JADWAL PELAKSANAAN

KEGIATAN PEMBUATAN LANDSCPE BLK SAMARINDA


PEKERJAAN PEMBUATAN LANDSCPE BLK SAMARINDA
LOKASI SAMARINDA
TAHUN ANGGARAN 2,020
JADWAL PELAKSANAAN
NO URAIAN PEKERJAAN BOBOT (%) waktu pelaksanaan 5 bulan KETERANGAN
Bulan 1 Bulan 2 Bulan 3 Bulan 4
3 1 2 3 4 5 6 7 8 5 6 7 8 5 6 7 8 20

I PEKERJAAN PERSIAPAN
#NAME? #NAME? #NAME?

II #NAME?
#NAME? #NAME? #NAME?

III PEKERJAAN LANSCAPE A


#NAME? #NAME? #NAME? #NAME? #NAME?

IV PEKERJAAN TANAMAN LANDSCPE


#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

V #NAME?
#NAME? #NAME? #NAME? #NAME?

VI PEKERJAAN GATE
#NAME? #NAME? #NAME? #NAME? #NAME?

VII #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

Jumlah Nilai Pekerjaan #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Rencana Kemajuan Pekerjaan #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Rencana Komulatip Kemajuan Pekerjaan WAKTU PELAKSANAAN 120
Realisasia Kemajuan Pekerjaan HARI KALENDER
Realisasia Komulatip Kemajuan Pekerjaan
Perbedaan Komulatip
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengukuran dan Pemasangan 1 M Bouwplank


Satuan / Unit : M1
Analisa : AHSP PU A.2.2.1.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1000 95,000.00 9,500.00
2 Tukang Kayu OH 0.1000 105,000.00 10,500.00
3 Kepala Tukang OH 0.0100 130,000.00 1,300.00
4 Mandor OH 0.0050 145,000.00 725.00
Jumlah Tenaga Kerja 22,025.00
B. BAHAN
1 Kayu Benkirai 5 x 7 cm M3 0.012 3,100,000.00 37,200.00
2 Paku 2" -3" Kg 0.200 16,000.00 3,200.00
3 Kayu Bengkirai Papan 2/30 M3 0.007 2,250,000.00 15,750.00
Jumlah Bahan 56,150.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 78,175.00
E Overhead & Profit 10% X D 7,817.50
F Harga Satuan Pekerjaan ( D + E ) 85,992.50
G Dibulatkan 85,900.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pekerjaan Pagar Seng Sementara
Satuan / Unit : M2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.4000 95,000.00 38,000.00
2 Tukang Kayu OH 0.2000 105,000.00 21,000.00
3 Kepala Tukang OH 0.0200 130,000.00 2,600.00
4 Mandor OH 0.0200 145,000.00 2,900.00
Jumlah Tenaga Kerja 64,500.00
B. BAHAN
1 Kayu Galam Bh 1.250 30,000.00 37,500.00
2 Seng Gelombang 1.200 #NAME? #NAME?
3 Kayu Meranti 5/7 0.072 #NAME? #NAME?
4 Paku Biasa 2:-5 0.060 16,000.00 960.00
Jumlah Bahan #NAME?
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #NAME?
E Overhead & Profit 10% X D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?

Jenis Pekerjaan : Pekerjaan Bongkar Pasang Paving Block


Satuan / Unit : M2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 95,000.00 28,500.00
2 Tukang Kayu OH 0.4000 105,000.00 42,000.00
3 Kepala Tukang OH 0.0400 130,000.00 5,200.00
4 Mandor OH 0.0200 145,000.00 2,900.00
Jumlah Tenaga Kerja 78,600.00
B. BAHAN
1 Paving Block Pengganti Bh 2.000 #NAME? #NAME?

Jumlah Bahan #NAME?


C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #NAME?
E Overhead & Profit 10% X D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pembersihan 1 M2 Lapangan dan Perataan


Satuan / Unit : M2
Analisa : AHSP PU A.2.2.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1000 95,000.00 9,500.00
2 Mandor OH 0.0500 145,000.00 7,250.00
Jumlah Tenaga Kerja 16,750.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 16,750.00
E Overhead & Profit 10% X D 1,675.00
F Harga Satuan Pekerjaan ( D + E ) 18,425.00
G Dibulatkan 18,400.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7500 95,000.00 71,250.00
2 Mandor OH 0.0250 145,000.00 3,625.00
Jumlah Tenaga Kerja 74,875.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 74,875.00
E Overhead & Profit 10% X D 7,487.50
F Harga Satuan Pekerjaan ( D + E ) 82,362.50
G Dibulatkan 82,300.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 2 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.9000 95,000.00 85,500.00
2 Mandor OH 0.0450 145,000.00 6,525.00
Jumlah Tenaga Kerja 92,025.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
E Overhead & Profit 10% X D 9,202.50
F Harga Satuan Pekerjaan ( D + E ) 101,227.50
G Dibulatkan 101,200.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Mengurug Kembali Galian


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2500 95,000.00 23,750.00
2 Mandor OH 0.0833 145,000.00 12,078.50
Jumlah Tenaga Kerja 35,828.50
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 35,828.50
E Overhead & Profit 10% X D 3,582.85
F Harga Satuan Pekerjaan ( D + E ) 39,411.35
G Dibulatkan 39,400.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Timbunan Tanah didatangkan Termasuk Perataan dan Pemadatan


Satuan / Unit : M3
Analisa : AHSP PU - T.14 E

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5000 95,000.00 47,500.00
2 Mandor OH 0.0500 145,000.00 7,250.00
Jumlah Tenaga Kerja 54,750.00
B. BAHAN
1 Tanah Timbun M3 1.200 120,000.00 144,000.00
Jumlah Bahan 144,000.00
C. PERALATAN
1 Pemadat Timbunan Jam 0.005 400,000.00 2,000.00
Jumlah Peralatan 2,000.00
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 200,750.00
E Overhead & Profit 10% X D 20,075.00
F Harga Satuan Pekerjaan ( D + E ) 220,825.00
G Dibulatkan 220,800.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Urugan Pasir


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 95,000.00 28,500.00
2 Mandor OH 0.0100 145,000.00 1,450.00
Jumlah Tenaga Kerja 29,950.00
B. BAHAN
1 Pasir Urug M3 1.200 100,000.00 120,000.00
Jumlah Bahan 120,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 149,950.00
E Overhead & Profit 10% X D 14,995.00
F Harga Satuan Pekerjaan ( D + E ) 164,945.00
G Dibulatkan 164,900.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : 1 Titik Pancang Ulin 10/10 - 2 meter


Satuan / Unit : Titik
Analisa :

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.1000 95,000.00 104,500.00
2 Tukang OH 0.2900 105,000.00 30,450.00
3 Kepala Tukang OH 0.0290 130,000.00 3,770.00
2 Mandor OH 0.0250 145,000.00 3,625.00
Jumlah Tenaga Kerja 142,345.00
B. BAHAN
1 Ulin 10/10 M3 0.020 4,700,000.00 94,000.00
Jumlah Bahan 94,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 236,345.00
E Overhead & Profit 10% X D 23,634.50
F Harga Satuan Pekerjaan ( D + E ) 259,979.50
G Dibulatkan 259,900.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : 1 Titik Pancang Ulin 10/10 - 4 meter


Satuan / Unit : Titik
Analisa :

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.1000 95,000.00 104,500.00
2 Tukang OH 0.2900 105,000.00 30,450.00
3 Kepala Tukang OH 0.0290 130,000.00 3,770.00
2 Mandor OH 0.0250 145,000.00 3,625.00
Jumlah Tenaga Kerja 142,345.00
B. BAHAN
1 Ulin 10/10 M3 0.040 4,700,000.00 188,000.00
Jumlah Bahan 188,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 330,345.00
E Overhead & Profit 10% X D 33,034.50
F Harga Satuan Pekerjaan ( D + E ) 363,379.50
G Dibulatkan 363,300.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pondasi Batu Belah / Kali Campuran 1 : 4


Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.5000 95,000.00 142,500.00
2 Tukang OH 0.7500 105,000.00 78,750.00
3 Kepala Tukang OH 0.0750 130,000.00 9,750.00
4 Mandor OH 0.0750 145,000.00 10,875.00
Jumlah Tenaga Kerja 241,875.00
B. BAHAN
1 Batu Gunung/ Batu Kali M3 1.200 200,000.00 240,000.00
2 Semen Portland (PC) Kg 163.000 1,100.00 179,300.00
3 Pasir Pasang M3 0.520 112,500.00 58,500.00
Jumlah Bahan 477,800.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 719,675.00
E Overhead & Profit 10% X D 71,967.50
F Harga Satuan Pekerjaan ( D + E ) 791,642.50
G Dibulatkan 791,600.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Batu Kosong ( Anstamping )


Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7800 95,000.00 74,100.00
2 Tukang OH 0.3900 105,000.00 40,950.00
3 Kepala Tukang OH 0.0390 130,000.00 5,070.00
4 Mandor OH 0.0390 145,000.00 5,655.00
Jumlah Tenaga Kerja 125,775.00
B. BAHAN
1 Batu Gunung/ Batu Kali M3 1.2000 200,000.00 240,000.00
2 Pasir Urug M3 0.4320 100,000.00 43,200.00
Jumlah Bahan 283,200.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 408,975.00
E Overhead & Profit 10% X D 40,897.50
F Harga Satuan Pekerjaan ( D + E ) 449,872.50
G Dibulatkan 449,800.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pekerjaan Kanstin


Satuan / Unit : M3
Analisa

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Jam 0.0860 13,571.43 1,167.14
2 Tukang Jam 0.0860 15,000.00 1,290.00
4 Mandor Jam 0.1700 18,571.43 3,157.14
Jumlah Tenaga Kerja 5,614.29
B. BAHAN
1 Kantsin 2 Bh 60,000.00 120,000.00
2 Mortar Dan Material Lainnya 1 Ls 10,000.00 10,000.00

Jumlah Bahan 130,000.00


C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 135,614.29
E Overhead & Profit 10% X D 13,561.43
F Harga Satuan Pekerjaan ( D + E ) 149,175.71
G Dibulatkan 149,100.00
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Lantai Kerja mutu f'c = 7,4 MPa


Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.2000 95,000.00 114,000.00
2 Tukang OH 0.2000 105,000.00 21,000.00
3 Kepala Tukang OH 0.0200 130,000.00 2,600.00
4 Mandor OH 0.0600 145,000.00 8,700.00
Jumlah Tenaga Kerja 146,300.00
B. BAHAN
1 Semen Portland (PC) Kg 230.00 1,100.00 253,000.00
2 Pasir Beton (PB) M3 0.6379 335,000.00 213,682.14
3 Kerikil (KR) M3 0.7607 350,000.00 266,259.26
4 Air Liter 200.00 100.00 20,000.00
Jumlah Bahan 752,941.40
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 899,241.40
E Overhead & Profit 10% X D 89,924.14
F Harga Satuan Pekerjaan ( D + E ) 989,165.54
G Dibulatkan 989,100.00
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu fc = 19,3 MPa (K 225), Ready Mix


Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 95,000.00 156,750.00
2 Tukang OH 0.2750 105,000.00 28,875.00
3 Kepala Tukang OH 0.0280 130,000.00 3,640.00
4 Mandor OH 0.0830 145,000.00 12,035.00
Jumlah Tenaga Kerja 201,300.00
B. BAHAN
1 Beton Ready Mix K - 225 M3 1.10 1,150,000.00 1,265,000.00
Jumlah Bahan 1,265,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,466,300.00
E Overhead & Profit 10% X D 146,630.00
F Harga Satuan Pekerjaan ( D + E ) 1,612,930.00
G Dibulatkan 1,612,900.00
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2)
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 95,000.00 156,750.00
2 Tukang OH 0.2750 105,000.00 28,875.00
3 Kepala Tukang OH 0.0280 130,000.00 3,640.00
4 Mandor OH 0.0830 145,000.00 12,035.00
Jumlah Tenaga Kerja 201,300.00
B. BAHAN
1 Beton Ready Mix K - 250 M3 1.10 #NAME? #NAME?
Jumlah Bahan #NAME?
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #NAME?
E Overhead & Profit 10% X D #NAME?
F Harga Satuan Pekerjaan ( D + E ) #NAME?
G Dibulatkan #NAME?
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Polos


Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 95,000.00 6,650.00
2 Tukang OH 0.0700 105,000.00 7,350.00
3 Kepala Tukang OH 0.0070 130,000.00 910.00
4 Mandor OH 0.0400 145,000.00 5,800.00
Jumlah Tenaga Kerja 20,710.00
B. BAHAN
1 Besi Beton Polos Kg 10.500 12,200.00 128,100.00
2 Kawat Beton Kg 0.150 25,000.00 3,750.00
Jumlah Bahan 131,850.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 152,560.00
E Per Kg Pembesian = D / 10 15,256.00
F Overhead & Profit 10% X E 1,525.60
G Harga Satuan Pekerjaan ( E + F ) 16,781.60
H Dibulatkan 16,700.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Pondasi


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.20

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5200 95,000.00 49,400.00
2 Tukang OH 0.2600 105,000.00 27,300.00
3 Kepala Tukang OH 0.0260 130,000.00 3,380.00
4 Mandor OH 0.0260 145,000.00 3,770.00
Jumlah Tenaga Kerja 83,850.00
B. BAHAN
1 Kayu Begesting Kayu Kelas II M3 0.040 3,100,000.00 124,000.00
2 Paku 5 cm - 10 cm Kg 0.300 16,000.00 4,800.00
3 Minyak Bekisting Liter 0.100 5,000.00 500.00
Jumlah Bahan 129,300.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 213,150.00
E Overhead & Profit 10% X D 21,315.00
F Harga Satuan Pekerjaan ( D + E ) 234,465.00
G Harga Satuan Pekerjaan ( F )Pemakaian 1 x 234,465.00
H Dibulatkan 234,400.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Sloof


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5200 95,000.00 49,400.00
2 Tukang OH 0.2600 105,000.00 27,300.00
3 Kepala Tukang OH 0.0260 130,000.00 3,380.00
4 Mandor OH 0.0260 145,000.00 3,770.00
Jumlah Tenaga Kerja 83,850.00
B. BAHAN
1 Kayu Kelas III M3 0.045 2,250,000.00 101,250.00
2 Paku 5 cm - 10 cm Kg 0.400 16,000.00 6,400.00
3 Minyak Bekisting Liter 0.100 5,000.00 500.00
Jumlah Bahan 108,150.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 192,000.00
E Overhead & Profit 10% X D 19,200.00
F Harga Satuan Pekerjaan ( D + E ) 211,200.00
G Harga Satuan Pekerjaan ( F )Pemakaian 2 x 105,600.00
H Dibulatkan 105,600.00
NO URAIAN

A PEKERJAAN PERSIAPAN

B #NAME?

C PEKERJAAN LANSCAPE A

I Pekerjaan Pasangan Pondasi

II #NAME?

III #NAME?

IV #NAME?

V #NAME?

E #NAME?

F #NAME?
REKAPITULASI
KEGIATAN : PEMBUATAN LANDSCPE BLK SAMARINDA
PEKERJAAN : PEMBUATAN LANDSCPE BLK SAMARINDA
LOKASI : SAMARINDA
TAHUN ANGGARAN : 2020

NO URAIAN JUMLAH HARGA

A PEKERJAAN PERSIAPAN Rp. 2,750,000.00

B PEKERJAAN LANSCAPE A Rp. 234,874,085.94

C PEKERJAAN TANAMAN LANDSCPE Rp. 100,309,430.10

D PEKERJAAN GATE Rp. 26,811,575.33

E PEKERJAAN PEMBUATAN KOLAM Rp. 22,831,091.10

F PEKERJAAN LANDSCPE TAMBAHAN Belakang Kantor Rp. 13,719,920.00

JUMLAH Rp. 401,296,102.47

PPN 10% Rp. 40,129,610.25

TOTAL Rp. 441,425,712.72

DIBULATKAN Rp. 441,425,000.00

Empat Ratus Empat Puluh Satu Juta Empat Ratus Dua Puluh Lima Ribu Rupiah

Samboja, 31 Maret 2020


Di buat oleh
Penawar,
CV. PUTRA SAMBOJA

ANDI IRSYAD
Direktur
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBUATAN LANDSCPE BLK SAMARINDA
PEKERJAAN : PEMBUATAN LANDSCPE BLK SAMARINDA
LOKASI : SAMARINDA
TAHUN ANGGARAN : 2020

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
A PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 Bh 250,000.00 250,000.00
2 Pembersihan Dan Perataan 1.00 Ls 2,500,000.00 2,500,000.00

