Marco Rodríguez Huesca

Marco Rodríguez Huesca

Álvaro Obregón, Ciudad de México, México
2 mil seguidores Más de 500 contactos

Acerca de

Purpose.

As a forward-thinking leader in the automotive industry with over 17 years of experience and an MBA, my purpose is to drive innovation and sustainable growth. I excel in strategy development, transformative leadership, and collaborative execution, which allows me to consistently deliver innovative solutions accompanied with tangible results.

Profile

My extensive expertise spans government relations, public policy, regulatory affairs, sustainability, product development, and program management.

In my current role at Daimler Truck Mexico, I lead external affairs, public policy, and sustainability efforts, negotiating at all government levels, fostering B2B connections, and implementing ESG strategies. My track record includes successful incentive packages negotiations, significant legislative modifications, seamless representation of the company in Chambers and Associations; and the development of high-level networks across various sectors.

My international experience, including key positions at Stellantis (formerly Fiat Chrysler Automobiles), has broadened my perspective and deepened my understanding of global business practices. I have a proven ability to create and execute long-term strategies, optimize operations, and lead organizational transformations. My commitment to results-driven leadership and peer respect consolidation drives me to evolve organizations and achieve their full potential.

Actividad

Unirse para ver toda la actividad

Experiencia

  • Daimler Truck and Buses Mexico

    Mexico City, Mexico

  • -

    Mexico City Metropolitan Area

  • -

    Bosques de las Lomas, Mexico City, Mexico

  • -

    Santa Fe, Mexico

  • -

    Mexico City Area, Mexico

  • -

    Auburn Hills, Michigan

  • -

    Mexico City Area, Mexico

  • -

    Mexico City Area, Mexico

  • -

    Mexico City Area, Mexico

Educación

  • Gráfico

    -

  • -

    Actividades y grupos:SAMET - Students Society of Mechatronics Engineering as treasurer Soccer Swimming Gym Electraton

Licencias y certificaciones

Experiencia de voluntariado

  • Gráfico Gleaners Community Food Bank of Southeastern Michigan

    Chrysler Interior Trim leader event

    Gleaners Community Food Bank of Southeastern Michigan

    - actualidad 11 años 6 meses

    Servicios sociales

    - Organize a community service event for the Interior Trim team.
    - The event consisted in staple bags to mailer cards.

  • Gráfico All Saints Church

    Helper

    All Saints Church

    - actualidad 11 años 11 meses

    Servicios sociales

    - Organize food on the layout
    - Pack food for thanksgiving

  • Gráfico The Salvation Army

    Donator

    The Salvation Army

    - actualidad 11 años 5 meses

    Servicios sociales

    - Donate cloth for poor people

  • Gráfico The Salvation Army

    Donator

    The Salvation Army

    - actualidad 12 años 1 mes

    Servicios sociales

    - Goods donation for poor people

  • Gráfico St. Vincent de Paul Society

    Helper

    St. Vincent de Paul Society

    - actualidad 11 años 1 mes

    Servicios sociales

    Sorting different items (cloth, books, miscellaneous)

  • House builder

    Techo - Mexico

    - actualidad 10 años 7 meses

    Servicios sociales

    Spent a day at La Penuela, Toluca building a house from scratch for people living in extreme poverty.

  • Make ornaments for Xmas tree

    Casa Hogar Alegria IAP

    - actualidad 9 años 11 meses

    Infancia

  • Gráfico Pronatura México A.C.

    Reforestation

    Pronatura México A.C.

    - actualidad 10 años 2 meses

    Medio ambiente

  • Clean streets

    Promesa IAP

    - actualidad 10 años 4 meses

    Medio ambiente

  • Build food bags for poor people

    Promesa IAP

    - actualidad 10 años 4 meses

    Lucha contra la pobreza

  • Gráfico Aquí Nadie Se Rinde, A.C.

    Runner

    Aquí Nadie Se Rinde, A.C.

