Dossier Technique Eci Sarl
Dossier Technique Eci Sarl
Dossier Technique Eci Sarl
REFERENCES
TRAVAUX EXECUTES
ET EN COURS D’EXECUTION
PETRO-SEA LOGISTICS
Construction d’un Hangar de 1000 m2 à VRIDI
Août 2018
HUXLEY INTERNATIONAL
Construction d’une Usine de transformation des noix de cajou à ZUENOULA
Mars 2020
SEA-INVEST
Réhabilitation du Quai 14
Dallage extérieur sur 10.000 m2 et génie civil de réservoirs
Travaux réalisés en 2014
PROJET NGOM
Construction d’un Immeuble R+2 à MBANDON
Travaux 2018
Education :
1987 - 1992
Ecole Nationale Supérieure d’Ingénieurs ENSI. TOGO
Diplôme d’Ingénieur de Conception en Génie civil (Bac+5) avec la mention Bien
1986
Collège Saint Théophile de Kinshasa
Baccalauréat série scientifique.
Autres formations :
2017
PLB Consultants - Paris FRANCE
Formation en BIM (Building Information Modeling) : technologie qui propose des processus
associés pour produire, communiquer et analyser des modèles de construction. Il se définit à
la fois comme un processus d'intégration, de production, de gestion et de visualisation de
données.
CV AIME TAMBWE 1
Principales qualifications
Etude et Assistance technique - Bâtiment /Travaux Publics
Expérience professionnelle
Depuis 2004
Construction et Assistance Technique – CAT SARL
CV AIME TAMBWE 2
Bureau d’études : Béton armé – Charpente métallique et bois – Génie civil et Assistance à la
Maîtrise d’ouvrage.
Fonction : Directeur Général
2002 - 2004
MOODY INTERNATIO NAL SA - CÔTE D’IVOIRE, filiale de MOODY INTERNATIONAL
LIMITED, West Sussex, RH161DB, ANGLETERRE
Bureau de contrôle des projets relevant des secteurs suivants : travaux publics et infrastructures des
transports (routes, autoroutes, ouvrages d’art, tunnels; ouvrages aéroportuaires et portuaires;
maritimes et offshore ; plateformes pétrolières, pipelines et canalisations en mer, voies ferrées,
etc….); de l’énergie; de l’hydraulique, du drainage et de l’assainissement ; de l’alimentation en eau
potable; des bâtiments ; de l’industrie ; de l’environnement et des échanges commerciaux ;
Inspection, Contrôle technique, Expertise et Normalisation des Risques des ouvrages relevant des
secteurs susvisés ;
Préparation à la Certification de systèmes de management ISO 9001, ISO 14001, ISO 22000, ISO
13485, OHSAS 18001, TS 16949, EN 9100.
1999 - 2002
BUREAU VERITAS - COTE DIVOIRE
Contrôles Techniques réglementaires BTP, de conformité et de fonctionnement - Expertise et audits
techniques. Préparation à la Certification de systèmes de management ISO 9001, ISO 14001
1998 – 1999
ETECO (Etudes Techniques et Coordination) - Abidjan. Bureau d’Etudes – Bâtiment Travaux
Publics.
1994 - 1999
Société de Coordination et d’Ordonnancement SCO-AO
Bureau d’études : Béton armé – Charpente métallique et bois – Génie civil - Coordination des
travaux et Assistance à la Maîtrise d’ouvrage.
CV AIME TAMBWE 3
- Construction du siège de la Banque Régionale de Solidarité
(BRS) au Plateau à Abidjan Bâtiment R+1
- Construction de la Banque CECP de San Pedro Bâtiment R+1
- Construction d’un Immeuble R+11 à Luanda en Angola
- Construction de l’Usine d’anacarde de BOUAKE – OLAM CI
- Projet AERIA : construction de 4 entrepôts de 5000 m2
- Usines d’égrenage de coton au Mali ; 4800 m2
- Projet d’extension de la Cité financière (ME-MEF) – Bâtiment R+6
- Construction de l’Agence BNI d’Abengourou
- Projet de construction de la Direction Régionale de l’Education
National (DREN) à Abidjan – Bâtiment R+2.
- Projet de construction de l’Agence SGBCI Boulevard des Martyrs
à Abidjan
- Construction de dix (10) mini laboratoires dans la région de
Bonoua – Projet OCAB financé par l’Union Européenne.
