to the enjoyment. In NSW, railway operational staff would be provided with the Rule Book, the General Appendix, and poss
Australian Model Railway Magazine3 min read
Modelling the Railways of South Australia Convention 2024
The 27th annual Modelling the Railways of South Australia Convention was held at the 200-seat Medical Lecture Theatre and Tutorial Rooms of the Flinders Medical Centre on Saturday, 7th September 2024. Included in the Convention were morning and after

Related Books & Audiobooks