RAB SR REGULER (Draft PERWALI)
RAB SR REGULER (Draft PERWALI)
RAB SR REGULER (Draft PERWALI)
HARGA (Rp)
NO URAIAN/JENIS BARANG SATUAN VOLUME
SATUAN JUMLAH
A. BAHAN :
1 Clamp Sadle Ø 4" - 3" - 2" x 1¼" PE Bh 1.00 201,750.00 201,750.00
2 Ferrule Cutter Ø 1¼" x ½" Bh 1.00 101,500.00 101,500.00
3 Pipa HDPE Ø 20 mm M' 8.00 10,200.00 81,600.00
4 Lockable Valve Magnetic Ø ½" Bh 1.00 239,000.00 239,000.00
5 Brass Water Meter Ø ½" Set 1.00 339,000.00 339,000.00
6 Brass Gate Meter / Stop Kran Ø ½" Bh 1.00 61,500.00 61,500.00
7 Box Water Meter Bh 1.00 46,600.00 46,600.00
8 Valve Socket Ø ½" PVC Bh 1.00 6,500.00 6,500.00
9 Pipa PVC Ø 20 mm M' 0.80 12,750.00 10,200.00
10 Pit Kran Ø ½" Bh 1.00 33,250.00 33,250.00
11 Knee Foucet PVC Ø ½" Bh 1.00 5,000.00 5,000.00
12 Knee PVC Ø ½" Bh 1.00 5,000.00 5,000.00
13 Dop PVC Ø ½" Bh 1.00 5,000.00 5,000.00
14 Tee PVC Ø ½" x ½" Bh 1.00 5,000.00 5,000.00
15 Seal Tape Roll 2.00 4,500.00 9,000.00
16 Lem PVC Tube 1.00 17,125.00 17,125.00
17 Segel / Lak Water Meter Ø ½" Bh 1.00 18,000.00 18,000.00
TOTAL A (PEKERJAAN PENGADAAN BAHAN) 1,185,025.00
B. UPAH KERJA :
1 Penggalian/Penimbunan & Pemasangan Ls 1.00 400,000.00 400,000.00
2 Pemasangan Pondasi Water Meter Ls 1.00 185,000.00 185,000.00
TOTAL B (PEKERJAAN PEMASANGAN) 585,000.00
C. BIAYA LAIN-LAIN :
1 Jasa Survey Lapangan Ls 1.00 180,000.00 180,000.00
2 Biaya Administrasi Ls 1.00 50,000.00 50,000.00
TOTAL C (BIAYA LAIN-LAIN) 230,000.00
A. BAHAN :
1 Clamp Sadle Ø 4" - 3" - 2" x 1¼" PE Bh 1.00
2 Male Thread Elbow Ø 20 mm x ½" PE Bh 2.00
3 Pipa HDPE Ø 20 mm M' 20.00
4 Lockable Valve Magnetic Ø ½" Bh 1.00
5 Water Meter Ø ½" Bh 1.00
6 Coupling Brass Ø ½" Bh 1.00
7 Elbow M-F GIP Ø ½" Bh 1.00
8 Gate Valve Ø ½" Bh 1.00
9 Box Water Meter Bh 1.00
10 Valve Socket Ø ½" PVC Bh 1.00
11 Pipa PVC Ø 20 mm M' 0.80
12 Pit Kran Ø ½" Bh 1.00
13 Knee Foucet PVC Ø ½" Bh 1.00
14 Knee PVC Ø ½" Bh 1.00
15 Dop PVC Ø ½" Bh 1.00
16 Tee PVC Ø ½" x ½" Bh 1.00
17 Seal Tape Roll 2.00
18 Lem PVC Tube 1.00
19 Segel / Lak Water Meter Ø ½" Bh 1.00
TOTAL A (PEKERJAAN PENGADAAN BAHAN)
B. UPAH KERJA :
1 Penggalian/Penimbunan & Pemasangan Ls 1.00
2 Pemasangan Pondasi Water Meter Ls 1.00
TOTAL B (PEKERJAAN PEMASANGAN)
C. BIAYA LAIN-LAIN :
1 Jasa Survey Lapangan Ls 1.00
2 Biaya Administrasi Ls 1.00
TOTAL C (BIAYA LAIN-LAIN)
D. TOTAL (A+B+C)
DIBULATKAN
Terbilang : Dua Juta Rupiah
RAKAN
UM TIRTA ALAM TARAKAN
n 77111 TIRTA DHARMA
HARGA (Rp)
SATUAN JUMLAH
201,750.00 201,750.00
21,500.00 43,000.00
8,500.00 170,000.00
253,500.00 253,500.00
290,000.00 290,000.00
49,125.00 49,125.00
5,500.00 5,500.00
56,500.00 56,500.00
46,600.00 46,600.00
3,000.00 3,000.00
12,750.00 10,200.00
33,250.00 33,250.00
3,000.00 3,000.00
3,000.00 3,000.00
3,000.00 3,000.00
3,000.00 3,000.00
2,375.00 4,750.00
17,125.00 17,125.00
16,700.00 16,700.00
1,213,000.00
400,000.00 400,000.00
185,000.00 185,000.00
585,000.00
152,000.00 152,000.00
50,000.00 50,000.00
202,000.00
2,000,000.00
2,000,000.00