Cronograma Valorizado Agoragra Finaal
Cronograma Valorizado Agoragra Finaal
Cronograma Valorizado Agoragra Finaal
"MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DE PROTECCIÓN CONTRA DESBORDES DE AGUA EN EL CENTRO POBLADO URBANO DE LLICUA, MARGEN DERECHO E IZQUIERDA DE LA QUEBRADA AGORAGRA (LONG. 1395ML), DISTRITO DE AMARILIS,
PROYECTO : PROVINCIA Y REGIÓN HUÁNUCO"
CLIENTE : GOBIERNO REGIONAL DE HUANUCO
REGIÓN : HUANUCO PROVINCIA: HUANUCO DISTRITO: AMARILIS
FECHA : NOVIEMBRE DEL 2021 CONSULTOR : ING. EMILIO FELIX VELASQUEZ VASQUEZ
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12
Item Descripción Und. Metrado Parcial (S/.)
PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL
01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES S/362,061.12 S/283,820.21 S/78,240.91 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
01.01 OBRAS PROVISIONALES S/18,466.59 S/18,466.59 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60*2.40m und 1.00 S/1,000.91 S/1,000.91
01.01.02 CONSTRUCCION PROVISIONAL DE ALMACENES m2 12.00 S/2,294.28 S/2,294.28
01.01.03 CONSTRUCCION PROVISIONAL DE OFICINAS m2 24.00 S/4,588.56 S/4,588.56
01.01.04 CONSTRUCCION PROVISIONAL DE COMEDORES m2 24.00 S/4,588.56 S/4,588.56
01.01.05 CASETA DE GUARDIANIA m2 4.00 S/378.96 S/378.96
01.01.06 CAMPAMENTO PROVISIONAL DE LA OBRA m2 30.00 S/2,060.10 S/2,060.10
01.01.07 SERVICIOS HIGIENICOS PARA EL PERSONAL OBRERO und 2.00 S/3,555.22 S/3,555.22
01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS S/50,270.00 S/50,270.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA GLB 1.00 S/50,270.00 S/50,270.00
01.03 FLETE TERRESTRE S/105,932.20 S/105,932.20 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
01.03.01 FLETE TERRESTRE DE LIMA A HUANUCO GLB 1.00 S/105,932.20 S/105,932.20
01.04 INSTALACIONES PROVISIONALES S/1,950.00 S/1,950.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
01.04.01 INSTALACION DE AGUA PARA LA OBRA GLB 1.00 S/150.00 S/150.00
01.04.02 ENERGIA ELECTRICA PARA LA CONSTRUCCION mes 12.00 S/1,800.00 S/1,800.00
01.05 DEMOLICIONES S/185,442.33 S/107,201.42 S/78,240.91 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
01.05.01 DEMOLICION DE MUROS DE CONCRETO CICLOPEO EXISTENTE h=4.10m, e=0.40m m3 258.40 S/41,176.04 S/31,678.72 S/9,497.32
01.05.02 DEMOLICION DE MUROS DE MANPOSTERIA EXISTENTE h=4.00m, e=1.00m m3 885.00 S/6,779.10 S/6,779.10
01.05.03 DEMOLICIÓN DE MUROS DE CONCRETO CICLOPEO EXISTENTE h=1.50m, e=0.40m m3 45.00 S/7,170.75 S/3,585.38 S/3,585.38
01.05.04 DEMOLICION DE MUROS DE CONCRETO CICLOPEO EXISTENTE h=3.80m, e=0.40m m3 465.30 S/74,145.56 S/37,072.78 S/37,072.78
01.05.05 DEMOLICION DE MUROS DE CONCRETO CICLOPEO EXISTENTE h=3.50m, e=0.40m m3 310.20 S/49,430.37 S/24,715.19 S/24,715.19
01.05.06 DEMOLICION DE MUROS DE CONCRETO CICLOPEO EXISTENTE h=3.20m, e=0.40m m3 42.30 S/6,740.51 S/3,370.26 S/3,370.26
02 SEGURIDAD Y SALUD OCUPACIONAL S/91,893.26 S/78,922.13 S/12,387.79 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33
02.01 SEGURIDAD S/26,121.04 S/26,089.86 S/31.18 S/0.00
02.01.01 PLAN DE SALUD Y SEGURIDAD EN EL TRABAJO S/4,062.00 S/4,062.00
02.01.01.01 IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD GLB 1.00 S/1,500.00 S/1,500.00
