JEMBATAN BOX BETON PRATEKAN METODA BALANCE CANTILEVER

Jembatan cantilever box tunggal


L = 94 m
fc' = 45 N/mm2
fci' = 35 N/mm2 fct = -0.25 (fci)^0.5 = -1.5 Mpa
fups = 1860 N/mm2 fca' = 0.6 fci = 21 Mpa
fps = 1040 N/mm2
b = 9 m
Lc = 1.5 m
b' = b-2Lc
= 6 m

Tinggi box bagian tumpuan


D = ≥ L/22
= 4.272727 m ≈ 5 m
Tinggi box bagian tengah
D' = ≥ 1,5
= 2 m
Jumlah cell
n = 1
Tebal web
tw = 0.3 m
Bentang bersih slab
Ls = (b' - (n+1) x tw)/2
= 5.4 m
Tebal slab
ts = (Ls/14>ts> Ls/17 dan ts>12") Ls/14 = 0.38571
= ts > 12 Ls/17 = 0.31765
= 0.3 m ts > 12 = 0.3

Tebal slab cantilever


tsc = 0.3 m
Tebal bawah box
tsb = 0.3 m
Persamaan parabola tinggi box
0 5 5
0 5 5 45 2
45 2
90 2025.00 A 45.00B 5= 2
2025 A 45 B 5 = 2 A = 0.001481
8100 A 90 B 5 = 5 B = -0.06677
-4050 A 0.00B 5 = -1 90 8100.00 A 90.00B 5= 5
-4050.0 A 0.00B 5= -1
h (x) = 0.0015 x^2 -0.1333 x 5 A 0.0015
B -0.133

Perhitungan momen saat pelaksanaan

Segment X pjg tinggi 1 tinggi 2 Beton pusat Yt Yb A I


basah beban
ke thd ctkan, pkrja, trvl thd
pusat pilar pusat pilar
(m) (m) (m) (m) (ton) (m) (m) (m) (m2) (m4)
0 0
1 4.2 4.2 5 4.475 105.65 2.1 2.796 2.204 7.140 19.2737
2 8.4 4.2 4.475 4.000 102.18 6.3 2.513 1.962 6.825 14.9843
3 12.6 4.2 4.000 3.575 99.06 10.5 2.255 1.745 6.540 11.6018
4 16.8 4.2 3.575 3.200 96.29 14.7 2.022 1.553 6.285 8.96802
5 21 4.2 3.200 2.875 93.87 18.9 1.815 1.385 6.060 6.94539
6 25.2 4.2 2.875 2.600 91.79 23.1 1.635 1.240 5.865 5.41603
7 29.4 4.2 2.600 2.375 90.06 27.3 1.482 1.118 5.700 4.28078
8 33.6 4.2 2.375 2.200 88.67 31.5 1.355 1.020 5.565 3.45812
9 37.8 4.2 2.200 2.100 87.72 35.7 1.257 0.943 5.460 2.88321
10 42 4.2 2.100 2.025 87.11 39.9 1.200 0.900 5.400 2.580
Total Beban Pelaksanaan / sisi 942.39 Ton
Total Beban Pelaksanaan 2 sisi 1884.787 Ton

Dipasang tendon prestress 12 strands 0.50 inch


Aps 1184.52 mm²
T tendon 1321924.32 N

Mpelaksanaan terhadap masing2 segment


0 4.2 8.4 12.6 16.8 21 25.2 29.4 33.6 37.8

(ton-m)

221.861
865.613 214.584038
1905.789 838.690 208.03519
3321.287 1849.760 814.67715 202.214
5095.370 3229.603 1800.2793 399.3344 197.1204
7215.670 4964.393 3149.5611 977.598 394.241 192.7545
9674.182 7044.673 4851.6077 1923.179 972.504 385.5091 189.11629
12467.267 9465.347 6899.8703 3226.619 1918.086 952.8579 378.23258 186.20569
15598.746 12228.416 9294.5307 4884.461 3221.526 1883.886 936.84964 372.41138 184.205
19074.440 15338.248 12038.5 6896.705 4879.368 3173.319 1857.8729 925.02533 368.409 182.93126
A (m2) 7.140 6.825 6.540 6.285 6.060 5.865 5.700 5.565 5.460 5.400
I (m4) 19.274 14.984 11.602 8.968 6.945 5.416 4.281 3.458 2.883 2.580
yt (m) 2.796 2.513 2.255 2.022 1.815 1.635 1.482 1.355 1.257 1.200
yb (m) 2.204 1.962 1.745 1.553 1.385 1.240 1.118 1.020 0.943 0.900
f top (Mpa) -27.673 -25.721 -23.394 -15.550 -12.753 -9.580 -6.430 -3.625 -1.606 -0.851
f bot (Mpa) 21.810 20.086 18.111 11.943 9.728 7.265 4.854 2.728 1.205 0.638
n Tendon 11 10 9 8 7 6 5 4 3 2
stress (kN) 14541.2 13219.2 11897.3 10575.4 9253.5 7931.5 6609.6 5287.7 3965.8 2643.8
f top (Mpa) -19.738 -18.214 -16.363 -9.046 -6.836 -4.313 -1.881 0.133 1.293 1.114
f bot (Mpa) 19.197 17.673 15.895 9.923 7.906 5.648 3.455 1.565 0.301 0.021
fct = -1.48 -1.48 -1.48 -1.48 -1.48 -1.48 -1.48 -1.48 -1.48 -1.48
fca= 21 21 21 21 21 21 21 21 21 21