Jumlah 2,750,000.00
B PEKERJAAN LANSCAPE A

1 Pekerjaan Pasangan Pondasi


2 Galian Tanah 20.09 M3 82,300.00 1,652,995.50
3 Urugan Kembali 6.70 M3 39,400.00 263,783.00
4 Pancang Ulin Lokal 10/10 - 2M Jarak 1,5 M 41.00 Ttk 259,900.00 10,655,900.00
5 Pondasi Batu Gunung 1:5 35.50 M3 791,600.00 28,099,425.20
6 Pekerjaan Pondasi Tangga
- Pondasi Rolag Bata Pas 1 Bata 30.26 M2 221,700.00 6,708,021.24
- Plesteran 30.26 M2 63,700.00 1,927,383.64
- Acian 30.26 M2 39,400.00 1,192,133.68
_ Cat Catan 30.26 M2 33,500.00 1,013,616.20
7 Cor Rabat
- Cor Rbat Bawah Koral Sikat + Anak Tangga 26.37 M3 989,100.00 26,086,770.68
8 Pekerjaan Koral Sikat Warna Maron 74.36 M2 124,800.00 9,279,504.00
9 Pekerjaan Koral Sikat Warna Abu Abu 76.50 M2 124,800.00 9,547,200.00
10 Pekerjaan Koral Sikat Warna Oraange 139.36 M2 124,800.00 17,392,128.00
11 Pekerjaan Koral Sikat Jalan Masuk Garmen 3.00 M2 124,800.00 374,400.00
12 Pekerjaan Finishing Cor Pembatas Koral Sikat 4.33 M3 989,100.00 4,280,824.80
13 Tulisan (" BLK Samarinda" ) Plat Tinggi 1 Meter Finish Cat 1.00 Unit 21,300,000.00 21,300,000.00
14 Pembuatan Booth Taman Kayu + Tulisan Jati belanda 2.00 Unit 5,000,000.00 10,000,000.00
15 Pembuatan Kantin Ex Peti Kemas + Tangga 1.00 Unit 45,000,000.00 45,000,000.00
16 Pemsangan Grill Besi Parit bEsi Siku 45.00 M' 250,000.00 11,250,000.00
17 Kursi Tanam Pipa 2,5 Inch 3.00 Unit 1,200,000.00 3,600,000.00
18 Kursi Taman kayu Lapis Bata 5.00 Unit 2,500,000.00 12,500,000.00
19 Kursi Kubus Pas Bata 80x 80 + Finissihng Cat 5.00 Unit 750,000.00 3,750,000.00
18 Kursi Café Hollow Lapis Jati belanda Meja Tanam 6.00 Set 1,500,000.00 9,000,000.00

Jumlah 234,874,085.94

C PEKERJAAN TANAMAN LANDSCPE


1 type I 50.00
1 Pemasangan Bata 1 :4 12.20 M2 108,300.00 1,321,260.00
2 Plesteran 12.20 M2 63,700.00 777,140.00
3 Acian 12.20 M2 39,400.00 480,680.00
4 Cat Catan 12.20 M2 33,500.00 408,700.00
5 Penambahan Tanah Top Soil 6.10 M3 150,000.00 915,000.00
6 Pupuk Kandang 1.00 Krg 45,000.00 45,000.00
7 Penanaman Rumput Gajah Mini 8.81 M2 35,000.00 308,437.50
8 Penanaman Pohon Tabebuya Ungu Daun Besar 2.00 Phon 350,000.00 700,000.00
9 Tanaman Kecil ( Kromosan) 50.00 Polybak 10,000.00 500,000.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
2 type2
1 Pemasangan Bata 1 :4 11.82 M2 108,300.00 1,280,106.00
2 Plesteran 11.82 M2 63,700.00 752,934.00
3 Acian 11.82 M2 39,400.00 465,708.00
4 Cat Catan 11.82 M2 33,500.00 395,970.00
5 Penambahan Tanah Top Soil 5.91 M3 150,000.00 886,500.00
6 Pupuk Kandang 2.00 Krg 45,000.00 90,000.00
7 Penanaman Rumput Gajah Mini 6.87 M2 35,000.00 240,408.00
8 Palm Ponik 1 Meter 3.00 Phn 500,000.00 1,500,000.00
9 Tanaman Kecil ( Kromosan) 50.00 Polybak 10,000.00 500,000.00

3 type 3
1 Pemasangan Bata 1 :4 9.50 M2 108,300.00 1,028,850.00
2 Plesteran 9.50 M2 63,700.00 605,150.00
3 Acian 9.50 M3 39,400.00 374,300.00
4 Cat Catan 9.50 M4 33,500.00 318,250.00
5 Penambahan Tanah Top Soil 4.75 M3 150,000.00 712,500.00
6 Pupuk Kandang 1.00 Krg 45,000.00 45,000.00
7 Penanaman Rumput Gajah Mini 9.50 M2 35,000.00 332,500.00
8 Ketapang Kencana 2 Meter 1.00 Phn 350,000.00 350,000.00
9 Tanaman Kecil ( Kromosan) 50.00 Polybeck 10,000.00 500,000.00

4 type 4
1 Pemasangan Bata 1 :4 36.00 M2 108,300.00 3,898,800.00
2 Plesteran 36.00 M2 63,700.00 2,293,200.00
3 Acian 36.00 M2 39,400.00 1,418,400.00
4 Cat Catan 36.00 M2 33,500.00 1,206,000.00
5 Penambahan Tanah Top Soil 8.50 M3 150,000.00 1,275,000.00
6 Pupuk Kandang 2.00 Krg 45,000.00 90,000.00
7 Penanaman Rumput Gajah Mini + Pupuk 8.50 M2 35,000.00 297,500.00
8 Bugenville Varigata 10.00 Phn 185,000.00 1,850,000.00

5 type 5
1 Pemasangan Bata 1 :4 9.40 M2 108,300.00 1,018,020.00
2 Plesteran 9.40 M2 63,700.00 598,780.00
3 Acian 9.40 M3 39,400.00 370,360.00
4 Cat Catan 9.40 M4 33,500.00 314,900.00
5 Penambahan Tanah Top Soil 1.62 M3 150,000.00 243,000.00
6 Penanaman Rumput Gajah Mini + Pupuk 9.40 M2 35,000.00 329,000.00
7 Pupuk Kandang 1.00 Krg 45,000.00 45,000.00
8 Beringin Putih 2 Meter 1.00 Phn 350,000.00 350,000.00
9 Tanaman Kecil ( Kromosan) 50.00 Plybak 10,000.00 500,000.00

6 type 6
1 Pemasangan Bata 1 :4 24.70 M2 108,300.00 2,675,010.00
2 Plesteran 24.70 M2 63,700.00 1,573,390.00
2 Acian 24.70 M2 39,400.00 973,180.00
2 Cat Catan 24.70 M2 33,500.00 827,450.00
3 Penambahan Tanah Top Soil 13.50 M3 150,000.00 2,025,000.00
4 Penanaman Rumput Gajah Mini 24.70 M2 35,000.00 864,500.00
5 Pupuk Kandang 2.00 Krg 45,000.00 90,000.00
6 Tanaman Tabebuya Daun Besar Ungu Dan Kuning 2,5 Meter 2.00 Phn 350,000.00 700,000.00
7 Tanaman Kecil ( Kromosan) 60.00 Plybak 10,000.00 600,000.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
7 type 7
1 Pemasangan Bata 1 :4 18.00 M2 108,300.00 1,949,400.00
2 Plesteran 18.00 M2 63,700.00 1,146,600.00
3 Acian 18.00 M3 39,400.00 709,200.00
4 Cat Catan 18.00 M4 33,500.00 603,000.00
5 Penambahan Tanah Top Soil 10.00 M3 150,000.00 1,500,000.00
6 Pupuk Kandang 2.00 Krg 45,000.00 90,000.00
7 Penanaman Rumput Gajah Mini + Pupuk 12.00 M2 35,000.00 420,000.00
8 Pohon Ketapang Kencana Tinggi 2 Meter 1.00 Phn 350,000.00 350,000.00
9 Tanaman Kecil ( Kromosan) 20.00 Plybak 10,000.00 200,000.00

8 type 8
1 Pemasangan Bata 1 :4 5.92 M2 108,300.00 641,352.60
2 Plesteran 5.92 M2 63,700.00 377,231.40
3 Acian 5.92 M3 39,400.00 233,326.80
4 Cat Catan 5.92 M4 33,500.00 198,387.00
5 Penambahan Tanah Top Soil 1.82 M3 150,000.00 273,358.80
6 Penanaman Rumput Gajah Mini + Pupuk 5.92 M2 35,000.00 207,270.00
7 Pupuk Kandang 1.00 Krg 45,000.00 45,000.00
8 Tanaman Kecil ( Kromosan) 50.00 Plybak 10,000.00 500,000.00

