Casos Prácticos

Télécharger au format pdf ou txt
Télécharger au format pdf ou txt
Vous êtes sur la page 1sur 7

8 9 10 11 13 14 16 17 18 21

-1
B C−G
B’ 6 C’ 3−A 7 3−B 3−C 3−D 13.88 3−E 3−F 3−G 3−H 3−I 3−J

CAMBIADOR DE PAÑALES

CAMBIADOR DE PAÑALES
1.00 1.00

USOS USOS 1.00 1.00 9.67 3−K


MÚLTIPLES MÚLTIPLES
D D'
1.50
junta constructiva
7.30 9.65 10.00 10.00 9.58
SUBE
(P=18 cm)

A−4 1.20 4.87

BAÑOS H BAÑOS M 9.70 10.78 10.65 VESTÍBULO 15.30


N.P.T. +4.45 BAJA
(P=17.6 cm) H
O-5 TR046 TR045 TR044 TR043 TR043 TR042
3−1 I
CAMBIADOR DE PAÑALES

0.84 3−1 I

BR046
BR044

BR045

BR045

BR045
DUCTO DUCTO DUCTO DUCTO
LTT023 LTT022 LTT021 LTT020 I
5 2.80
INST. ESP. INST. HÚMEDAS ELÉCTRICO EXTR. AIRE

4 LTT047
U0 LTT043 LTT042 LTT042 LTT041
3−2 TP TPU010
3−2 J
A−3 TR015
TR016 TR017
LTT048
J PARA COLOCACIÓN DE LTT043 LTT042 LTT042 LTT041 limite de losa J
TPM008
TANQUE ESTACIONARIO

TPU040
TPU041

TPU041

TPU041
SUBE BAJA

TPU043
P=17.4cm P=17.5cm

DE GAS LTT049

TPU042

LTT010A
NTT030

LTT010

LTT010

LTT010

LTT010
LTT024
TR032

TR031
LTT045

TR030
LTT043 LTT042 LTT042 LTT041
7 11.40

TR
04 SECCIONES PREFABRICADAS
TR

−10
−3 NTT055

TP PU 0
LTT050
TP

T
A−2

U 0 46
PEND. 6%
52 TPM007 LTT043 LTT042 LTT042 LTT041

44
0
TT

LTT046
L LOCAL LTT051
33 m² m²
LTT043 m² m²
LTT042 m² m²
LTT042 m² m²
LTT041
5 2 ELEVADOR
NTT053 NTT052 NTT052 NTT051
T0
B1
LT
F' K
3−4 BR022 TPU009 3−4 K
2 TR044 TR043 TR043 TR042
−4 05 TPM006 BR010
TP

BR040

BR041
T

TR
48 LT

H1
4.30

−9
0 LTTE003
6.80 TR 52

TP
A−1 3 0
05

U0
TT
T L 200

47
L 6 PROYECCIÓN DE LOSA PROYECCIÓN DE LOSA
BR011 TPU008 A’’ L
LT 05

BR051

BR051

BR051

BR050
BR013
m² T 7
53

BR052
NT R0 4 92

B R R0 5
0
H−4

B
TT

05 4
T T0

LTT008
LOSAS TT

LTT008A
PROYECCIÓN DE CUBIERTA
L

LTT008

LTT008

TR014
LTT008
3

LTT008
junta constructiva

TR013
53##### NT 52 6.10
0 T0
49 L TT L T 1 : 50
0
TR 53 m²TPU007

TP
54 T0 131.10
M

U0
0 BR012 4−A M B1
H−3 TT LT 7

47
L 05
54 m² T 8 C’ 3−A 7 3−B 3−C 3−D 3−E 3−F 3−G 3−H 3−I
0 NT 0 4 0 91

BR
E
R
TT T TT SA

05
L 3

LTT006A
LO PROYECCIÓN DE CUBIERTA PROYECCIÓN DE CUBIERTA PROYECCIÓN DE CUBIERTA PROYECCIÓN DE CUBIERTA

LTT006

LTT006
N 5

LTT006

LTT006

LTT006

H1
5
54#####
E

TR011
T0
D
N
T0

TR012
LT


PEND. 13.9% LT
EC
C
O
Y 9.65
4 PR
TR

05

TP
−4

U0
##### LT 8 C−G

51
H−2 T 05
9
m² NT 0 4 0 TPU006 NERVIOS TT

BR
R
T T0 9 BR012 m² 4−B N N

05
DUCTO

NT 4

5
1 : 40
05

TPM001
VESTÍBULO
T ELEVADOR

LT
LTTE002
0
0.8

NTT045
LTT004
PROYECCIÓN DE LOSA

TR009

NTT044

LTT004

TR010
7.50
H−1
TR

TPM002
LTT005 BAJA
−3

P=17.4cm

3.00

DUCTO
GIMNASIO N.P.T. +5.45

PR
T−2 NTT031

BR
O
A A'
SUBE

H1
TPU005

YE
P=17.5cm

05
O

C
C
BR012 4−C O

6 IÓ
15.49

N
NTT031

D
SERVICIO

E
C
UB
SA

IER
LO

TA
E
SERVICIO
N
D B1

LTT003A
LTT003A
C

TR005

LTT003

LTT003
LTT003

LTT003
SALA 2 C
YE

TR008
RO
0
0.9 BUSINESS
1.0
0
CENTER P
LOSAS NIVEL 1 LOSAS NIVEL 1 9.65
T−1
BODEGA E
C
UB
IER
TA

CLAVE LONGITUD CANT. B1 H1 UBICACIÓN CLAVE LONGITUD CANT. B1 H1 UBICACIÓN


TRABES
D
PR

VACÍO
N 1 : 40
O


YE

0
SALA 1 C
C

C
0.9

YE
C

0

1.0

RO
LTT001 11.03 4 2.80 0.40 MÓDULO C LTT042 9.46 10 2.80 0.40 MÓDULO B TPU004

N

P
D

PEND. 6%

E'
1.0

4−D P
0

BR012
C
UB

COLABORADORES
LTT001A 11.03 1 2.80 0.40 MÓDULO C LTT043 9.14 5 2.80 0.40 MÓDULO B
I ER
TA

LTT002 9.46 8 2.80 0.40 MÓDULO C LTT045 6.59 1 2.80 0.40 MÓDULO B
LTT002A 9.46 2 2.80 0.40 MÓDULO C LTT046 2.11 1 2.80 0.40 MÓDULO B

NTT004
NTT005
LTT002A

LTT002
TR007

LTT002
LTT002

LTT002
1 LTT003 9.11 4 2.80 0.40 MÓDULO C LTT047 6.57 1 2.80 0.40 MÓDULO B m²

TR006
MANTENIMIENTO

LTT003A 9.11 2 2.80 0.40 MÓDULO C LTT048 9.38 1 2.60 0.40 MÓDULO B 10.00
LTT004 6.96 2 2.80 0.40 MÓDULO C LTT049 9.26 1 2.80 0.40 MÓDULO B
CARA 1
LTT005 2.81 1 2.80 0.40 MÓDULO C LTT050 6.63 1 2.80 0.40 MÓDULO B
LTT006 9.11 5 2.80 0.40 MÓDULO C LTT051 4.00 1 2.80 0.40 MÓDULO B TPU003

