GNK4UYC2EGNTC74RM4BK110

Télécharger au format pdf ou txt
Télécharger au format pdf ou txt
Vous êtes sur la page 1sur 1

4.

44

s s s s s s

s s

A/E
REST-01

24.33
CINEMA 508,21
3.390,34 TOTAL=651,51

s
s s
A/E
REST-03
s
204,00
TOTAL=276,10

22.30
13.57
A/E
REST-02
295,02
s 16.18 (vitrine cinema) TOTAL=345,68

1.65

0.35
0.50
3.21

7.90
S DOCA B
FF-11

5.13
28,40
L-114/115 L-116 L-117/118
REST 04
112,50 112,50 150,00 2.48
3.00 307,58

10.80
2.42 S
TOTAL=325,95

L-119 L-121

6.94
FF-01A/B FF-01C
47,80 49,15

8.54
90,48 45,24 PD= 4,20m

2.75

14.21
LN-02 REST-09
7.28 10.03 4.94 7.33 7.30 9.83 4.78 512,20 TÉRREO 197,27
FF-01/02 TOTAL=256,87

PROJ. ESCADA ROLANTE


76,02 LN-06 A/E
PECORINO

8.73

6.76
L-122/23 37,81

4.53
LN-07

13.54
TOTAL=113,26 68,68
31,20
A/E LN-09

4.33
LN-01 7.97
25,00 42,95
4.14
4.6 3.87
3
LN-27
132,20
FF-03 27.74

6.60
50,55 PRAÇA DE 4.13 4.83 LSU-4 LSU-03/L-21/L-12
1.444,15 1.431,66
ALIMENTAÇÃO 9.93 9.95 5.50

7.50
5.03
10.35
4.96
4.29 4.88
5.47 6.07
5.3 12
8 .11

9
FF-04 L-125 LN-14 LN-17 LN-18 LN-19 LN-20 LN-21 LN-22

4.5
8.97
160,47 51,95 65,00 LN-15 LN-16 60,10 61,70 63,80 140,45 161,40 145,50
LN-23 5.67
TOTAL=226,07 71,15 51,30 PD= 8,40m
58,40

4.31
24.10
LN-24

2.1
6
1.18 4.80 4.76 5.00 5.67 5.31 45,00 6.
1.40 4.79 4.90 5.72 92
L-109 L-108 L-107 FF-09 FF-10 LN-25

1
5.3
FF-05 37,50

5.3
FF-06 FF-07/08 37,50 37,50 44,25 41,35 25,65

4
37,90

17
37,50 64,79 L-110

.4
6
49,22

3.75

7.42
L-101A

18
L-132

.53
2.35 3.00 42,19
L-105 42,19
L-103 180,55

10.99
28,13 L-104
MIK 790 L-01/B L-06/07 L-08/09 L-10/11 LN-13A/L-128 L-129 L-130 LN-10/11 LN-12 LN-13 L-131 L-133 L-134 L-135/36 L-13 L-137 LN-26 L-22/23 L-24

10.33
L-101B L-003/102 42,19

7.43
56,25 28,00 87,95 56,25 56,26 56,25 118,90 126,56 60,06 158,53 49,20 63,67 63,93 42,19 45,40 83,42 49,93 129,65 54,60 56,56 28,13
42,19

7.32 3.33 3.25 3.55 7.40 7.40 7.30 7.03 3.27 3.55 12.91 8.93 9.65 4.75 8.89 5.50 5.14 5.17 3.22 3.54 3.69 7.02 3.96 13.60 3.32 14.53 7.33 3.29