9 type 9
1 Pemasangan Bata 1 :4 25.80 M2 108,300.00 2,794,140.00
2 Plesteran 25.80 M2 63,700.00 1,643,460.00
3 Acian 25.80 M3 39,400.00 1,016,520.00
4 Cat Catan 25.80 M2 33,500.00 864,300.00
5 Penambahan Tanah Top Soil 36.00 M3 150,000.00 5,400,000.00
6 Penanaman Rumput Gajah Mini + Pupuk 120.00 M2 35,000.00 4,200,000.00
7 Pupuk Kandang 10.00 Krg 45,000.00 450,000.00
8 Tanaman Kecil ( Kromosan) 300.00 Polyback 10,000.00 3,000,000.00
9 Pohon Bonsai Cemara Udang Batang Besar Minmal diameter 20 1.00 Pohon 10,000,000.00 10,000,000.00
10 Pohon Bonsai Beringin dolar Batang Besar Minimal Diameter 20 1.00 Pohon 10,000,000.00 10,000,000.00
11 Kamboja Bali 2 Meter 5.00 Pohon 400,000.00 2,000,000.00
12 Tabe bUya Daun Besar 2 Meter 5.00 Pohon 350,000.00 1,750,000.00

10 Penanaman Rumput Jepang 105.22 M2 35,000.00 3,682,700.00


11 Top Soil 10.52 M3 150,000.00 1,578,300.00
12 Pupuk Kandang 5.00 Krg 45,000.00 225,000.00

Jumlah 100,309,430.10
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6

D PEKERJAAN GATE 5.00


1 Galian Tanah Pondasi 6.40 82,300.00 526,720.00
2 Urugan Tanah Kembali 2.13 39,400.00 84,053.33
3 Pancang Ulin Lokal 10/10 - 2M Jarak 1,5 M 4.00 259,900.00 1,039,600.00
4 Pondasi Batu Gunung 1:5 1.35 791,600.00 1,068,660.00
5 Sloff 15/20
cor 0.15 M3 989,100.00 148,365.00
Pembesian 52.68 Kg 16,700.00 879,756.00
Begisting 2.00 M2 105,600.00 211,200.00
6 Kolom Praktis 15.00 M' 96,800.00 1,452,000.00
7 Pasangan Bata 11.00 m2 108,300.00 1,191,300.00
8 Rink Balk 15/20
cor 0.15 M3 989,100.00 148,365.00
Pembesian 52.68 Kg 16,700.00 879,756.00
Begisting 2.00 M2 105,600.00 211,200.00
9 Plesteran 22.00 m2 63,700.00 1,401,400.00
10 Acian 44.00 m2 39,400.00 1,733,600.00
11 Cat Catan 44.00 m2 33,500.00 1,474,000.00
12 Pemasangan Grill Hollow Atap 20.00 M2 200,000.00 4,000,000.00
13 ACP Cuting Ukiran Daerah 4.00 M2 800,000.00 3,200,000.00
14 Balok Mainan Rangka Hollow Bungkus ACP 10.40 M2 429,000.00 4,461,600.00
15 Tulisan ( BLK Samarinda ) 1.00 Set 2,700,000.00 2,700,000.00

Jumlah 26,811,575.33

E PEKERJAAN PEMBUATAN KOLAM


1 Galian Tanah 5.33 M3 82,300.00 438,988.20
2 pasangan rolag bata 1 : 2 6.60 M2 221,700.00 1,462,111.50
3 Plesteran Bata 6.60 M2 68,000.00 448,460.00
4 Acian 6.60 M2 33,500.00 220,932.50
5 Water Profing 15.49 M2 100,000.00 1,549,000.00
6 Cor Lantai 0.89 M3 989,100.00 879,309.90
7 Benangan 13.19 M' 63,100.00 832,289.00
9 Instalasi + Filter + Asseories 1.00 Unit 2,000,000.00 2,000,000.00
10 Ikan Koi Lokal Ukuran Min 20 Cm (5 Jenis) 50.00 Ekor 300,000.00 15,000,000.00

Jumlah 22,831,091.10

F PEKERJAAN LANDSCPE TAMBAHAN Belakang Kantor


1 Pasangan Koral Sikat 25.40 M2 124,800.00 3,169,920.00
2 Pasangan Rumput Jepang 16.60 M2 35,000.00 581,000.00
3 Kursi Taman Lapis Bata 2.00 Unit 2,500,000.00 5,000,000.00
4 Pemasangan Bata 1 :4 10.00 M2 108,300.00 1,083,000.00
5 Plesteran 10.00 M2 63,700.00 637,000.00
6 Acian 10.00 M2 39,400.00 394,000.00
7 Cat Catan 10.00 M2 33,500.00 335,000.00
8 Penambahan Tanah Top Soil 3.00 M3 150,000.00 450,000.00
9 Penanaman Rumput Gajah Mini + Pupuk 8.00 M2 35,000.00 280,000.00
10 Pupuk Kandang 2.00 Kr 45,000.00 90,000.00
12 Tanaman Kecil ( Kromosan) 100.00 Polyback 10,000.00 1,000,000.00
13 Tabe bUya Daun Besar 2 Meter 2.00 Pohon 350,000.00 700,000.00

Jumlah 13,719,920.00
ENGINEERING ESTIMATE
PEKERJAAN : PEMBUATAN LANDSCPE BLK SAMARINDA
LOKASI : SAMARINDA

TAHUN ANGGARAN : 2019

HARGA
JUMLAH
SATUAN
NO. URAIAN PEKERJAAN SATUAN VOLUME HARGA
( Rp )
( Rp )

PEKERJAAN ELEKTRIKAL

1 Power Panel Listrik set 2.00 16,000,000.00 32,000,000.00


- MCB 3P / 40A, 10 KA ( Schneider ) 1 pcs

- MCB 3P / 25A, 10 KA ( Schneider ) 1 pcs

- MCB 1P / 6A, 4,5 KA ( Schneider ) 2 pcs


- Pilot Lamp RST ( MAC ) 3 pcs

- Wiring + Accessories 1 Lot


- Box Panel Uk. 600 (T) x 400 (P) x 250 (L) mm Plat 2mm,Type Outdoor

2 Panel Kontrol Lighting Set 2.00 12,000,000.00 24,000,000.00


- MCB 3P / 25A, 10 KA ( Schneider ) 1 pcs

- MCB 1P / 16A, 10 KA ( Schneider ) 1 pcs

- MCB 1P / 6A, 4,5 KA ( Schneider ) 2 pcs


- KONTAKTOR 16 A ( Schneider ) 1 pcs

- Timer 24 jam (Theben) 1 pcs

- Pilot Lamp RST ( MAC ) 3 pcs


- Wiring + Accessories 1 Lot

- Box Panel Uk. 600 (T) x 400 (P) x 250 (L) mm Plat 2mm,Type Outdoor
- Pondasi Panel Uk. 650 (T) x 450 (P) x 300 (L) mm

3 Kabel Fedder dari Meter PLN ke Panel kontrol Ligting NYFGBy 4 x 16 mm2 m' 90.00 95,000.00 8,550,000.00

4 Lampu Sorot Sclupture


- Flood Light LED 125W ex Artolite bh 8.00 2,015,000.00 16,120,000.00

- Body Alumunium die cast

- Color Warm Whiite


- IP 65

- Voltage 220 V

- Pondasi lampu Uk. 400 (T) x 400 (P) x 300 (L) termasuk pengaman
- Instalasi penerangan lampu pagar NYM 3x2,5 mm2 dalam conduit ttk 8.00 385,000.00 3,080,000.00

5 Lampu Pedestrian

-Pedestrian Light LED 60W type PL Atrial LED ex Artolite bh 12.00 16,800,000.00 201,600,000.00

- Body Alumunium die cast


- Color Whiite

- IP 66

- Voltage 220 V

- Tiang Bulat 7 mtr

- Pondasi lampu Uk. 400 (T) x 400 (P) x 500 (L) termasuk angkur
- Instalasi penerangan lampu pagar NYM 3x2,5 mm2 dalam conduit ttk 12.00 385,000.00 4,620,000.00

6 Lampu Step Lantai


- Step Light LED 1W ex Artolite bh 216.00 750,000.00 162,000,000.00

- Body Alumunium die cast

- Color Warm Whiite


- IP 54

- Voltage 220 V

- Instalasi penerangan lampu pagar NYM 3x2,5 mm2 dalam conduit ttk 216.00 385,000.00 83,160,000.00

7 Lampu Spot pohon dan Pergola

- Spot light LED 1W ex Artolite bh 24.00 1,850,000.00 44,400,000.00

- Body Alumunium die cast

Halaman 16 dari 42
HARGA
JUMLAH
SATUAN
NO. URAIAN PEKERJAAN SATUAN VOLUME HARGA
( Rp )
( Rp )