2 LTT006A 9.11 1 2.80 0.40 MÓDULO C LTT052 9.06 5 2.80 0.40 MODULO A BR012 4−E Q Q
TIENDA
LTT008 5.56 5 2.80 0.40 MÓDULO C LTT053 9.46 5 2.80 0.40 MODULO A

CARA 2
CARA 4
ANCLA
LTT008A 5.56 1 2.80 0.40 MÓDULO C LTT054 9.46 5 2.80 0.40 MODULO A
LTT010 10.96 4 2.80 0.40 MÓDULO B1 LTTE001 13.66 1 2.80 0.40 MÓDULO C

NTT004
NTT005
DOBLE

LTT002A

LTT002
3 m²

TR004
TR003

LTT002
LTT002

LTT002
ALTURA
LTT010A 10.96 1 2.80 0.40 MÓDULO B1 LTTE002 5.12 1 2.80 0.40 MÓDULO C 10.00

F LTT020
LTT021
LTT022
14.78
10.09
10.24
1
1
1
2.80
2.80
2.80
0.40
0.40
0.40
MÓDULO
MÓDULO
MÓDULO
B1
B1
B1
LTTE003 14.61 1 2.80 0.40 MÓDULO B1
CARA 3

TPU002

4 LTT023 9.13 1 2.80 0.40 MÓDULO B1 BR012 4−F R R
LTT024 10.96 1 2.80 0.40 MÓDULO B1
LTT041 9.06 5 2.80 0.40 MÓDULO B ORIENTACIÓN DE COLUMNAS
1 : 30

PROYECCIÓN DE LOSA

NTT002
NTT001
LTT001
LTT001A

TR002
LTT001
TR001
LTT001

LTT001
11.60
5 X INDICA EJE NUEVO DE ARQUITECTURA

TPU001
BR009 4−G S S

BR039
BR036
LTTE001
CIS
6.63
6. PROYECCIÓN DE LOSA

SERVICIOS PROPIOS
TRANSFORMADOR
PREPARACIÓN
RESTRICCIÓN
3−J
PRIMER NIVEL 3−K
T
1 18
1 : 250 21

TRABES NIVEL 1 TRABES NIVEL 1 TRABES NIVEL 1 TRABES NIVEL 1 NERVIOS NIVEL 1

CLAVE LONGITUD CANT. B1 H1 UBICACIÓN CLAVE LONGITUD CANT. B1 H1 UBICACIÓN CLAVE LONGITUD CANT. B1 H1 UBICACIÓN CLAVE LONGITUD CANT. B1 H1 UBICACIÓN CLAVE LONGITUD CANT. B1 H1 UBICACIÓN NOTA IMPORTANTE: VERIFICAR NIVELES Y COTAS CON
PROYECTO ARQUITECTÓNICO

BR009 2.98 1 0.50 0.85 MÓDULO C TPU002 13.52 1 0.50 0.85 MÓDULO C TR010 6.60 1 0.50 0.75 MÓDULO C NTT001 11.03 1 1.40 0.40 MÓDULO C No. ACTUALIZACIÓN No. ACTUALIZACIÓN
BR010 2.03 1 0.50 0.85 MÓDULO B1 TPU003 13.66 1 0.50 0.85 MÓDULO C TR011 8.83 1 0.50 0.75 MÓDULO C NTT002 11.03 1 0.95 0.40 MÓDULO C 01 04
BR011 2.98 1 0.50 0.85 MÓDULO C TPU004 13.80 1 0.50 0.85 MÓDULO C TR012 8.83 1 0.50 0.75 MÓDULO C NTT004 9.46 2 1.40 0.40 MÓDULO C 02 05
BR012 2.98 6 0.50 0.85 MÓDULO C TPU005 13.94 1 0.50 0.85 MÓDULO C TR013 5.26 1 0.50 0.75 MÓDULO C NTT005 9.46 2 1.00 0.40 MÓDULO C 03 06
BR013 3.48 1 0.50 0.85 MÓDULO B1 TPU006 14.04 1 0.50 0.85 MÓDULO C TR014 5.25 1 0.50 0.75 MÓDULO C NTT030 10.96 1 1.40 0.40 MÓDULO B1
07 11
BR022 2.98 1 0.50 0.85 MÓDULO B1 TPU007 14.17 1 0.50 0.85 MÓDULO C TR015 8.83 1 0.50 0.85 MÓDULO B1 NTT031 2.81 1 1.40 0.40 MÓDULO C
08 12
BR036 2.98 1 0.50 0.75 MÓDULO C TPU008 14.26 1 0.50 0.85 MÓDULO C TR016 9.94 1 0.50 0.85 MÓDULO B1 NTT044 6.96 1 1.40 0.40 MÓDULO C
09 13
BR039 2.98 1 0.50 0.75 MÓDULO C TPU009 14.31 1 0.50 0.85 MÓDULO B1 TR017 9.79 1 0.50 0.85 MÓDULO B1 NTT045 6.96 1 1.07 0.40 MÓDULO C
10 14
BR040 3.33 1 0.50 0.85 MÓDULO B1 TPU010 14.44 1 0.50 0.85 MÓDULO B1 TR030 10.66 1 0.50 0.85 MÓDULO B1 NTT051 9.06 1 1.40 0.40 MÓDULO B
BR041 3.33 1 0.50 0.85 MÓDULO B1 TPU040 13.36 1 0.50 0.85 MÓDULO B TR031 10.68 1 0.50 0.85 MÓDULO B1 NTT052 9.46 2 1.40 0.40 MÓDULO B 15 19

BR044 2.68 1 0.50 0.85 MÓDULO B1 TPU041 13.36 3 0.50 0.85 MÓDULO B TR032 10.66 1 0.50 0.85 MÓDULO B1 NTT053 9.14 1 1.40 0.40 MÓDULO B 16 20

BR045 2.68 3 0.50 0.85 MÓDULO B1 TPU042 13.36 1 0.50 0.85 MÓDULO B TR042 8.76 2 0.50 0.75 MÓDULO B NTT055 6.59 1 1.12 0.40 MÓDULO B 17 21

BR046 2.65 1 0.50 0.85 MÓDULO B1 TPU043 15.56 1 0.50 0.85 MÓDULO B TR043 9.16 4 0.50 0.75 MÓDULO B NTT056 9.06 1 1.40 0.40 MODULO A 18 22
BR050 3.48 1 0.50 0.85 MÓDULO B TPU044 13.36 1 0.50 0.85 MÓDULO B TR044 8.84 2 0.50 0.75 MÓDULO B NTT057 9.46 1 1.40 0.40 MODULO A ---

UBIC.
BR051 3.48 3 0.50 0.85 MÓDULO B TPU045 8.04 1 0.50 0.85 MÓDULO B TR045 6.29 1 0.50 0.75 MÓDULO B NTT058 9.46 1 1.40 0.40 MODULO A
BR052 3.48 1 0.50 0.85 MÓDULO B TPU046 13.36 1 0.50 0.85 MODULO A TR046 2.70 1 0.50 0.75 MÓDULO B NTT090 9.46 1 0.82 0.40 MODULO A
BR053 3.48 1 0.50 0.85 MÓDULO B TPU047 13.36 2 0.50 0.85 MODULO A TR047 8.76 2 0.50 0.75 MODULO A NTT091 9.46 1 0.82 0.40 MODULO A NÚMERO
PLANTA DE MONTAJE

