Bbs Tugas Tingkat 2
Bbs Tugas Tingkat 2
Bbs Tugas Tingkat 2
BAB I
PERHITUNGAN PANJANG TULANGAN
1. Kolom ( C1 )
a. Denah Kolom Lt.1
KOLOM C1
DIMENSI 400X1000
TULAGAN 16D16
SENGKANG SK. D10-150
Detail Kolom
b. Perhitungan Kolom C1
Tulangan Utama Kolom C1
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
L = Lo + (2*1/2Lo) + (2*20d)
= 3500+3500+320
= 7640 cm = 7,64 m
kebutuhan 1 kolom = 7,64*16
= 122,24 m
berat D16 = 1,578 kg/m
Sengkang Kolom C1
C1
(Tulangan 16 384 7640 2933760 4629,4738
pokok)
K604
(Sengkang
Utama
10 552 2547,14 1406021,28 867,515
Kolom
K6b)
Denah Balok
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
15d = 15*19
= 285
12d = 12*19
= 228 mm
A = 285+L/4+b
= 285+1200+170
= 1655 mm
B = 1/4π (D+2d)
= ¼*π*(114,3+2*19)
= 119,6 mm
C = A- (1/2 Dpen+dtul)
= 1655- (76,15)
= 1578,85 mm
L = C+B+12d
= 1578,85+119,6+228
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
= 1926,45 mm
d = 19mm
20d = 380mm
Lo/2 = 4800/2
= 2400 mm
L = 2(20d)+(Lo/2)
= 760+2400
= 3160 mm
1 lapangan dalam satu tumpuan = 3160*2 = 6320 mm
Tulangan dibagian tumpuan kanan (bentang 500) dengan tumpuan kiri (bentang
600)
d = 19mm
20d = 380mm
Lo/2 = 5600/2
= 2800 mm
L = 2(20d)+(Lo/2)
= 760+2800
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
= 3560 mm
1 lapangan dalam satu bentang = 3560*2 = 7120 mm
Tulangan dibagian tumpuan kanan (bentang 600) dengan tumpuan kiri (bentang
500*)
d = 19mm
20d = 380mm
Lo/2 = 4600/2
= 2300 mm
L = 2(20d)+(Lo/2)
= 760+2300
= 3060 mm
1 lapangan dalam satu bentang = 3060*2 = 6120 mm
Tulangan dibagian tumpuan kanan (bentang 600) dengan tumpuan kiri (bentang
500*)
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
15d = 15*19
= 285
12d = 12*19
= 228 mm
A = 285+L/4+b
= 285+1200+170
= 1655 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
B = 1/4π (D+2d)
= ¼*π*(114,3+2*19)
= 119,6 mm
C = A- (1/2 Dpen+dtul)
= 1655- (76,15)
= 1578,85 mm
L = C+B+12d
= 1578,85+119,6+228
= 1926,45 mm
d = 19mm
20d = 380mm
Lo/2 = 4800/2
= 2400 mm
L = 2(20d)+(Lo/2)
= 760+2400
= 3160 mm
1 lapangan dalam satu tumpuan = 3160*2 = 6320 mm
Tulangan dibagian tumpuan kanan (bentang 500) dengan tumpuan kiri (bentang
600)
d = 19mm
20d = 380mm
Lo/2 = 5600/2
= 2800 mm
L = 2(20d)+(Lo/2)
= 760+2800
= 3560 mm
1 lapangan dalam satu bentang = 3560*2 = 7120 mm
Tulangan dibagian tumpuan kanan (bentang 600) dengan tumpuan kiri (bentang
500*)
d = 19mm
20d = 380mm
Lo/2 = 4600/2
= 2300 mm
L = 2(20d)+(Lo/2)
= 760+2300
= 3060 mm
1 lapangan dalam satu bentang = 3060*2 = 6120 mm
Tulangan dibagian tumpuan kanan (bentang 600) dengan tumpuan kiri (bentang
500*)
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
d = 19 mm
Dpen = 114,3 mm
15d = 15*19
= 285
12d = 12*19
= 228 mm
A = 285+L/4+b
= 285+737,5+220
= 1242,5 mm
B = 1/4π (D+2d)
= ¼*π*(114,3+2*19)
= 119,6 mm
C = A- (1/2 Dpen+dtul)
= 1242,5- (76,15)
= 1166,35 mm
L = C+B+12d
= 1166,35+119,6+228
= 1783,05 mm
Tulangan dibagian tumpuan kanan (bentang 395) dengan tumpuan kiri (bentang
550)
Tulangan Sengkang
d = 19 mm
Dpen = 114,3 mm
15d = 15*19
= 285
12d = 12*19
= 228 mm
A = 285+L/4+b
= 285+737,5+220
= 1242,5 mm
B = 1/4π (D+2d)
= ¼*π*(114,3+2*19)
= 119,6 mm
C = A- (1/2 Dpen+dtul)