- Color RGB

- IP 65

- Voltage 220 V
- Instalasi penerangan lampu pagar NYM 3x2,5 mm2 dalam conduit ttk 24.00 385,000.00 9,240,000.00

8 TOILET UMUM A DAN B

ELEKTRIKAAL

- MCB Box Toilet 4 grup set 2.00 800,000.00 1,600,000.00


- Kabel fedder dari Power Panel Listrik ke MCB Box Toilet NYY 3x6 mm2 m' 12.00 32,000.00 384,000.00

- Lampu Down light LED 11 watt bh 16.00 125,000.00 2,000,000.00

- Saklar Ganda bh 1.00 70,000.00 70,000.00


- Saklar Tunggal bh 12.00 70,000.00 840,000.00

- Stop kontak 200 watt bh 4.00 80,000.00 320,000.00


- Instalasi Penerangan NYM 3x2,5 mm2 dalam pipa conduit 20 mm2 ttk 16.00 385,000.00 6,160,000.00

- Instalasi Stop kontak NYM 3x2,5 mm2 dalam pipa conduit 20 mm2 ttk 4.00 395,000.00 1,580,000.00

MEKANIKAL PLUMBING

- Biofil Kapasitas 1 m3 unit 2.00 3,250,000.00 6,500,000.00


- Tandon air stainlestell Kapasitas 1 m3 unit 2.00 3,500,000.00 7,000,000.00

- Instalasi Air bersih Pipa PVC class AW dia. 1/2"\ m' 28.00 16,000.00 448,000.00

- Instalasi Air Bekas Pipa PVC class AW dia. 3" m' 44.00 65,000.00 2,860,000.00
- Instalasi Air Kotor Pipa PVC class AW dia 4" m' 48.00 80,000.00 3,840,000.00

JUMLAH 622,372,000.00

Halaman 17 dari 42
ANALISA HARGA SATUAN PEKERJAAN

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7500 95,000.00 71,250.00
2 Mandor OH 0.0250 145,000.00 3,625.00
Jumlah Tenaga Kerja 74,875.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 74,875.00
E Overhead & Profit 10% X D 7,487.50
F Harga Satuan Pekerjaan ( D + E ) 82,362.50
G Dibulatkan 82,300.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Mengurug Kembali Galian


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2500 95,000.00 23,750.00
2 Mandor OH 0.0833 145,000.00 12,078.50
Jumlah Tenaga Kerja 35,828.50
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 35,828.50
E Overhead & Profit 10% X D 3,582.85
F Harga Satuan Pekerjaan ( D + E ) 39,411.35
G Dibulatkan 39,400.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : 1 Titik Pancang Ulin 10/10 - 2 meter


Satuan / Unit : Titik
Analisa :

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.1000 95,000.00 104,500.00
2 Tukang OH 0.2900 105,000.00 30,450.00
3 Kepala Tukang OH 0.0290 130,000.00 3,770.00
2 Mandor OH 0.0250 145,000.00 3,625.00
Jumlah Tenaga Kerja 142,345.00
B. BAHAN
1 Ulin 10/10 M3 0.020 4,700,000.00 94,000.00
Jumlah Bahan 94,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 236,345.00
E Overhead & Profit 10% X D 23,634.50
F Harga Satuan Pekerjaan ( D + E ) 259,979.50
G Dibulatkan 259,900.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pondasi Batu Belah / Kali Campuran 1 : 4


Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.5000 95,000.00 142,500.00
2 Tukang OH 0.7500 105,000.00 78,750.00
3 Kepala Tukang OH 0.0750 130,000.00 9,750.00
4 Mandor OH 0.0750 145,000.00 10,875.00
Jumlah Tenaga Kerja 241,875.00
B. BAHAN
1 Batu Gunung/ Batu Kali M3 1.200 200,000.00 240,000.00
2 Semen Portland (PC) Kg 163.000 1,100.00 179,300.00
3 Pasir Pasang M3 0.520 112,500.00 58,500.00
Jumlah Bahan 477,800.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 719,675.00
E Overhead & Profit 10% X D 71,967.50
F Harga Satuan Pekerjaan ( D + E ) 791,642.50
G Dibulatkan 791,600.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Lantai Kerja mutu f'c = 7,4 MPa


Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.2000 95,000.00 114,000.00
2 Tukang OH 0.2000 105,000.00 21,000.00
3 Kepala Tukang OH 0.0200 130,000.00 2,600.00
4 Mandor OH 0.0600 145,000.00 8,700.00
Jumlah Tenaga Kerja 146,300.00
B. BAHAN
1 Semen Portland (PC) Kg 230.00 1,100.00 253,000.00
2 Pasir Beton (PB) M3 0.6379 335,000.00 213,682.14
3 Kerikil (KR) M3 0.7607 350,000.00 266,259.26
4 Air Liter 200.00 100.00 20,000.00
Jumlah Bahan 752,941.40
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 899,241.40
E Overhead & Profit 10% X D 89,924.14
F Harga Satuan Pekerjaan ( D + E ) 989,165.54
G Dibulatkan 989,100.00
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Polos


Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 95,000.00 6,650.00
2 Tukang OH 0.0700 105,000.00 7,350.00
3 Kepala Tukang OH 0.0070 130,000.00 910.00
4 Mandor OH 0.0400 145,000.00 5,800.00
Jumlah Tenaga Kerja 20,710.00
B. BAHAN
1 Besi Beton Polos Kg 10.500 12,200.00 128,100.00
2 Kawat Beton Kg 0.150 25,000.00 3,750.00
Jumlah Bahan 131,850.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 152,560.00
E Per Kg Pembesian = D / 10 15,256.00
F Overhead & Profit 10% X E 1,525.60
G Harga Satuan Pekerjaan ( E + F ) 16,781.60
H Dibulatkan 16,700.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Sloof


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5200 95,000.00 49,400.00
2 Tukang OH 0.2600 105,000.00 27,300.00
3 Kepala Tukang OH 0.0260 130,000.00 3,380.00
4 Mandor OH 0.0260 145,000.00 3,770.00
Jumlah Tenaga Kerja 83,850.00
B. BAHAN
1 Kayu Kelas III M3 0.045 2,250,000.00 101,250.00
2 Paku 5 cm - 10 cm Kg 0.400 16,000.00 6,400.00
3 Minyak Bekisting Liter 0.100 5,000.00 500.00
Jumlah Bahan 108,150.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 192,000.00
E Overhead & Profit 10% X D 19,200.00
F Harga Satuan Pekerjaan ( D + E ) 211,200.00
G Harga Satuan Pekerjaan ( F )Pemakaian 2 x 105,600.00
H Dibulatkan 105,600.00
Catatan : Bahan digunakan lebih 1 (satu) kali
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Kolom


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.22

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 95,000.00 62,700.00
2 Tukang OH 0.3300 105,000.00 34,650.00
3 Kepala Tukang OH 0.0330 130,000.00 4,290.00
4 Mandor OH 0.0330 145,000.00 4,785.00
Jumlah Tenaga Kerja 106,425.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 2,250,000.00 90,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 16,000.00 6,400.00
3 Minyak Bekisting Liter 0.2000 5,000.00 1,000.00
4 Balok Kayu Kelas II M3 0.0150 3,100,000.00 46,500.00
5 Mutipleks tebal 9 mm Lbr 0.3500 130,000.00 45,500.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.0000 30,000.00 60,000.00
Jumlah Bahan 249,400.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 355,825.00
E Overhead & Profit 10% X D 35,582.50
F Harga Satuan Pekerjaan ( D + E ) 391,407.50
G Harga Satuan Pekerjaan ( F )Pemakaian 2 x 195,703.75
H Dibulatkan 195,700.00
Catatan : Bahan digunakan lebih 1 (satu) kali

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Balok


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.23

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 95,000.00 62,700.00
2 Tukang OH 0.3300 105,000.00 34,650.00
3 Kepala Tukang OH 0.0330 130,000.00 4,290.00
4 Mandor OH 0.0330 145,000.00 4,785.00
Jumlah Tenaga Kerja 106,425.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 2,250,000.00 90,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 16,000.00 6,400.00
3 Minyak Bekisting Liter 0.2000 5,000.00 1,000.00
4 Balok Kayu Kelas II M3 0.0180 3,100,000.00 55,800.00
5 Mutipleks tebal 9 mm Lbr 0.3500 130,000.00 45,500.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.0000 30,000.00 60,000.00
Jumlah Bahan 258,700.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 365,125.00
E Overhead & Profit 10% X D 36,512.50
F Harga Satuan Pekerjaan ( D + E ) 401,637.50
G Harga Satuan Pekerjaan ( F )Pemakaian 2 x 200,818.75
H Dibulatkan 200,800.00
Catatan : Bahan digunakan lebih 1 (satu) kali
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Kolom Praktis Beton Bertulang (13X13) cm-PUPR-PR 28/PRT/M/2016