TITULO
E03
BR054 3.48 1 0.50 0.85 MODULO A TPU051 13.36 1 0.50 0.85 MODULO A TR048 9.16 2 0.50 0.75 MODULO A NTT092 9.06 1 0.82 0.40 MODULO A
NIVEL 1
BR055 3.48 2 0.50 0.85 MODULO A TR001 10.76 1 0.50 0.75 MÓDULO C TR049 9.16 2 0.50 0.75 MODULO A
BR056 3.48 1 0.50 0.85 MODULO A TR002 10.75 1 0.50 0.75 MÓDULO C 94 NO.PROYECTO
TCS 5.37 1 MÓDULO B TR003 9.16 1 0.50 0.75 MÓDULO C DISEÑÓ ---
TPM001 6.96 1 0.50 0.75 MÓDULO C TR004 9.15 1 0.50 0.75 MÓDULO C

RXX
REVISÓ ---
TPM002 6.96 1 0.50 0.75 MÓDULO C TR005 8.84 1 0.50 0.75 MÓDULO C
APROBÓ ---
TPM006 6.44 1 0.50 0.75 MÓDULO B TR006 9.15 1 0.50 0.75 MÓDULO C

DISEÑO
DIBUJÓ ING. R.R.c:
TPM007 6.59 1 0.50 0.75 MÓDULO B TR007 9.16 1 0.50 0.75 MÓDULO C
TPM008 6.59 1 0.50 0.75 MÓDULO B TR008 8.83 1 0.50 0.75 MÓDULO C ESCALA Como se indica

TPU001 13.36 1 0.50 0.85 MÓDULO C TR009 6.61 1 0.50 0.75 MÓDULO C FECHA --- REVISIÓN
NIT 8.53
T−1 T−2 H−1 H−2 H−3 H−4 A−1 2−C A−2 2−E A−3 2−G A−4
NIT 8.31
NIT 7.44 SEGUNDO NIVEL
FIRME DE MALLA
NIT 7.30
10.85% 9.10 ELECTROSOLDADA
N.S.F. CONCRETO 6cm
13.90% NIT 8.35 NIT 8.55 NIT 8.35
6X6−8/8
NIT 5.75
plataforma para

22 5
proy. cuarto

360.8
NIT 4.20

27
NIT 4.43 tanque de gas PRIMER NIVEL

20
NIT 7.21

259.9
para basura
NPT 4.70 5.45
acceso 500 11
NIT 5.62 TANQUE DE GAS
NIT 5.53 VIGUETA
4.70 PRETENSADA BOVEDILLA DE
NIT 2.93 NIT 4.30 NIT 4.10 POLIESTIRENO
TRABE TR
13.90% NIT 2.80 NPT 0.40 AJUSTAR EN BORDES 40X40 CIMBRA TEMPORAL
NPT 0.80

315.7
NIT 1.28

355
NPT 0.80 NPT 0.55

246.2
NIT 2.70 NPT 0.85 NIT 0.75
NPT 0.75
GUARNICIÓN NSD 0.25 NSD 0.25 PLANTA BAJA
NIT 1.05 NIT 1.15 50 50 0.75
DETALLE VIGUETA Y BOVEDILLA
NIT 0.15 DR−01 DR−01 1 : 25
NIT −0.02 NIT 0.15 NIT 0.15 NIT 0.15 130 130
NIT −0.15 NIT −0.50
NPT −2.95 NIT −0.50
NPT −2.80 100 ZR-2 ZR-2 100
PROY. PENDIENTE DE NSD −3.60 NSD −3.60
NSD −3.65 NSD −3.65 NSD −3.60 FIRME EN SÓTANO NSD −3.50 NDZ −2.05
NDZ −2.05
DR−01 DR−01 DR−01 DR−01 2
DR−01 DR−01 ZAPATA DE
130 130 130 PROY. ZAPATA DE MURO 130 130 MURO 130

70 70 70 ZR-2 100 ZR-3 80 ZR-3 80 147

EJE DE COLUMNAS DE RAMPA


NDZ −5.65 NDZ −5.65 NDZ −5.60 NDZ −5.60
NDZ −5.90 NDZ −5.70
MAX 75 CM
45
30 15

EJE 1 ESTRUCTURAL / RAMPA


1 1 : 150
parapeto
vehicular

PROY. MÓDULO A,
HOTEL O ANCLA
100
T−1 T−2 H−1 H−2 H−3 H−4 A−1 2−C A−2 2−E A−3 2−G A−4

NIT 8.31
SEGUNDO NIVEL FIRME DE
NIT 7.30 CONCRETO 6cm
9.10
#3@25
NIT 8.35 NIT 8.35 2

15 12
plataforma para

5
360.9
tanque de gas PRIMER NIVEL

27
NIT 7.21

22
NIT 4.20

260
cuarto para NPT 4.70 5.45 15
#3@20
basura NIT 5.62 TANQUE DE GAS
NIT 5.53
4.70
NIT 4.30 VIGUETA
NIT 4.10
13.90% PRETENSADA
FIRME SOBRE LOSAS
315.7

NIT 2.80
246.2

NPT 0.80 NPT 0.80 NPT 0.75 NPT 0.75 NPT 0.75 NPT 0.55 NPT 0.50
NIT 2.70
PLANTA BAJA
50 50 50 0.75
VER ARMADO TP−1
NIT 1.15
NIT 1.05 DR−01 PLANO E42
NIT −0.19 NIT 0.15 NIT 0.15 130 DR−01 DR−01 130 130
NIT −0.50
NPT −2.95 ZR-4 70 70 ZR-4
NPT −2.80 100 ZR-2
NSD −3.50
NSD −3.10
NSD −3.10 NSD −3.10 PROY. PENDIENTE DE FIRME EN
SÓTANO
NSD −3.10 NSD −3.10
NDZ −2.05
NDZ −1.75 NDZ −1.75 DETALLE BORDE DE RAMPA
DR−01 ZAPATA DR−01 DR−01 DR−01 DR−01
5 1 : 25
DE MURO 185
130 130 130 130 ZAPATA DE DR−01
MURO 130
70 ZR-1 70 ZR-4 100 ZR-2 80 ZR-3
ZR-1 70 ZR-3 80
NDZ −5.10 NDZ −5.10
NDZ −5.40 NDZ −5.20
NDZ −5.60
NDZ −5.65