02.01.01.02 DESARROLLO DEL PLAN DE SALUD Y SEGURIDAD EN EL TRABAJO GLB 1.00 S/600.00 S/600.00
02.01.01.03 CAPACITACION EN SEGURIDAD Y SALUD mes 12.00 S/1,962.00 S/1,962.00
02.01.02 SEÑALIZACION EN OBRA S/1,608.84 S/1,577.66 S/31.18
02.01.02.01 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 S/1,608.84 S/1,577.66 S/31.18
02.01.03 EQUIPOS DE PROTECCION PERSONAL S/18,525.60 S/18,525.60 S/0.00 S/0.00 S/0.00
02.01.03.01 EQUIPOS DE PROTECCION PERSONAL jgo 60.00 S/17,400.60 S/17,400.60
02.01.03.02 EQUIPOS DE PROTECCION COLECTIVO GLB 1.00 S/1,125.00 S/1,125.00
02.01.04 PROGRAMA DE RESPUESTA ANTE EMERGENCIAS S/1,924.60 S/1,924.60
02.01.04.01 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE
GLB EL TRABAJO
1.00 S/1,924.60
(MEDICINA DE PRIMEROS AUXILIOS)
S/1,924.60
02.02 SALUD EN OBRA S/65,772.22 S/52,832.27 S/12,356.61 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33
02.02.01 PLAN SARS-COV-2 (COVID-19) S/65,772.22 S/52,832.27 S/12,356.61 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33
02.02.01.01 ACTIVIDADES PREVIAS S/4,186.46 S/4,083.73 S/102.73 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.01.01 ACTIVIDADES PREVIAS AL INCIO DE OBRA S/2,500.00 S/2,500.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.01.01.01 PRUEBAS RAPIDAS und 50.00 S/2,500.00 S/2,500.00
02.02.01.01.02 INFORMACION DE SENSIBILZACION S/343.22 S/343.22 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.01.02.01 PANELES INFORMATIVOS und 1.00 S/343.22 S/343.22
02.02.01.01.03 LIMPIEZA Y DESINFECCION DE AMBIENTES S/131.68 S/66.02 S/65.66 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.01.03.01 EQUIPOS PARA LIMPIEZA Y DESINFECCION DE AMBIENTES (ALMACEN) GLB 1.00 S/66.02 S/66.02
02.02.01.01.03.02 INSUMOS PARA LIMPIEZA Y DESINFECCION DE AMBIENTES (ALMACEN) mes 1.00 S/31.65 S/31.65
02.02.01.01.03.03 EPP PARA LIMPIEZA Y DESINFECCION DE AMBIENTES (ALMACEN) mes 1.00 S/34.01 S/34.01
02.02.01.01.04 LIMPIEZA Y DESINFECCION DE IMPLEMENTOS PARA CHARLAS Y HERRAMIENTAS S/37.07 S/0.00 S/37.07 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.01.04.01 INSUMOS PARA LIMPIEZA Y DESINFECCION DE IMPLEMENTOS PARA CHARLAS mes 1.00 S/23.44 S/23.44
02.02.01.01.04.02 INSUMOS PARA LIMPIEZA Y DESINFECCION DE HERRAMIENTAS mes 1.00 S/13.63 S/13.63
02.02.01.01.05 PREVENCION Y CONTROL DE PERSONAL S/474.49 S/474.49 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.01.05.01 EPP PREVENCION Y CONTROL - RIESGO BAJO mes 1.00 S/25.44 S/25.44
02.02.01.01.05.02 INSUMOS LAVADO DE MANOS mes 1.00 S/53.00 S/53.00
02.02.01.01.05.03 INSUMOS DESINFECCION DE MANOS mes 1.00 S/49.44 S/49.44
02.02.01.01.05.04 ADECUACION DE LAVA MANOS GLB 1.00 S/346.61 S/346.61
02.02.01.01.06 MOVILIZACION Y DESMOVILIZACION DE PERSONAL S/700.00 S/700.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.01.06.01 MOVILIZACION Y DESMOVILIZACION DE PERSONAL PROFESIONAL Y AUXILIAR - INICIO
VJE Y FIN 2.00 S/700.00
DE POST EJECUCION S/700.00
02.02.01.02 ACTIVIDADES EJECUCION S/57,399.30 S/44,562.08 S/12,253.88 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33
02.02.01.02.01 ACTIVIDADES PREVIAS AL INCIO DE OBRA S/2,500.00 S/2,500.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.02.01.01 PRUEBAS RAPIDAS und 50.00 S/2,500.00 S/2,500.00