Satuan / Unit : M'
Analisa : -

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1800 95,000.00 17,100.00
2 Tukang Batu OH 0.0200 105,000.00 2,100.00
3 Tukang Kayu OH 0.0200 105,000.00 2,100.00
4 Tukang Besi OH 0.0200 105,000.00 2,100.00
5 Kepala Tukang OH 0.0060 130,000.00 780.00
6 Mandor OH 0.0090 145,000.00 1,305.00
Jumlah Tenaga Kerja 25,485.00
B. BAHAN
1 Kayu Kelas III M3 0.0020 2,250,000.00 4,500.00
2 Paku 5 cm - 10 cm Kg 0.0100 16,000.00 160.00
3 Minyak Bekisting Liter 0.1000 5,000.00 500.00
4 Besi Beton Polos Kg 3.0000 12,200.00 36,600.00
5 Kawat Bendrat Kg 0.4500 25,000.00 11,250.00
6 Semen Pc Kg 4.0000 1,100.00 4,400.00
7 Pasir Beton M3 0.0060 335,000.00 2,010.00
8 Kerikil M3 0.0090 350,000.00 3,150.00
Jumlah Bahan 62,570.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 88,055.00
E Overhead & Profit 10% X D 8,805.50
F Harga Satuan Pekerjaan ( D + E ) 96,860.50
G Dibulatkan 96,800.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 2 PP.
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 95,000.00 28,500.00
2 Tukang OH 0.1000 105,000.00 10,500.00
3 Kepala Tukang OH 0.0100 130,000.00 1,300.00
4 Mandor OH 0.0150 145,000.00 2,175.00
Jumlah Tenaga Kerja 42,475.00
B. BAHAN
1 Batu Bata Bh 70.000 550.00 38,500.00
2 Semen Portland (PC) Kg 18.950 1,100.00 20,845.00
3 Pasir Pasang M3 0.038 112,500.00 4,275.00
Jumlah Bahan 63,620.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 106,095.00
E Overhead & Profit 10% X E 10,609.50
F Harga Satuan Pekerjaan ( E + F ) 116,704.50
H Dibulatkan 116,700.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 4 PP.
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 95,000.00 57,000.00
2 Tukang OH 0.2000 105,000.00 21,000.00
3 Kepala Tukang OH 0.0200 130,000.00 2,600.00
4 Mandor OH 0.0300 145,000.00 4,350.00
Jumlah Tenaga Kerja 84,950.00
B. BAHAN
1 Batu Bata Bh 140.000 550.00 77,000.00
2 Semen Portland (PC) Kg 26.550 1,100.00 29,205.00
3 Pasir Pasang M3 0.093 112,500.00 10,462.50
Jumlah Bahan 116,667.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 201,617.50
NO URAIAN PEKERJAAN ANALISA HARGA SATUAN
A PEKERJAAN PERSIAPAN
1 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509

B PEKERJAAN TANAH
1 Galian Tanah Biasa Sedalam 1 Meter AHSP PU A.2.3.1.1 82,362.50
2 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509
4 Mengurug Kembali Galian AHSP PU A.2.3.1.9 39,411.35
5 Memadatkan tanah (per 20 cm) AHSP PU A.2.3.1.10 60,225.00
6 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509
9 Err:509 Err:509 Err:509

C PEKERJAAN PASANGAN
1 Pondasi Batu Belah / Kali Campuran 1 : 4 AHSP PU A.3.2.1.2 791,642.50
2 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509
5 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509
9 Err:509 Err:509 Err:509
10 Err:509 Err:509 Err:509
11 Err:509 Err:509 Err:509

D PEKERJAAN PEMBESIAN
1 Pembesian 1 Kg Dengan Besi Polos AHSP PU A.4.1.1.17 16,781.60
2 Pembesian 1 Kg Dengan Besi Ulir AHSP PU A.4.1.1.17.a 16,781.60
3 Memasang 1 Kg Jaring Kawat Baja / Wire Mesh AHSP PU A.4.1.1.19 21,008.90

E PEKERJAAN BEKISTING
1 Err:509 Err:509 Err:509
2 Memasang Bekisting Untuk Sloof AHSP PU A.4.1.1.21 211,200.00
3 Memasang Bekisting Untuk Kolom AHSP PU A.4.1.1.22 391,407.50
4 Memasang Bekisting Untuk Balok AHSP PU A.4.1.1.23 401,637.50
5 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509

F PEKERJAAN BAJA BERAT


1 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509

G PEKERJAAN ALUMINIUM
1 Err:509 Err:509 Err:509
2 Pemasangan Rangka besi Hollow 40 x 40 x 2 mm AHSP PU A.4.2.1.20 #REF!

H PEKERJAAN BATU BATA DAN PLASTERAN


1 Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 2 PP. AHSP PU A.4.4.1.1 116,704.50
2 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509
4 Pasangan Dinding Bata cm Tebal 1/2 Bata Camp. 1Pc : 4 PP AHSP PU A.4.4.1.3 108,308.75
5 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509
9 Err:509 Err:509 Err:509
10 Err:509 Err:509 Err:509
11 Err:509 Err:509 Err:509
12 Err:509 Err:509 Err:509
13 Err:509 Err:509 Err:509
14 Pasangan Dinding Kerawang (Roster) Camp. 1 PC : 4 PP AHSP PU A.4.4.1.23 74,527.75
15 Err:509 Err:509 Err:509
16 Plesteran 1 PC : 2 PP Tebal 15 mm AHSP PU A.4.4.2.2 68,058.54
17 Err:509 Err:509 Err:509
18 Plesteran 1 PC : 4 PP Tebal 15 mm AHSP PU A.4.4.2.4 63,732.90
19 Err:509 Err:509 Err:509
20 Acian AHSP PU A.4.4.2.27 39,407.50

I PEKERJAAN LANTAI
1 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509
5 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509
9 Err:509 Err:509 Err:509
10 Err:509 Err:509 Err:509
11 Err:509 Err:509 Err:509
12 Err:509 Err:509 Err:509
13 Err:509 Err:509 Err:509
14 Err:509 Err:509 Err:509
15 Err:509 Err:509 Err:509
16 Err:509 Err:509 Err:509
17 Err:509 Err:509 Err:509
18 Err:509 Err:509 Err:509
19 Err:509 Err:509 Err:509
20 Err:509 Err:509 Err:509

J PEKERJAAN PLAFOND DAN ATAP


1 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509
5 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509
9 Err:509 Err:509 Err:509
10 Err:509 Err:509 Err:509
11 Err:509 Err:509 Err:509
12 Err:509 Err:509 Err:509
13 Err:509 Err:509 Err:509
14 Err:509 Err:509 Err:509
15 Err:509 Err:509 Err:509
16 Err:509 Err:509 Err:509
17 Pemasangan 1 M2 Genteng Aspal AHSP PU A.4.5.2.31 #REF!

K PEKERJAAN KAYU
1 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509
5 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509
9 Err:509 Err:509 Err:509
10 Err:509 Err:509 Err:509
11 Err:509 Err:509 Err:509
12 Err:509 Err:509 Err:509

L PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509
5 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509

M PEKERJAAN SANITASI
1 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509
5 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509
9 Err:509 Err:509 Err:509

N PEKERJAAN KACA
1 Err:509 Err:509 Err:509

O PEKERJAAN PENGECATAN
1 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509
3 Pengecatan Tembok Baru (1 x plamir, 1 x cat dasar, 2 x cat penutup) interior AHSP PU A.4.7.1.10 33,502.15
4 Err:509 Err:509 Err:509

P PEKERJAAN PEMIPAAN (PLUMBING)


1 Memasang 1 M' pipa Galvanis Dia. 1/2" AHSP PU A.8.4.1.1 #REF!
2 Memasang Pipa PVC dia.3" AHSP PU A.8.4.1.1.a #REF!
3 Memasang Pipa PVC dia.4" AHSP PU A.8.4.1.1.b #REF!