EJE 2 ESTRUCTURAL / RAMPA PARAPETO


VEHICULAR
2 1 : 150
FIRME DE
COMPRESIÓN 5cm
ESPESOR
MÓDUL
OB GUARNICIÓN 15cm
ESPESOR

MÓDU
LO A VIGUETAS
PRETENSADAS

BOVEDILLA DE 5 LOSA MACIZA


POLIESTIRENO 27
22
E L
NIV
UN
DO TRABE DE
SEG CONCRETO
9. 1
0 HOTE REFORZADO
L
SECCIÓN L

EL
R NIV
PR IM E

5 .4
5
VIGUETA Y BOVEDILLA / RAMPA
TIENDA
ANCLA NOTA IMPORTANTE: VERIFICAR NIVELES Y COTAS CON
PROYECTO ARQUITECTÓNICO
ZR-2
A JA ZR-4
AB SIST SEG U N No. ACTUALIZACIÓN No. ACTUALIZACIÓN
NT EMA
PL A ZR-4 DO NIV
EL
5 V IG U 01 04
0.7 ETA 9.10
Y BO 02 05
BED
IL L A 03 06

ZR-2 07 11
PRIME
R NIV 08 12
EL
5 . 45 09 13
ZR-2
PROYECCIÓN GUARNICIÓN 10 14
EN ACCESO
15 19
plataforma
"CONSULTAR PLANOS para tanque de ZR-3 16 20
ARQUITECTÓNICOS PARA gas PL ANT 17 21
VERIFICACIÓN DE NIVELES" A BAJ
A
ZR-3 0.75
18 22

ZR-3 ---

UBIC.
ZR-2
SOTAN
ZR-3 O NÚMERO
LOSA ALIGERADA TIPO 2 CORTES POR EJES DE

TITULO
ZR-4

E41
PROY. CIMENTACIÓN RAMPA VEHICULAR
DE MURO ZR-2
ISOMÉTRICO CIMENTACIÓN RAMPA ZR-1
NO.PROYECTO
3 DISEÑÓ ---
ZR-4

RXX
REVISÓ ---

APROBÓ ---

DISEÑO
ZR-1 ZR-1 DIBUJÓ ING. R.R.c:

ESCALA Como se indica


ZR-1 FECHA --- REVISIÓN
C’ 7 3−B 3−C 3−D 3−E 3−F 3−G 3−H 3−I 3−J 3−K C’
6 3−A
7 3−B 3−C 3−D 3−E 3−F 3−G 3−H 3−I 3−J 3−K
B’
A−4 B’
A−4

3−1 3−1 3−1 3−1


J A−3 CIS−1 CIS−1 CIS−1 CIS−1 J J A−3 CIS−1 CIS−1 CIS−1 CIS−1 J

CIS−1

CIS−1

CIS−1

CIS−1
1

1
S−

S−
A−2 CIS−3 A−2 CIS−3

CI

CI
3−3 3−3 3−3 3−3

CIS−3

CIS−3
CIS−2 CIS−2 CIS−2 CIS−2 CIS−1 CIS−2 CIS−2 CIS−2 CIS−2 CIS−1 CIS−1 CIS−1 CIS−1
3−4 3−4 3−4 3−4

1
A−1 A−1

S−

S−
CIS−4 CIS−4

CI

CI
H−4 A’’ H−4 A’’
CIS−6 CIS−6

CIS−1

CIS−1
CIS−1

CIS−1
1

1
S−

S−
1

1
S−

S−
CI

CI
H−3 H−3

CI

CI
4−A 4−A
C’ 7 3−B 3−C 3−D 3−E 3−F 3−G 3−H 3−I C’
6 3−A
7 3−B 3−C 3−D 3−E 3−F 3−G 3−H 3−I

CIS−1

CIS−1

CIS−1

CIS−1
1

1
S−

S−
CI

CI
H−2 CIS−3
H−2 CIS−3
4−B 4−B

1
S−

S−
CI

CI
CIS−1

CIS−1

CIS−1

CIS−1
H−1
T−2 H−1
T−2
4−C 4−C

CIS−1

CIS−1

CIS−1

CIS−1
T−1 T−1

4−D 4−D
5

CIS−1

CIS−1

CIS−1

CIS−1
1
1
2 4−E 2 4−E

CIS−1

CIS−1

CIS−1

CIS−1
3 3

4−F 4−F
4 4

CIS−1

CIS−1

CIS−1

CIS−1
5
4−G 4−G

6. CIS−4 6. CIS−4

3−J 3−K
3−J 3−K

PRIMER NIVEL / COLADOS EN SITIO SEGUNDO NIVEL / COLADOS EN SITIO


1 1 : 500
2 1 : 500
MALLA 50 VARIABLE 50 VARIABLE 50 ANCLAR CON HILTI
ELECTROSOLDADA
FIRME DE RE−500
CONTINUIDADES COMPRESIÓN 60
NSF #3@25
7 3−B
3−J 3−K 10 4
#3@15 B’

65
VARILLA RECTA ZONA MACIZA
CIS−3 #3@20 #3@20 A−4 IR 305X52.2
4−A 3−4 3−4
TANQUE DE GAS CONEXIÓN A CONEXIÓN A 20
NERVIO
CIS−1

CIS−1

NERVIO 4.70
ANCLAR CON HILTI RE−500

DE TRABE
TRABE PREFABRICADA
4−B
TRABE PREFABRICADA TRABE
PREFABRICADA
CIS−1

CIS−1

COLADO EN SITIO TIPO 2 (CIS−2) A


9

4−C E35 RXX LOSA DE CONCRETO


1 : 30 E35 RXX
B−B / CIS−6
B
CIS−1

CIS−1

IR 305X52.2 1 : 30 12 6
MALLA B
50 VARIABLE 50 VARIABLE 50
ELECTROSOLDADA
4−D FIRME DE E35 RXX
CONTINUIDADES COMPRESIÓN 60
NSF #3@25 45 30
31.8 12
CIS−1

CIS−1

CONEXIÓN A
10
anclaje 60cm PLACA 25X40X1/2"
LD 2X1/4"
recto 9
4−E #4@20
SOR
ESPE m2 6 13.1 6 IR 305X52.2
#3@20 #3@20 CONEXIÓN A I ZA / c 6.4mm
7 3−B MAC 0 kg
CIS−1

CIS−1

TRABE
LOSAm F’c=25 PREFABRICADA 25

NERVIO 12 c
NERVIO
4−F CONEXIÓN A TRABE
CIS−5 TRABE PREFABRICADA ANCLAJE CON 9 PREFABRICADA
COLADO EN SITIO TIPO 6 / PLANTA ESCUADRA
52 .2
1 : 15

3−J
8 IR 305X BR052
#3@20 #3@15
3−K 1 : 75
COLADO EN SITIO TIPO 3 (CIS−3)
1 : 30

12
AZOTEA
CIS−2 / COLADOS EN SITIO ANCLAR 2
#4@15
IR 305X52.2
VARS.#6
3 1 : 500
VARS.#6 CON
HILTI RE−500
LD 2X1/4"
IR 305X52.2
BR053

B-B
E35 RXX COLADO EN SITIO TIPO 6 CONEXIÓN A
60 TRABE
#4@10
(ALTERNADAS VAR RECTA
12 PREFABRICADA
#4@15 (ALTERNADAS GANCHO/RECTA)
NOTA IMPORTANTE: VERIFICAR NIVELES Y COTAS CON
GANCHO/RECTA) VAR. ESCUADRA PROYECTO ARQUITECTÓNICO

