KONSULTAN PERENCANA
REKAPITULASI RENCANA ANGGARAN BIAYA
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) Rp. 179,697,300.18
(B) Pajak Pertambahan Nilai ( PPn ) Rp. 19,766,703.02
(C) Jumlah Total Harga Pekerjaan= ( A + B ) Rp. 199,464,003.19
(D) Dibulatkan Rp. 199,464,000.00
Terbilang :
Seratus Sembilan Puluh Sembilan Juta Empat Ratus Enam Puluh Empat Juta
Rupiah,-
4,068,000.00
1 A.2.3.1.1. Pek. Galian Tanah Biasa sedalam 1 m' M3 159.12 98,325.00 15,645,474.00
A. TENAGA
Pekerja L.01 OH 0.250 110,000.00 27,500.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
Jumlah Harga Tenaga Kerja 30,500.00
B. BAHAN
Urugan Pilihan / Opritan M3 1.200 75,000.00 90,000.00
Jumlah Harga Bahan 90,000.00
C. PERALATAN
A.4.1.1.5. Membuat 1 M3 Meton Mutu f'c = 14,50 Mpa, Slump (120 ± 20)mm
Jumlah Harga
No. Uraian Kode Sat. Koefisien Harga Satuan (Rp.)
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 110,000.00 181,500.00
Tukang Kayu L.02 OH 0.275 130,000.00 35,750.00
Kepala Tukang L.03 OH 0.028 145,000.00 3,987.50
Mandor L.04 OH 0.083 120,000.00 9,960.00
Jumlah Harga Tenaga Kerja 231,197.50
B. BAHAN
Semen Portland (PC) Kg 326.00 1,820.00 593,320.00
Pasir Beton M3 760.00 234.69 178,367.35
Kerikil Max. 30mm M3 1,029.00 259.26 266,777.78
Air Ltr 215.00 100.00 21,500.00
Jumlah Harga Bahan 1,059,965.13
C. PERALATAN
1 2 3 4
A. TENAGA
1 Mandor OH Rp 120,000.00
2 Kepala tukang OH Rp 145,000.00
3 Tukang Batu OH Rp 130,000.00
4 Tukang Kayu OH Rp 130,000.00
5 Tukang Besi OH Rp 130,000.00
6 Pekerja OH Rp 110,000.00
B. BAHAN DASAR
1 Tanah Urug M3 Rp 75,000.00
2 Urugan Pilihan/Opritan M3 Rp 75,000.00
3 Pasir Urug M3 Rp 235,000.00
4 Pasir Pasangan M3 Rp 328,571.43
5 Pasir Beton M3 Rp 300,000.00
6 Batu Belah/Gunung M3 Rp 345,000.00
7 Koral Beton/Split 2 - 3Cm M3 Rp 350,000.00
8 Koral Beton/Split 5 - 7Cm M3 Rp 350,000.00
9 Kerikil sungai M3 Rp 270,000.00
10 Air Ltr Rp 100.00
11 Semen Portland (PC) Kg Rp 1,820.00
12 Minyak Bekisting Ltr Rp 17,500.00
13 Multipleks 9 mm Lbr Rp 160,000.00
14 Dolken Kayu Ø 7-10cm Pjg 4 M' Btg Rp 10,000.00
15 Kayu Klas II Balok M3 Rp 2,500,000.00
16 Papan Kayu Kls III M3 Rp 2,000,000.00
17 Balok Kayu Kls III M3 Rp 2,000,000.00
18 Papan Kayu (Perancah) M3 Rp 2,000,000.00
19 Balok Kayu (Perancah) M3 Rp 2,000,000.00
20 Kawat Beton Kg Rp 30,000.00
21 Besi Beton Polos Kg Rp 20,000.00
22 Paku Campur 5"-12" Kg Rp 30,000.00
23 Pipa PVC ø 1,5" (AW) 4 m Wavin M Rp 18,750.00 75,000 /Btg
24 Pipa PVC ø 2" (AW) 4 m Wavin M Rp - /Btg
BACK UP DATA
Pekerjaan : DRAINASE PENATAAN KAWASAN PERMUKIMAN KEL. KEMARAYA
Lokasi : Kota Kendari
Volume : 240 m
Lebar 1 Lebar 2 Tinggi Panjang
No. GAMBAR SKET
m m m M
BACK UP DATA
Pekerjaan : Pemb. Drainase Perkantoran Bupati KolTim Nomor Kontrak
Lokasi : Kompleks Perkantoran Bupati Kolaka Timur Nilai Kontrak
Volume : Kontraktor Pelaksan
Lebar 1 Lebar 2 Tinggi Panjang
No. GAMBAR SKET
m m m m
Sisi Unit
Volume
Bh Bh
Type I
x 1 = 159.12 M3
= - M3
= - M3
= 159.12 M3
x = 5.78 M3
x 1 = 68.51 M3
= - M3
= 74.29 M3
x 1 = 386.75 M3
x 1 = 9.00 M3
= 395.75 M3
ACK UP DATA
Nomor Kontrak : ……………………………………….
: Rp. 400.000.000,-
Kontraktor Pelaksan : ……………………………………….
