PEKERJAAN : PEMBANGUNAN RUMAH RAKYAT LAYAK HUNI (3 Unit) KONTRAKTOR : CV. WAN MUARA
LOKASI : KABUPATEN JAYAWIJAYA SPP KONTRAK NO. : 050 / 1668 Tanggal 20 Mei 2
TAHUN ANGGARAN : 2015 SPMK NOMOR : 050 / ... Tanggal ...
NILAI KONTRAK : Rp. 998.800.000,-
151,477,640.85 154,400,080.26
KONTRAK SEMULA KONTRAK PERUBAHAN
No. URAIAN PEKERJAAN SAT. HARGA SATUAN HARGA SATUAN
VOL. JUMLAH HARGA (Rp) VOL. JUMLAH HARGA (Rp)
(Rp) (Rp)
TAMBAH / KURANG
HARGA SATUAN
VOL JUMLAH HARGA (Rp)
(Rp)
10 11 12
- 102,260.00 -
-
- 81,635.00 -
- 1,557,500.00 -
-
- 6,083,241.55 -
-
- 511,653.60 -
- 511,653.60 -
-
- 6,083,241.55 -
- 532,318.70 -
- 8,719,200.00 -
- 8,719,200.00 -
- 418,639.00 -
- 9,541,860.00 -
- 9,541,860.00 -
- 299,070.00 -
- 224,587.00 -
25.00 65,000.00 1,625,000.00
- 909,690.00 -
- 1,209,760.00 -
32.00 25,000.00 800,000.00
25.00 30,000.00 750,000.00
(0.89) 6,083,241.55 (5,429,293.08)
(8.92) 74,862.33 (668,146.32)
(2,922,439.41)
TAMBAH / KURANG
HARGA SATUAN
VOL JUMLAH HARGA (Rp)
(Rp)
- 7,728,800.00 -
- 9,330,150.00 -
- 95,447.00 -
- 7,728,800.00 -
- 7,728,800.00 -
- 99,540.00 -
- 65,635.00 -
- 174,645.00 -
- 9,781,250.00 -
- 865,000.00 -
- 865,000.00 -
- 790,200.00 -
(9.00) 100,785.00 (907,065.00)
(9.00) 148,825.00 (1,339,425.00)
- 60,755.00 -
- 560,090.97 -
- 1,817,721.83 -
45.00 25,000.00 1,125,000.00
(1,121,490.00)
- 71,000.00 -
- 60,000.00 -
- 65,000.00 -
- 65,000.00 -
- 495,000.00 -
- 5,500,000.00 -
- 450,000.00 -
- 450,000.00 -
-
- 15,193,274.68 -
- 1,432,850.00 -
- 2,859,425.00 -
- 39,900.00 -
- 109,550.00 -
- 835,000.00 -
- 935,000.00 -
- 6,836,250.00 -
- 4,580,996.99 -
- 211,505.00 -
- 211,505.00 -
-
TAMBAH / KURANG
HARGA SATUAN
VOL JUMLAH HARGA (Rp)
(Rp)
- 76,190.00 -
- 86,757.50 -
- 37,740.00 -
-
- 55,000.00 -
- 64,010.00 -
- 72,000.00 -
- 72,000.00 -
- 83,900.00 -
- 128,000.00 -
- 249,875.00 -
- 314,875.00 -
- 132,000.00 -
-
- 377,400.00 -
- 300,000.00 -
-
USULAN RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN TAMBAH KURANG
PEKERJAAN : PEMBANGUNAN RUMAH RAKYAT LAYAK HUNI (3 Unit) KONTRAKTOR : CV. WAN MUARA
LOKASI : KABUPATEN JAYAWIJAYA SPP KONTRAK NO. : 050 / 1668 Tanggal 20 Mei 201
TAHUN ANGGARAN : 2015 SPMK NOMOR : 050 / ... Tanggal ...
NILAI KONTRAK : Rp. 998.800.000,-
Rekapitulasi
KONTRAK SEMULA KONTRAK PERUBAHAN
No. URAIAN PEKERJAAN
JUMLAH HARGA (Rp) JUMLAH HARGA (Rp)
apitulasi
TAMBAH / KURANG
-
-
-
-
(2,922,439.408)
(1,121,490.000)
-
-
-
-
-
(4,043,929.408)
(48,527,152.900)
(4,852,715.290)
(53,379,868.191)
(53,380,000.000)
WENE HALUK
Direktur
PERHITUNGAN VOLUME PEK. TAMBAH KURANG
Pek. Tambah
No. Uraian Pekerjaan uraian perhitungan volume sat.