15
A−A / CIS−6 No. ACTUALIZACIÓN No. ACTUALIZACIÓN

NSF
50 VAR. 50 MALLA
ELECTROSOLDADA
VAR. RECTA #3@20 A 1 : 30
01 04

#3@25 02 05
#4@10
B/2

VAR. RECTA LOSA PREFABRICADA


#3@20 03 06

07 11
A-A TRABE PREFABRICADA
B

B/2 B/2 COLUMNA PREFABRICADA


#3@15 08 12
E35 RXX
09 13
#4@15
B/2

#3@20
10 14

NERVIO NERVIO 15 19
VAR. RECTA
TRABE PREFABRICADA
#4@15 #4@10 A−A / CIS−4 VAR. RECTA
16 20
17 21
B/2 B/2 1 : 40 LOSA TT
60 18 22
B
VAR. ESCUADRA #4@10 ---

UBIC.
COLADO EN SITIO TIPO 1 (CIS−1) (ALTERNADAS LOSA TT
VAR. RECTA GANCHO/RECTA) #4@15 (ALTERNADAS
1 : 30
GANCHO/RECTA)
NÚMERO

TITULO
E35
15 COLADOS EN SITIO
COLADO EN SITIO TIPO 4 / PLANTA #3@20
1 : 75 NO.PROYECTO
SE MUESTRA LECHO SUPERIOR #3@20
DISEÑÓ ---
TRABE PREFABRICADA

RXX
LOSA PREFABRICADA TIPO BR TRABE PREFABRICADA REVISÓ ---
TIPO BR
TRABE PREFABRICADA APROBÓ ---

DISEÑO
DIBUJÓ ING. R.R.c:
B/2 B/2
ESCALA Como se indica

B−B / CIS−4 COLADO EN SITIO TIPO 4 FECHA --- REVISIÓN

1 : 40
A
D I PERFILES ESTRUCTURALES
267 20 1632 20 267
PERFIL d (mm) tw (mm) bf (mm) tf (mm)
14640 ESCALERA
1830 1830 1830 1830 1830 1830 1830 1830 3 CE 10X15.3 66 1500 66 6mm CE 10X15.30 254.0 6.1 66.0 11.1
25
25 W 8X10 200.0 4.3 100.0 5.2
CNX 3 W 10X12 250.7 4.8 100.6 5.3

182
W 44X230 ES−02

182
W 12X14 302.3 5.1 100.8 5.7
24
5 5 W 14X22 348.0 5.8 127.0 8.5

W 8X10
W 30X99 W 30X99 24 W 14X30 350.5 6.9 170.9 9.8
W 30X90 749.3 11.9 264.2 15.5
W 30X99 754.4 13.2 266.7 17.0
W 8X10 ESCALON FORJADO
A W 40X149 970.3 16.0 299.7 21.1
3660

3949
W 14X22
W 44X230 1089.7 18.0 401.3 31.0

W 14X22
W 14X22

W 14X22

W 14X22

W 8X10
CE 10X15.3 CE 10X15.3
A−A / ESCALON 25 NOTAS GENERALES:
A
PARA APOYO DE

1 : 10
W 8X10 W 8X10 W 8X10 W 8X10 W 8X10 W 8X10 1. ACOTACIONES EN MILIMETROS, EXCEPTO
PLACAS DE CONEXIÓN
W 8X10 UNIÓN DE PERFILES DETALLE ESCALON 25
ESCALERA

INDICADAS
SUPERIOR

CNX 12 6 7
CNX 4 1 : 15 1 : 15 CLAVE ESPESOR PESO CONEXIÓN 2. NIVELES EN METROS

W 44X230
ES−04
3. VERIFICAR DIMENSIONES Y NIVELES CON LOS
2447

ES−02
PL-1 PL 1/2" 19.66 kg CNX-1 PLANOS ARQUITECTÓNICOS CORRESPONDIENTES

W 44X230
W 8X10
CNX 1

3083
100 PL-2 PL 1/2" 34.90 kg CNX-1 4. LAS COTAS RIGEN AL DIBUJO, NO TOMAR
ES−02 242 50 PL 3/8"
402 18 192 PL 3/8" PL-3 PL 3/8" 10.90 kg CNX-2 MEDIDAS A ESCALA
PL 1/2" PL 1/2" 192 18 292 PL−13
PL 1/2" PL−14 W 8X10 PL-4 PL 3/8" 6.82 kg CNX-2 5. ACERO ESTRUCTURAL PARA PERFILES A992
W 30X99 PL−2 200 10 PL−1 192 18 192 10 90 W 8X10
PL−2 PL-5 PL 1/2" 40.64 kg CNX-3 6. ACERO ESTRUCTURAL PARA PLACAS A-36

25
W 8X10

32 150 18
W 44X230
1939

PL-6 PL 3/8" 6.93 kg CNX-11 7. ACERO DE REFUERZO fy = 4200 kg/cm2


14640

14640

32

31

50
CNX 2 5 AGUJEROS

50 150 150 150 150 50


8. SOLDADURA "TIPO" E-70XX

200
STD PARA PL-7 PL 3/8" 1.48 kg CNX-12
ES−02 W 30X99 TORNILLOS PL-8 PL 3/8" 3.54 kg CNX-12

50
W 8X10
CNX 17 - INDICA CLAVE DE CONEXIÓN

2653
A-325 5/8" PL-9 PL 3/8" 1.48 kg CNX-13
W 44X230

25
3 AGUJEROS STD PL-10 PL 3/8" 3.36 kg CNX-13 ES−05 - INDICA PLANO DE UBICACIÓN

754
700
CNX 5 PL 1/2" PARA TORNILLOS PL-11 PL 3/8" 0.75 kg CNX-4
PL 3/8"
ES−02
2944

W 8X10 PL−1 A-325 1/2" PL-12 PL 3/8" 0.68 kg CNX-4


PL−14

1090
1028
1027
PL-13 PL 3/8" 9.81 kg CNX-5

W 8X10
PL-14 PL 3/8" 14.70 kg CNX-5 tw

1372
bf
PL-15 PL 3/8" 11.88 kg CNX-6 bf
W 8X10

23
W 8X10 W 8X10 W 8X10 W 8X10 W 8X10 W 8X10

tf

tf
W 30X99 PL-16 PL 1/2" 10.96 kg CNX-14
W 30X99 PL-17 PL 3/8" 6.80 kg CNX-14
tw

d
PL-20 PL 5/8" 18.72 kg CNX-15 tw

d
W 14X22
W 14X22
W 14X22

W 14X22

W 14X22

d
W 8X10
PL-21 PL 1/2" 28.76 kg CNX-17
PL 3/8"