    - actualidad 10 años 4 meses

    Infancia

    Run 5 miles to support children with cancer

Cursos

  • BUSINESS MANAGEMENT AND STRATEGY

    -

  • Basic NX for Engineers

    -

  • Basic Root Cause Analysis Workshop

    -

  • Budgeting

    -

  • CAST IRON AND ALUMINUM WORKSHOP

    -

  • CPCP: The Chrysler Product Creation Process Overview - 2pm-3pm WHQ: Conf Ctr 1A

    -

  • CoDep Inquiry

    -

  • CoDep for all PRs/PCs/Engineers

    -

  • Cost Elements, ABC Cost Methodology and Cost Estimation Tools

    -

  • Crisis Management

    -

  • DESIGN FOR REPAIR EFFICIENCY (DSE or DRE)

    -

  • DFMEA: Design Failure Mode and Effects Analysis

    -

  • DFSS WEEK 'B1' OPTIMIZE TRAINING/WORKSHOP

    -

  • DFSS Week A

    -

  • DFSS week C

    -

  • DVP&R Effective Test Planning Basics

    -

  • DVP&R Function Based Testing

    -

  • Design Failure Mode and Effects Analysis - DFMEA

    -

  • ERROR / MISTAKE PROOFING TECHNIQUES

    -

  • GD&T BASICO

    -

  • GD&T of Functional Gages & Fixtures

    -

  • GROW

    -

  • Innovation

    -

  • Innovation Skills / TRIZ

    -

  • Introduction to Plastic Injection Mold

    -

  • MS Project Management

    -

  • Material Cost Management Training/MCM 100

    -

  • Owning Your Development

    -

  • PF-SAFETY<S> The Use of Safety Shields

    -

  • Power Point level 1

    -

  • Program Management

    -

  • Reactive Green Belt - Kepner Tregoe

    -

  • Reactive Green Belt - Shainin technique

    -

  • Strategic Thinking

    -

  • Supplier Engineering Design & Development

    -

  • Supplier Engineering Design & Development 1

    -

  • TEST TO FAILURE FOR MECHANICAL SYSTEMS

    -

  • TRIZ

    -

  • Talent Selection Process

    -

  • Teamcenter with releases

    -

  • Thermal Protection of Vehicle Components

    -

  • Understanding Fastener Torque Standards and Determining a Torque Spec.

    -

  • WCM basics

    -

  • e-CIMS CORRECTIVE ACTION PROCESS METHODOLOGY

    -

Proyectos

  • 2017 MY Product Development

    Hard Trim, Soft Trim

  • 2018 MY Product Development

    Hard Trim, Soft Trim, Overhead systems

  • 2017 MY Promaster develoment

    - actualidad

  • 2016 MY Dodge Journey Launch

    - actualidad

  • 2016 MY F500 Launch

    - actualidad

  • 2016 MY Promaster launch and development

    - actualidad

  • Launch of interior trim components for different platforms for 2014 MY Chrysler vehicles

    - Lead engineering team through the development of components changing until launch
    - Support at Assembly plant as interior trim representative during pilots phases and launch phase
    - Support at suppliers plants as Chrysler interior trim representative

  • Launch of Interior Trim components for 2013 MY Fiat 500 E

    - Lead engineering team through the development until launch
    - Brand new floor components, floor carpet, floor mats, nvh and trunk tray
    - Support at Assembly plant as interior trim representative during pilots phases and launch phase
    - Support at suppliers plants as Chrysler interior trim representative

  • Launch of Interior Trim components for 2013 MY Fiat 500 and Dodge Journey

    - Lead engineering team through the development until launch
    - Development of new carpet density, Beats components and foot rest for Fiat 500 and headliners modifications for Dodge Journey
    - Support at Assembly plant as interior trim representative during pilots phases and launch phase
    - Support at suppliers plants as Chrysler interior trim representative

  • 2013 MY Homologation project for Fiat 500 and Dodge Journey for International Markets

    - Headliners for 2013 MY Dodge Journey and Fiat 500 had new homologation requirements for warning labels for international markets.
    - Determine impact on existing bill of materials
    - Define warning labels for each platform
    - Validation of new assemblies
    - Coordination with suppliers (Tier 1 and Tier 2)
    - Engineering change kick off
    - Implementation in the assembly plant.
    - For Dodge Journey I helped the company to save $155K in expedited material just by finding different…

    - Headliners for 2013 MY Dodge Journey and Fiat 500 had new homologation requirements for warning labels for international markets.
    - Determine impact on existing bill of materials
    - Define warning labels for each platform
    - Validation of new assemblies
    - Coordination with suppliers (Tier 1 and Tier 2)
    - Engineering change kick off
    - Implementation in the assembly plant.
    - For Dodge Journey I helped the company to save $155K in expedited material just by finding different means to expedite the material from China.