- Projet de construction de Huit (8) Mini Cités Financières en Côte
d’Ivoire - Bâtiments R+3
- Projet de construction du Hall Commercial de Treichville
- Projet de construction du Centre d’Analyses et de Recherche
(CAR) de PETROCI à Vridi.
- Réhabilitation de l’Immeuble Annexe PETROCI Plateau –
Bâtiment SS+R+3
- Réhabilitation de BIAO CI – Agence Centrale d’Abidjan
- Construction d’un Amphithéâtre de 1000 places à l’Université
d’Abobo Adjamé
- Construction d’un Immeuble R+5 au Plateau – Bureaux du
Ministère de l’Administration du Territoire de Côte d’Ivoire
(MEMAT)
- Construction du Siège de la Banque ORABANK (BRS) au
Plateau à Abidjan
- Construction de l’Auditorium de 500 places à la GESTOCI Vridi.
- Construction de l’Agence BIAO de Yamoussoukro- Bâtiment R+1
- Construction du bâtiment technique d’ORANGE CI à Yopougon.
- Construction des Immeubles R+3 SICOGI LATRILLE – Abidjan 2
Plateaux
- Construction de 5 Amphithéâtres de 530 places à Bouaké et
Korhogo.
- Construction des Silos de stockage à SOLIBRA sur le Bd VGE à
Abidjan.
- Réservoir d’eau de 3.000 m3 à Badalabougou au Mali
- Calcul des Dalots : Construction de la route Bobo – Orodara
CV AIME TAMBWE 4
Langues :
Français BON
Anglais BON
Attestation
Je, soussigné, certifie, en toute conscience, que les renseignements ci-dessus rendent
fidèlement compte de ma situation, de mes qualifications et de mon expérience.
CV AIME TAMBWE 5
HUXLEY INTERNATIONAL CÔT.E D'IVOIRE
28/1.212OL9
TEL:07 0827 87
SUBJECT: WORK ORDER FOR CONSTRUCTION OF HUXLEY NEW WARE HOUSE I44X3O
Dear Sir,
With reference to above subject, we are issuing This work order to complete Civil
works at Huxley project at Zuenoula -lVC, Work order Value is CFA 141,074,970.00 (
Including VAT 18% )
Target handing over building: 6 Weeks from This work order -Dated: 22.2.2O2O
Common term & Conditions: This is temporary work order to obtain bank
guarantee, Detail work order will be issued after submitting Bank guarantee
1. Prices are fixed as per signed BOQ , no escalation on unitprices till project
hand over
2. Advance Payment: 30M CFA will be paid as Advance payment to you
after getting Valid bank guarantee.
llFage
V h
Huxley International Côte dlvoire S.A.R.L. unipersonnelle
au capital social de 50 000 000 FCFA
siege social: Abidjan-Plateau, rue du coïnmerce
- ôt ep6079-Abidi;;ôrlitgp"ulique de côte
Té1.:(22s187 81 BZ BZ -Tg s4 9s 03 - RCCM: N, d Tvoire )
cr_ABJ _2oLB_B_2zz2T
3. I't running bill paid once all Excavation and plain concrete work
completion
4. 2d running bill will be paid after base work completion
5. 3rd running bill will be paid after column casting completion.
6. 4th running bill will be paid after retain wall /Beam work completion,2|%o
of advance payment will be deducted on each running bills of Contractors.
7. English speaking person for technical discussion to be available by
arranged by CI at site on regular day basis.
8. Commence date will be consider for project on either advance payment
made by HUXLEY or the day work order contract is given to Contractor
or actual work started at site whichever is earlier.
9. Contractor can raise running bills in each STAGE V/ISE, AS PER ABOVE,
and submit to HUXLEY engineer with all supporting document such as
original billisoft copy ( English ), joint measure records, site register, cube
test reports, yield test reports on iron rods, Compaction test report if there
is back filling.
lO.Client will make running payment based on work done value, and payment
will be made within l0 days after bill submission or bill checking
whichever is later in dates.
l l.Contractor should take all safety measures. Client will not be held
responsible for any accident.
l2.Contractor will make his iclient site office & store for his own & labour
staying affangement on his own expenses and will provide Utilities
required for project & his manpower.
l3.Contractor has to arrange his own power supply system & water supply
from outside
l4.Contract is based on agreed rates & fixed rates & final payment to be
calculated based on physical measurements by client Civil Engineer.
l5.NaturalHazardslRAIN WATER / Force majeure/ accidents impact on the
project will subject to contractor for completion of project in time.
l6.Project should be delivered on target date as specified above & will attract
l0% of total order value as penalty on weekly basis in case if delay.