31
6 6 PL-22 PL 3/8" 14.70 kg CNX-18
3650

3584
TIPO TIPO 3 3 PL−13 d
6 192 18 192 6 W 44X230 TIPO W 44X230 TIPO PL-23 PL 3/8" 11.88 kg CNX-18
W 8X10 3 3
PL-24 PL 1/2" 10.96 kg CNX-19 SECCIÓN CE SECCIÓN W SECCIÓN LI
W 44X230
CNX 6 PL-25 PL 1/2" 10.47 kg CNX-20
ES−02 W 8X10 PL-26 PL 1/2" 9.09 kg CNX-20 d
CNX−1 / ALZADO CNX−1 / ISOMÉTRICO CNX−5 / ALZADO CNX−5 / ISOMÉTRICO
7 7 8 9 16 17
1 : 20 1 : 20
W 44X230

tw
1830 1830 1830 1830 1830 1830 1840 1820
50
14640 PL 3/8" W 8X10
W 14X22
292 18 192 W 8X10
W 14X22 PL−15 EXISTENTE
127 13 277 PL 3/8" 90 10 192 18 192 EXISTENTE

50
PL 3/8" PL−3 W 14X22 SECCIÓN OC

31
10 140 W 30X99
D I PL−4

98 98
3 AGUJEROS STD

17

348
22 295
50 100 100 50
PARA TORNILLOS
A-325 1/2"
3 AGUJEROS STD

300
348
NIVEL 10,11,12 / PLANTA DE CONEXIONES PARA TORNILLOS

50
1 1 : 100
A-325 1/2"
CONEXIONES

31
720
CNX PLANO DISEÑO
W 14X22
1 ES-02 W44X230 < W30X99
PL 3/8"
PL 3/8" 2 ES-02 W30X99 < W14X22
PL−4
W 44X230 4 PL−3 PL 3/8" 3 ES-02 W44X230 < W44X230
192 TIPO 4 PL−15 4 ES-02 W8X10 < W8X10
CE 10X15.3 4 TIPO
4
5 ES-02 W44X230 < W8X10
223 31

4 W 44X230 6 ES-02 W44X230 < W14X22


254

TIPO 127 13 127 W 44X230


4 W 30X99 11 ES-04 W30X90 < W8X10
12 ES-04 W14X22 < W8X10
13 ES-04 W14X22 < W14X22
CNX−6 / ALZADO CNX−6 / ISOMÉTRICO 14 ES-04 W30X90 < W14X22
18 19
TIPO RECORTAR PERFIL CNX−2/ALZADO CNX−2 / ISOMÉTRICO 1 : 20 15 ES-05 W44X230 < W44X230
1090

45°
CE 10 11 17 ES-05 W44X230 < W30X90
1 : 15
CE 10X15.3 18 ES-05 W44X230 < W14X22
836

402 19 ES-05 W30X90 < W14X22


402 226
277 20 ES-04 W30X90 < W30X90
100 302 127 20 382 206 20
192 20 257
382 20 302 100 50 176
227 50 10720

25 5959 25
100 20 172

20

50 150
20

20
20

50 100 100 50
150 50
192 18 402 PL 1/2"

168
PL 3/8"
W 44X230 W 14X22 10 200 PL−5

PL−3

300
W 44X230 W 44X230
EXISTENTE

150
W 14X22
31

150
50 150 150 150 150 150 150 50

PL 3/8"
PL 3/8"
CONEXIÓN DE ESCALERA

PL−6
PL−4
680
680
720

720
700
PL 1/2"
2

150
PL−2

550
1 : 20

150

PL 1/2"
PL 1/2"

1000
1027

PL−5
987
PL 1/2"

420
PL−5

1027
987

PL−1

150
CONEXIÓN SUPERIOR / ESCALERA

50 150
5
1001
1090

150
20

20
100 126
127 150

150 50
327
73 254 73 7 AGUJEROS STD
W 44X230 W 44X230 PARA TORNILLOS

27
20
A-325 3/4"

20

20
3
15 .
58

10 X 20
CE 192 18 192 8 210 192
TIPO
8
3
CE 10X15.30

No. ACTUALIZACIÓN No. ACTUALIZACIÓN


5.
X1
10

01 SE COMPLEMENTA PLANO 04
171 48
CE

60 02 SIN CAMBIOS 05
60 156 15 38 10
A-A A-A NTC CNX−3 / ALZADO CNX−3 / ISOMÉTRICO 15 45
45 15 100 50 03 06
12 13 50 121

10
1 : 20

15
80

70 30 07 11

15

15
25 64 64 25
ESCALON 08 12
HILTI KWIK

PL 3/8"
FORJADO

25
PL−8
BOLT 1/2"

178

PL 3/8"
09 13

PL 3/8"

PL 3/8"

PL 3/8"
PL−10
300
PL−9
330
300
PL 3/8"

PL−12
PL−11
50 300 50

169
189
100

50
10 14

PL−7

331
331
301

301
400 15 19

25
PL 3/8"

153
16 20
PL−11 100

15
70 30 17 21
150

10
15

15
PL 3/8"
PLACA 1/2" 48 4 100 W 8X10 18 22
4 ANCLAJES KWIK PL−12 111 60
ANCLAJE DE ESCALERA BOLT TZ 1/2" 48 4 48 10 42 292
3 1 : 10
W 8X10
292
W 8X10

PROYECTO
5

20 272 272 20 227


192
50

242 50 50 242 127 000

25 50 50 25
172 20 20 207
10720
25

177 50
20

20
-ANCLAR CON 4 ANCLAJES HILTI KWIK

50 98 98 50
150
BOLT TZ PROFUNDIDAD 8CM. 2 AGUJEROS STD

20

20
50 100 100 50
190
190
190

100
50

PARA TORNILLOS

295
400 -EL ANCLAJE SE DEBERÁ HACER SOBRE A-325 1/2"

PL 1/2"

UBIC.
PL−16

300
EL VALLE DE LA LOSA; EN CASO DE
25

73 254 73 CAER EN CRESTA SE DEBERÁ AJUSTAR LA


50 300 50 PLACA PARA QUE SE CUMPLA LA
50

PL 1/2" CONDICIÓN DE ANCLAR EN VALLE DE

PL 3/8"
NÚMERO

PL−17
678

678
LOSACERO.
5

TITULO
718

718
50

DETALLES ESCALERAS
82

PL 3/8"
PL 3/8"

PL 3/8"
PL−14

PL−18 PL−15
PL−13

1027
1027

1027
987

987
-SE DEBERÁ MANTENER LA DISTANCIA DE 4 4

ES-02
TIPO TIPO PL 3/8"
230

4 4
130

50mm AL BORDE DE LA PLACA POR


66

418
W 8X10 877
PARTE DE LOS ANCLAJES KWIK BOLT PL−12 NO.PROYECTO

732
PL−19
3 3 PL 3/8"
82

DISEÑÓ ---
50

PL−11

R2

20

20
EL ATIESADOR PL−12 SE REVISÓ ---
CE 10X15.30 INCLUIRÁ SIEMPRE Y CUANDO NO
TIPO EXISTA UNA TRABE EN EL LADO 127 100 APROBÓ ---

