BoQ JN
BoQ JN
BoQ JN
HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)
A. UPAH
1 Kepala Tukang Hari 120,000.00
2 Mandor Hari 90,000.00
3 Pekerja Hari 68,000.00
4 Tukang Hari 100,000.00
B. BAHAN
1 Air Liter 50.00
2 Atap Seng Genteng Metal 0,30 Lembar 70,000.00
3 Batu Bata Buah 750.00
Balok Kayu Kelas I M3 11,859,375.00
Balok Kayu Kelas II M3 7,115,625.00
4 Batu Kali/Batu Belah (Sungai/Gunung) 15/20 Cm M3 287,500.00
5 Batu Belah 5/7 Cm M3 442,750.00
6 Besi Beton Polos Kg 15,275.00
7 Besi Beton Ulir Kg 18,299.00
8 Besi Strip Tebal 5 mm Kg 18,000.00
9 Cat Dasar Kg 32,890.00
10 Cat Tembok Extana Avitek Kg 23,403.00
11 Cat Kayu/Minyak Kg 51,750.00
12 Cat Menie Besi Kg 55,344.00
13 Kayu Bakau/Dolken Kayu Ø 8 - 10, 4 Meter Batang 20,000.00
14 Engsel Jendela 3" Pasang 18,975.00
15 Engsel Pintu 4" Pasang 23,719.00
16 Gypsum Tebal 9 mm Lembar 94,875.00
17 Kaca Bening Tebal 5 mm M2 154,172.00
18 Kait Angin Buah 15,813.00
19 Kawat Beton Kg 21,491.00
20 Kayu Klas I (Semantok/Damar Laut) M3 8,855,000.00
21 Kayu Klas II (Merantee/Kruing) M3 6,957,500.00
22 Kayu Klas III (Semaram/Borneo/dll) untuk Bekesting M3 5,000,000.00
23 Kayu Klas IV (Sengon/dll) untuk Bouwplank M3 5,000,000.00
24 Keramik 20 x 20 Cm Buah 2,833.60
25 Keramik 40 x 40 Cm Homogenius Polished Buah 13,156.00
26 Keramik 40 x 40 Cm Homogenius Unpolished Buah 13,156.00
27 Keramik 30 x 30 Cm Homogenius Polished Buah 4,667.85
28 Keramik 30 x 30 Cm Homogenius Unpolished Buah 6,831.00
29 Keramik Dinding 20 x 25 Cm Buah 3,660.00
30 Keramik Sisi Kulit Jeruk 20 x 20 Cm Buah 2,833.60
31 Kerikil Beton/Bersih M3 265,000.00
32 Kerikil Beton/Bersih (1.350 Kg/M3) Kg 196.30
33 Kertas Amplas Lembar 6,279.00
34 Kunci Pintu Buah 145,475.00
35 Lem Kayu Kg 39,531.00
36 List Profil Triplek M' 7,700.00
37 Minyak Bekisting Liter 5,000.00
HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)
VOLUME/KELILING JUMLAH
NO. URAIAN BANYAK JUMLAH
P (M) L (M) T (M) T' (M) DIBULATKAN
1 Kolom 15 x 15 Cm
Beton 0.150 0.150 0.023 M2
1 M3 Dibagi Dengan Jumlah 1.000 44.444 M1
2 Kolom 13 x 13 Cm
Beton 0.130 0.130 0.017 M2
1 M3 Dibagi Dengan Jumlah 1.000 59.172 M1
3 Sloof 30 x 40 Cm
Beton 0.300 0.400 0.120 M2
1 M3 Dibagi Dengan Jumlah 1.000 8.333 M1
4 Balok 30 x 50 Cm
Beton 0.300 0.500 0.150 M2
1 M3 Dibagi Dengan Jumlah 1.000 6.667 M1
5 Balok 30 x 40 Cm
Beton 0.300 0.400 0.120 M2
1 M3 Dibagi Dengan Jumlah 1.000 8.333 M1
6 Balok 20 x 40 Cm
Beton 0.200 0.400 0.080 M2
1 M3 Dibagi Dengan Jumlah 1.000 12.500 M1
7 Balok Latai 25 x 30 Cm
Beton 0.250 0.300 0.075 M2
1 M3 Dibagi Dengan Jumlah 1.000 13.333 M1
8 Balok Latai 13 x 15 Cm
Beton 0.130 0.150 0.020 M2
1 M3 Dibagi Dengan Jumlah 1.000 51.282 M1
9 Ring Balok 13 x 15 Cm
Beton 0.130 0.150 0.020 M2
1 M3 Dibagi Dengan Jumlah 1.000 51.282 M1
10 Ring Balok 13 x 40 Cm
Beton 0.130 0.400 0.052 M2
1 M3 Dibagi Dengan Jumlah 1.000 19.231 M1
11 Plat Lantai T = 12 Cm
Beton 0.120 1.000 0.120 M2
1 M3 Dibagi Dengan Jumlah 1.000 8.333 M1
13 Kolom 30/40 Cm
Beton 0.300 0.400 0.120 M2
1 M3 Dibagi Dengan Jumlah 1.000 8.333 M1
15 Kolom 13 x 13 Cm
Beton 0.130 0.130 0.017 M2
1 M3 Dibagi Dengan Jumlah 1.000 59.172 M1
-
-
Banda Aceh, 11 Mei 2016
CV. BUDI PRIMA SENTOSA
-
-
PERHITUNGAN VOLUME
A. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.000 Paket 1.000 Paket
### #REF!
### PEKERJAAN TANAH DAN PASIR
### Galian Tanah Pondasi Tapak Type I 2.200 2.200 1.650 20.000 159.720 M3
Cicin sumuran (лr²) 0.785 0.950 3.140 0.500 20.000 14.915 M3
174.635 M3 174.635 M3
### Galian Tanah Pondasi Tapak Type II 1.700 1.700 1.650 16.000 76.296 M3
Cicin sumuran (лr²) 0.785 0.950 3.140 0.500 16.000 11.932 M3
2.000 1.700 1.650 1.000 5.610 M3
93.838 M3 93.838 M3
### Galian Tanah Pondasi Menerus 104.000 0.400 0.450 18.720 M3 18.720 M3
### Pondasi Batu Kali 1 : 4 104.000 0.250 0.400 0.200 0.300 10.400 M3 10.400 M3
### Beton Cor 1 : 2 : 3 Isian Sumuran 0.785 1.000 3.140 0.500 20.000 15.700 M3
0.785 1.000 3.140 0.500 16.000 12.560 M3
28.260 M3 28.260 M3
### Lantai Kerja di bawah Pondasi Tapak 2.200 2.200 0.100 20.000 9.680 M3
1.700 1.700 0.100 16.000 4.624 M3
2.000 1.700 0.100 1.000 0.340 M3
14.644 M3 14.644 M3
### Beton Bertulang Kolom Pendestal 30/40 cm 0.400 0.300 1.450 20.000 3.480 M3
0.400 0.300 1.450 6.000 1.044 M3
4.524 M3 4.524 M3
### Beton Bertulang Kolom Pendestal 30/30 cm 0.300 0.300 1.450 10.000 1.305 M3 1.305 M3
### Beton Bertulang Sloof 30/40 cm 0.300 0.400 163.800 19.656 M3 19.656 M3
### Beton Bertulang Kolom Induk 30/40 cm 0.300 0.400 3.500 26.000 10.920 M3 10.920 M3
### Beton Bertulang Kolom Teras 30/30 cm 0.300 0.300 3.600 10.000 3.240 M3 3.240 M3
### Beton Bertulang Balok 30/50 cm 0.300 0.500 28.000 4.200 M3 4.200 M3
### Beton Bertulang Balok 30/40 cm 0.300 0.400 171.800 20.616 M3 20.616 M3
### Beton Bertulang Balok 20/40 cm 0.200 0.400 4.500 0.360 M3 0.360 M3
### Beton Bertulang Balok Latai 13/15 cm 0.130 0.150 70.000 1.365 M3 1.365 M3
### Beton Bertulang Ring Balok untuk selasar 13/15 cm 0.130 0.150 44.000 0.858 M3 0.858 M3
### Beton Bertulang Balok Ornamen Teras 30/40 cm 0.400 0.300 0.400 12.000 0.576 M3 0.576 M3
### Beton Bertulang Plat Bordes dan Anak Tangga 6.700 2.000 0.150 2.010 M3
4.000 3.000 0.150 1.800 M3
3.810 M3 3.810 M3
LANTAI II
### Beton Bertulang Kolom Induk 30/40 cm 3.700 0.300 0.400 26.000 11.544 M3 11.544 M3
### Beton Bertulang Kolom Teras 30/30 cm 3.700 0.300 0.300 10.000 3.330 M3 3.330 M3
### Beton Bertulang Balok 25/30 cm 125.000 0.250 0.300 1.000 9.375 M3 9.375 M3
### Beton Bertulang Balok Latai 13/15 cm 72.800 0.130 0.150 1.000 1.420 M3 1.420 M3
### Beton Bertulang untuk selasar 13/15 cm (dudukan batu bata) 44.000 0.130 0.150 1.000 0.858 M3 0.858 M3
### #REF!
LANTAI I
### Pasangan Trasram Bata 1 PC : 2 PS di bawah Lantai 95.300 0.400 38.120 M2
38.120 M2 38.120 M2
#REF!
### Pasangan Dinding Bata 1 PC : 4 PS 104.400 3.550 370.620 M2
3.700 3.550 13.135 M2
370.620 M2
Dikurangi
Pas. Batu Kerawang Bagian Lantai atas 2.000 1.660 1.000 3.320 M2
Pintu Type. P-1 Bagian Lantai bawah 2.600 1.300 4.000 13.520 M2
Jendela Type J-1 Bagian Lantai bawah 2.650 1.400 12.000 44.520 M2
Jendela Type J-12 Bagian Lantai bawah 2.000 1.400 4.000 11.200 M2
72.560 M2
Pas. Batu Bata Dikurangi Pintu, Jendela, kolom,dll 298.060 M2 298.060 M2
-
### Plesteran Dinding Bata 1 PC : 4 PS 596.120 M2 596.120 M2
E. PEKERJAAN LANTAI
Pekerjaan Timbunan dan Urugan
1 Timbunan Tanah Bawah Lantai Ruangan 8.870 6.870 0.620 4.000 151.124 M3 151.124 M3
4.370 6.870 0.620 1.000 18.614 M3
169.737 M3
3 Urugan Pasir di Bawah Lantai Ruangan 8.870 6.870 0.100 4.000 24.375 M3 24.375 M3
4.370 6.870 0.100 1.000 3.002 M3
27.377 M3
### Beton Tumbuk di Bawah Lantai Keramik t = 5 cm Selasar 40.000 1.370 0.050 2.740 M3
40.000 1.870 0.050 3.740 M3
10.370 1.370 0.050 2.000 1.421 M3
7.901 M3 7.901 M3
### Lantai Keramik 40 x 40 cm Anti Slip Pada Selasar 40.000 1.370 54.800 M2
40.000 1.870 74.800 M2
10.370 1.370 2.000 28.414 M2
158.014 M2 158.014 M2
Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan
### #REF! 2.000 0.200 20.000 8.000 M2
2.000 0.300 20.000 12.000 M2
2.000 4.000 1.000 8.000 M2
28.000 M2 28.000 M2
#REF!