17 .Total program of work should be submit to client before work starts, and
contractor need submit weekly plan I its actual completioninYo on weekly
basis on every Saturday meeting at site.
Civil works:
V 2lWag*"
h
l. Material required forproject will be supplied by contractor excludes of
IRON REBARS & CEMENTS.
2. Work should be carried out as per drawing / details are given by client, if
any changes in execution or in drawing will be notiÿ time to time by client
engineer.
3. Agreed I't advance will be paid after getting bank guarantee from
contractor & subsequent payments will be calculated on 2/4weekbasis and
will be verified by Client Civil Engineer.
4. Contractor will provide all tools, equipment's, consumable & labour
required for project.
5. Running payment will be paid on basis of Joint measurement Record which
could be prepared by contractor and signed by Client Engineer.
6. Contractor will take care for any disturbance which may be created by local
workers for his work OR IF ANY Govt body.
7. Any work not confirming to quality standards, will be replaced by
contractor on his own cost which effect of holding payment till get replaced
quality ofworks.
8. Work period for completion the project is 8 weeks.
9. Daily report / weekly report / monthly report I daily labour report to be
submitted by contractor either soft copy or hard copy on time to time
l0.Cube test for each 30 meter cubic concrete to be submitted time to time for
7 days 128 days on weekly basis
1l.No escalation on prices, amount will be paid on actual QTY executed as
per Client Engineer instruction or either as per drawing.
l2.Curing for l5 days on fresh concrete, on wall plastering, on wall setting
out should be carried by contractor as per client engineer direction.
13.Site inspection, site meeting to be informed one day ago in advance.
l4.Site store record to be maintained on daily basis on client supplied
materials, if any misusing of client supply materials or client property will
be effect on penalty or debit on contractor account.
l5.Detailed site program should be submitted by contractor and work should
move as per program, if any advance materials require to complete work
on time, contractor should inform to client 7 days in advance.
3lPage
\,
h
Accepted & agreed for above terms & conditions
ECI SARL
(HUXLEY INTERNATIONAL Cl)
üq
IONAT
IaDirecüon
Té,,:22427166
\
l{J
J
xa "&,
{. Le Directeur t
*
g\
$
4lPagt:
SOCIETE MULTINATIONALE DE BITUMES
SA au capital de 4 872 000 000,00 XOF R.Commerce: C|-ABJ-1976-8-21.801
"f
él : 21237070- fax : 21270518 12 BP 622 Abidjan 12
N" de Contribuable 7802150 G
ABIDJAII, LE 27 I II I2O2O
FOURNISSEUR: ENTREPRISE DE CONSTRUCTION ET D'ING ERCG 11
Code: FLl472
OBSERVATIONS
No d'ordre Désignation CodeSMB Quantité
-
r Prix Unitaire Montant Totâl '
TOTAL BC 44 592200
MONTANT R"EMISE 0
MONTANT HT 4 592240
MONTANT TVA 0
CONDITIONS DE PAIEMENT
(D ate rêce ption factu re )
9ü jours
s. J1,§
27t11t2020
ryrû|?\:ry
tffi.t&llz.& ENTREPRISE
Page I sur I
,À
( -
I Entr"eprrse de Constructron et d'lngenierue
BÛN BE LtrVRATS&N
,Æcsezl/ææ
tsON DE E,E§RAISON Conceme votre Client - Destinataire
N" 0017 COMMANDEN" cAC2{}2Gl1r66 SOCIETE MUI,TINATIONÂ{"E DE ETTUMES
Date:2510112021 f)u : 27t1u202t (sMB)
12 BP 622 ABIDJAN 12
COTE DTVOIRE
TV OO5 TRAVAUX DE GEI{IE CTVIL ET tsATIMENT MONTANT RES Ï'RAVÀUX r0096 44 592 z0t
EN F CFA T{T
AMENAGEMENT DE L'ACCES PAR LA CLOTURE SIR
COTE OUEST DANS LE CADRE DU PROIET DE
REMPLACEMENT DE LA COLONNE 42C01
ACON4PTE 50% 22 296 10ü
TE
3§,t1,2ü2.[
I} É PÀRT§E{ §N T Fft G*USTI O i!