Q PEKERJAAN PENATAAN HALAMAN


1 Penanaman Rumput Lempengan AHSP PU A.2.P.12.A #REF!
2 Memasang 1 m2 Alumunium Composite Panel (ACP) 0 429,048.51
HALAMAN

1
1

1
2
2
2
3
3
3
4
4

4
5
5
6
6
7
7
8
8
9
9

10
10
11

11
12
12
13
13
14
14
15

15
16

16
17

17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
27

27
28
28
29
29
30
30
31
31
32
32
33
33
34
34
35
35
36
39
40

36
37
37
38
38
39
40
41
41
42
42
43
43
44
48
49
62

44
45
45
46
46
47
47
48
49
50
50
51

51
52
52
52
53
53

54
54
55
55
56
56
57
57
58

58

59
59
60
60

61
61
61

62
63
DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT

KEGIATAN : PEMBUATAN LANDSCPE BLK SAMARINDA


PEKERJAAN : PEMBUATAN LANDSCPE BLK SAMARINDA
LOKASI : SAMARINDA
TAHUN ANGGARAN : 2020

Harga
No. UPAH / BAHAN / ALAT SATUAN Satuan KET

(Rp)
A UPAH

1 Pekerja Hari 95,000.00 Di Lokasi


2 Tukang Hari 105,000.00 Di Lokasi
3 Kepala Tukang Hari 130,000.00 Di Lokasi
4 Mandor Hari 145,000.00 Di Lokasi

B BAHAN

A AGREGAT KASAR,BAHAN PEREKAT DAN BAHAN JADI


1 Pasir beton m3 335,000.00 Di Lokasi
2 Pasir urug/mahakam m3 112,500.00 Di Lokasi
3 Pasir Urug Lokal m3 100,000.00 Di Lokasi
4 Pasir pasang/mahakam m3 112,500.00 Di Lokasi
5 Batu koral beton m3
350,000.00 Di Lokasi
6 Batu Gunung m3 200,000.00 Di Lokasi
7 Semen portland Kg 1,100.00 Di Lokasi
8 Semen warna Kg 12,000.00 Di Lokasi
9 Batu bata Buah 550.00 Di Lokasi
10 Tanah Timbunan M3 120,000.00 Di Lokasi
11 Air Ltr 100.00 Di Lokasi
12 Beton ready Mix K-225 M3 1,150,000.00 Di Lokasi
16 Koral Sikat Kg 3,500.00 Di Lokasi

C BAHAN LOGAM
1 Kawat bendrat Kg 25,000.00 Di Lokasi
2 Paku Biasa Kg 16,000.00 Di Lokasi
3 Paku Atap kg 50,000.00 Di Lokasi
4 Besi Beton Polos / Ulir Kg 12,200.00 Di Lokasi
5 besi hollow Plafond M1 21,250.00 Di Lokasi
6 Penggantung bh 800.00 Di Lokasi
Scrup Fixcer
7 Paku Skrup Kg 45,000.00 Di Lokasi
Harga
No. UPAH / BAHAN / ALAT SATUAN Satuan KET

(Rp)
D BAHAN KAYU
1 Dolken Kayu Galam Ø 5-8 cm, panjang 4 m batang 30,000.00 Di Lokasi
2 Kayu meranti m 3
3,400,000.00 Di Lokasi
3 Kayu bekisting (kelas II )/meranti m3 3,100,000.00 Di Lokasi
4 Kayu bekisting (kelas III ) m3 2,250,000.00 Di Lokasi
5 Minyak bekisting Ltr 5,000.00 Di Lokasi
6 Plywood 9 mm Lbr 130,000.00 Di Lokasi
7 Gypsum 9 mm Lbr 80,000.00 Di Lokasi
8 List Profil Gifsum 5x5 m1 45,000.00 Di Lokasi
9 Calsiboard 6 mm Lbr 108,000.00 Di Lokasi
10 Papan Kayu Bengkirai m3 5,200,000.00 Di Lokasi
11 Balok Kayu Bengkirai m3 5,000,000.00 Di Lokasi
12 Balok Kayu Ulin m3 4,700,000.00 Di Lokasi
Harga
No. UPAH / BAHAN / ALAT SATUAN Satuan KET

(Rp)
E BAHAN FINISHING Di Lokasi
1 Cat dinding interior setara Mowilex Liter 55,000.00 Di Lokasi
2 Cat dinding eksterior anti jamur setara Mowilex Liter 88,000.00 Di Lokasi
3 Cat dasar Liter 49,000.00 Di Lokasi
4 Cat kayu kg 57,000.00 Di Lokasi
Cat Coating kg 45,000.00 Di Lokasi
5 Plamur dinding kg 15,600.00 Di Lokasi
6 Kertas gosok lbr 8,000.00 Di Lokasi
7 Meni kayu kg 70,000.00 Di Lokasi
8 Cat meni besi kg 47,000.00 Di Lokasi
9 Dempul kayu kg 67,000.00 Di Lokasi
10 Cat dasar Kayu kg 70,000.00 Di Lokasi
11 Lem gypsum kg 2,750.00 Di Lokasi
12 Amplas Bh 8,000.00 Di Lokasi
13 Alumunium Composite Panel (ACP) M2 225,000.00 Di Lokasi
14 Braket L Batang 10,000.00 Di Lokasi
15 Sealent ACP Tube 48,000.00 Di Lokasi
16 Folding Gate M2 1,000,000.00 Di Lokasi
17 Baja Ringan C . 75 M 15,000.00 Di Lokasi
18 Reng 0.4 M 8,900.00 Di Lokasi
19 Screw 12 Pcd 810.00 Di Lokasi
20 Screw 10 Pcd 790.00 Di Lokasi
21 Dynabolt Pcd 4,300.00 Di Lokasi
22 Bracket L Pcd 90,000.00 Di Lokasi

F ALAT
2 Steger Set 50,000.00 Di Lokasi
FORMULIR REKAPITULASI PERHITUNGAN

TINGKAT KOMPONEN DALAM NEGERI ( TKDN )

Nilai Gabungan Barang / Jasa ( Rp.) TKDN


TOTAL
URAIAN PEKERJAAN
DN LN Ribu % Barang Gabungan
Rp. KDN Jasa
(1) (2) (3) (4) (5) (8) (9)

Barang
I. Material Langsung
(Bahan Baku) 280,907.27 280,907.27 70.00 280,907.27 280,907.27

II. Peralatan (Barang Jadi)

A. Sub Total Barang 280,907.27 280,907.27 70.00 280,907.27 280,907.27

Jasa - - - - -

III. Managemen Proyek


dan Perekayasaan 12,038.88 12,038.88 3.00 12,038.88 12,038.88

IV. Alat Kerja / Fasilitas


Kerja 28,090.73 28,090.73 7.00 28,090.73 28,090.73

V. Konstruksi dan
Fabrikasi 40,129.61 40,129.61 10.00 40,129.61 40,129.61

VI. Jasa Umum 40,129.61 40,129.61 10.00 40,129.61 40,129.61


B. Sub Total Jasa 120,388.83 120,388.83 30.00 120,388.83 120,388.83

C. Total Biaya ( A + B ) 401,296.10 401,296.10 100.00 401,296.10 401,296.10

Formulasi Perhitungan :
& TKDN (Gabungan
Barang dan jasa = NILAI Barang Total (3C) - Nilai Barang Luar Negeri (3B)
Nilai Gabungan Barang dan Jasa (9C)

NILLAI Jasa Total (8C) - Nilai Barang Luar Negeri (8B)


Nilai Gabungan Barang dan Jasa (9C)

Samboja, 31 Maret 2020


Di buat oleh
Penawar,
CV. PUTRA SAMBOJA

ANDI IRSYAD
Direktur
JADWAL PELAKSANAAN PEKERJAAN

KEGIATAN : PEMBUATAN LANDSCPE BLK SAMARINDA


LOKASI : PEMBUATAN LANDSCPE BLK SAMARINDA
TAHUN ANGGARAN : 2020

Jangka waktu pelaksanaan 5 Bulan


JUMLAH HARGA Bulan Ke
No. URAIAN PEKERJAAN BOBOT (%) Keterangan
(Rp) 1 2 3
1 2 3 4 5 6 7 8 9 10 11 12
100%

A PEKERJAAN PERSIAPAN 2,750,000.00 0.69 0.69

B PEKERJAAN LANSCAPE A 234,874,085.94 58.53 11.71 11.71 11.71 11.71 11.71

C PEKERJAAN TANAMAN LANDSCPE 100,309,430.10 25.00 6.25 6.25 6.25 6.25


50%
D PEKERJAAN GATE 26,811,575.33 6.68 3.34 3.34

E PEKERJAAN PEMBUATAN KOLAM 22,831,091.10 5.69 2.84 2.84

F PEKERJAAN LANDSCPE TAMBAHAN Belakang Kantor 13,719,920.00 3.42 1.71 1.71

0%
JUMLAH 401,296,102.47 100.00
KEMAJUAN RENCANA (%) 0.6853 11.706 11.706 11.706 17.955 17.955 9.5897 9.5897 2.8447 2.8447 1.7095 1.7095
KEMAJUAN KOMULATIF RENCANA (%) 0.6853 12.391 24.097 35.80 53.757 71.712 81.3 90.892 93.736 96.581 98.291 100

