I PEKERJAAN PERSIAPAN
#NAME? #NAME? #NAME?
II #NAME?
#NAME? #NAME? #NAME?
V #NAME?
#NAME? #NAME? #NAME? #NAME?
VI PEKERJAAN GATE
#NAME? #NAME? #NAME? #NAME? #NAME?
VII #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Jumlah Nilai Pekerjaan #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Rencana Kemajuan Pekerjaan #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Rencana Komulatip Kemajuan Pekerjaan WAKTU PELAKSANAAN 120
Realisasia Kemajuan Pekerjaan HARI KALENDER
Realisasia Komulatip Kemajuan Pekerjaan
Perbedaan Komulatip
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2)
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
A PEKERJAAN PERSIAPAN
B #NAME?
C PEKERJAAN LANSCAPE A
II #NAME?
III #NAME?
IV #NAME?
V #NAME?
E #NAME?
F #NAME?
REKAPITULASI
KEGIATAN : PEMBUATAN LANDSCPE BLK SAMARINDA
PEKERJAAN : PEMBUATAN LANDSCPE BLK SAMARINDA
LOKASI : SAMARINDA
TAHUN ANGGARAN : 2020
Empat Ratus Empat Puluh Satu Juta Empat Ratus Dua Puluh Lima Ribu Rupiah
ANDI IRSYAD
Direktur
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBUATAN LANDSCPE BLK SAMARINDA
PEKERJAAN : PEMBUATAN LANDSCPE BLK SAMARINDA
LOKASI : SAMARINDA
TAHUN ANGGARAN : 2020
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
A PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 Bh 250,000.00 250,000.00
2 Pembersihan Dan Perataan 1.00 Ls 2,500,000.00 2,500,000.00
Jumlah 2,750,000.00
B PEKERJAAN LANSCAPE A
Jumlah 234,874,085.94
3 type 3
1 Pemasangan Bata 1 :4 9.50 M2 108,300.00 1,028,850.00
2 Plesteran 9.50 M2 63,700.00 605,150.00
3 Acian 9.50 M3 39,400.00 374,300.00
4 Cat Catan 9.50 M4 33,500.00 318,250.00
5 Penambahan Tanah Top Soil 4.75 M3 150,000.00 712,500.00
6 Pupuk Kandang 1.00 Krg 45,000.00 45,000.00
7 Penanaman Rumput Gajah Mini 9.50 M2 35,000.00 332,500.00
8 Ketapang Kencana 2 Meter 1.00 Phn 350,000.00 350,000.00
9 Tanaman Kecil ( Kromosan) 50.00 Polybeck 10,000.00 500,000.00
4 type 4
1 Pemasangan Bata 1 :4 36.00 M2 108,300.00 3,898,800.00
2 Plesteran 36.00 M2 63,700.00 2,293,200.00
3 Acian 36.00 M2 39,400.00 1,418,400.00
4 Cat Catan 36.00 M2 33,500.00 1,206,000.00
5 Penambahan Tanah Top Soil 8.50 M3 150,000.00 1,275,000.00
6 Pupuk Kandang 2.00 Krg 45,000.00 90,000.00
7 Penanaman Rumput Gajah Mini + Pupuk 8.50 M2 35,000.00 297,500.00
8 Bugenville Varigata 10.00 Phn 185,000.00 1,850,000.00
5 type 5
1 Pemasangan Bata 1 :4 9.40 M2 108,300.00 1,018,020.00
2 Plesteran 9.40 M2 63,700.00 598,780.00
3 Acian 9.40 M3 39,400.00 370,360.00
4 Cat Catan 9.40 M4 33,500.00 314,900.00
5 Penambahan Tanah Top Soil 1.62 M3 150,000.00 243,000.00
6 Penanaman Rumput Gajah Mini + Pupuk 9.40 M2 35,000.00 329,000.00
7 Pupuk Kandang 1.00 Krg 45,000.00 45,000.00
8 Beringin Putih 2 Meter 1.00 Phn 350,000.00 350,000.00
9 Tanaman Kecil ( Kromosan) 50.00 Plybak 10,000.00 500,000.00
6 type 6
1 Pemasangan Bata 1 :4 24.70 M2 108,300.00 2,675,010.00
2 Plesteran 24.70 M2 63,700.00 1,573,390.00
2 Acian 24.70 M2 39,400.00 973,180.00
2 Cat Catan 24.70 M2 33,500.00 827,450.00
3 Penambahan Tanah Top Soil 13.50 M3 150,000.00 2,025,000.00
4 Penanaman Rumput Gajah Mini 24.70 M2 35,000.00 864,500.00
5 Pupuk Kandang 2.00 Krg 45,000.00 90,000.00
6 Tanaman Tabebuya Daun Besar Ungu Dan Kuning 2,5 Meter 2.00 Phn 350,000.00 700,000.00
7 Tanaman Kecil ( Kromosan) 60.00 Plybak 10,000.00 600,000.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
7 type 7
1 Pemasangan Bata 1 :4 18.00 M2 108,300.00 1,949,400.00