  • Launch of Interior Trim components for 2012 MY Fiat 500

    - Support at Assembly plant as Santa Fe interior trim representative during pilots phases and launch phase
    - Support at suppliers plants as Chrysler interior trim representative
    - Lead hands off of Interior Trim components from Chrysler corporation to Santa Fe engineering

  • 2010 MY HD Ram trucks launch

    Development and release of floor systems components towards 2010 MY HD Ram trucks launch.
    - Re-release floor vinyls due to an initial release issue that shut down the plant during pilot phase.
    - Coordinate an execute the communization of floor carpets part numbers for manual transmission and automatic transmission trucks
    - On site support at Assembly Plant
    - Chrysler de Mexico team leader during launch for interiors

  • Development of floor carpets and floor vinyls

    - Modify carry over floor components to support new 2010 ram truck
    - Manage floor suppliers through the development of brand new components for new cab size of ram trucks.
    - Follow up validation of floor components
    - Support pilot phases at the assembly plant

  • Design of cut out opening for floor carpets and vinyls with mini console

    - To avoid increase of complexity on floor part numbers I proposed to have a die cut at the sequencer and make a cut out in that facility before sequencing, parts would arrive flat.
    - Packaging study
    - Design of cut out
    - Coordinate with sequencer tool construction
    - Follo up kick off, validation and implementation into production

  • Tunnel silencer design

    - Improve NVH performance on ram trucks
    - Design and release the tunnel silencer
    - Source the tunnel silencer
    - Validate tunnel silencer
    - Implement the tunnel silencer at the assembly plant

  • Launch of Unique components for Brand New Ram truck

    - Complete the development at supplier facilities of unique components for brand new Ram truck Mega Cab
    - Plant support during pilot phases and launch.
    - Warranty reports analysis.

  • 2015 MY Ram Promaster city launch

    -

    Otros creadores
    • Antonio Tovark
    • Karl Sonnenberg
  • 2015 MY Ram Promaster launch

    -

  • 2015 MY Dodge Journey Launch

    -

  • 2015 MY F500 launch

    -

  • Launch of 2014 MY Ram trucks for Global markets

    -

    Coordinate the activities with the engineering team, assembly plants, suppliers, platform team and other functional groups through the launch phase of the Interior Trim components for the 2014 MY Ram trucks for global markets.

    The challenge here was having 2 assembly plants making ram trucks, several supplier locations making components to meet the volumes for this program, different platform teams depending if it is light duty or heavy duty and different requirements depending the price…

    Coordinate the activities with the engineering team, assembly plants, suppliers, platform team and other functional groups through the launch phase of the Interior Trim components for the 2014 MY Ram trucks for global markets.

    The challenge here was having 2 assembly plants making ram trucks, several supplier locations making components to meet the volumes for this program, different platform teams depending if it is light duty or heavy duty and different requirements depending the price class or package for the truck.

    The complexity is overwhelming and the requirements are very strict, you are not allowed to make mistakes or it could be extremely expensive to the company.