14.80 3.65 3.75 3.61 3.67 4.35 14.85 3.85 6.43 7.45 7.35 7.33 7.30 3.65 7.38 7.31 7.33 3.55
L-077 L-078 L-080 L-79/S-01

3.99

4.05
31,64 168,75 168,75 43,62

2
13.03 11.08 7.30 7.40

8.39

8.39
L-040/41 L-042 L-043

8.32
L-025 L-026A L-026B L-027/28/29 L-039

8.3
387,22 42,19 42,19 70,31 50,62 420,47 45,00 90,75 L-057 A 062 L-063 L-064 L-065 L-066/67/68

4.08
L-036/37/38 295,31 168,75 168,75 84,38 70,32
L-052 L-053/54 L-075/76
70,31 140,63 70,25 80,86

8.30
L-49/50/51
182,81

3.39

3.68

3.72

3.65
7.58
L-069 L-074

3.65

3.58

3.55
3.28
L-030/31 L-044/48 56,25 42,19
56,26 L-034/035 296,75

7.35
3.65 7.40
112,50 L-055/56
154,69 L-073

3.60

3.58
42,19
L-070/71 S-02

7.33
112,50 25,07
L-032 L-033

3.28

3.58
28,13 56,25

L-210 L-217 L-238


L-219/20 L-221 L-222 L-223 L-234/35 30,00

3.60
DOCA C L-207/08 34,39 32,00 48,00 24,00 24,00 24,00 81,00
66,00 L-218 L-231 L-233
L-203/04 L-206 L-224/25 L-226/27 L-228/29 L-230 DOCA A

7.77
L-216 24,00 34,39 L-232 32,00
60,00 47,00 L-209 78,00 96,00 96,00 47,00
46,00 32,00
32,00
L-201/02 L-211 L-212 L-213/15 3.82 7.85 3.85 3.85 3.85 L-236/37 L-239/40
47,00 38,22 153,76 60,00 82,46

7.40

7.40

7.42
79,55 0
L-205 5.71 3.85 1.73 5.4 1.73 3.85 3.85 1.69

8.4
3.63
30,00

5
3.0
6

2.9
3.0

8
0

5.7
3
4 1

6
2.5
2.4 2.9

2.6
1.64

1
6.90 1.78 1.85 4.63 10.62 1.40 7.40 7.40 1.59 2.01 6.90

ESPAÇO
1.6 BRINCAR 3.85
1 2
1.8
14.58

1.26
1.72 2.07 15.40 1.77 1.73 7.40 3.58 6.01 9.62 3.25
2.7

1
2.4
9

6
2.7
L-249/50 L-248 L-246/47 L-242 L-241

5.7

9
5.6
8.2

2
5 L-251 96,00 48,00 94,36 45,00 97,00

3.91
1.87 5.86 3.54 L-243/44/45

3.66
46,76

6
392,85

5.4
L-280 L-279 L-277/78 8.00 15.85
80,83 48,00 109,95 7.98
L-269/70 L-252
47,00
A-02-01 46,64

5.78
1.391,86 AR COND.
L-253/254

9.64
80,67

L-266/68/71/76 A1
TOTAL=3.443,75
1.378,00
L-255/57 MEZANINO=1.895,06
336,00 TÉRREO=1.548,69

11.71
11.70
MAPA CHAVE L-281 L-258 A 261
128,82 407,00

18.74
18.74
PISO TÉRREO 0 10 20 50

ESCALA GRÁFICA

LEGENDA:
PROPOSTA DE LOCAÇÃO
PDL: PÉ DIREITO DO PISO ATÉ A LAJE

4.00 NOTAS:
- ESTE ESTUDO SERVE APENAS COMO
REFERÊNCIA E NÃO DEVE SER USADO COMO

BASE PARA EXECUÇÃO DE PROJETO.


L-231
8.07

34,39 - NÃO TIRAR MEDIDAS NA ESCALA.


10.19

- CONFERIR MEDIDAS EXISTENTES NO LOCAL.


PDL: 5,27
- INTERFERÊNCIAS ESTRUTURAIS DEVEM SER

CONFERIDAS NA PLANTA TÉCNICA E NO LOCAL.

1.73
9 5
2. PD MALL: 4,20 PAVIMENTO TÉRREO
ESTUDO COMERCIAL
Atualizada em 10/01/2023
PLANTA COMERCIAL
Revisão: R00
LUC L231

Vous aimerez peut-être aussi