= 1242,5- (76,15)
= 1166,35 mm
L = C+B+12d
= 1166,35+119,6+228
= 1783,05 mm
Tulangan dibagian tumpuan kanan (bentang 395) dengan tumpuan kiri (bentang
550)
4. Pelat ( A1 sampai I4 )
a. Denah Pelat Lt.1
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
Diameter = 10 mm
Tebal Pelat = 150 mm
Dpen = 38,1 mm
B = ⅜. 𝜋.(Dpen + 2d)
= ⅜.(3,14).(38,1 + 20)
= 68,41 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
C = ¼.𝜋.(Dpen + 2d)
= ¼.(3,14).(38,1 + 20)
= 45,61 mm
L = 6d + B + D + C +
A + 9575 + 350 +
1737,08
= 60 + 68,41 + 91,9
P01a
+ 45,61 + 72 +
9575 + 350 +
1737,08
= 12000 mm
L = 40d + 4141,5085
P01b
= 4181,5085 mm
Diameter = 10 mm
Tebal Pelat = 150 mm
Dpen = 38,1 mm
B = ⅜. 𝜋.(Dpen + 2d)
= ⅜.(3,14).(38,1 + 20)
= 68,41 mm
C = ¼.𝜋.(Dpen + 2d)
= ¼.(3,14).(38,1 + 20)
= 45,61 mm
L = 6d + B + A +
5239
P02a = 60 + 68,41 + 72 +
5239
= 5439,41 mm
Diameter = 10 mm
L = 6d + B + D + C +
A + 4500 + 500 +
6662,08
= 60 + 68,41 + 91,9
P03a
+ 45,61 + 72 +
4500 + 500 +
6662,08
= 12000 mm
L = 40d + 2837,92 +
500 + 8262,08
P03b = 400 + 2837,92 +
500 + 8262,08
= 12000 mm
L = 40d + 1237,92 +
500 + 4500 + A +
C + D + B + 6d
= 400 +1237,92 +
P03c
500 + 4500 + 72
+ 45,61 + 91,9 +
68,41 + 60
= 6975,84 mm
Diameter 10 mm
L = 6d + B + A +
4500 + 500 +
6799,59
P04a = 60 + 68,41 + 72 +
4500 + 500 +
6799,59
= 12000 mm
L = 40d + 2700,41 +
500 + 8399,59
P04b = 400 + 2700,41 +
500 + 8399,59
= 12000 mm
L = 40d + 1237,92 +
500 + 4500 + A +
B + 6d
P04c = 400 + 1237,92 +
500 + 4500 + 72
+ 68,41 + 60
= 6975,84 mm
(P05) Tulangan Pelat Bagian Atas Tipe c
Diameter 10 mm
L = 6d + B + D + C +
A + 4500 + 500 +
6662,08
= 60 + 68,41 + 91,9
P05a
+ 45,61 + 72 +
4500 + 500 +
6662,08
= 12000 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
L = 40d + 2837,92 +
A+C+D+B
+6d
P05b = 400 + 2837,92 +
72 + 45,61 + 91,9
+ 68,41 + 60
= 3575,84 mm
Diameter 10 mm
L = 6d + B + A +
4500 + 500 +
6799,59
P06a = 60 + 68,41 + 72 +
4500 + 500 +
6799,59
= 12000 mm
L = 40d + 2700,41 +
A + B + 6d
P06b = 400 + 2700,41 +
72 + 68,41 + 60
= 3300,82 mm
(P07) Tulangan Pelat Bagian Atas Tipe d
Diameter 10 mm
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
L = 6d + B + D + C +
A + 4750 + 500 +
6412,08
= 60 + 68,41 + 91,9
P07a
+ 45,61 + 72 +
4750 + 500 +
6412,08
= 12000 mm
L = 40d + 3087,92
P07b = 400 + 3087,92
= 3487,92 mm
Diameter 10 mm
L = 6d + B + A +
4750 + 500 +
6549,59
P08a = 60 + 68,41 + 72 +
4750 + 500 +
6549,59
= 12000 mm
L = 40d + 2950,41
P08b = 400 + 2950,41
= 3350,41 mm
4181,50
P01b 10 100 418150,85 257999
85
BAB II
PERHITUNGAN KEBUTUHAN JUMLAH BATANG TULANGAN
Diketahui : 1 lente = 12 m
Tulangan Diameter 16 mm
1. C1 (Tulangan Utama Kolom)
Jumlah Tulangan
Panjang Tulangan
Sisa tulangan
Jumlah lente
Total sisa
Tulangan Diameter 19 mm
1. G2A5 (Tulangan Balok)
Jumlah Tulangan
Panjang Tulangan
Sisa tulangan
Jumlah lente
Total sisa
2. G34A (Tulangan Balok)
Jumlah Tulangan
Panjang Tulangan
Sisa tulangan
sisa 1 lente
Total sisa
3. G36 (Tulangan Balok)
Jumlah Tulangan
Panjang Tulangan
Sisa tulangan
sisa 1 lente
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
Total sisa
4. P01a
Jumlah Tulangan = 100 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 100 lente