02.02.01.02.02 RECURSOS HUMANOS PARA PREVENCION Y CONTROL S/45,600.00 S/33,725.00 S/11,875.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.02.02.01 PERSONAL PARA PREVENCION Y CONTROL mes 12.00 S/45,600.00 S/33,725.00 S/11,875.00
02.02.01.02.03 EQUIPOS PARA EVALUACION DE DESCARTE S/211.45 S/0.00 S/211.45 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.02.03.01 EQUIPOS PARA EVALUACION DE DESCART GLB 1.00 S/211.45 S/211.45
02.02.01.02.04 INFORMACION DE SENSIBILZACION S/343.22 S/343.22 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.02.04.01 PANELES INFORMATIVOS und 1.00 S/343.22 S/343.22
CRONOGRAMA VALORIZADO DE PROGRAMACIÓN DE OBRA (360 DIAS CALENDARIOS)
"MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DE PROTECCIÓN CONTRA DESBORDES DE AGUA EN EL CENTRO POBLADO URBANO DE LLICUA, MARGEN DERECHO E IZQUIERDA DE LA QUEBRADA AGORAGRA (LONG. 1395ML), DISTRITO DE AMARILIS,
PROYECTO : PROVINCIA Y REGIÓN HUÁNUCO"
CLIENTE : GOBIERNO REGIONAL DE HUANUCO
REGIÓN : HUANUCO PROVINCIA: HUANUCO DISTRITO: AMARILIS
FECHA : NOVIEMBRE DEL 2021 CONSULTOR : ING. EMILIO FELIX VELASQUEZ VASQUEZ
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12
Item Descripción Und. Metrado Parcial (S/.)
PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL
02.02.01.02.05 LIMPIEZA Y DESINFECCION DE AMBIENTES S/3,771.26 S/3,731.02 S/40.24 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.02.05.01 EQUIPOS PARA LIMPIEZA Y DESINFECCION DE AMBIENTES (OFICINA, ZONA DE CONTROL,
GLB ALMACEN,
1.00 SSHHS/453.50 S/453.50
02.02.01.02.05.02 INSUMOS PARA LIMPIEZA Y DESINFECCION DE AMBIENTES (OFICINA, ZONA DE CONTROL,
mes ALMACEN,
12.00 S/2,356.80
SSHH) S/2,356.80
02.02.01.02.05.03 EPP PARA LIMPIEZA Y DESINFECCION DE AMBIENTES OFICINA, ZONA DE CONTROL,
mesALMACEN,
12.00SSHH) S/960.96 S/920.72 S/40.24
02.02.01.02.06 LIMPIEZA Y DESINFECCION DE EQUIPOS DE OFICINA Y HERRAMIENTAS S/1,539.72 S/1,470.86 S/68.86 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.02.06.01 INSUMOS PARA LIMPIEZA Y DESINFECCION DE EQUIPOS DE OFICINA mes 12.00 S/1,376.16 S/1,376.16
02.02.01.02.06.02 INSUMOS PARA LIMPIEZA Y DESINFECCION DE HERRAMIENTAS mes 12.00 S/163.56 S/94.70 S/68.86
02.02.01.02.07 PREVENCION Y CONTROL DE PERSONAL S/2,733.65 S/2,733.65 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.02.07.01 EPP PREVENCION Y CONTROL - RIESGO MEDIO mes 12.00 S/852.48 S/852.48
02.02.01.02.07.02 EPP PREVENCION Y CONTROL - RIESGO BAJO mes 12.00 S/305.28 S/305.28
02.02.01.02.07.03 INSUMOS LAVADO DE MANOS mes 12.00 S/636.00 S/636.00
02.02.01.02.07.04 INSUMOS DESINFECCION DE MANOS mes 12.00 S/593.28 S/593.28
02.02.01.02.07.05 ADECUACION DE LAVA MANOS GLB 1.00 S/346.61 S/346.61
02.02.01.02.08 MOVILIZACION Y DESMOVILIZACION DE PERSONAL S/700.00 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33
02.02.01.02.08.01 MOVILIZACION Y DESMOVILIZACION DE PERSONAL PROFESIONAL Y AUXILIAR - INICIO
VJE Y FIN 2.00 S/700.00
DE POST EJECUCION S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33 S/58.33