DISEÑO
45° OPUESTO DIBUJÓ Ing. R.R.c:
20

20

ESCALA Como se indica


192 100
A−A / ANCLAJE DE ESCALERA ANCLAJE DE BASE / ESCALERA CNX−4 / ALZADO CNX−4 / ISOMÉTRICO 100 192 FECHA --- REVISIÓN
A-A 1 : 10
4 14 1:5
15
80
80
6 COLUMNA PREFABRICADA
columna prefabricada
E36 RX

brazo tipo br 50x75 BRAZO TIPO BR 50X85

BRAZO TIPO BR 50x85 BRAZO TIPO BR 50X75


BR 50X75

BR 50X75
BR 50X85

BR 50X85
75

75
85

85
DETALLE 2

n.i.t. DETALLE 3
70

70
TRABE PREFABRICADA
55

55
OC 6" CED 80
ménsula de soporte

OC 6" CED 80

OC 6" CED 80
OC 6" CED 80 BRAZO

DETALLE 1

OC 6" CED 80
180

180

180

180
OC
6" 80
CE D
D CE
80 6"
OC
BRAZO

MÉNSULA DE SOPORTE
14.2 133.3 140

140 133.3 14.2


PL 25X35X3/8"
DETALLE 1
LI 4X4X3/8" L=25cm

OC CT 1/4"
D 80 6"
CE
CT 1/4". CE D 8
6" 0
OC
ALZADO FRONTAL
1 1 : 30
6 1 : 30
BRAZO
PREFABRICADO
50X75

25
LI 4X4X3/8" L=25cm
OC 6" CED 80 OC 6" CED 80
25 BRAZO PREFABRICADO
LI 4X4X3/8" L=25cm BR 50X85

OC 6" CED 80 OC 6" CED 80


40 40 CNX 4

CT 1/4".
CNX 4 OC 6" CED 80

70
COLUMNA PREFABRICADA
55

8 12 22 CT 1/4"
PL 250X250X22mm OC 6" CED 80
COLUMNA PREFABRICADA

OC 6" CED 80 OC 6" CED 80

OC 6" CED 80
PL 250X250X22mm
CNX 1
ANCLAR CON HILTI
RE−500 Ó SIMILAR
CNX 3 CNX 3
CNX 1

OC 6" CED 80
OC 6" CED 80

DETALLE 1 DETALLE 2 DETALLE 3 SISTEMA DE MONTAJE DE BRAZOS NIVEL 1, 2 Y AZOTEA


2 1 : 15
7 1 : 15
8 1 : 15
12

COLUMNA PREFABRICADA
50
OC 6" CED 80
8 12 2.2 22

50
7
3 #6 80
COLUMNA PREFABRICADA 40 40
BRAZO PREFABRICADO
27.5 25 27.5

ANCLAR CON LI 4X4X3/8" L=25cm LI 4X4X3/8" L=25cm 4 8.5 8.5 4


HILTI RE−500
O SIMILAR

4
CNX 2
2 #6 PL 250X250X22mm

17
25
PL 250X250X22mm CT 1/4"
5
AJUSTAR DE ACUERDO A DETALLE 2 Y 3

PL 250X250X22mm

4
PL 250X250X22mm #6
PL 250X250X22mm 7
PL 250X250X22mm LI 4X4X3/8" L=25cm
OC 6" CED 80 CT 1/4" NOTA IMPORTANTE: VERIFICAR NIVELES Y COTAS CON
PL 25X35X3/8" PROYECTO ARQUITECTÓNICO
OC 6" CED 80
CNX−1 / ALZADO LI 4X4X3/8" L=25cm
3 PLACA EN COLUMNA No. ACTUALIZACIÓN No. ACTUALIZACIÓN
1 : 10
13 1 : 10
CT 1/4"
01 04
02 05
5 03 06
OC 6" CED 80 CT 1/4" OC 6" CED 80
#6
25 07 11
5
7 5 15 5 08 12
TORN. A−325 Ø=25.4mm ANCLAR CON HILTI OC 6" CED 80 09 13
RE−500 O SIMILAR
5

10 14

OC 6" CED 80

UBIC.
OC 6" CED 80
25
15

4 TORNILLOS
A−336 Ø = 25.4mm
OC 6" CED 80 OC 6" CED 80 NÚMERO
5

SISTEMA DE MONTAJE

TITULO
OC 6" CED 80

E36
placa esp=22mm PARA BRAZOS BR
4 barrenos p/tornillo
a−325 Ø = 25.4mm CNX−3 Y CNX−4 NO.PROYECTO
11 DISEÑÓ Ing. L.D.S

CNX−1 Y CNX−2 CNX−4 / FRONTAL CNX−3 / UNION DE PERFILES

RX
REVISÓ ---

5 10 9 APROBÓ ---

DISEÑO
1 : 10 1 : 15
CNX−2 / FRONTAL DIBUJÓ ---

4 1 : 10
ESCALA Como se indica

FECHA --- REVISIÓN


1052 1014.9 1063.2 1067.5 1063.2 1014.9 1052
7448.4

5400.1

1067.9
1067.8 1067.8
807.9 1031.5
.1 1031.5 260 BARRENOS Ø=20 mm 260 807.8 102
1024 2 A 80 807.8 VARI
A DE 4.1
E 15 26 0 2 60 1 52 A
R I AD 771.4 80
V A 771.4
304.7

1091 1091
26 0 26 0

EJE DE 
577.5
653.7

TRABE
961 PL‐4 PL‐4 961
PL‐2 PL‐2
348.9

85 85
CONEXIÓN 2 85 85 Radio hacia paño superior 
11910.1 PL‐4
76.2

80 3082.6 80
PL‐4 10
1044.3 20mm BARRENOS EN PATIN INFERIOR BARRE 44.2
= NOS Ø
CONEXIÓN 1 NOS Ø =20
BARRE mm
1021 5285.7 1021
24.5 7278.6 24.5
7327.6
Proy. Largero
ELEVACIÓN
T4
1 : 20 152
35 41 41 35
Barreno
7

PL‐4 Ø=20mm
7

PL‐2 PL‐2
PL‐4 DENTRO DE 
139

PL‐2 ANDEN
5
139
152

5
7

T4
7

19

PLC‐1 IR 152X22.4
IR 152X22.4
266 PROYECTO:

CONEXION 1 CONEXIÓN 2
PL‐2 000
BARRENOS EN 
1:5 1:5
PATIN INFERIOR
266 PLANO:
PLANO DE TALLER PARA TRABE
43 50 80 50 43
ISOMÉTRICO T4 EN CUBIERTA
PL e=19 mm
130 T4

73 57 73 PL‐2 PLACAS T4 DIBUJÓ: RRC


50

58 15 CLAVE CANTIDAD PESO


85

No. DE REVISIÓN: 0
15

PL-2 8 0.66 kg
15

PL-2 12 13.19 kg CLAVE:


PL‐2
180

80

FECHA: ---
e=13mm

PT-T4
109

139

PL-4 8 8.23 kg
146

e=10mm ESCALA: ACOTACIÓN


139
109

E1-01
85

PLC-1 2 14.36 kg
S/E MILIMETROS
50

30 36.43 kg
15

PL‐2
15

TRABE SECCIÓN VARIABLE:


7

57 58 15 BARRENOS Ø=25mm
PL‐4 EN PLACA Y PATIN INFERIOR IR 152X22.4
PL‐2 PLANTA CONEXIÓN 2 (PATIN INFERIOR) PESO = 166.84 kg
1:5
26
1 19 2 2 20 2 3 22 4
5 6
8
7 8
10
9
4 5 2 33 5 33 24 8 7
1
28
4 TORONES