Total sisa =-
5. P01b
Jumlah Tulangan = 100 tulangan
Panjang Tulangan = 4181,5085 mm
Sisa tulangan = 3636,98
Jumlah lente = 50 lente
Total sisa = 181849,15 mm
6. P02a
Jumlah Tulangan = 100 tulangan
Panjang Tulangan = 5439,41 mm
Sisa tulangan = 1121,18 mm
Jumlah lente = 50 lente
Total sisa = 56059 mm
7. P02b
Jumlah Tulangan = 100 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 100 lente
Total sisa =-
8. P03a
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
9. P03b
Jumlah Tulangan = 52 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 52 lente
Total sisa =-
10. P03c
Jumlah Tulangan = 52 tulangan
Panjang Tulangan = 6975,84 mm
Sisa tulangan = 5024,16 mm
Jumlah lente = 52 lente
Total sisa = 261256,32 mm
11. P04a
Jumlah Tulangan = 52 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 52 lente
Total sisa =-
12. P04b
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
13. P04c
Jumlah Tulangan = 52 tulangan
Panjang Tulangan = 6975,84 mm
Sisa tulangan = 5024,16 mm
Jumlah lente = 52 lente
Total sisa = 261256,32 mm
14. P05a
Jumlah Tulangan = 24 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 24 lente
Total sisa =-
15. P05b
Jumlah Tulangan = 24 tulangan
Panjang Tulangan = 3575,84 mm
Sisa tulangan = 1272,48 mm
Jumlah lente = 6 lente
Total sisa = 7634,88 mm
16. P06a
Jumlah Tulangan = 24 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 24 lente
Total sisa =-
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
17. P06b
Jumlah Tulangan = 24 tulangan
Panjang Tulangan = 3300,82 mm
Sisa tulangan = 2097,54 mm
Jumlah lente = 6 lente
Total sisa = 12585,24 mm
18. P07a
Jumlah Tulangan = 58 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 58 lente
Total sisa =-
19. P07b
Jumlah Tulangan = 58 tulangan
Panjang Tulangan = 3487,92 mm
Sisa tulangan = 1536,24 mm
Jumlah lente = 20 lente
Total sisa = 30724,8 mm
20. P08a
Jumlah Tulangan = 58 tulangan
Panjang Tulangan = 12000 mm
Sisa tulangan = -
Jumlah lente = 58 lente
Total sisa =-
21. P08b
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
BAB III
PERHITUNGAN SISA TULANGAN
Panjang Sisa
Jumlah Jumlah Total Sisa Sisa Akhir
No. Kode Tulangan tulangan Keterangan
Tulangan lente (mm) (mm)
(mm) (mm)
Diameter 22
1 K401 11,382.545 420 617.455 420 259,331.100 259,331.100
2 K501 9,247.090 140 2,752.911 140 385,407.470 644,738.570
3 K601 9,247.090 60 2,752.911 60 165,174.630 809,913.200
4 K603 7,347.090 20 4,652.911 20 93,058.210 902,971.410
Dipakai
5 B01a 6780 15 5220 15 - -
untuk B02a
6 B01b 120 15 1800 15
7 B01c 10880 15 16800 15
Memakai
8 B02a 5220 10 - 10 - -
sisa B01a
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
Diameter 16
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Diameter 10
Sisa
1 K402 8,905.595 60 3,094.405 60 terpakai - 902,971.410
untuk K403
2 K403 2,961.251 69 133.154 60 7,989.240
154.996 2 309.992
9,038.749 1 9,038.749 920,309.391
3 K404 2,209.251 35 953.745 7 6,676.215 926,985.606
LABORATORIUM KONSTRUKSI BETON
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
Jl. Gegerkalong Hilir Ds. Ciwaruga Kotak Pos 6468 BDCD Tlp. (022) 2013789, Ext. 266 Bandung
BAB IV
KESIMPULAN