Etude Hydrologique de Smach Et Slim
Etude Hydrologique de Smach Et Slim
Etude Hydrologique de Smach Et Slim
#DIV/0!
BV S (km2) L (km) I (%) tc (h)
BV1 52.796 17.697 0.69503305645025 12.6644961286469
2.297 2.711 0.95905569900406 1.96029270751725
BV3 0.936 1.897 2.79388508170796 0.733155331169761
BV4 0.4151 0.73963 4.32648756810838 0.392347580265608
Si S < 25 km2 : Formule de Ventura
tc = 1.2667 *RACINE(S/I) 0
Si 25 < S < 250 km2 : Fonnule de Passini
tc==1,1*((S*L)^(1/3))/RACINE(I)
72
c S (km2) Ka Kr tc (h) i (mm/h) (T=50)
BV1 52.796 0.9 0.4 12.73974278 2.38660753425604
BV2 2.3 1 0.4 1.971525613 14.5823828473849
BV3 0.94 1 0.4 0.738491073 37.8000134774171
BV4 0.42 1 0.4 0.406130882 67.5119749446552
kc
T 50 T20
A 28.17 24.21
B -0.97 -0.95
Q (V-P) (T=50)(m3/s)
12.6003331378582
3.72660894988725 calcul de débit par la METHODE RATIONNELLE
3.94800140764134
3.15055883075058 0.278KakriA
2.46772366059298
35.886
NELLE
Formule KALLEL Pour centre de la tunisie Q=Q0*A^α'T^b
Q(m3/s)
617.090788
91.8036056
47.399431
24.2951987
Table
Débit de
N° B.V. N°O.H PT CFE S Km2
projet m3/s
Section utile
L
(m)
BV2 OH1 2.3 4.47 2.00
BV3 OH2 0.94 4.47 2.00
BV4 OH3 0.42 3.6 1.00
Dimensions
Section utile
H Capacité Vitesse MANNING_STRICKLER
adoptées (m) d'ouvrage dans l'ouvrage
(m) (m3/s) (m/s) Qa100 La Hdt Rh
1.00 2x1 3.20 3.35 4.47 2.00 0.80 0.44
1.00 2.10 3.20 3.35 4.47 2.00 0.80 0.44
1.00 2x(1x1) 1.60 5.40 3.60 1.00 0.80 0.31
Pour l'équation de : X^(5/2) - bX - C
I_dalot % V_dt
0.50 2.79 vérifié
0.50 2.79 vérifié
0.50 2.25 vérifié