02.02.01.03 ACTIVIDADES POST EJECUCION S/4,186.46 S/4,186.46 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.03.01 ACTIVIDADES PREVIAS AL INCIO DE OBRA S/2,500.00 S/2,500.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.03.01.01 PRUEBAS RAPIDAS und 50.00 S/2,500.00 S/2,500.00
02.02.01.03.02 INFORMACION DE SENSIBILZACION S/343.22 S/343.22 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.03.02.01 PANELES INFORMATIVOS und 1.00 S/343.22 S/343.22
02.02.01.03.03 LIMPIEZA Y DESINFECCION DE AMBIENTES S/131.68 S/131.68 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.03.03.01 EQUIPOS PARA LIMPIEZA Y DESINFECCION DE AMBIENTES (ALMACEN) GLB 1.00 S/66.02 S/66.02
02.02.01.03.03.02 INSUMOS PARA LIMPIEZA Y DESINFECCION DE AMBIENTES (ALMACEN) mes 1.00 S/31.65 S/31.65
02.02.01.03.03.03 EPP PARA LIMPIEZA Y DESINFECCION DE AMBIENTES (ALMACEN) mes 1.00 S/34.01 S/34.01
02.02.01.03.04 LIMPIEZA Y DESINFECCION DE IMPLEMENTOS PARA CHARLAS Y HERRAMIENTAS S/37.07 S/37.07 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.03.04.01 INSUMOS PARA LIMPIEZA Y DESINFECCION DE IMPLEMENTOS PARA CHARLAS mes 1.00 S/23.44 S/23.44
02.02.01.03.04.02 INSUMOS PARA LIMPIEZA Y DESINFECCION DE HERRAMIENTAS mes 1.00 S/13.63 S/13.63
02.02.01.03.05 PREVENCION Y CONTROL DE PERSONAL S/474.49 S/474.49 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.03.05.01 EPP PREVENCION Y CONTROL - RIESGO BAJO mes 1.00 S/25.44 S/25.44
02.02.01.03.05.02 INSUMOS LAVADO DE MANOS mes 1.00 S/53.00 S/53.00
02.02.01.03.05.03 INSUMOS DESINFECCION DE MANOS mes 1.00 S/49.44 S/49.44
02.02.01.03.05.04 ADECUACION DE LAVA MANOS GLB 1.00 S/346.61 S/346.61
02.02.01.03.06 MOVILIZACION Y DESMOVILIZACION DE PERSONAL S/700.00 S/700.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
02.02.01.03.06.01 MOVILIZACION Y DESMOVILIZACION DE PERSONAL PROFESIONAL Y AUXILIAR - INICIO
VJE Y FIN 2.00 S/700.00
DE POST EJECUCION S/700.00
03 ESTRUCTURAS DE MURO DE CONTENCIÓN S/10,916,409.58 S/44,681.15 S/237,970.07 S/906,876.94 S/875,945.05 S/671,785.91 S/1,352,262.08 S/1,342,557.56 S/1,397,293.61 S/1,355,883.06 S/2,052,471.61 S/603,865.11 S/74,817.41
03.01 MURO DE CONTENCION TIPO I - H=4.00M S/618,949.23 S/34,561.88 S/36,144.41 S/75,036.75 S/107,172.22 S/125,395.09 S/33,612.58 S/60,881.65 S/72,053.38 S/69,254.82 S/4,836.45 S/0.00 S/0.00
03.01.01 TRABAJOS PRELIMINARES S/1,123.20 S/624.84 S/498.36 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 390.00 S/682.50 S/184.14 S/498.36
03.01.01.02 TRAZO Y REPLANTEO DURANTE LA OBRA m2 390.00 S/440.70 S/440.70
03.01.02 MOVIMIENTO DE TIERRAS S/95,104.15 S/33,937.04 S/35,646.05 S/25,521.07 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
03.01.02.01 EXCAVACION MASIVA CON MAQUINARIA EN TERRENO NORMAL m3 3,637.42 S/15,313.54 S/9,990.78 S/5,322.76
03.01.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 854.95 S/14,286.21 S/6,097.19 S/8,189.02
03.01.02.03 RELLENO CON GRAVA DE 1/2" A 1" (DRENAJE) m3 592.50 S/35,698.13 S/17,849.07 S/17,849.07
03.01.02.04 RELLENO CON GRAVA DE 2" A 4"(DRENAJE) m3 60.00 S/4,285.20 S/4,285.20
03.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO CON MAQUINARIA Y TRANSPORTE m3 VOLQUETE DE 10 M3)S/25,521.07
2,984.92 REND.= 272 M3/DIA S/25,521.07