1 #REF! 8.700 6.600 4.000 229.680 M3 M3
4.000 2.000 8.000
3 #REF! 4.000 M2 M2
### #REF!
#REF!
### Kayu Kanopi Kuda-kuda Terpasang 10.000 Bh 10.000 Bh
#REF!
### Rangka Kuda-Kuda dan Gording Zincalume Type 100, 35.250 7.650 28.400 42.100 2.000 539.325
Penutup Atap dan Rabung Genteng Metal + Terpasang (SNI) 11.880 7.650 0.500 2.000 90.882
630.207 M2 630.207 M2
b. Daun Pintu Panel Ukuran 60 x 210 cm x 2 2.100 1.200 16.000 40.320 M² 40.320 M²
### Daun Jendela Ukuran 60 x 85 cm 2.700 0.130 0.050 96.000 1.685 #REF! 1.685 #REF!
### Ventilasi Ambang Ukuran 40 x 60 cm 1.800 0.130 0.050 96.000 1.123 #REF! 1.123 #REF!
### #REF!
### #REF! 40.200 630.000 655.860 1,326.060 M2 1,326.060 M2
-
-
Banda Aceh, 11 Mei 2016
CV. BUDI PRIMA SENTOSA
-
-
DAFTAR ANALISA HARGA SATUAN
I. PEKERJAAN TANAH
SNI 2835-2008-6.1
1 M3 Galian Tanah Keras Sedalam 1 Meter
0.7500 OH Pekerja @Rp 68,000.00 Rp. 51,000.00
0.0250 OH Mandor @Rp 75,000.00 Rp. 1,875.00
Jumlah Rp. 52,875.00
Dibulatkan Rp. 52,875.00
SNI 2835-2008-6.2
1 m³ Galian Tanah Biasa Sedalam 2 Meter
0.900 OH Pekerja @Rp 68,000.00 Rp. 61,200.00
0.045 OH Mandor @Rp 75,000.00 Rp. 3,375.00
Jumlah Rp. 64,575.00
Dibulatkan Rp. 64,575.00
SNI 2835-2008-6.9
1 M3 Urugan Tanah Kembali
0.2500 OH Pekerja @Rp 68,000.00 Rp. 17,000.00
0.0080 OH Mandor @Rp 75,000.00 Rp. 600.00
Jumlah Rp. 17,600.00
Dibulatkan Rp. 17,600.00
SNI 2835-2008-6.11
1 M3 Mengurug Pasir Urug
1.2000 M3 Pasir Urug @Rp 96.43 Rp. 115.71
0.3000 OH Pekerja @Rp 68,000.00 Rp. 20,400.00
0.0100 OH Mandor @Rp 75,000.00 Rp. 750.00
Jumlah Rp. 21,265.71
Dibulatkan Rp. 21,265.71
SNI 2835-2008-6.11.a
1 M3 Mengurug Tanah Timbun
1.2000 M3 Tanah Timbun @Rp 87,000.00 Rp. 104,400.00
0.3000 OH Pekerja @Rp 68,000.00 Rp. 20,400.00
0.0100 OH Mandor @Rp 75,000.00 Rp. 750.00
Jumlah Rp. 125,550.00
Dibulatkan Rp. 125,550.00
SNI 7394-2008-6.4
1 M3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,87
893.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 12,502,000.00
1,027.0000 Kg Kerikil Beton @Rp 5,220.00 Rp. 5,360,940.00
230.0000 Kg Semen Portland @Rp 71,000.00 Rp. 16,330,000.00
200.0000 Liter Air @Rp 100.00 Rp. 20,000.00
1.2000 OH Pekerja @Rp 68,000.00 Rp. 81,600.00
0.2000 OH Tukang @Rp 70,000.00 Rp. 14,000.00
0.0200 OH Kepala Tukang @Rp 80,000.00 Rp. 1,600.00
0.0600 OH Mandor @Rp 75,000.00 Rp. 4,500.00
Jumlah Rp. 34,314,640.00
Dibulatkan Rp. 34,314,640.00
SNI 7394-2008-6.5
1 M3 Beton Mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
760.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 10,640,000.00
1,029.0000 Kg Kerikil Beton (Maximum 30 mm) @Rp 5,220.00 Rp. 5,371,380.00
326.0000 Kg Semen Portland @Rp 71,000.00 Rp. 23,146,000.00
215.0000 Liter Air @Rp 100.00 Rp. 21,500.00
1.6500 OH Pekerja @Rp 68,000.00 Rp. 112,200.00
0.2750 OH Tukang @Rp 70,000.00 Rp. 19,250.00
0.0280 OH Kepala Tukang @Rp 80,000.00 Rp. 2,240.00
0.0830 OH Mandor @Rp 75,000.00 Rp. 6,225.00
Jumlah Rp. 39,318,795.00
Dibulatkan Rp. 39,318,795.00
SNI 7394-2008-6.7
1 M3 Beton Mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
698.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 9,772,000.00
1,047.0000 Kg Kerikil Beton (Maximum 30 mm) @Rp 5,220.00 Rp. 5,465,340.00
371.0000 Kg Semen Portland @Rp 71,000.00 Rp. 26,341,000.00
215.0000 Liter Air @Rp 100.00 Rp. 21,500.00
1.6500 OH Pekerja @Rp 68,000.00 Rp. 112,200.00
0.2750 OH Tukang @Rp 70,000.00 Rp. 19,250.00
0.0280 OH Kepala Tukang @Rp 80,000.00 Rp. 2,240.00
0.0830 OH Mandor @Rp 75,000.00 Rp. 6,225.00
Jumlah Rp. 41,739,755.00
Dibulatkan Rp. 41,739,755.00
SNI 7394-2008-6.8
1 M3 Beton Mutu F'C = 21,7 MPa (K250), Slump (12 ± 2) cm, w/c = 0,56
692.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 9,688,000.00
1039.0000 Kg Kerikil Beton (Maximum 30 mm) @Rp 5,220.00 Rp. 5,423,580.00
384.0000 Kg Semen Portland @Rp 71,000.00 Rp. 27,264,000.00
215.0000 Liter Air @Rp 100.00 Rp. 21,500.00
1.6500 OH Pekerja @Rp 68,000.00 Rp. 112,200.00
0.2750 OH Tukang @Rp 70,000.00 Rp. 19,250.00
0.0280 OH Kepala Tukang @Rp 80,000.00 Rp. 2,240.00
0.0830 OH Mandor @Rp 75,000.00 Rp. 6,225.00
Jumlah Rp. 42,536,995.00
Dibulatkan Rp. 42,536,995.00
SNI 7394-2008-6.9
1 M3 Beton Mutu f'c = 24 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53
684.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 9,576,000.00
1,026.0000 Kg Kerikil Beton (Maximum 30 mm) @Rp 5,220.00 Rp. 5,355,720.00
406.0000 Kg Semen Portland @Rp 71,000.00 Rp. 28,826,000.00
215.0000 Liter Air @Rp 100.00 Rp. 21,500.00
1.6500 OH Pekerja @Rp 68,000.00 Rp. 112,200.00
0.2750 OH Tukang @Rp 70,000.00 Rp. 19,250.00
0.0280 OH Kepala Tukang @Rp 80,000.00 Rp. 2,240.00
0.0830 OH Mandor @Rp 75,000.00 Rp. 6,225.00
Jumlah Rp. 43,919,135.00
Dibulatkan Rp. 43,919,135.00
SNI 7394-2008-6.17
1 Kg Besi Polos
1.0500 Kg Besi Beton Polos @Rp 11,000.00 Rp. 11,550.00
0.0150 Kg Kawat Beton @Rp 17,000.00 Rp. 255.00
0.0070 OH Pekerja @Rp 68,000.00 Rp. 476.00
0.0070 OH Tukang @Rp 70,000.00 Rp. 490.00
0.0007 OH Kepala Tukang @Rp 80,000.00 Rp. 56.00
0.0004 OH Mandor @Rp 75,000.00 Rp. 30.00
Jumlah Rp. 12,857.00
Dibulatkan Rp. 12,857.00
SNI 7394-2008-6.17.a
1 Kg Besi Ulir
1.0500 Kg Besi Ulir @Rp 13,000.00 Rp. 13,650.00
0.0150 Kg Kawat Beton @Rp 17,000.00 Rp. 255.00
0.0070 OH Pekerja @Rp 68,000.00 Rp. 476.00
0.0070 OH Tukang @Rp 70,000.00 Rp. 490.00
0.0007 OH Kepala Tukang @Rp 80,000.00 Rp. 56.00
0.0004 OH Mandor @Rp 75,000.00 Rp. 30.00
Jumlah Rp. 14,957.00
Dibulatkan Rp. 14,957.00
SNI 7394-2008-6.20
1 M2 Bekisting Untuk Pondasi
0.0400 M3 Kayu Kelas III @Rp 2,300,000.00 Rp. 92,000.00
0.3000 Kg Paku Biasa @Rp 19,000.00 Rp. 5,700.00
0.1000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 4,945.00
0.5200 OH Pekerja @Rp 68,000.00 Rp. 35,360.00
0.2600 OH Tukang @Rp 70,000.00 Rp. 18,200.00
0.0260 OH Kepala Tukang @Rp 80,000.00 Rp. 2,080.00
0.0260 OH Mandor @Rp 75,000.00 Rp. 1,950.00
Jumlah Rp. 160,235.00
Dibulatkan Rp. 160,235.00
SNI 7394-2008-6.21
1 M2 Bekisting Untuk Sloof
0.0450 M3 Kayu Kelas III @Rp 2,300,000.00 Rp. 103,500.00
0.3000 Kg Paku Biasa @Rp 19,000.00 Rp. 5,700.00
0.1000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 4,945.00
0.5200 OH Pekerja @Rp 68,000.00 Rp. 35,360.00
0.2600 OH Tukang @Rp 70,000.00 Rp. 18,200.00
0.0260 OH Kepala Tukang @Rp 80,000.00 Rp. 2,080.00
0.0260 OH Mandor @Rp 75,000.00 Rp. 1,950.00
Jumlah Rp. 171,735.00
Dibulatkan Rp. 171,735.00
SNI 7394-2008-6.22
1 M2 Bekisting Untuk Kolom
0.0400 M3 Kayu Kelas III @Rp 2,300,000.00 Rp. 92,000.00
0.4000 Kg Paku Biasa @Rp 19,000.00 Rp. 7,600.00
0.2000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 9,890.00
0.0150 M3 Balok Kayu Kelas III @Rp 2,300,000.00 Rp. 34,500.00
0.3500 Lembar Plywood Tebal 9 mm @Rp 100,000.00 Rp. 35,000.00
2.0000 Batang Dolken Kayu Ø 8 - 10, 4 M @Rp 7,560.00 Rp. 15,120.00
0.6600 OH Pekerja @Rp 68,000.00 Rp. 44,880.00
0.3300 OH Tukang @Rp 70,000.00 Rp. 23,100.00
0.0330 OH Kepala Tukang @Rp 80,000.00 Rp. 2,640.00