2 Plesteran 18.00 M2 63,700.00 1,146,600.00
3 Acian 18.00 M3 39,400.00 709,200.00
4 Cat Catan 18.00 M4 33,500.00 603,000.00
5 Penambahan Tanah Top Soil 10.00 M3 150,000.00 1,500,000.00
6 Pupuk Kandang 2.00 Krg 45,000.00 90,000.00
7 Penanaman Rumput Gajah Mini + Pupuk 12.00 M2 35,000.00 420,000.00
8 Pohon Ketapang Kencana Tinggi 2 Meter 1.00 Phn 350,000.00 350,000.00
9 Tanaman Kecil ( Kromosan) 20.00 Plybak 10,000.00 200,000.00
8 type 8
1 Pemasangan Bata 1 :4 5.92 M2 108,300.00 641,352.60
2 Plesteran 5.92 M2 63,700.00 377,231.40
3 Acian 5.92 M3 39,400.00 233,326.80
4 Cat Catan 5.92 M4 33,500.00 198,387.00
5 Penambahan Tanah Top Soil 1.82 M3 150,000.00 273,358.80
6 Penanaman Rumput Gajah Mini + Pupuk 5.92 M2 35,000.00 207,270.00
7 Pupuk Kandang 1.00 Krg 45,000.00 45,000.00
8 Tanaman Kecil ( Kromosan) 50.00 Plybak 10,000.00 500,000.00
9 type 9
1 Pemasangan Bata 1 :4 25.80 M2 108,300.00 2,794,140.00
2 Plesteran 25.80 M2 63,700.00 1,643,460.00
3 Acian 25.80 M3 39,400.00 1,016,520.00
4 Cat Catan 25.80 M2 33,500.00 864,300.00
5 Penambahan Tanah Top Soil 36.00 M3 150,000.00 5,400,000.00
6 Penanaman Rumput Gajah Mini + Pupuk 120.00 M2 35,000.00 4,200,000.00
7 Pupuk Kandang 10.00 Krg 45,000.00 450,000.00
8 Tanaman Kecil ( Kromosan) 300.00 Polyback 10,000.00 3,000,000.00
9 Pohon Bonsai Cemara Udang Batang Besar Minmal diameter 20 1.00 Pohon 10,000,000.00 10,000,000.00
10 Pohon Bonsai Beringin dolar Batang Besar Minimal Diameter 20 1.00 Pohon 10,000,000.00 10,000,000.00
11 Kamboja Bali 2 Meter 5.00 Pohon 400,000.00 2,000,000.00
12 Tabe bUya Daun Besar 2 Meter 5.00 Pohon 350,000.00 1,750,000.00
Jumlah 100,309,430.10
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
Jumlah 26,811,575.33
Jumlah 22,831,091.10
Jumlah 13,719,920.00
ENGINEERING ESTIMATE
PEKERJAAN : PEMBUATAN LANDSCPE BLK SAMARINDA
LOKASI : SAMARINDA
HARGA
JUMLAH
SATUAN
NO. URAIAN PEKERJAAN SATUAN VOLUME HARGA
( Rp )
( Rp )
PEKERJAAN ELEKTRIKAL
- Box Panel Uk. 600 (T) x 400 (P) x 250 (L) mm Plat 2mm,Type Outdoor
- Pondasi Panel Uk. 650 (T) x 450 (P) x 300 (L) mm
3 Kabel Fedder dari Meter PLN ke Panel kontrol Ligting NYFGBy 4 x 16 mm2 m' 90.00 95,000.00 8,550,000.00
- Voltage 220 V
- Pondasi lampu Uk. 400 (T) x 400 (P) x 300 (L) termasuk pengaman
- Instalasi penerangan lampu pagar NYM 3x2,5 mm2 dalam conduit ttk 8.00 385,000.00 3,080,000.00
5 Lampu Pedestrian
-Pedestrian Light LED 60W type PL Atrial LED ex Artolite bh 12.00 16,800,000.00 201,600,000.00
- IP 66
- Voltage 220 V
- Pondasi lampu Uk. 400 (T) x 400 (P) x 500 (L) termasuk angkur
- Instalasi penerangan lampu pagar NYM 3x2,5 mm2 dalam conduit ttk 12.00 385,000.00 4,620,000.00
- Voltage 220 V
- Instalasi penerangan lampu pagar NYM 3x2,5 mm2 dalam conduit ttk 216.00 385,000.00 83,160,000.00
Halaman 16 dari 42
HARGA
JUMLAH
SATUAN
NO. URAIAN PEKERJAAN SATUAN VOLUME HARGA
( Rp )
( Rp )
- Color RGB
- IP 65
- Voltage 220 V
- Instalasi penerangan lampu pagar NYM 3x2,5 mm2 dalam conduit ttk 24.00 385,000.00 9,240,000.00
ELEKTRIKAAL
- Instalasi Stop kontak NYM 3x2,5 mm2 dalam pipa conduit 20 mm2 ttk 4.00 395,000.00 1,580,000.00
MEKANIKAL PLUMBING
- Instalasi Air bersih Pipa PVC class AW dia. 1/2"\ m' 28.00 16,000.00 448,000.00
- Instalasi Air Bekas Pipa PVC class AW dia. 3" m' 44.00 65,000.00 2,860,000.00
- Instalasi Air Kotor Pipa PVC class AW dia 4" m' 48.00 80,000.00 3,840,000.00
JUMLAH 622,372,000.00
Halaman 17 dari 42
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 2 PP.