Sisi Unit
Volume
Bh Bh
Type II
x 1 = 6.08 M3
x 1 = 1.46 M3
x 2 = 0.78 M3
= 8.32 M3
x 2 = 3.95 M3
x 1 = 1.46 M3
x 2 = 0.78 M3
= 6.19 M3
x 2 = 5.20 M3
x 2 = 19.76 M3
= 24.96 M3
= 13 Bh
0.40 = 5.20 M'
Dibuat Oleh,
Kontraktor Pelaksana
CV. …………………………….
( …………………………………. )
Staf Teknik
ACK UP DATA
Nomor Kontrak : ……………………………………….
: Rp. 0
Kontraktor Pelaksan : ……………………………………….
Sisi Unit
Volume
Bh Bh
x 1 = 21.20 M3
x 1 = 4.60 M3
x 2 = 2.88 M3
= 28.68 M3
x 30% = 8.60 M3
x 1 = 0.48 M3
x 2 = 0.68 M3
= 1.16 M3
x 2 - 0.64 = 10.40 M3
x 1 = 3.68 M3
x 2 = 2.88 M3
x 2 = 0.54 M3
= 17.50 M3
x 2 = 1.36 M3
x 2 = 3.36 M3
x 2 = 16.00 M3
= 20.72 M3
x 1 = 3.04 M3
x 2 = 0.64 M3
= 3.68 M3
x 1 = 8.00 M2
x 4 = 6.40 M2
x 2 = 0.76 M2
= 15.16 M2
x 2 = 1.80 M3
x 1 = 15.90 M3
x 1 = 3.45 M3
x 2 = 2.04 M3
= 21.39 M3
x 30% = 6.42 M3
x 1 = 0.36 M3
x 2 = 0.51 M3
= 0.87 M3
x 2 - 0.48 = 7.80 M3
x 1 = 2.76 M3
x 2 = 2.04 M3
x 2 = 0.54 M3
= 13.14 M3
x 2 = 1.36 M3
x 2 = 3.36 M3
x 2 = 14.40 M3
= 19.12 M3
x 1 = 2.28 M3
x 2 = 0.48 M3
= 2.76 M3
x 1 = 6.00 M2
x 4 = 4.80 M2
x 2 = 0.76 M2
= 11.56 M2
x 2 = 1.20 M3
TABEL PERHITUNGAN PANJANG DAN BERAT BESI TULANGAN DEUKER
b
PEMB. DRAINASE SKPD KAB. KOLAKA TIMUR
a b c
1 P - Tu 1 ø 12 14 52 20 52 ---- 5 30
a c
d 2 P - Tu 2 ø 12 14 184 ---- ---- ---- 5 30
d b
b 3 P - Tu 3 ø 12 184 ---- ---- ---- ---- 5 15
b 4 P - Tu 4 ø 10 794 a---- ---- ---- ---- 5
b
b 5 P - TB 1 ø 10 11.60 794
Kait
---- ---- ---- 5 15
a c d
6 P - TB 2 ø 10 794 ---- ---- ---- 5 15
a d c
7 P - Tb 1 ø 8 36 14 36 14 ---- 4 b 15
Kaitb 8 P - Ta 1 ø 10 36 25 36 ---- ---- 15 40
a
b
Kait
a c Kait
Kait
a
b b
Kait
a a
Kait Kait
a
d
b b
a
a a
Kait Kait
Kait
Kait Kait
Kait
a
Kait Kait b
a
a TABEL PERHITUNGAN
a PANJANG DAN BERAT BESI TULANGAN DEUKER
Kait b Kait
PEMB. DRAINASE SKPD KAB. KOLAKA TIMUR
Kait Kait
a c Dimensi / Ukuran (cm) Pjg
Diameter Kait Jarak
Bentuk Tulangan ( Sket ) No. Type / Kode (mm) Tulangan
b a b c d e
(cm) (cm)
d
b
b Pembesian Tulangan DEUKER PLAT TYPE II 3 Unit
a b c
1 P - Tu 1 ø 12 14 52 20 52 ---- 5 30
a c
2 P - Tu 2 ø 12 14 184 ---- ---- ---- 5 30
d
d P - Tu 3 ø 184 ---- ---- ---- ----
3 12 5 15
b
b 4 P - Tu 4 ø 10 594 ---- ---- ---- ---- 5
bb
a c
a c
d
a c
b
d
b a
b
Kait
5 P - TB 1 ø 10 11.60 594 ---- ---- ---- 5
d 15
Kait 8 P - Ta 1 ø 10 36
a 25 36 ---- ---- 15 40
Kait
Kait
a
b b Kait
a a
Kait Kait
a
d
b b
a
a a
Kait Kait Kait
a a
Kait Kait
Kait Kait
b
G DAN BERAT BESI TULANGAN DEUKER PLAT
ASE SKPD KAB. KOLAKA TIMUR
Kait
a
Kait
a
a
Kait
Kait
b
Total : - 385.75
a
Kait Kait
15 6.27 13 1 81.54 0.62 - 50.24
d
15 6.04 13 1 78.52 0.62 - 48.38
b 15 1.04 13 2 27.04 0.39 - 10.67
Kait
a
Kait
a
a
Kait
Kait
- 343.84
3 Unit
b
Total : - 1,031.53