0.0330 OH Mandor @Rp 75,000.00 Rp. 2,475.00
Jumlah Rp. 267,205.00
Dibulatkan Rp. 267,205.00
SNI 7394-2008-6.23
1 M2 Bekisting Untuk Balok
0.0400 M3 Kayu Kelas III @Rp 2,300,000.00 Rp. 92,000.00
0.4000 Kg Paku Biasa @Rp 19,000.00 Rp. 7,600.00
0.2000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 9,890.00
0.0180 M3 Balok Kayu Kelas III @Rp 2,300,000.00 Rp. 41,400.00
0.3500 Lembar Plywood Tebal 9 mm @Rp 100,000.00 Rp. 35,000.00
2.0000 Batang Dolken Kayu Ø 8 - 10, 4 M @Rp 7,560.00 Rp. 15,120.00
0.6600 OH Pekerja @Rp 68,000.00 Rp. 44,880.00
0.3300 OH Tukang @Rp 70,000.00 Rp. 23,100.00
0.0330 OH Kepala Tukang @Rp 80,000.00 Rp. 2,640.00
0.0330 OH Mandor @Rp 75,000.00 Rp. 2,475.00
Jumlah Rp. 274,105.00
Dibulat Rp. 274,105.00
SNI 7394-2008-6.24
1 M2 Bekisting Untuk Plat Lantai
0.0400 M3 Kayu Kelas III @Rp 2,300,000.00 Rp. 92,000.00
0.4000 Kg Paku Biasa @Rp 19,000.00 Rp. 7,600.00
0.2000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 9,890.00
0.0150 M3 Balok Kayu Kelas III @Rp 2,300,000.00 Rp. 34,500.00
0.3500 Lembar Plywood Tebal 9 mm @Rp 100,000.00 Rp. 35,000.00
6.0000 Batang Dolken Kayu Ø 8 - 10, 4 M @Rp 7,560.00 Rp. 45,360.00
0.6600 OH Pekerja @Rp 68,000.00 Rp. 44,880.00
0.3300 OH Tukang @Rp 70,000.00 Rp. 23,100.00
0.0330 OH Kepala Tukang @Rp 80,000.00 Rp. 2,640.00
0.0330 OH Mandor @Rp 75,000.00 Rp. 2,475.00
Jumlah Rp. 297,445.00
Dibulatkan Rp. 297,445.00
SNI 7394-2008-6.26
1 M2 Bekisting Untuk Tangga
0.0300 M3 Kayu Kelas III @Rp 2,300,000.00 Rp. 69,000.00
0.4000 Kg Paku Biasa @Rp 19,000.00 Rp. 7,600.00
0.1500 Liter Minyak Bekisting @Rp 49,450.00 Rp. 7,417.50
0.0150 M3 Balok Kayu Kelas III @Rp 2,300,000.00 Rp. 34,500.00
0.3500 Lembar Plywood Tebal 9 mm @Rp 100,000.00 Rp. 35,000.00
2.0000 Batang Dolken Kayu Ø 8 - 10, 4 M @Rp 7,560.00 Rp. 15,120.00
0.6600 OH Pekerja @Rp 68,000.00 Rp. 44,880.00
0.3300 OH Tukang @Rp 70,000.00 Rp. 23,100.00
0.0330 OH Kepala Tukang @Rp 80,000.00 Rp. 2,640.00
0.0330 OH Mandor @Rp 75,000.00 Rp. 2,475.00
Jumlah Rp. 241,732.50
Dibulatkan Rp. 241,732.50
Pekerjaan Lain-lain
Membongkar dan Menyiram Beton
1.0000 OH Pekerja @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 68,000.00
Suplemen 2
1 M3 Sloof Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,536,995.00 Rp. 42,536,995.00
190.0464 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 2,443,426.56
2.2222 M2 SNI 7394-2008-6.21 @Rp 171,735.00 Rp. 381,633.33
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 45,430,054.90
Dibulatkan Rp. 45,430,054.90
Suplemen 3
1 M3 Balok Beton Bertulang Ukuran 30 x 50 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,536,995.00 Rp. 42,536,995.00
176.7957 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 2,273,062.74
3.5333 M2 SNI 7394-2008-6.23 @Rp 274,105.00 Rp. 968,504.33
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 45,846,562.08
Dibulatkan Rp. 45,846,562.08
Suplemen 4
1 M3 Balok Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,536,995.00 Rp. 42,536,995.00
183.9173 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 2,364,625.15
3.5833 M2 SNI 7394-2008-6.23 @Rp 274,105.00 Rp. 982,209.58
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 45,951,829.74
Dibulatkan Rp. 45,951,829.74
Suplemen 5
1 M3 Balok Beton Bertulang Ukuran 20 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,536,995.00 Rp. 42,536,995.00
170.3235 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 2,189,849.24
4.7500 M2 SNI 7394-2008-6.23 @Rp 274,105.00 Rp. 1,301,998.75
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 46,096,842.99
Dibulatkan Rp. 46,096,842.99
Suplemen 6
1 M3 Balok Beton Bertulang Ukuran 25 x 30 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,536,995.00 Rp. 42,536,995.00
133.5339 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 1,716,844.92
5.6667 M2 SNI 7394-2008-6.23 @Rp 274,105.00 Rp. 1,553,261.67
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 45,875,101.59
Dibulatkan Rp. 45,875,101.59
Suplemen 7
1 M3 Balok Latai Beton Bertulang Ukuran 13 x 15 Cm
1.0000 M3 SNI 7394-2008-6.7 @Rp 41,739,755.00 Rp. 41,739,755.00
247.3795 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 3,180,558.07
5.1282 M2 SNI 7394-2008-6.23 @Rp 274,105.00 Rp. 1,405,666.67
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 46,393,979.73
Dibulatkan Rp. 46,393,979.73
Suplemen 8
1 M3 Ring Balok Beton Bertulang Ukuran 13 x 15 Cm
1.0000 M3 SNI 7394-2008-6.7 @Rp 41,739,755.00 Rp. 41,739,755.00
247.3795 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 3,180,558.07
5.1282 M2 SNI 7394-2008-6.23 @Rp 274,105.00 Rp. 1,405,666.67
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 46,393,979.73
Dibulatkan Rp. 46,393,979.73
Suplemen 9
1 M3 Balok Ornamen Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,536,995.00 Rp. 42,536,995.00
163.7783 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 2,105,698.03
6.0256 M2 SNI 7394-2008-6.23 @Rp 274,105.00 Rp. 1,651,658.33
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 46,362,351.37
Dibulatkan Rp. 46,362,351.37
Suplemen 10
1 M3 Lantai Beton Bertulang Ukuran T = 12 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,536,995.00 Rp. 42,536,995.00
123.3000 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 1,585,268.10
4.1667 M2 SNI 7394-2008-6.24 @Rp 297,445.00 Rp. 1,239,354.17
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 45,429,617.27
Dibulatkan Rp. 45,429,617.27
Suplemen 11
1 M3 Plat Bordes dan Anak Tangga Beton Bertulang Ukuran T = 15 cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,536,995.00 Rp. 42,536,995.00
142.0416 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 1,826,228.85
3.3333 M2 SNI 7394-2008-6.26 @Rp 241,732.50 Rp. 805,775.00
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 45,236,998.85
Dibulatkan Rp. 45,236,998.85
Suplemen 12
1 M3 Kolom Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,536,995.00 Rp. 42,536,995.00
163.7783 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 2,105,698.03
1.9444 M2 SNI 7394-2008-6.22 @Rp 267,205.00 Rp. 519,565.28
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 45,230,258.31
Dibulatkan Rp. 45,230,258.31
Suplemen 13
1 M3 Kolom Beton Bertulang Ukuran 30 x 30 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,536,995.00 Rp. 42,536,995.00
177.1547 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 2,277,677.55
2.2222 M2 SNI 7394-2008-6.22 @Rp 267,205.00 Rp. 593,788.89
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 45,476,461.44
Dibulatkan Rp. 45,476,461.44
Suplemen 14
1 M3 Kolom Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,536,995.00 Rp. 42,536,995.00
137.4743 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 1,767,507.50
1.9444 M2 SNI 7394-2008-6.22 @Rp 267,205.00 Rp. 519,565.28
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 44,892,067.78
Dibulatkan Rp. 44,892,067.78
Suplemen 15