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.1
B PEKERJAAN TANAH
1 Galian Tanah Biasa Sedalam 1 Meter AHSP PU A.2.3.1.1 82,362.50
2 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509
4 Mengurug Kembali Galian AHSP PU A.2.3.1.9 39,411.35
5 Memadatkan tanah (per 20 cm) AHSP PU A.2.3.1.10 60,225.00
6 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509
9 Err:509 Err:509 Err:509
C PEKERJAAN PASANGAN
1 Pondasi Batu Belah / Kali Campuran 1 : 4 AHSP PU A.3.2.1.2 791,642.50
2 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509
5 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509
9 Err:509 Err:509 Err:509
10 Err:509 Err:509 Err:509
11 Err:509 Err:509 Err:509
D PEKERJAAN PEMBESIAN
1 Pembesian 1 Kg Dengan Besi Polos AHSP PU A.4.1.1.17 16,781.60
2 Pembesian 1 Kg Dengan Besi Ulir AHSP PU A.4.1.1.17.a 16,781.60
3 Memasang 1 Kg Jaring Kawat Baja / Wire Mesh AHSP PU A.4.1.1.19 21,008.90
E PEKERJAAN BEKISTING
1 Err:509 Err:509 Err:509
2 Memasang Bekisting Untuk Sloof AHSP PU A.4.1.1.21 211,200.00
3 Memasang Bekisting Untuk Kolom AHSP PU A.4.1.1.22 391,407.50
4 Memasang Bekisting Untuk Balok AHSP PU A.4.1.1.23 401,637.50
5 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509
G PEKERJAAN ALUMINIUM
1 Err:509 Err:509 Err:509
2 Pemasangan Rangka besi Hollow 40 x 40 x 2 mm AHSP PU A.4.2.1.20 #REF!
I PEKERJAAN LANTAI
1 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509
5 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509
9 Err:509 Err:509 Err:509
10 Err:509 Err:509 Err:509
11 Err:509 Err:509 Err:509
12 Err:509 Err:509 Err:509
13 Err:509 Err:509 Err:509
14 Err:509 Err:509 Err:509
15 Err:509 Err:509 Err:509
16 Err:509 Err:509 Err:509
17 Err:509 Err:509 Err:509
18 Err:509 Err:509 Err:509
19 Err:509 Err:509 Err:509
20 Err:509 Err:509 Err:509
K PEKERJAAN KAYU
1 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509
5 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509
9 Err:509 Err:509 Err:509
10 Err:509 Err:509 Err:509
11 Err:509 Err:509 Err:509
12 Err:509 Err:509 Err:509
M PEKERJAAN SANITASI
1 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509
5 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509
9 Err:509 Err:509 Err:509
N PEKERJAAN KACA
1 Err:509 Err:509 Err:509
O PEKERJAAN PENGECATAN
1 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509