  • 2013.5 MY Ram truck Laramie Limited launch

    -

    - Development of new floor mats
    - Development of new "Limited" badge
    - Interface with Design Office
    - Budget definition
    - Mange Design team
    - Design Validation
    - Prototype tooling kick off
    - Tooling kick off
    - Validation
    - Implementation

  • Headliner substrate materials change

    -

    Quality concerns with the previous material led us to switch to PP on headliners.
    This project started about a year prior being PC but during this time frame the activities to lead were:
    - Tooling kick off convertible vehicles and hatchback vehicles
    - Implementation for convertible vehicles
    - Implement recovery actions for a 4 months delay of the equipment.
    - Component validation
    - Head impact validation
    - Appearance validation
    - Implementation in the assembly plant

  • Quarter Trim Panel Safety cap development

    -

    Propose a feasible solution for the quarter trim panels to achieve 5 starts on side impact test.
    General tasks to coordinate were:
    - Define requirements
    - Brainstorming with safety office and my engineering team
    - Design and buy off from Design Office
    - Interface design with Quarter panel
    - Virtual validation (Packaging, mold flow, load test on snaps)
    - Budget definition
    - Tooling kick off
    - Prototype tool kick off
    - PV testing
    - Appearance Approval…

    Propose a feasible solution for the quarter trim panels to achieve 5 starts on side impact test.
    General tasks to coordinate were:
    - Define requirements
    - Brainstorming with safety office and my engineering team
    - Design and buy off from Design Office
    - Interface design with Quarter panel
    - Virtual validation (Packaging, mold flow, load test on snaps)
    - Budget definition
    - Tooling kick off
    - Prototype tool kick off
    - PV testing
    - Appearance Approval authorization for prototype tool
    - Implementation
    - Appearance approval authorization for production tool
    - Implementation of parts out of production tool

    Otros creadores
    • Jose Alberto Sanchez Cruz
    • Daniel Aquilina
    • Chris Sleiman
    • Steve Cole
    • Jose Luis Contreras Dordelly
  • 2013 MCA "Beats" Components

    -

    Manage the team towards the implementation of the 2013 MY "Beats" components.
    Tasks were:
    - Interface with Design Office
    - Budget definition
    - Mange Design team
    - Design Validation
    - Prototype tooling kick off
    - Tooling kick off
    - Validation
    - Implementation

    The components were a load floor, side trim with speaker attached as part of the assembly, A pillars "Beats" badges, new amplifier cover

    Otros creadores
    • Matt Dodd
    • John Pray
    • Ernie Willobhy
    • Antonio Cruz
  • Headliner fabric change and substrate change kick off

    -

    Quality concerns with the current fabric led us to switch to trilaminate fabric and new substrate.
    The main activities to lead for fabric change were:
    - Requirements definition
    - Budget definition
    - Fabric try out at assembly plant.
    - CAD update to reflect new fabric
    - Packaging validation
    - Fabric validation
    - Increase fabric density per fabric validation results
    - Re-validate fabric
    - Kick off engineering change

    The main activities to lead for substrate…

    Quality concerns with the current fabric led us to switch to trilaminate fabric and new substrate.
    The main activities to lead for fabric change were:
    - Requirements definition
    - Budget definition
    - Fabric try out at assembly plant.
    - CAD update to reflect new fabric
    - Packaging validation
    - Fabric validation
    - Increase fabric density per fabric validation results
    - Re-validate fabric
    - Kick off engineering change

    The main activities to lead for substrate change were:
    - Define material
    - Define supplier capability
    - Explore other suppliers option
    - Define and analyze supplier requirements
    - Budget definition
    - Freeze activities
    - Kick off engineering change

    Otros creadores
    • Luis Felipe Luna
    • Kevin May
  • Design and development of a bench seat for fleet vehicles

    -

    Complains in regards the bench seat at that time led us to completely redesign the bench seat for mexican market fleet. The activities performed were:
    - Define requirements
    - Product Design
    - Design Validation with supplier
    - Budget definition
    - Kick off engineering change
    - Tooling kick off
    - Implementation at assembly plant
    - Presentation of the new design to the dealers during a dealers event with Chrysler Mexico CEO.

Idiomas

  • English

    Competencia bilingüe o nativa

  • Spanish

    Competencia bilingüe o nativa

Más actividad de Marco

Ver el perfil completo de Marco

  • Descubrir a quién conocéis en común
  • Conseguir una presentación
  • Contactar con Marco directamente
Unirse para ver el perfil completo

Perfiles similares

Añade nuevas aptitudes con estos cursos