1 M3 Kolom Beton Bertulang Ukuran 30 x 30 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,536,995.00 Rp. 42,536,995.00
183.2991 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 2,356,676.67
2.2222 M2 SNI 7394-2008-6.22 @Rp 267,205.00 Rp. 593,788.89
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 45,555,460.56
Dibulatkan Rp. 45,555,460.56
Suplemen 16
1 M3 Kolom Beton Bertulang Ukuran 13 x 13 Cm
1.0000 M3 SNI 7394-2008-6.7 @Rp 41,739,755.00 Rp. 41,739,755.00
163.7783 Kg SNI 7394-2008-6.17 @Rp 12,857.00 Rp. 2,105,698.03
2.5641 M2 SNI 7394-2008-6.22 @Rp 267,205.00 Rp. 685,141.03
1.0000 Ls Pekerjaan Lain-lain @Rp 68,000.00 Rp. 68,000.00
Jumlah Rp. 44,598,594.06
Dibulatkan Rp. 44,598,594.06
IV. PEKERJAAN DINDING
SNI 6897-2008-6.7
1 M2 Pasangan Bata Merah Tebal 1/2 Bata Adukan 1PC : 2 PP
0.0380 M3 Pasir Pasang @Rp 2,000.00 Rp. 76.00
70.0000 Buah Batu Bata @Rp 700.00 Rp. 49,000.00
18.9500 Kg Semen Portland @Rp 71,000.00 Rp. 1,345,450.00
0.3000 OH Pekerja @Rp 68,000.00 Rp. 20,400.00
0.1000 OH Tukang @Rp 70,000.00 Rp. 7,000.00
0.0100 OH Kepala Tukang @Rp 80,000.00 Rp. 800.00
0.0150 OH Mandor @Rp 75,000.00 Rp. 1,125.00
Jumlah Rp. 1,423,851.00
Dibulatkan Rp. 1,423,851.00
SNI 6897-2008-6.9
1 M2 Pasangan Bata Merah Tebal 1/2 Bata Adukan 1PC : 4 PP
0.0430 M3 Pasir Pasang @Rp 2,000.00 Rp. 86.00
70.0000 Buah Batu Bata @Rp 700.00 Rp. 49,000.00
11.5000 Kg Semen Portland @Rp 71,000.00 Rp. 816,500.00
0.3000 OH Pekerja @Rp 68,000.00 Rp. 20,400.00
0.1000 OH Tukang @Rp 70,000.00 Rp. 7,000.00
0.0100 OH Kepala Tukang @Rp 80,000.00 Rp. 800.00
0.0150 OH Mandor @Rp 75,000.00 Rp. 1,125.00
Jumlah Rp. 894,911.00
Dibulatkan Rp. 894,911.00
V. PEKERJAAN PLESTERAN
SNI 2837-2008-6.2
1 M2 Plesteran 1 PC : 2 PP : Tebal 15 mm
0.0200 M3 Pasir Beton @Rp 15,000.00 Rp. 300.00
10.2240 Kg Semen Portland @Rp 71,000.00 Rp. 725,904.00
0.3000 OH Pekerja @Rp 68,000.00 Rp. 20,400.00
0.1500 OH Tukang @Rp 70,000.00 Rp. 10,500.00
0.0150 OH Kepala Tukang @Rp 80,000.00 Rp. 1,200.00
0.0150 OH Mandor @Rp 75,000.00 Rp. 1,125.00
Jumlah Rp. 759,429.00
Dibulatkan Rp. 759,429.00
SNI 2837-2008-6.3
1 M2 Plesteran 1 PC : 3 PP : Tebal 15 mm
0.0230 M3 Pasir Beton @Rp 15,000.00 Rp. 345.00
7.7760 Kg Semen Portland @Rp 71,000.00 Rp. 552,096.00
0.3000 OH Pekerja @Rp 68,000.00 Rp. 20,400.00
0.1500 OH Tukang @Rp 70,000.00 Rp. 10,500.00
0.0150 OH Kepala Tukang @Rp 80,000.00 Rp. 1,200.00
0.0150 OH Mandor @Rp 75,000.00 Rp. 1,125.00
Jumlah Rp. 585,666.00
Dibulatkan Rp. 585,666.00
SNI 2837-2008-6.4
1 M2 Plesteran 1 PC : 4 PP : Tebal 15 mm
0.0240 M3 Pasir Beton @Rp 15,000.00 Rp. 360.00
6.2400 Kg Semen Portland @Rp 71,000.00 Rp. 443,040.00
0.3000 OH Pekerja @Rp 68,000.00 Rp. 20,400.00
0.1500 OH Tukang @Rp 70,000.00 Rp. 10,500.00
0.0150 OH Kepala Tukang @Rp 80,000.00 Rp. 1,200.00
0.0150 OH Mandor @Rp 75,000.00 Rp. 1,125.00
Jumlah Rp. 476,625.00
Dibulatkan Rp. 476,625.00
SNI 2837-2008-6.27
1 M2 Acian
3.2500 Kg Semen Portland @Rp 71,000.00 Rp. 230,750.00
0.2000 OH Pekerja @Rp 68,000.00 Rp. 13,600.00
0.1000 OH Tukang @Rp 70,000.00 Rp. 7,000.00
0.0100 OH Kepala Tukang @Rp 80,000.00 Rp. 800.00
0.0100 OH Mandor @Rp 75,000.00 Rp. 750.00
Jumlah Rp. 252,900.00
Dibulatkan Rp. 252,900.00
SNI 3434-2008-6.5
Membuat dan Memasang 1 M2 Daun Pintu Panel Kayu Kelas I
0.0400 M3 Papan Kayu Kelas I @Rp 5,000,000.00 Rp. 200,000.00
0.5000 Kg Lem Kayu @Rp 100.00 Rp. 50.00
1.0000 OH Pekerja @Rp 68,000.00 Rp. 68,000.00
3.0000 OH Tukang @Rp 70,000.00 Rp. 210,000.00
0.3000 OH Kepala Tukang @Rp 80,000.00 Rp. 24,000.00
0.0500 OH Mandor @Rp 75,000.00 Rp. 3,750.00
Jumlah Rp. 505,800.00
Dibulatkan Rp. 505,800.00
SNI 3434-2008-6.6
Membuat dan memasang 1 M2 Pintu dan Jendela Kaca Kayu Kelas I
0.0240 M3 Papan Kayu Kelas I @Rp 5,000,000.00 Rp. 120,000.00
0.3000 Kg Paku Biasa @Rp 19,000.00 Rp. 5,700.00
0.8000 OH Pekerja @Rp 68,000.00 Rp. 54,400.00
2.4000 OH Tukang @Rp 70,000.00 Rp. 168,000.00
0.2400 OH Kepala Tukang @Rp 80,000.00 Rp. 19,200.00
0.0400 OH Mandor @Rp 75,000.00 Rp. 3,000.00
Jumlah Rp. 370,300.00
Dibulatkan Rp. 370,300.00
SNI 3434-2008-6.10
Memasang 1 M2 Jalusi Kusen Kayu Kelas I
0.0600 M3 Papan Kayu Kelas I @Rp 5,000,000.00 Rp. 300,000.00
0.1500 Kg Paku Biasa @Rp 19,000.00 Rp. 2,850.00
0.6700 OH Pekerja @Rp 68,000.00 Rp. 45,560.00
2.0000 OH Tukang @Rp 70,000.00 Rp. 140,000.00
0.2000 OH Kepala Tukang @Rp 80,000.00 Rp. 16,000.00
0.3350 OH Mandor @Rp 75,000.00 Rp. 25,125.00
Jumlah Rp. 529,535.00
Dibulatkan Rp. 529,535.00
SNI 3434-2008-6.13
Memasang 1 M3 Kontruksi Kuda-Kuda Konvensional Kayu Kelas I
1.1000 M3 Balok Kayu Kelas I @Rp 5,000,000.00 Rp. 5,500,000.00
15.0000 Kg Besi Strip Tebal 5 mm @Rp 12,000.00 Rp. 180,000.00
5.6000 Kg Paku Biasa @Rp 19,000.00 Rp. 106,400.00
4.0000 OH Pekerja @Rp 68,000.00 Rp. 272,000.00
12.0000 OH Tukang @Rp 70,000.00 Rp. 840,000.00
1.2000 OH Kepala Tukang @Rp 80,000.00 Rp. 96,000.00
0.2000 OH Mandor @Rp 75,000.00 Rp. 15,000.00
Jumlah Rp. 7,009,400.00
Dibulatkan Rp. 7,009,400.00
SNI 3434-2008-6.15
Memasang 1 M3 Kontruksi Gordeng Kayu Kelas II
1.1000 M3 Balok Kayu Kelas II @Rp 3,300,000.00 Rp. 3,630,000.00
3.0000 Kg Paku Biasa @Rp 19,000.00 Rp. 57,000.00
2.4000 OH Pekerja @Rp 68,000.00 Rp. 163,200.00
7.2000 OH Tukang @Rp 70,000.00 Rp. 504,000.00
0.7200 OH Kepala Tukang @Rp 80,000.00 Rp. 57,600.00
0.1200 OH Mandor @Rp 75,000.00 Rp. 9,000.00
Jumlah Rp. 4,420,800.00
Dibulatkan Rp. 4,420,800.00
SNI 3434-2008-6.18
Memasang 1 M2 Rangka Langit - Langit 60 x 60, Kayu Kelas II
0.0154 M3 Kaso - Kaso / Kayu Klas II @Rp 3,300,000.00 Rp. 50,820.00
0.2000 Kg Paku Biasa @Rp 19,000.00 Rp. 3,800.00
0.1500 OH Pekerja @Rp 68,000.00 Rp. 10,200.00
0.3000 OH Tukang @Rp 70,000.00 Rp. 21,000.00
0.0300 OH Kepala Tukang @Rp 80,000.00 Rp. 2,400.00
0.0750 OH Mandor @Rp 75,000.00 Rp. 5,625.00
Jumlah Rp. 93,845.00
Dibulatkan Rp. 93,845.00
SNI 3434-2008-6.21
Memasang 1 M' Lisplank Ukuran (3 x 20) Cm, Kayu Kelas I
0.0108 M3 Papan Kayu Klas I @Rp 3,300,000.00 Rp. 35,640.00
0.1000 Kg Paku Biasa @Rp 19,000.00 Rp. 1,900.00
0.1000 OH Pekerja @Rp 68,000.00 Rp. 6,800.00
0.2000 OH Tukang @Rp 70,000.00 Rp. 14,000.00
0.0200 OH Kepala Tukang @Rp 80,000.00 Rp. 1,600.00
0.0050 OH Mandor @Rp 75,000.00 Rp. 375.00
Jumlah Rp. 60,315.00
Dibulatkan Rp. 60,315.00
SNI 7395-2008-6.34a
Memasang 1 M2 Lantai Keramik 40 x 40 Cm
0.0450 M3 Pasir Pasang @Rp 2,000.00 Rp. 90.00
6.6300 Buah Keramik 40 x 40 cm Polished @Rp 9,000.00 Rp. 59,670.00
9.8000 Kg Semen Portland @Rp 71,000.00 Rp. 695,800.00
1.3000 Kg Semen Warna @Rp 50,000.00 Rp. 65,000.00
0.7000 OH Pekerja @Rp 68,000.00 Rp. 47,600.00
0.3500 OH Tukang @Rp 70,000.00 Rp. 24,500.00
0.0350 OH Kepala Tukang @Rp 80,000.00 Rp. 2,800.00
0.0350 OH Mandor @Rp 75,000.00 Rp. 2,625.00
Jumlah Rp. 898,085.00
Dibulatkan Rp. 898,085.00
SNI7395-2008-6.15
Memasang 1 M2 Lantai Keramik 30 x 30 Cm Polished
0.0450 M3 Pasir Pasang @Rp 2,000.00 Rp. 90.00
11.8700 Buah Keramik 30 x 30 cm Unpolished @Rp 5,200.00 Rp. 61,724.00
10.0000 Kg Semen Portland @Rp 71,000.00 Rp. 710,000.00