III. PEKERJAAN BALOK, TIANG, LANTAI & DINDING III. PEKERJAAN BALOK, TIANG, LANTAI & DINDING
1 Tiang Kolom Kayu Besi 10/10 0.70 m3 7,383,450.00 5,138,881.20 1 Tiang Kolom Kayu Besi 10/10 0.70 m3 7,383,450.00 7,383,450 5,138,881.20 - TETAP
2 Tringbalok Kayu Besi 5/10 0.25 m3 7,383,450.00 1,845,862.50 2 Tringbalok Kayu Besi 5/10 0.25 m3 7,383,450.00 7,383,450 1,845,862.50 - TETAP
3 Skor Tiang Kayu Besi 5/10 0.40 m3 6,757,420.00 2,702,968.00 3 Skor Tiang Kayu Besi 5/10 0.40 m3 6,757,420.00 6,757,420 2,702,968.00 - TETAP
4 Gelagar Kayu Besi 2 x 5/10 0.41 m3 7,408,200.00 3,037,362.00 4 Gelagar Kayu Besi 2 x 5/10 0.41 m3 7,408,200.00 7,408,200 3,037,362.00 - TETAP
5 Balok Lantai Kayu Besi 5/10 0.52 m3 6,757,420.00 3,513,858.40 5 Balok Lantai Kayu Besi 5/10 0.52 m3 6,757,420.00 6,757,420 3,513,858.40 - TETAP
6 Lantai Papan 2/20 48.00 m2 371,920.00 17,852,160.00 6 Lantai Papan 2/20 48.00 m2 371,920.00 371,920 17,852,160.00 - TETAP
7 Rangka Dinding Kayu Matoa 5/10 + 5/5 0.56 m3 5,492,420.00 3,075,755.20 7 Rangka Dinding Kayu Matoa 5/10 + 5/5 0.56 m3 5,492,420.00 5,492,420 3,075,755.20 - TETAP
8 Dinding Papan Kayu Besi 2/20 61.13 m2 371,920.00 22,735,469.60 8 Dinding Papan Kayu Besi 2/20 61.13 m2 371,920.00 371,920 22,735,469.60 - TETAP
9 List Keliling Luar Dinding Papan Kayu Besi 2/5 170.70 m' 39,690.00 6,775,083.00 9 List Keliling Luar Dinding Papan Kayu Besi 2/5 170.70 m' 39,690.00 39,690 6,775,083.00 - TETAP
10 Dinding Tripleks 4 mm 29.58 m2 232,870.00 6,888,294.60 10 Dinding Tripleks 4 mm 29.58 m2 232,870.00 232,870 6,888,294.60 - TETAP
11 Pasang Railing Kayu Teras Depan 0.08 m3 6,757,420.00 540,593.60 11 Pasang Railing Kayu Teras Depan 0.08 m3 6,757,420.00 6,757,420 540,593.60 - TETAP
12 Pasang Tangga Kayu 2.00 set 2,518,550.00 5,037,100.00 12 Pasang Tangga Kayu 2.00 set 2,518,550.00 2,518,550 5,037,100.00 - TETAP
13 Pasang Kawat Harmonika 2.10 m2 231,950.00 487,095.00 13 Pasang Kawat Harmonika 2.10 m2 231,950.00 231,950 487,095.00 - TETAP
V. PEKERJAAN KUSEN, PINTU DAN JENDELA V. PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Kusen Kayu Besi 5/10 0.38 m3 11,681,750.00 4,381,240.34 1 Kusen Kayu Besi 5/10 0.38 - 11,681,750.00 11,681,750 4,381,240.34 - TETAP
2 Pintu Panel Kayu 9.20 m2 1,001,000.00 9,209,200.00 2 Pintu Panel Kayu 9.20 - 1,001,000.00 1,001,000 9,209,200.00 - TETAP
3 Pintu Kayu Kelas II Lapis Seng Plat 1.40 m2 1,075,000.00 1,505,000.00 3 Pintu Kayu Kelas II Lapis Seng Plat 1.40 m2 1,075,000.00 1,075,000 1,505,000.00 - TETAP
4 Jendela Panel Kaca 5.98 m2 1,669,400.00 9,977,002.16 4 Jendela Panel Kaca 5.98 m2 1,669,400.00 1,669,400 9,977,002.16 - TETAP
5 Jalusi Kayu Kelas I 4.46 m2 759,940.00 3,385,532.70 5 Jalusi Kayu Kelas I 4.46 - 759,940.00 759,940 3,385,532.70 - TETAP
6 Jendela Kaca Lover 7 klip 1.00 bh 342,500.00 342,500.00 6 Jendela Kaca Lover 7 klip 1.00 bh 342,500.00 342,500 342,500.00 - TETAP
VIII. PEKERJAAN PENGGANTUNG DAN PENGUNCI VIII. PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Kunci Tanam 2 Slaag (Yale) 4.00 bh 285,320.00 1,141,280.00 1 Kunci Tanam 2 Slaag (Yale) 4.00 bh 285,320.00 285,320 1,141,280.00 - TETAP
2 Kunci Tanam 1 Slaag 1.00 bh 199,820.00 199,820.00 2 Kunci Tanam 1 Slaag 1.00 bh 199,820.00 199,820 199,820.00 - TETAP
3 Engsel Pintu Ring Nilon 15.00 bh 97,160.00 1,457,400.00 3 Engsel Pintu Ring Nilon 15.00 bh 97,160.00 97,160 1,457,400.00 - TETAP
4 Engsel Jendela Ring Nilon 14.00 bh 75,440.00 1,056,160.00 4 Engsel Jendela Ring Nilon 14.00 bh 75,440.00 75,440 1,056,160.00 - TETAP
5 Grendel Jendela 14.00 bh 81,680.00 1,143,520.00 5 Grendel Jendela 14.00 bh 81,680.00 81,680 1,143,520.00 - TETAP
XI. PEKERJAAN FINISHING DAN LAINNYA XI. PEKERJAAN FINISHING DAN LAINNYA
1 Finishing dan Pembersihan Akhir 1.00 Ls 600,000.00 600,000.00 1 Finishing dan Pembersihan Akhir 1.00 LS 600,000.00 600,000 600,000.00 - TETAP
2 Laporan Akhir dan As-Build Drawing 1.00 Ls 600,000.00 600,000.00 2 Laporan Akhir dan As-Build Drawing 1.00 LS 600,000.00 600,000 600,000.00 - TETAP
Terbilang : (Satu milyar empat ratus tujuh puluh empat juta tiga puluh dua ribu rupiah) Terbilang : (Sembilan ratus sembilan puluh delapan juta delapan ratus ribu rupiah)
PANITIA PENELITI PELAKSANAAN KONTRAK (PPPK) Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor
No. Nama Tanda Tangan CV. CITRA DAYA BINA CV. WAN MUARA