8Ë/
DiRECTION
.ru
ËCT
Tél : 2? 4l i1
Cocody Riviera Palrneraie- 18 8? 2787 ABJ 18 - Tél 22 42 71 66/ 40 07 64 64- RC N' C|-ABJ-2018-B-2887G
CC N' 1863740 M - Compte bancaire BNI N" 034'l'161ûfr)5û2 - Êmail : [email protected]
REÀLlsATloN ET REI{ABILITATION TOUS TRAVAUX : BATIMENTS - GENIE Clvlt - TftAVAUX PUBLICS
CotvtprrcNIE DEs
ffi Cnourcnoucs DU
PatgoÉ COMMANDE D'ACHAT: 02-CA1900645
Ë
ti
No Fournlsseur: LECIOO
ENTREPRISE DE CONSTRUCTION ET
Page 1 RIVIERA PALMERAIE, COCODYOI BP 2942
N" Matricule Fiscal:1272160 P
Têlephone: 22427166
Fax:
\
Article Unit6 N'DA Prix Date
Description Quantité Montant
unitaire réception
D41900053 AUTRES SERVICES EXTERIEURS
11 615 2
000 nÈcE EXTENTION DU LOCAL TOUR A 1 15t02t19 11 615 24s
45
GRAVER
Montant 11 61524s
g§l FÀTlûiE
Cûl§PÂültiii rrc§ 0i,ûüül0W$ Total rernise 0
c.ü.P. Total HT ll 6tS 2/ts
\- Sorvlcs Àohet
01 §P lt tr - ÀB§IÀS1 01
Té{: 20 30 5t t5 ' Faxt ë} 37 15 4d
uNE FAcruRE pAR C.C. àü*#nÿftâ&& ÀADRESsER EN rRots
u-pRtËnE
ETABuR
BON DECOMMANDE EMPLAIRESÀ01 BP 1I91 ABIDJAN 01 CÔTE D1VOIRE
ET MENTIONNER LA WA PAYÉ ORIGINAL DU BON DE COMMANDE À JOINDRE AVEC LE BON DE LIVRAISON
Signature
Responsable achats DAF Directeur général
w (-1. . ..4:
11t01t2019 11t41/2019
0l BP I191 tùidjan 0l Côte d'hpire SA arcc CA d PDG au apihl de I 245 000 000 rcn Comptes bancairæ
Tel.:20 30 51 15/ 20 3051 16 Gntre et-Regine d'irposilion - DGE Réel normd BlCl0 n" Cl00Ê01 550 0000 939 00082 72
Fu:203051 17 BGI'I g-ABl-1 962-8485 - Cn' 6Gltt528 I SGffI no(1008{0066 6630943515 77
TAMBVVE, a mené à bien, les travaux de bitumage des Zones dégradées dans la région
Le montant des travaux réalisés par l'entreprise s'élevait à la somme de : 4 466 654 francs
CFA TTC et a fait l'objet de deux bons de commande numérotées comme suit : N"
Ces travaux, qui se sont déroulés du 05 Septembre20lg au1.4 Septembre 2019 ont été
exécutes gn ôon6àité avec les clauses du cahier des charges, et ont fait l'objet d'une
En foi de quoi, la présente attestation est déIivrée pour servir et valoir ce que de droit.
i-riïitlii:;';
'i.,,'j --r: r i
-f1
-1':,.:.
j j.. ::l '-,.,
,; ,'
: il -. rr!
JI
i
I
.,t:: 'd1
c.i't'\-
tL'i.t f --] L .--!
: ?:t
^ tt'r t- i
"!_L iM /
,1 dl
Signature
Responsable achats Contrôle de gestion DAF Directeur général
,") ;-
t-.? -/t--
.i -f
-.:--. "'
-
( ts- )-.'