1.5000 Kg Semen Warna @Rp 50,000.00 Rp. 75,000.00
0.2600 OH Pekerja @Rp 68,000.00 Rp. 17,680.00
0.1300 OH Tukang @Rp 70,000.00 Rp. 9,100.00
0.0130 OH Kepala Tukang @Rp 80,000.00 Rp. 1,040.00
0.0130 OH Mandor @Rp 75,000.00 Rp. 975.00
Jumlah Rp. 875,609.00
Dibulatkan Rp. 875,609.00
SNI7395-2008-6.15.a
Memasang 1 M2 Lantai Keramik 30 x 30 Cm Unpolished
0.0450 M3 Pasir Pasang @Rp 2,000.00 Rp. 90.00
11.8700 Buah Keramik 30 x 30 cm Unpolished @Rp 5,200.00 Rp. 61,724.00
10.0000 Kg Semen Portland @Rp 71,000.00 Rp. 710,000.00
1.5000 Kg Semen Warna @Rp 50,000.00 Rp. 75,000.00
0.2600 OH Pekerja @Rp 68,000.00 Rp. 17,680.00
0.1300 OH Tukang @Rp 70,000.00 Rp. 9,100.00
0.0130 OH Kepala Tukang @Rp 80,000.00 Rp. 1,040.00
0.0130 OH Mandor @Rp 75,000.00 Rp. 975.00
Jumlah Rp. 875,609.00
Dibulatkan Rp. 875,609.00
VIII. PEKERJAAN LANGIT-LANGIT
SNI 2839-2008-6.1
1 M2 Pasang Plafond Asbes Semen
1.1000 M2 Asbes Semen @Rp 15,000.00 Rp. 16,500.00
0.0100 Kg Paku @Rp 19,000.00 Rp. 190.00
0.0300 OH Pekerja @Rp 68,000.00 Rp. 2,040.00
0.0700 OH Tukang @Rp 70,000.00 Rp. 4,900.00
0.0070 OH Kepala Tukang @Rp 80,000.00 Rp. 560.00
0.0040 OH Mandor @Rp 75,000.00 Rp. 300.00
Jumlah Rp. 24,490.00
Dibulatkan Rp. 24,490.00
SNI 2839-2008-6.5
1 M2 Pasang Plafond Tripleks Tebal 4 mm
0.3750 Lembar Tripleks Tebal 4 mm @Rp 25,000.00 Rp. 9,375.00
0.0300 Kg Paku @Rp 4,000.00 Rp. 120.00
0.1000 OH Pekerja @Rp 68,000.00 Rp. 6,800.00
0.1000 OH Tukang @Rp 70,000.00 Rp. 7,000.00
0.0100 OH Kepala Tukang @Rp 80,000.00 Rp. 800.00
0.0050 OH Mandor @Rp 75,000.00 Rp. 375.00
Jumlah Rp. 24,470.00
Dibulatkan Rp. 24,470.00
SNI 2839-2008-6.10
1 M' Pasang List Langit - Langit Kayu Profil
1.0500 M' List Kayu Profil @Rp 5,000.00 Rp. 5,250.00
0.0100 Kg Paku Kayu Biasa @Rp 19,000.00 Rp. 190.00
0.0500 OH Pekerja @Rp 68,000.00 Rp. 3,400.00
0.0500 OH Tukang @Rp 70,000.00 Rp. 3,500.00
0.0050 OH Kepala Tukang @Rp 80,000.00 Rp. 400.00
0.0030 OH Mandor @Rp 75,000.00 Rp. 225.00
Jumlah Rp. 12,965.00
Dibulatkan Rp. 12,965.00
SNI 03-3431-2002-6.5
1 Buah Engsel Pintu
1.0000 Psg Engsel Pintu @Rp 12,650.00 Rp. 12,650.00
0.0150 OH Pekerja @Rp 68,000.00 Rp. 1,020.00
0.1500 OH Tukang @Rp 70,000.00 Rp. 10,500.00
0.0150 OH Kepala Tukang @Rp 80,000.00 Rp. 1,200.00
0.0008 OH Mandor @Rp 75,000.00 Rp. 56.25
Jumlah Rp. 25,426.25
Dibulatkan Rp. 25,426.25
SNI 03-3431-2002-6.6
1 Buah Engsel Jendela Kupu - Kupu
1.0000 Psg Engsel Jendela @Rp 10,000.00 Rp. 10,000.00
0.0100 OH Pekerja @Rp 68,000.00 Rp. 680.00
0.1000 OH Tukang @Rp 70,000.00 Rp. 7,000.00
0.0100 OH Kepala Tukang @Rp 80,000.00 Rp. 800.00
0.0005 OH Mandor @Rp 75,000.00 Rp. 37.50
Jumlah Rp. 18,517.50
Dibulatkan Rp. 18,517.50
SNI 03-3431-2002-6.9
1 Buah Kait Angin Jendela
1.0000 Buah Kait Angin @Rp 10,000.00 Rp. 10,000.00
0.0150 OH Pekerja @Rp 68,000.00 Rp. 1,020.00
0.1500 OH Tukang @Rp 70,000.00 Rp. 10,500.00
0.0150 OH Kepala Tukang @Rp 80,000.00 Rp. 1,200.00
0.0008 OH Mandor @Rp 75,000.00 Rp. 56.25
Jumlah Rp. 22,776.25
Dibulatkan Rp. 22,776.25
SNI 03-3431-2002-6.17
1 M2 Pasang Kaca Tebal 5 mm
1.1000 M2 Kaca Tebal 5 mm @Rp 57,500.00 Rp. 63,250.00
0.0150 OH Pekerja @Rp 68,000.00 Rp. 1,020.00
0.1500 OH Tukang @Rp 70,000.00 Rp. 10,500.00
0.0150 OH Kepala Tukang @Rp 80,000.00 Rp. 1,200.00
0.0008 OH Mandor @Rp 75,000.00 Rp. 56.25
Jumlah Rp. 76,026.25
Dibulatkan Rp. 76,026.25
1 Pondasi
ø16 1.578 1.000 10.000 15.782
0.300 31.565 105.216
ø 16 1.578 1.000 10.000 15.782
1 Sloof 30/40
ø16 1.578 1.000 12.000 18.939
0.120 22.806 190.046
ø8 0.395 1.400 7.000 3.867
2 Kolom 30/40
ø16 1.578 1.000 4.000 6.313
0.120 19.653 163.778
ø8 0.395 1.400 7.000 3.871
3 Kolom 30/30
ø16 1.578 1.000 4.000 6.313
0.090 15.944 177.155
ø8 0.395 1.200 7.000 3.318
7 Balok 30/50
ø16 1.578 1.000 10.000 15.782
0.150 26.519 176.796
ø8 0.395 1.600 7.000 4.424
8 Balok 30/40
ø16 1.578 1.000 10.000 15.782
0.120 22.070 183.917
ø8 0.395 1.400 7.000 3.871
9 Balok 20/40
ø16 1.578 1.000 5.000 7.891
0.080 13.626 170.323
ø8 0.395 1.200 7.000 3.318
10 Balok 25/30
ø14 1.208 1.000 4.000 4.833
0.075 10.015 133.534
ø8 0.395 1.000 7.000 2.765
14 Plat lantai T = 12 cm
ø10 0.617 1.000 12.000 7.398
0.120 14.796 123.300
ø10 0.617 1.000 12.000 7.398
15 Plat Bordes T = 15 cm
ø12 0.888 1.000 12.000 10.653
0.150 21.306 142.042
ø12 0.888 1.000 12.000 10.653
0
0
Banda Aceh, 11 Mei 2016
CV. BUDI PRIMA SENTOSA
0
0
PERHITUNGAN VOLUME
### Galian Tanah Pondasi Tapak Type II 1.700 1.700 1.650 16.000 76.296 M3
Cicin sumuran (лr²) 0.785 0.950 3.140 0.500 16.000 11.932 M3
2.000 1.700 1.650 1.000 5.610 M3
93.838 M3 93.838 M3
### Galian Tanah Pondasi Menerus 104.000 0.400 0.450 18.720 M3 18.720 M3
### Urugan Pasir di bawah Pondasi 104.000 0.400 0.050 2.080 M3 9.402 M3
2.200 2.200 0.050 20.000 4.840 M3
1.700 1.700 0.050 16.000 2.312 M3
2.000 1.700 0.050 1.000 0.170 M3
9.402 M3
### Pondasi Batu Kali 1 : 4 104.000 0.250 0.400 0.200 0.300 10.400 M3 10.400 M3
### Beton Cor 1 : 2 : 3 Isian Sumuran 0.785 1.000 3.140 0.500 20.000 15.700 M3
0.785 1.000 3.140 0.500 16.000 12.560 M3
28.260 M3 28.260 M3
### Lantai Kerja di bawah Pondasi Tapak 2.200 2.200 0.100 20.000 9.680 M3
1.700 1.700 0.100 16.000 4.624 M3
2.000 1.700 0.100 1.000 0.340 M3
14.644 M3 14.644 M3
### Beton Bertulang Kolom Pendestal 30/40 cm 0.400 0.300 1.450 20.000 3.480 M3
0.400 0.300 1.450 6.000 1.044 M3
4.524 M3 4.524 M3
### Beton Bertulang Kolom Pendestal 30/30 cm 0.300 0.300 1.450 10.000 1.305 M3 1.305 M3
### Beton Bertulang Sloof 30/40 cm 0.300 0.400 163.800 19.656 M3 19.656 M3
### Beton Bertulang Kolom Induk 30/40 cm 0.300 0.400 3.500 26.000 10.920 M3 10.920 M3
### Beton Bertulang Kolom Teras 30/30 cm 0.300 0.300 3.600 10.000 3.240 M3 3.240 M3
### Beton Bertulang Balok 30/50 cm 0.300 0.500 28.000 4.200 M3 4.200 M3
### Beton Bertulang Balok 30/40 cm 0.300 0.400 171.800 20.616 M3 20.616 M3
### Beton Bertulang Balok 20/40 cm 0.200 0.400 4.500 0.360 M3 0.360 M3
### Beton Bertulang Balok Latai 13/15 cm 0.130 0.150 70.000 1.365 M3 1.365 M3
### Beton Bertulang Ring Balok untuk selasar 13/15 cm 0.130 0.150 44.000 0.858 M3 0.858 M3
### Beton Bertulang Balok Ornamen Teras 30/40 cm 0.400 0.300 0.400 12.000 0.576 M3 0.576 M3
### Beton Bertulang Plat Bordes dan Anak Tangga 6.700 2.000 0.150 2.010 M3
4.000 3.000 0.150 1.800 M3
3.810 M3 3.810 M3
Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan
LANTAI II
### Beton Bertulang Kolom Induk 30/40 cm 3.700 0.300 0.400 26.000 11.544 M3 11.544 M3
### Beton Bertulang Kolom Teras 30/30 cm 3.700 0.300 0.300 10.000 3.330 M3 3.330 M3
### Beton Bertulang Balok 25/30 cm 125.000 0.250 0.300 1.000 9.375 M3 9.375 M3
### Beton Bertulang Balok Latai 13/15 cm 72.800 0.130 0.150 1.000 1.420 M3 1.420 M3
### Beton Bertulang untuk selasar 13/15 cm (dudukan batu bata) 44.000 0.130 0.150 1.000 0.858 M3 0.858 M3
### #REF!
LANTAI I
### Pasangan Trasram Bata 1 PC : 2 PS di bawah Lantai 95.300 0.400 38.120 M2
38.120 M2 38.120 M2
5 #REF!
#REF!