3 Pengecatan Tembok Baru (1 x plamir, 1 x cat dasar, 2 x cat penutup) interior AHSP PU A.4.7.1.10 33,502.15
4 Err:509 Err:509 Err:509
1
1
1
2
2
2
3
3
3
4
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
27
27
28
28
29
29
30
30
31
31
32
32
33
33
34
34
35
35
36
39
40
36
37
37
38
38
39
40
41
41
42
42
43
43
44
48
49
62
44
45
45
46
46
47
47
48
49
50
50
51
51
52
52
52
53
53
54
54
55
55
56
56
57
57
58
58
59
59
60
60
61
61
61
62
63
DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT
Harga
No. UPAH / BAHAN / ALAT SATUAN Satuan KET
(Rp)
A UPAH
B BAHAN
C BAHAN LOGAM
1 Kawat bendrat Kg 25,000.00 Di Lokasi
2 Paku Biasa Kg 16,000.00 Di Lokasi
3 Paku Atap kg 50,000.00 Di Lokasi
4 Besi Beton Polos / Ulir Kg 12,200.00 Di Lokasi
5 besi hollow Plafond M1 21,250.00 Di Lokasi
6 Penggantung bh 800.00 Di Lokasi
Scrup Fixcer
7 Paku Skrup Kg 45,000.00 Di Lokasi
Harga
No. UPAH / BAHAN / ALAT SATUAN Satuan KET
(Rp)
D BAHAN KAYU
1 Dolken Kayu Galam Ø 5-8 cm, panjang 4 m batang 30,000.00 Di Lokasi
2 Kayu meranti m 3
3,400,000.00 Di Lokasi
3 Kayu bekisting (kelas II )/meranti m3 3,100,000.00 Di Lokasi
4 Kayu bekisting (kelas III ) m3 2,250,000.00 Di Lokasi
5 Minyak bekisting Ltr 5,000.00 Di Lokasi
6 Plywood 9 mm Lbr 130,000.00 Di Lokasi
7 Gypsum 9 mm Lbr 80,000.00 Di Lokasi
8 List Profil Gifsum 5x5 m1 45,000.00 Di Lokasi
9 Calsiboard 6 mm Lbr 108,000.00 Di Lokasi
10 Papan Kayu Bengkirai m3 5,200,000.00 Di Lokasi
11 Balok Kayu Bengkirai m3 5,000,000.00 Di Lokasi
12 Balok Kayu Ulin m3 4,700,000.00 Di Lokasi
Harga
No. UPAH / BAHAN / ALAT SATUAN Satuan KET
(Rp)
E BAHAN FINISHING Di Lokasi
1 Cat dinding interior setara Mowilex Liter 55,000.00 Di Lokasi
2 Cat dinding eksterior anti jamur setara Mowilex Liter 88,000.00 Di Lokasi
3 Cat dasar Liter 49,000.00 Di Lokasi
4 Cat kayu kg 57,000.00 Di Lokasi
Cat Coating kg 45,000.00 Di Lokasi
5 Plamur dinding kg 15,600.00 Di Lokasi
6 Kertas gosok lbr 8,000.00 Di Lokasi
7 Meni kayu kg 70,000.00 Di Lokasi
8 Cat meni besi kg 47,000.00 Di Lokasi
9 Dempul kayu kg 67,000.00 Di Lokasi
10 Cat dasar Kayu kg 70,000.00 Di Lokasi
11 Lem gypsum kg 2,750.00 Di Lokasi
12 Amplas Bh 8,000.00 Di Lokasi
13 Alumunium Composite Panel (ACP) M2 225,000.00 Di Lokasi
14 Braket L Batang 10,000.00 Di Lokasi
15 Sealent ACP Tube 48,000.00 Di Lokasi
16 Folding Gate M2 1,000,000.00 Di Lokasi
17 Baja Ringan C . 75 M 15,000.00 Di Lokasi
18 Reng 0.4 M 8,900.00 Di Lokasi
19 Screw 12 Pcd 810.00 Di Lokasi