:
15110t2019 21t1012019
0t BFI ffi Abidjanll Côte dlvoire SAavec CA et PDG au capital de I 245 000 000 fCFA Cornptes bancaires
Tel. : 20 ]0 5t t5 / æ lf5-1 16 Centre et.,BÉgime d'lmpositior - DGE'Réel nsrmal. BIKJ ne t]006{]55C CI000 939 00û82 72
Fax:2tS 51 f7 Pf,tH ++Al I .;e2:P.-À95 .-e n"+:0- !1523 i Sffi€tÊ" tj§€tffiê€ffitbïSe ç àflÇ / /
REPUBLIQUE DE COTE D',I-V0IRE
Unio n-Discipline-Travail
N/REF : 0l 25IDCA-YC/DMC-MM/awt
En foi de quoi,]A présente attestation lui est délivrée pour servir et valoir ce que
de dwiitî
!,4
t
-k ,*e .,.;.i:Li(
o Calice
t i\'jiÇ:ll
(') (;t-ie;a: ecteur Çénérrl Adjoint
\
,J;
i/ À
régic u.ar la loi n' 9? -5 I9 du 0-t S r:picm.br-c I 99-1. .-l,icrer de cr§srion 1O0L-59
-§oc iété d'Erar
R CCM ao -Ct-ÂBl-2OOl-B-z: 2. eu cepiial <i.: .jür'j.{r()(-r.U0(j .r- (
2682 CC : O3O9Z_tO E Ccutrc dcs Io.p ôts
Irnmcublc ÀGEROU-I-E - Àvcnuc '['o rrasso Ir dc Fot:gèrc-s, r\bi.iiaa pl..etc-au .t
Tél-: (?25) 2'O. f.i. rO. 00 (.?25) ?O. ?5 10. 0?- - Fr,x. : (:tS,i rrr '-,,r r,l o'è B P. ?6t)4 ARtDI.\:§ clit (.-.o:c d I
. CoraraG.NIE r>E§
/
q C*otrcnoucsuu
PalqoÉ CTMMANDE E'ACHAT: 05-CA1 9t 061 e
No Fournisseur: LEC|OO
ENTREPRISE DE CONSTRUCTION Ei
Page COCODY0I B? ?e42
11v_iEl4. P-,CLM ËRArË,
1
t,âiil,:rie*Ur
-. -... I
\,,
r---.!"C
-r' ,i"
t t."
S
01 BP 1 I9 I Abidjan 0l Côte d'Ivoke 5A avec CA et POG au apital de 1 245 000 000 FCH Comptæ bancaires
Tel.:20 30 5l 15 / 20 30 5l 16 Centre et Régime d'imposition - DGE Réel normal BlCl0 n" C1006 01 550 0000 939 00082 72
Êax:20 30 5l 17 BCCM CI-ABJ-I962-&485 - CC n" 50-14528 I SGBCI n" C1008 00066 06630943516 77
Les Produits "MACACI" sont fabriques par la Compaqnie des Caoutchoucs du Pakidié
On gère
REFERENCES TRAVAUX
2019 – 2022
INTERIEUR HANGAR
TERRASSEMENT
FONDATION
FONDATION 2
FINITION DALLAGE
PETRO-SEA LOGISTICS
Dallage Parking extérieur espace ENI – 1500 m2
Novembre 2022
DALLAGE PARKING 1
DALLAGE PARKING 2
SCI IVOIRE
SS+R+12 Zone 4
Entreprise : SKYLINE
Hussein JABER
Début des travaux : octobre 2021
CAT SARL
1
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
CAT SARL
2
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
CAT SARL
3
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
CAT SARL
4
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
CAT SARL
5
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
RESIDENCE KOIRA
SS+R+12 Zone 4
Début des travaux : Janvier 2023
CAT SARL
6
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
CAT SARL
7
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
CAT SARL
8
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
CAT SARL
9
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
SCI NAHIDA
R+12 Zone 4
Début des travaux : Février 2022
CAT SARL
10
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
CAT SARL
11
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
CAT SARL
12
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
CAT SARL
13
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
SCI JULIA
R+12 Zone 4
Début des travaux : Mai 2022
CAT SARL
14
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
CAT SARL
15
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
CAT SARL
16
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
PROJET SANACHA
R+12 Zone 4
Début des travaux : Juin 2022
CAT SARL
17
NOS PROJETS IGH EN COURS DE REALISATION PHASE EXE
ETUDE DE STRUCTURE ET SUIVI D’EXECUTION
CAT SARL
18