### Pasangan Dinding Bata 1 PC : 4 PS 85.600 3.550 303.880 M2 M2
3.700 3.550 13.135 M2
303.880 M2
Dikurangi
Pas. Batu Kerawang Bagian Lantai atas 2.000 1.660 1.000 3.320 M2
Pintu Type. P-1 Bagian Lantai bawah 2.600 1.300 4.000 13.520 M2
Jendela Type J-1 Bagian Lantai bawah 2.650 1.400 12.000 44.520 M2
Jendela Type J-12 Bagian Lantai bawah 2.000 1.400 4.000 11.200 M2
72.560 M2
Pas. Batu Bata Dikurangi Pintu, Jendela, kolom,dll 231.320 M2
E. PEKERJAAN LANTAI
Pekerjaan Timbunan dan Urugan
1 Timbunan Tanah Bawah Lantai Ruangan 8.870 6.870 0.620 4.000 151.124 M3 151.124 M3
4.370 6.870 0.620 1.000 18.614 M3
169.737 M3
3 Urugan Pasir di Bawah Lantai Ruangan 8.870 6.870 0.100 4.000 24.375 M3 24.375 M3
4.370 6.870 0.100 1.000 3.002 M3
27.377 M3
### Beton Tumbuk di Bawah Lantai Keramik t = 5 cm Selasar 40.000 1.370 0.050 2.740 M3
40.000 1.870 0.050 3.740 M3
10.370 1.370 0.050 2.000 1.421 M3
7.901 M3 7.901 M3
### Lantai Keramik 40 x 40 cm Anti Slip Pada Selasar 40.000 1.370 54.800 M2
40.000 1.870 74.800 M2
10.370 1.370 2.000 28.414 M2
158.014 M2 158.014 M2
Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan
### #REF! 2.000 0.200 20.000 8.000 M2
2.000 0.300 20.000 12.000 M2
3.500 4.000 1.000 14.000 M2
34.000 M2 34.000 M2
#REF!
1 #REF! 8.870 6.870 4.000 243.748 M3 M3
4.500 2.000 9.000
3 #REF! 4.000 M2 M2
### #REF!
#REF!
### Kayu Kanopi Kuda-kuda Terpasang 10.000 Bh 10.000 Bh
b. Daun Pintu Panel Ukuran 60 x 210 cm x 2 2.100 1.200 8.000 20.160 M² 20.160 M²
### Daun Jendela Ukuran 60 x 85 cm 2.700 0.130 0.050 48.000 0.842 #REF! 0.842 #REF!
### Ventilasi Ambang Ukuran 40 x 60 cm 1.800 0.130 0.050 48.000 0.562 #REF! 0.562 #REF!
### #REF!
### #REF! 40.200 630.000 655.860 1,326.060 M2 1,326.060 M2
### Cat Kayu Lesplang dan Lis Plafond 42.000 0.210 8.820 M2 8.820 M2
-
-
Banda Aceh, 11 Mei 2016
CV. BUDI PRIMA SENTOSA
-
-
GRAND TOTAL REKAPITULASI
PEKERJAAN :
PERENCANAAN PEMBANGUNAN MUSHALLA SDN 7 KOTA JANTHO
Lokasi : ACEH
JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)
Terbilang : Dua Ratus Sembilan Puluh Tujuh Juta Empat Ratus Empat Puluh Ribu Rupiah
FAHMI
Direktur
Lampiran Alat
Jumlah Status
Tahun
No Jenis Peralatan Peralatan Merk dan Type Tenaga Kapasitas Kepemilikan Lokasi Alat
(unit) Pembuatan Peralatan
RUDI
Manager Peralatan
REKAPITULASI
BILL OF QUANTITY (BOQ)
JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.)
Terbilang : Dua Ratus Sembilan Puluh Tujuh Juta Empat Ratus Empat Puluh Ribu Rupiah
FAHMI
Direktur
BILL OF QUANTITY (BOQ)
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6 7=3x6
A. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.000 Ls Taksir 500,000.00 500,000.00
2 Pembersihan Lapangan 1.000 Ls Taksir 500,000.00 500,000.00
3 Adminitrasi dan Dokumentasi 1.000 Ls Taksir 1,000,000.00 1,000,000.00
4 Kesehatan Keselamatan Kerja (K3) 1.000 M Taksir 1,000,000.00 1,000,000.00
5 Pengukuran dan Pemasangan Bouwplank 1.000 M Taksir 475,000.00 475,000.00
JUMLAH 3,475,000.00
B. PEKERJAAN TANAH
1 Galian Tanah Pondasi Tapak 6.000 M3 A. 2.2.3.1.1 60,806.25 364,837.50
2 Galian tanah pondasi menerus 18.630 M3 A. 2.2.3.1.1 60,806.25 1,132,820.44
3 Urugan Kembali Bekas Galian 7.389 M3 A. 2.2.3.1.9 43,412.50 320,774.96
4 Timbunan Dan Pemadatan Tanah Bawah lantai 69.235 M3 A. 2.2.3.1.10 43,412.50 3,005,664.44
5 Urugan Pasir Bawah lantai T = 5 cm 4.864 M3 A. 2.2.3.1.11 162,322.50 789,536.64
6 Urugan Pasir Bawah Pondasi Tapak 0.300 M3 A. 2.2.3.1.11 162,322.50 48,696.75
JUMLAH 5,662,330.73
C. PEKERJAAN PONDASI
- Pondasi Menerus
1 Urugan Pasir Bawah Pondasi T = 5 cm 1.553 M3 A. 2.2.3.1.11 162,322.50 252,086.84
2 Aastamping Batu Kosong T = 15 cm 4.658 M3 A. 3.2.1.9 300,822.75 1,401,232.37
3 Pasangan Pondasi Batu Kali/Gunung 16.163 M3 A. 3.2.1.2 614,982.50 9,939,962.15
- Pondasi Bata Rollag Keliling Bangunan
1 Galian Tanah Pondasi Rolag Pasangan Bata 8.804 M3 A. 2.2.3.1.1 60,806.25 535,338.23
2 Beton Cor 1 : 3 : 5 Dibawah Pondasi Rolag Selasar 1.258 M3 A. A.4.1.1.5 856,865.82 1,077,937.20
3 Pondasi Rolag Pasangan Bata Tebal 1 Bata Pas 1 : 3 41.925 M2 A.4.4.1.7 122,121.38 5,119,938.65
4 Plesteran Pondasi Rolag 1 : 2 83.850 M2 A.4.4.2.14 58,218.75 4,881,642.19
JUMLAH 23,208,137.62
D. PEKERJAAN BETON & BETON BERTULANG
1 Beton Cor 1 : 3 : 5 Dibawah Pondasi Tapak 0.300 M3 A. A.4.1.1.5 856,865.82 257,059.75
2 Pondasi Tapak 80 x 80 cm 0.768 M3 Anl.Supl.K1 6,162,674.38 4,732,933.93
3 Kolom Pendestal 25 x 25 cm 0.458 M3 Anl.Supl.KPD 6,162,674.38 2,822,504.87
4 Sloof 18 x 20 cm 1.242 M3 Anl.Supl.SL1 4,770,513.74 5,924,978.07
5 Kolom 25 x 25 cm 3.075 M3 Anl.Supl.KPD 6,162,674.38 18,950,223.73
6 Kolom 15 x 35 cm 0.431 M3 Anl.Supl.K2 5,727,226.67 2,468,434.69
7 Balok Latai 11 x 15 cm 0.452 M3 Anl.Supl.RB3 7,495,318.61 3,387,884.01
8 Balok 18 x 20 cm Elv + 3.25 m 0.270 M3 Anl.Supl.RB2 6,360,722.43 1,717,395.06
9 Plat Dack T = 10 cm 0.313 M3 Anl.Supl.PD 5,241,843.89 1,640,697.14
10 Ring Balok RB-1 15 x 20 cm 0.960 M3 Anl.Supl.RB1 6,623,906.94 6,358,950.66
JUMLAH 48,261,061.89
E. PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan Bata Trasram 1 : 2 13.800 M2 A.4.4.1.7 122,121.38 1,685,274.98
2 Pasangan Bata Dinding Ruangan 1 : 4 102.708 M2 A.4.4.1.9 107,173.00 11,007,524.48
3 Plasteran Dinding Ruangan 1 : 2 27.600 M2 A.4.4.2.14 58,218.75 1,606,837.50
4 Plasteran Dinding Ruangan 1 : 4 205.416 M2 A.4.4.2.15 64,207.00 13,189,145.11
5 Pasang Batu Kerawang 144.000 Bh Taksir 25,000.00 3,600,000.00
6 Beton Tumbuk Bawah Keramik dan Keliling Bangunan T = 5 cm 5.197 M3 A. A.4.1.1.5 856,865.82 4,453,131.67
7 Pekerjaan lantai Ruangan Keramik 40 x 40 cm 67.125 M2 A.4.4.3.14a 123,021.25 8,257,801.41
JUMLAH 43,799,715.15
F. PEKERJAAN PINTU, JENDELA, VENTILASI DAN PENGUNCI
1 Kusen Kayu Pintu, Jendela dan Ventilasi Kayu Kelas II 0.643 M3 A.4.6.1.10 491,665.25 316,140.76
2 Daun Pintu Type P1 Kayu Kelas II Siap Terpasang 3.000 Unit Taksir 800,000.00 2,400,000.00
3 Daun Jendela Type J1 Kayu Kelas II + Kaca 5 mm Siap Terpasang 6.000 Unit Taksir 500,000.00 3,000,000.00
4 Jalusi Ventilasi Jendela 10.296 M2 Taksir 300,000.00 3,088,800.00
5 Handle Pintu Double 6.000 Set Taksir 150,000.00 900,000.00
6 Kunci Tanam 2 Kali Putar 3.000 Unit Taksir 50,000.00 150,000.00
7 Engsel Pintu 4 inci 12.000 Buah Taksir 20,000.00 240,000.00
A. 3.2.1.10 Pemasangan 1m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3KR dan 40% Batu Belah
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 3.400 68,000.00 231,200.00
Tukang batu L.02 OH 0.850 70,000.00 59,500.00
Kepala Tukang L.03 OH 0.085 80,000.00 6,800.00
Mandor L.04 OH 0.170 75,000.00 12,750.00
Jumlah Tenaga Kerja 310,250.00
B BAHAN
Batu Belah/ Kali m3 0.480 110,000.00 52,800.00
Semen Portland kg 194.000 1,250.00 242,500.00
Pasir Beton m3 0.312 135,000.00 42,120.00
Kerikil m3 0.468 135,000.00 63,180.00
Besi Beton Polos kg 126.000 11,000.00 1,386,000.00
Kawat Beton kg 1.800 17,000.00 30,600.00
Jumlah Harga Bahan 1,817,200.00
C PERALATAN
A. 4.1.1.1 Membuat 1 m3 beton mutu f'c = 7.4 Mpa (K 100),slump (12 ± 2) cm, w/c = 0.87
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.650 68,000.00 112,200.00
Tukang batu L.02 OH 0.275 70,000.00 19,250.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 75,000.00 6,225.00
Jumlah Tenaga Kerja 139,915.00
B BAHAN
Semen Portland kg 247 1,250.00 308,750.00
Pasir Beton kg 869 96.43 83,796.43
Kerikil (Maks 30 mm) kg 999 100.00 99,900.00
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan 513,946.43
C PERALATAN
A. 4.1.1.3 Membuat 1 m3 beton mutu f'c = 12.2 Mpa (K 150),slump (12 ± 2) cm, w/c = 0.72
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.650 68,000.00 112,200.00