Samboja, 31 Maret 2020


Di buat oleh
Penawar,
CV. PUTRA SAMBOJA

ANDI IRSYAD
Direktur
BACK UP DATA KUANTITAS

Kegiatan PEMBUATAN LANDSCPE BLK SAMARINDA


Pekerjaan PEMBUATAN LANDSCPE BLK SAMARINDA
Lokasi SAMARINDA
Th. Anggaran 2019

TOTAL
NO. URAIAN PEKERJAAN SATUAN ASUMSI VOLUME
VOLUME

I. PEKERJAAN PENDAHULUAN
1 Papan Nama Kegiatan Unit
a Jumlah = 1.00
1.00

2 Pengukuran dan Pemasangan 1 M Bouwplank


M1 a SISI 1. -
Sisi 2 -
-
volume = 2x(p+l) -

3 Pembersihan 1 M2 Lapangan
M2 a Panjang 1 -
b Lebar -
-
volume = 2x(pxl) - -

B Lanscape Sisi A
1 Pekerjaan Tanah
Galian Tanah M3 a Panjang 80.34
b lebar 1.00
c Tinggi 0.25
volume pxlxt 20.09

2 Galian Kolam M3 a Panjang 137.11


b lebar 1.00
c Tinggi 0.50
volume pxlxt

2 Pekerjaan Pondasi
Pas Batu Gunung M3 a Panjang 14.74
Lebar (A) 0.30
Lebar (B) 0.60
Tinggi 1.00
volume 6.63
Pancang Ulin ttk a Panjang 14.74
Jarak 2.00
Jumlah 8.00
volume 8.00

Pas Batu Gunung M3 a Panjang 65.60


Lebar (A) 0.30
Lebar (B) 0.80
Tinggi 0.80
volume 28.86
Pancang Ulin ttk a Panjang 65.60
Jarak 2.00
Jumlah 33.00
volume 33.00
Cor Bo M3 a Panjang 99.12
Lebar 8.00
Tinggi 0.10
Volume 79.30
Volume Area Parkir M2 66.05
Total Volume 85.90
Cor Beton Fc 20 M3 a Panjang 99.12
Lebar 8.00
Tinggi 0.15
Volume Area Parkir M2 66.05
Volume 118.94
Total Volume 128.85
Begesting M2 a Panjang 99.12
Tinggi 0.20
Volume 39.65
Pekerjaan Kanstin M' a Panjang 114.36
Panjang 91.26
Volume Kanstin 50.00
Pekerjaan Cat Marka Calan M' a Panjang 139.12

I PEKERJAAN PONDASI DAN BADAN TAMAN


1 Pondasi
Pas Rolag Bata elevasi + 20 M1 a Panjang 8.64
Pas Rolag Bata elevasi + 30 Panjang 16.68
Pas Rolag Bata elevasi + 40 Panjang 12.30
Pas Rolag Bata elevasi + 55 Panjang 6.80
Pas Rolag Bata elevasi + 70 Panjang 31.23
volume 30.26

-
2 Pekerjaan Cor Beton Finis WPC Composit Decing M3
a Luasan 13.76
b tebal 0.10
volume cor rabat m3 1.38
volume WPC Composit Decing m2 13.76
3 Pekerjaan Cor Beton Finis Print Brics Merah a Luasan 4.98
b volume Print Brics Merah 4.98
a Luasan cor rabat 32.81
b tebal 0.10
volume cor 3.28
a Luasan Rumput Gajah mini 21.37
Pek Cor Beton Rabat a Luasan Elv 00
Luas 198.00
tebal 0.07
volume 13.86
a Luasan Elv 50
Luas 180.00
tebal 0.07
volume 12.60
a Luasan Elv 100 154.22
tebal 0.07
volume 10.80

I PEKERJAAN CLUPTER
1 Pondasi Pour Plat Beton
- Beton M3 a Panjang 1.20
Lebar 1.20
Tinggi 0.40
0.58
besi utama tul atas x 2.10
pancang ulin 2 meter tul bawah x 2.10
tul atas y 2.10
tul bawah y 2.10
jarak 0.15
jumlah 9.00
Konfersi Besi D 13 1.04
begesting 78.62
panjang 1.20
tinggi 0.40
volume 1.92

-
II PEKERJAAN RUMAH JAGA
1 Rumah jaga + wc umum
- Pasangan Bouplank m' a Panjang 24.00
b Lebar 18.30
volume 42.30
- Galian Tanah m3 a Panjang 48.50
b Lebar 1.00
c Tinggi 0.40
volume 19.40
- Urugan Kembali m3 volume 6.47

- Pancang Ulin 10/10/2m,1,5m ttk a Panjang 48.50


b Jarak 1.50
volume 33.00
- Pasangan Batugung m3 a Panjang 48.50
b Lebar Atas 0.30
c Lebar Bawah 0.60
d Tinggi 0.75
Volume 16.37
Sloof Beton m3
Beton a Panjang 48.50
b Tebal 0.15
c Lebar 0.20
Volume 1.46
Tulangan a Jumlah 4.00
b Panjang 48.50
Kg c Dia 12 Konfersi 0.89
volume 172.08
a Panjang 0.75
Jarak 0.15
Dia 10 Konfersi 0.62
Jumlah 324.00
volume 150.66
Total Volume Tul Utama + Tul Begel 322.74
Begesting m2 a Panjang 48.50
b Tinggi 0.20
c volume 19.40
Kolom utama 20x20
Beton a Tinggi 4.00
dimensi lebar 0.20
dimensi tinggi 0.20
b jumlah 1.00
volume 0.16
jumlah kolom utama 11.000
vtotal volume beton 1.76
besi - Utama Kg a tinggi 4.00
b jumlah 4.00
c dia. Sni 12 konfersi 0.89
volume 14.19
jumlah kolom utama 11.000
total volume beton 156.11
- Begel a Panjang 0.70
b Tinggi 4.00
c jarak 0.15
d jumlah 27.00
e Dia Sni 10 konfersi 0.62
volume 11.72
jumlah kolom utama 11.000
total volume beton 128.90
begesting m2 a tinggi 4.00
b lebar 0.20
c volume 3.20
jumlah kolom utama 11.000
total volume beton 35.20
Kolom Praktis m' a Panjang 4.00
dimensi (B) 0.13
Dimensi (H) 0.13
jumlah 10.00
volume m3 0.68
m' 40.00
Ring Balk m3
beton a Panjang 65.12
b Tebal 0.15
c Lebar 0.20
Volume 1.95
a Jumlah 4.00
b Panjang 65.12
Kg c Dia 12 Konfersi 0.89
volume 231.05
a Panjang 0.75
Jarak 0.15
Dia 10 Konfersi 0.62
Jumlah 435.00
volume 202.28
Total Volume Tul Utama + Tul Begel 433.32
m2 a Panjang 65.12
b Tinggi 0.20
c volume 26.05
Plat Lantai
beton m3 a Area 58.05
tebal 0.10
volume 5.80
tulangan kg a Area 58.05
besi/m2 dobel layer 13.93
volume 808.91
begesting a Area 58.05
Tinggi 0.10
5.80
bata panjang 36.45
tinggi 3.80
volume 138.51
opening P1 3.78
P2 4.41
J1 0.94
BV 0.60
volume 9.73
volume bata 128.78

Cet Dalam Kamar tidur a panjang 9.40


Tinggi Dinding 3.00
Dapur panjang 13.07
Tinggi Dinding 3.00
Wc/R.Jaga panjang 6.40
Tinggi Dinding 3.00
Wc/umum panjang 6.10
Tinggi Dinding 3.00
volume 123.21
opening P1 3.78
P2 4.41
J1 0.94
BV 0.60
volume 9.73
Keramik Dinding 9.60
wc/umum 7.05
wc pribadi 8.55
volume 25.20
total volume cat dalam 88.28
Cat Luar a panjang 46.22
tinggi 3.00
volume 138.67
opening P1 1.89
P2 2.94
J1 0.94
BV 0.60
volume 6.37
total volume cat luar 132.30
Keramik 20/40 wc/umum 7.05
wc pribadi 8.55
volume 15.60
Keramik 20/20 wc/umum 2.50
wc pribadi 2.22
volume 6.93
keramik 40/40 Kamar 5.27
Dapur 5.92
R jaga 11.49
volume 22.68