17 A A B B B B A A
A A A A A A A A A A
8 TORONES
16 A A A A A A A A A A
10 TORONES
12 TORONES
12 TORONES
10 TORONES
28
12 10 5 5 5 5 5 5 5 5 5 10 13
27
ATPI078a 6 ATPI078c 14
56 TORONES Ø=1/2" TENSADOS A 14100 kg/toron
18 3
ATPI078b
32 5 6 7 8 9 ENDUCTAR:
1 2 3 4 15 32
ESTRIBOS DOBLES ESTRIBOS DOBLES ESTRIBOS DOBLES 24 TORONES "A" L=50 cm/extremo
34 50 5 75 8 38 10 600 10 150 7 50 11 100 10 29 5 51 10 98 3 4 TORONES "B" L=100 cm/extremo

10 ESP.@5 15 ESP.@5 5 [email protected] 60 ESP.@10 15 ESP.@10 EST.@5 10 ESP.@10 EST.@5 5 ESP.@10 13 [email protected]
DISTRIBUCIÓN DE TORONES
ARMADO LONGITUDINAL VISTA EN ALZADO
VISTA EN ALZADO
19 4 2 20 4 20 2 29 1 12 30 5 12
19 4 2 5 5 5 30
11.0 11.0 19 11.0 11.0 11.0
25 21 5 7 LISTADO DE VARILLAS
19 5 5 25
5 5 22 5 8
LONGITUD
5 5 18 26 CLAVE # VARILLA CANTIDAD DESARROLLO TOTAL PESO TOTAL kg
26
1 #4 80 3.25 260.39 m 257.78
17 2 #4 155 2.95 458.00 m 453.42
32 32 32
16 28 28 28 3 #12 4 13.16 52.66 m 470.77
27
27 28 27 28 28 27 27 32 4 #4 160 0.82 131.20 m 129.89
27 27 5 #12 2 11.47 22.95 m 205.17
27 27 27 27
6 #4 155 2.50 387.85 m 383.97
6 6 ATPI078b ATPI078b 11 7 #12 1 3.40 3.40 m 30.40
8 #12 1 4.49 4.49 m 40.14

ATPI078a 3 3 3 3 3 3 3 3 9 #12 1 1.66 1.66 m 14.84


3 3 3 3 3 3 10 #12 1 2.75 2.75 m 24.59
3 3 3 3 3 3
11 #4 6 2.90 17.41 m 17.24
12 #4 12 3.10 37.26 m 36.89
SECCIÓN 1-1 SECCIÓN 2-2 SECCIÓN 3-3 SECCIÓN 4-4 SECCIÓN 5-5 SECCIÓN 6-6 13 #4 6 2.90 17.41 m 17.24
VISTA EN ALZADO VISTA EN ALZADO VISTA EN ALZADO VISTA EN ALZADO VISTA EN ALZADO VISTA EN ALZADO 14 #4 8 2.74 21.94 m 21.72
15 #4 8 1.40 11.22 m 11.11
210.0 340.0 16 #4 5 4.67 23.35 m 23.11
5 29 5 1 14 1 210.0 80.0
17 #4 5 4.47 22.36 m 22.14
11.0 11.0
7 7 7 33.8 53.5 25.0 18 #10 3 1.71 5.14 m 31.99
23 9 19 #12 2 3.00 6.00 m 53.64
66.0
24 8 8 10 8 20 #4 11 2.71 29.78 m 29.49
EST.17 EST.16 VARILLA 8 VARILLA 32 21 #12 1 1.60 1.60 m 14.35
32 22 #12 1 2.69 2.69 m 24.09
27 ARMADO ARMADO ARMADO ARMADO 23 #12 1 1.20 1.20 m 10.73
28
160.5 120.0 24 #12 1 2.29 2.29 m 20.47
25 #12 1 1.90 1.90 m 17.03
26 #12 1 2.93 2.93 m 26.24
ATPI078c 15 27 #3 4 13.47 53.90 m 30.18
66.0 66.0
VARILLA 22 28 #3 2 11.47 22.95 m 12.85
29 #4 54 1.21 65.60 m 64.94
3 3 3 3 3 3 ARMADO
3 3 3 3 3 3 VARILLA 24 30 #4 12 1.06 12.78 m 12.65
32 #6 6 1.20 7.21 m 16.16
184.5 ARMADO 33 #4 16 0.50 8.00 m 7.92
SECCIÓN 7-7 SECCIÓN 8-8 SECCIÓN 9-9 166.0 726 1700.28 m 2533.14
VISTA EN ALZADO VISTA EN ALZADO VISTA EN ALZADO 66.0
VARILLA 26 66.0 VARILLA 10
ARMADO
ARMADO

210.0
109.0 109.0 11.0 NOTAS DE PROYECTO :
4 2 2 4 109.0 11.0
19 1• LAS COTAS RIGEN AL DIBUJO, NO TOMAR MEDIDAS A
31.0 12.6
ESCALA
51.0 71.0 2• ACOTACIONES EN CENTÍMETROS (EXCEPTO DONDE SE
5 86.0 51.0 56.0 INDIQUE OTRA UNIDAD) Y NIVELES EN METROS
56.0 31.3 3• ACERO ESTRUCTURAL ƒy = 4200 kg/cm²
86.0 21.0 4• CONCRETO ƒ'c=550 kg/cm² A LOS 28 DIAS CLASE-1
17 12.6 (ESTRUCTURAL)
5• CONCRETO ƒ'ci=280 kg/cm² PARA DESTENSAR
16 EST. 2 EST. 20 EST. 6 EST. 14 EST. 15 EST. 4 EST.30 6• TENSAR TORONES Ø = 1/2" A 14100 kg
7• TORONES Ø=1/2" CON ASP= 0.987 cm²
ARMADO ARMADO ARMADO ARMADO ARMADO ARMADO ARMADO 8• TODA LA SOLDADURA SERÁ AL ARCO ELÉCTRICO
9• EN SOLDADURA MANUAL SE UTILIZARAN ELECTRODOS
E-70xx
50.0 10• LAS SOLDADURAS SE HARÁN SIGUIENDO LAS NORMAS
DE LA A.W.S. (SOCIEDAD AMERICANA DE SOLDADURA)
11• TODAS LAS SOLDADURAS SE HARÁN POR OBREROS
CALIFICADOS
109.0 12• EN SOLDADURA AUTOMÁTICA SE EMPLEARA UNA
20.6 109.0 86.0 86.0 COMBINACIÓN DE ELECTRODO Y FUNDENTE QUE PRODUZCA
90 UNA SOLDADURA DE RESISTENCIA IGUAL A LA OBTENIDA
18 21.0 CON ELECTRODOS E-70xx
ATPI078a
30.0 3.0 50.0 3 71.0 51.0
86.0

DETALLE DE NARIZ VAR. 18 EST. 1 EST. 29 EST.12 EST.13


VISTA EN ALZADO ARMADO ARMADO ARMADO ARMADO ARMADO

Vous aimerez peut-être aussi