20 Screw 10 Pcd 790.00 Di Lokasi
21 Dynabolt Pcd 4,300.00 Di Lokasi
22 Bracket L Pcd 90,000.00 Di Lokasi
F ALAT
2 Steger Set 50,000.00 Di Lokasi
FORMULIR REKAPITULASI PERHITUNGAN
Barang
I. Material Langsung
(Bahan Baku) 280,907.27 280,907.27 70.00 280,907.27 280,907.27
Jasa - - - - -
V. Konstruksi dan
Fabrikasi 40,129.61 40,129.61 10.00 40,129.61 40,129.61
Formulasi Perhitungan :
& TKDN (Gabungan
Barang dan jasa = NILAI Barang Total (3C) - Nilai Barang Luar Negeri (3B)
Nilai Gabungan Barang dan Jasa (9C)
ANDI IRSYAD
Direktur
JADWAL PELAKSANAAN PEKERJAAN
0%
JUMLAH 401,296,102.47 100.00
KEMAJUAN RENCANA (%) 0.6853 11.706 11.706 11.706 17.955 17.955 9.5897 9.5897 2.8447 2.8447 1.7095 1.7095
KEMAJUAN KOMULATIF RENCANA (%) 0.6853 12.391 24.097 35.80 53.757 71.712 81.3 90.892 93.736 96.581 98.291 100
ANDI IRSYAD
Direktur
BACK UP DATA KUANTITAS
TOTAL
NO. URAIAN PEKERJAAN SATUAN ASUMSI VOLUME
VOLUME
I. PEKERJAAN PENDAHULUAN
1 Papan Nama Kegiatan Unit
a Jumlah = 1.00
1.00
3 Pembersihan 1 M2 Lapangan
M2 a Panjang 1 -
b Lebar -
-
volume = 2x(pxl) - -
B Lanscape Sisi A
1 Pekerjaan Tanah
Galian Tanah M3 a Panjang 80.34
b lebar 1.00
c Tinggi 0.25
volume pxlxt 20.09
2 Pekerjaan Pondasi
Pas Batu Gunung M3 a Panjang 14.74
Lebar (A) 0.30
Lebar (B) 0.60
Tinggi 1.00
volume 6.63
Pancang Ulin ttk a Panjang 14.74
Jarak 2.00
Jumlah 8.00
volume 8.00
-
2 Pekerjaan Cor Beton Finis WPC Composit Decing M3
a Luasan 13.76
b tebal 0.10
volume cor rabat m3 1.38
volume WPC Composit Decing m2 13.76
3 Pekerjaan Cor Beton Finis Print Brics Merah a Luasan 4.98
b volume Print Brics Merah 4.98
a Luasan cor rabat 32.81
b tebal 0.10
volume cor 3.28
a Luasan Rumput Gajah mini 21.37
Pek Cor Beton Rabat a Luasan Elv 00
Luas 198.00
tebal 0.07
volume 13.86
a Luasan Elv 50
Luas 180.00
tebal 0.07
volume 12.60
a Luasan Elv 100 154.22
tebal 0.07
volume 10.80
I PEKERJAAN CLUPTER
1 Pondasi Pour Plat Beton
- Beton M3 a Panjang 1.20
Lebar 1.20
Tinggi 0.40
0.58
besi utama tul atas x 2.10
pancang ulin 2 meter tul bawah x 2.10
tul atas y 2.10
tul bawah y 2.10
jarak 0.15
jumlah 9.00
Konfersi Besi D 13 1.04
begesting 78.62
panjang 1.20
tinggi 0.40
volume 1.92
-
II PEKERJAAN RUMAH JAGA
1 Rumah jaga + wc umum
- Pasangan Bouplank m' a Panjang 24.00
b Lebar 18.30
volume 42.30
- Galian Tanah m3 a Panjang 48.50
b Lebar 1.00
c Tinggi 0.40
volume 19.40
- Urugan Kembali m3 volume 6.47