Tukang batu L.02 OH 0.275 70,000.00 19,250.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 75,000.00 6,225.00
Jumlah Tenaga Kerja 139,915.00
B BAHAN
Semen Portland kg 299 1,250.00 373,750.00
Pasir Beton kg 799 96.43 77,046.43
Kerikil (Maks 30 mm) kg 1,017 100.00 101,700.00
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan 573,996.43
C PERALATAN
A. A.4.1.1.5 Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0.66
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.650 68,000.00 112,200.00
Tukang batu L.02 OH 0.275 70,000.00 19,250.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 75,000.00 6,225.00
Jumlah Tenaga Kerja 139,915.00
B BAHAN
Semen Portland kg 326 1,250.00 407,500.00
Pasir Beton kg 760 96.43 73,285.71
Kerikil (Maks 30 mm) kg 1,029 100.00 102,900.00
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan 605,185.71
C PERALATAN
A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19.3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0.58
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.650 68,000.00 112,200.00
Tukang batu L.02 OH 0.275 70,000.00 19,250.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 75,000.00 6,225.00
Jumlah Tenaga Kerja 139,915.00
B BAHAN
Semen Portland kg 371 1,250.00 463,750.00
Pasir Beton kg 698 96.43 67,307.14
Kerikil (Maks 30 mm) kg 1,047 100.00 104,700.00
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan 657,257.14
C PERALATAN
A. 4.1.1.9 Membuat 1 m3 beton mutu f'c = 24 Mpa (K 275), slump (12 ± 2) cm, w/c = 0.53
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.650 68,000.00 112,200.00
Tukang batu L.02 OH 0.275 70,000.00 19,250.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 75,000.00 6,225.00
Jumlah Tenaga Kerja 139,915.00
B BAHAN
Semen Portland kg 406 1,250.00 507,500.00
Pasir Beton kg 684 96.43 65,957.14
Kerikil (Maks 30 mm) kg 1,026 100.00 102,600.00
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan 697,557.14
C PERALATAN
A. 4.1.1.11 Membuat 1 m3 beton mutu f'c = 28.8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0.49
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 2.100 68,000.00 142,800.00
Tukang batu L.02 OH 0.350 70,000.00 24,500.00
Kepala Tukang L.03 OH 0.035 80,000.00 2,800.00
Mandor L.04 OH 0.105 75,000.00 7,875.00
Jumlah Tenaga Kerja 177,975.00
B BAHAN
Semen Portland kg 439 1,250.00 548,750.00
Pasir Beton kg 670 96.43 64,607.14
Kerikil (Maks 30 mm) kg 1,006 100.00 100,600.00
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan 735,457.14
C PERALATAN
A. 4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm, plafont
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.350 68,000.00 23,800.00
Tukang besi L.03 OH 0.350 70,000.00 24,500.00
Kepala Tukang L.03 OH 0.035 80,000.00 2,800.00
Mandor L.04 OH 0.018 75,000.00 1,350.00
Jumlah Tenaga Kerja 52,450.00
B BAHAN
Rangka metal Hollow
m' 4.000 25,000.00 100,000.00
40.40.2 mm
Assesories
(perkuatan,las. dll), Ls 1.000 25,000.00 25,000.00
100% dari rangka
Jumlah Harga Bahan 125,000.00
C PERALATAN
A. 4.4.1.7 Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu campuran 1SP : 2PP
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.300 68,000.00 20,400.00
Tukang batu L.02 OH 0.100 70,000.00 7,000.00
Kepala Tukang L.03 OH 0.010 80,000.00 800.00
Mandor L.04 OH 0.015 75,000.00 1,125.00
Jumlah Tenaga Kerja 29,325.00
B BAHAN
Bata Merah bh 70.000 700.00 49,000.00
Semen Portland kg 18.950 1,250.00 23,687.50
Pasir Pasang m3 0.038 110,000.00 4,180.00
Jumlah Harga Bahan 76,867.50
C PERALATAN
A. 4.4.1.8 Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu campuran 1SP : 3PP
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.300 68,000.00 20,400.00
Tukang batu L.02 OH 0.100 70,000.00 7,000.00
Kepala Tukang L.03 OH 0.010 80,000.00 800.00
Mandor L.04 OH 0.015 75,000.00 1,125.00
Jumlah Tenaga Kerja 29,325.00
B BAHAN
Bata Merah bh 70.000 700.00 49,000.00
Semen Portland kg 14.370 1,250.00 17,962.50
Pasir Pasang m3 0.040 110,000.00 4,400.00
Jumlah Harga Bahan 71,362.50
C PERALATAN
A. 4.6.1.2 Pembuatan dan Pemasangan 1m3 kusen pintu dan kusen jendela, kayu Klas II
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 6.000 68,000.00 408,000.00
Tukang Kayu L.03 OH 18.000 70,000.00 1,260,000.00
Kepala Tukang L.03 OH 1.800 80,000.00 144,000.00
Mandor L.04 OH 0.300 75,000.00 22,500.00
Jumlah Tenaga Kerja 1,834,500.00
B BAHAN
Balok Kayu m3 1.200 3,300,000.00 3,960,000.00
Paku 10 cm kg 1.250 15,000.00 18,750.00
Lem Kayu kg 1.000 19,000.00 19,000.00
Jumlah Harga Bahan 3,997,750.00
C PERALATAN
A. 4.7.1.4 Pengecatan 1 m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.070 68,000.00 4,760.00
Tukang Cat L.02 OH 0.009 70,000.00 630.00
Kepala Tukang L.03 OH 0.006 80,000.00 480.00
Mandor L.04 OH 0.003 75,000.00 225.00
Jumlah Tenaga Kerja 6,095.00
B BAHAN
Cat Menie kg 0.200 21,000.00 4,200.00
Plamur kg 0.150 20,000.00 3,000.00
Cat Dasar kg 0.170 18,000.00 3,060.00
Cat Penutup kg 0.260 19,000.00 4,940.00
Kuas Bh 0.010 12,000.00 120.00
Pengencer/Air kg 0.030 100.00 3.00
Amplas Lbr 0.200 5,000.00 1,000.00
Jumlah Harga Bahan 16,323.00
C PERALATAN
A. 4.7.1.11 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.028 68,000.00 1,904.00
Tukang Cat L.02 OH 0.042 70,000.00 2,940.00
Kepala Tukang L.03 OH 0.0042 80,000.00 336.00
Mandor L.04 OH 0.003 75,000.00 225.00
Jumlah Tenaga Kerja 5,405.00
B BAHAN
Cat Dasar kg 0.120 18,000.00 2,160.00
Cat Penutup kg 0.180 19,000.00 3,420.00
Jumlah Harga Bahan 5,580.00
C PERALATAN
A.4.7.1.14 Pengecatan 1 m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.070 0.00 0.00
Tukang Cat L.02 OH 0.009 0.00 0.00
Kepala Tukang L.03 OH 0.0060 0.00 0.00
Mandor L.04 OH 0.003 0.00 0.00
Jumlah Tenaga Kerja 0.00
B BAHAN
Cat Menie Kg 0.200 21,000.00 4,200.00
Plamir Kg 0.150 20,000.00 3,000.00
Cata Kayu Dasar Kg 0.170 18,000.00 3,060.00
Cat Mengkilat Kg 0.260 44,000.00 11,440.00
Kuas Bh 0.010 10,000.00 100.00
Tiner Liter 0.013 25,000.00 325.00
amplas Lbr 0.200 5,000.00 1,000.00
Jumlah Harga Bahan 23,125.00
C PERALATAN
A. UPAH
1 Kepala Tukang Hari 80,000.00
2 Mandor Hari 75,000.00
3 Pekerja Hari 68,000.00
4 Tukang Hari 70,000.00
B. BAHAN
1 Air Liter 100.00
2 Atap Seng Genteng Metal 0,30 Lembar 50,000.00
3 Batu Bata Buah 700.00
4 Balok Kayu Kelas I M3 5,000,000.00
5 Batu Kali/Batu Belah (Sungai/Gunung) 15/20 Cm M3 110,000.00
6 Batu Belah 5/7 Cm M3 285,000.00
7 Besi Beton Polos Kg 11,000.00
8 Besi Beton Ulir Kg 13,000.00
9 Cat Dasar Kg 18,000.00
10 Cat Tembok Kg 19,000.00
11 Cat Kayu/Minyak Kg 44,000.00
12 Cat Menie Besi Kg 21,000.00
13 Kayu Bakau/Dolken Kayu Ø 8 - 10, 4 Meter Batang 7,560.00
14 Engsel Jendela 3" Pasang 10,000.00
15 Engsel Pintu 4" Pasang 12,650.00
16 Kaca Bening Tebal 5 mm M2 57,500.00
17 Kait Angin Buah 10,000.00
18 Kawat Beton Kg 17,000.00
19 Kayu Klas I (Semantok/Damar Laut) M3 5,000,000.00
20 Kayu Klas II (Merantee/Kruing) M3 3,300,000.00
21 Kayu Klas III (Semaram/Borneo/dll) untuk Bekesting M3 2,300,000.00
22 Kayu Klas IV (Sengon/dll) untuk Bouwplank M3 2,000,000.00
23 Keramik sisi kulit jeruk 20 x 20 Cm Buah 2,400.00
24 Keramik 40 x 40 Cm Homogenius Polished Buah 9,000.00
25 Keramik 40 x 40 Cm Homogenius Unpolished Buah 10,000.00
26 Keramik 30 x 30 Cm Homogenius Polished Buah 5,130.00
27 Keramik 30 x 30 Cm Homogenius Unpolished Buah 5,220.00
28 Keramik 25 x 25 Cm Buah 2,500.00
29 Keramik dinding 20 x 25 Cm Buah 3,050.00
30 Kerikil Beton/Bersih M3 135,000.00
31 Kerikil Beton/Bersih (1.350 Kg/M3) Kg 100.00
32 Kertas Amplas Lembar 5,000.00
33 Kunci Pintu Buah 49,450.00
34 Lem Kayu Kg 19,000.00
NO. URAIAN SATUAN HARGA SATUAN (Rp.)
JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)
Pekerjaan : Lanjutan Pembangunan RKB SMPN 1 Lhoksukon Kontruksi II Lantai Bangun Lantai I Block B dan Block C (Relokasi)
Lokasi : Kab. Aceh Utara (6 Ruang)
Lokasi : Kecamatan Lhoksukon Kabupaten Aceh Utara
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6 7=3x6
A. PEKERJAAN PERSIAPAN
3 Adminitrasi dan Dokumentasi 1.00 Ls 1,000,000.00 0.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Kesehatan Keselamatan Kerja (K3) 1.00 M 1,000,000.00 0.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 Pengukuran dan Pemasangan Bouwplank 1.00 M 475,000.00 0.18 0.06 0.06 0.06
B. PEKERJAAN TANAH
1 Galian Tanah Pondasi Tapak 6.00 M3 364,837.50 0.13 0.03 0.03 0.03 0.03 0.03
2 Galian tanah pondasi menerus 18.63 M3 1,132,820.44 0.42 0.07 0.07 0.07 0.07 0.07 0.07
6 Urugan Pasir Bawah Pondasi Tapak 0.30 M3 48,696.75 0.02 0.01 0.01 0.01
C. PEKERJAAN PONDASI
- Pondasi Menerus
1 Urugan Pasir Bawah Pondasi T = 5 cm 1.55 M3 252,086.84 0.09 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
2 Aastamping Batu Kosong T = 15 cm 4.66 M3 1,401,232.37 0.52 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
3 Pasangan Pondasi Batu Kali/Gunung 16.16 M3 9,939,962.15 3.68 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37
3 Pondasi Rolag Pasangan Bata Tebal 1 Bata Pas 1 : 3 41.93 M2 5,119,938.65 1.89
1 Beton Cor 1 : 3 : 5 Dibawah Pondasi Tapak 0.30 M3 257,059.75 0.10 0.02 0.02 0.02 0.02
4 Sloof 18 x 20 cm 1.24 M3 5,924,978.07 2.19 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27
5 Kolom 25 x 25 cm 3.08 M3 18,950,223.73 7.01 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47
6 Kolom 15 x 35 cm 0.43 M3 2,468,434.69 0.91 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
9 Plat Dack T = 10 cm 0.31 M3 1,640,697.14 0.61 0.09 0.09 0.09 0.09 0.09
10 Ring Balok RB-1 15 x 20 cm 0.96 M3 6,358,950.66 2.35 0.34 0.34 0.34 0.34 0.34
1 Pasangan Bata Trasram 1 : 2 13.80 M2 1,685,274.98 0.62 0.12 0.12 0.12 0.12 0.12
2 Pasangan Bata Dinding Ruangan 1 : 4 102.71 M2 11,007,524.48 4.07 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34
5 Pasang Batu Kerawang 144.00 Bh 3,600,000.00 1.33 0.33 0.33 0.33 0.33
6 Beton Tumbuk Bawah Keramik dan Keliling Bangunan T = 5 5.20 M3 4,453,131.67 1.65
1 Kusen Kayu Pintu, Jendela dan Ventilasi Kayu Kelas II 0.64 M3 316,140.76 0.12 0.02 0.02 0.02 0.02 0.02
2 Daun Pintu Type P1 Kayu Kelas II Siap Terpasang 3.00 Unit 2,400,000.00 0.89
3 Daun Jendela Type J1 Kayu Kelas II + Kaca 5 mm Siap Terpa 6.00 Unit 3,000,000.00 1.11
5 Kubah Stainless Steel Diameter 100 cm Siap Terpasang 1.00 Unit 3,000,000.00 1.11
H. PEKERJAAN PENGECATAN
2 Pengecatan Bidang Kayu Kosen, Daun Pintu dan Jendela 40.22 M2 1,069,680.41 0.40
6 Instalasi Titik Kontak Termasuk Pipa, Kabel NYA 2,5 mm, 3.00 Buah 300,000.00 0.11 0.04 0.04
7 Instalasi Titik Penerangan Termasuk Pipa, Kabel NYA 2,5 mm 7.00 Buah 700,000.00 0.26 0.09 0.09
Galian tanah pondasi menerus 16.20 M3 985,061.25 0.36 0.12 0.12 0.12
Timbunan Dan Pemadatan Tanah Bawah lantai 14.40 M3 625,140.00 0.23 0.23
- Pondasi Menerus
Pasangan Pondasi Batu Kali/Gunung 8.29 M3 5,096,974.96 1.88 0.47 0.47 0.47 0.47
Galian Tanah Pondasi Rolag Pasangan Bata 1.62 M3 98,506.13 0.04 0.04
Beton Cor 1 : 3 : 5 Dibawah Pondasi Rolag Tangga dan salu 0.90 M3 771,179.24 0.29 0.29
Pondasi Rolag Pasangan Bata Tebal 1/2 Bata 1 : 2 9.00 M2 1,099,092.38 0.41 0.41
- Pekerjaan Struktur
Pasangan Bata Dinding Ruangan 1 : 4 74.50 M2 7,984,388.50 2.95 0.98 0.98 0.98
Pekerjaan lantai Keramik 25 x 25 cm Anti Slip Lantai dan Ta 27.32 M2 2,794,576.30 1.03 0.34 0.34 0.34
Pekerjaan Septick Tank+Resapan (cincin sumur) 1.00 Paket 4,000,000.00 1.48 0.30 0.30 0.30 0.30 0.30
Rangka Kuda-kuda Baja Ringan Multitruss 25.08 M2 2,006,400.00 0.74 0.25 0.25 0.25
- Pekerjaan Pengecatan
Progres rencana Mingguan 0.13 0.13 0.13 0.06 0.06 0.03 0.03 0.03 0.04 0.04 0.73 0.73 0.80 0.80 0.08 0.50 0.50 0.50 0.43 0.43 0.43 0.43 0.43 0.71 0.71 0.40 0.28 0.28 0.28 0.81 0.81 0.53 0.53 0.53 0.53 0.53 0.69 0.66 1.60 1.01 1.01 1.66 1.54 2.78 1.81 2.02 0.68 1.49 1.21 1.51 1.89 1.66 1.24 2.76 5.50 3.45 1.54 1.73 1.48
Progres Rencana Kumulatif Mingguan ( % ) 0.13 0.26 0.39 0.45 0.52 0.55 0.58 0.61 0.65 0.69 1.43 2.16 2.95 3.75 3.83 4.33 4.84 5.34 5.78 6.21 6.65 7.08 7.52 8.23 8.94 9.34 9.62 9.90 10.18 10.98 11.79 12.33 12.86 13.39 13.93 14.46 15.16 15.81 17.41 18.42 19.42 21.08 22.62 25.41 27.22 29.24 29.91 31.41 32.61 34.13 36.01 37.67 38.91 41.67 47.17 50.62 52.16 53.89 55.37
ANAAN PEKERJAAN (KURVA-S)
MASA PELAKSANAAN
Mg- KET.
Minggu-9 Minggu-10 Minggu-11 Minggu-12 Minggu-13 Minggu-14 Minggu-15 Minggu-16 Minggu-17
18
H-60 H-61 H-62 H-63 H-64 H-65 H-66 H-67 H-68 H-69 H-70 H-71 H-72 H-73 H-74 H-75 H-76 H-77 H-78 H-79 H-80 H-81 H-82 H-83 H-84 H-85 H-86 H-87 H-88 H-89 H-90 H-91 H-92 H-93 H-94 H-95 H-96 H-97 H-98 H-99 H-100 H-101 H-102 H-103 H-104 H-105 H-106 H-107 H-108 H-109 H-110 H-111 H-112 H-113 H-114 H-115 H-116 H-117 H-118 H-119 H-120
100%
0.06
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
90%
0.56 0.56
0.29
0.10 0.10
80%
0.09 0.09
0.34 0.34
70%
0.30 0.30
0.89
1.11
1.14
0.33
60%
0.06
0.09
0.09
0.02
0.04
0.09
0.04
0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47
0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
0.20 0.20
0.10 0.10
0.10
0.04
0.26
0.15
0.04
0.02
40%
0.04
0.09
0.18
30%
20%
10%
0.38 0.38
0.16
0.05
0.02
0.07
0.04
0.06 0%
0.81 2.12 1.12 0.82 0.82 1.29 1.29 0.47 0.47 0.47 0.47 0.47 1.01 1.01 1.01 0.79 0.89 1.66 2.23 3.13 1.75 1.38 0.78 4.82 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.51 0.51 0.51 0.51 0.51 0.76 0.26 0.26 0.26 0.56 0.66 0.63 0.19 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.19 0.01 0.01 0.01 0.01 0.07 0.00 0.00 0.00
56.18 58.30 59.42 60.24 61.06 62.34 63.63 64.10 64.57 65.05 65.52 65.99 67.00 68.01 69.02 69.81 70.71 72.36 74.60 77.72 79.47 80.85 81.62 86.44 87.33 88.22 89.11 90.00 90.89 91.78 92.67 93.56 94.06 94.57 95.08 95.59 96.09 96.85 97.11 97.37 97.63 98.18 98.84 99.47 99.66 99.67 99.68 99.68 99.69 99.69 99.70 99.71 99.90 99.90 99.91 99.92 99.92 99.99 99.99 99.99 100.00
DAFTAR PERSONIL INTI
Pekerjaan : Pembangunan Mushalla SDN 7 Kota Jantho Kab. Aceh Besar
Penawar : CV. Budi Prima Sentosa
Pelaksana Mekanikal No. 619/06/2004 Tgl. 15/06/2004 No. Reg SKA Ahli Teknik Tenaga Listrik Muda :
4 Yusrizal, ST Banda Aceh, 06/02/1977 S-I Teknik Elektro 7 SKA
Elektrikal Universitas Iskandar Muda Banda Aceh 1.4.401.3.150..01.1069100 Tgl. 27/01/2015
Nama Pekerjaan : Pembangunan Mushalla SDN 7 Kota Jantho Kab. Aceh Besar
Nama Penawar : CV. Budi Prima Sentosa
Status Kepemilikan
Jumlah
Tahun Peralatan
No Jenis Peralatan Peralatan Merk dan Type Tenaga Kapasitas Lokasi Alat
Pembuatan
(unit) Milik Sewa
Blang Bintang
1 Dump Truck 2 Mitsubishi 2010 - 4 Ton √
Aceh Besar
Blang Bintang
2 Pick Up 2 Mitsubishi 2012 - 2 M3 √
Aceh Besar
Blang Bintang
3 Concrete Mixer 2 Tiger 2012 - 150 L √
Aceh Besar
Blang Bintang
4 Concrete Vibrator 1 Mikasa 2012 - 3 Hp √
Aceh Besar
Blang Bintang
5 Kereta Sorong 5 Artco 2014 - 0,8 M3 √
Aceh Besar
Blang Bintang
6 Peralatan Tukang 3 Set Bosch 2012 - - √