03.01.03 CONCRETO SIMPLE S/32,073.60 S/0.00 S/0.00 S/18,170.88 S/0.00 S/4,634.24 S/9,268.48 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
03.01.03.01 SOLADOS S/32,073.60 S/0.00 S/0.00 S/18,170.88 S/0.00 S/4,634.24 S/9,268.48 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
03.01.03.01.01 SOLADO DE E = 4" MEZCLA C:H 1:12 CEMENTO:HORMIGON m2 416.00 S/18,170.88 S/18,170.88
03.01.03.01.02 CONCRETO SIMPLE F'C=140 KG/CM2 - BASE TUBERIA DE DREN m3 38.40 S/13,902.72 S/4,634.24 S/9,268.48
03.01.04 CONCRETO ARMADO S/470,545.61 S/0.00 S/0.00 S/31,344.80 S/107,172.22 S/115,533.24 S/22,291.71 S/57,244.26 S/66,061.46 S/66,061.46 S/4,836.45 S/0.00 S/0.00
03.01.04.01 CONCRETO F'C=280 KG/CM2 EN ZAPATAS m3 208.00 S/91,865.28 S/91,865.28
03.01.04.02 CONCRETO F'C=280 KG/CM2 EN PANTALLA m3 192.00 S/87,384.96 S/85,456.99 S/1,927.97
03.01.04.03 ENCOFRADO Y DESENCOFRADO EN MUROS DE CONTENCION m2 1,881.50 S/120,096.15 S/31,344.80 S/21,715.23 S/21,739.99 S/22,291.71 S/23,004.42
03.01.04.04 ACERO EN MUROS DE CONTENCION GRADO 60 kg 27,479.81 S/171,199.22 S/34,239.84 S/66,061.46 S/66,061.46 S/4,836.45
03.01.05 DRENAJE S/12,344.27 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/3,158.99 S/5,991.92 S/3,193.36 S/0.00 S/0.00 S/0.00
03.01.05.01 GEOTEXTIL NO TEJIDO DE POLIPROPILENO 200 gr m2 998.40 S/9,185.28 S/5,991.92 S/3,193.36
03.01.05.02 TUBERIA PERFORADA PVC SAL D=4", PARA DRENAJE m 143.20 S/3,158.99 S/3,158.99
03.01.06 SELLADO DE JUNTAS S/7,758.40 S/0.00 S/0.00 S/0.00 S/0.00 S/5,227.61 S/2,052.39 S/478.40 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
03.01.06.01 JUNTA DE CONSTRUCCION CON TEKNOPOR m 1,040.00 S/7,758.40 S/5,227.61 S/2,052.39 S/478.40
03.02 MURO DE CONTENCION TIPO II - H=4.50M S/1,846,522.61 S/9,282.91 S/130,402.30 S/89,733.66 S/540,542.89 S/487,892.78 S/186,679.54 S/46,837.33 S/195,928.48 S/149,998.06 S/8,529.60 S/695.05 S/0.00
03.02.01 TRABAJOS PRELIMINARES S/3,386.88 S/849.00 S/2,537.88 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
03.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,176.00 S/2,058.00 S/438.89 S/1,619.11
03.02.01.02 TRAZO Y REPLANTEO DURANTE LA OBRA m2 1,176.00 S/1,328.88 S/410.11 S/918.77
CRONOGRAMA VALORIZADO DE PROGRAMACIÓN DE OBRA (360 DIAS CALENDARIOS)
"MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DE PROTECCIÓN CONTRA DESBORDES DE AGUA EN EL CENTRO POBLADO URBANO DE LLICUA, MARGEN DERECHO E IZQUIERDA DE LA QUEBRADA AGORAGRA (LONG. 1395ML), DISTRITO DE AMARILIS,
PROYECTO : PROVINCIA Y REGIÓN HUÁNUCO"
CLIENTE : GOBIERNO REGIONAL DE HUANUCO
REGIÓN : HUANUCO PROVINCIA: HUANUCO DISTRITO: AMARILIS
FECHA : NOVIEMBRE DEL 2021 CONSULTOR : ING. EMILIO FELIX VELASQUEZ VASQUEZ
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12
Item Descripción Und. Metrado Parcial (S/.)
PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL
03.02.02 MOVIMIENTO DE TIERRAS S/279,004.03 S/8,433.91 S/127,864.42 S/52,815.68 S/37,170.06 S/33,557.12 S/16,066.80 S/3,096.03 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
03.02.02.01 EXCAVACION MASIVA CON MAQUINARIA EN TERRENO NORMAL m3 8,959.23 S/37,718.36 S/8,433.91 S/28,478.12 S/806.33
03.02.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 2,975.22 S/49,715.93 S/10,393.03 S/14,008.95 S/14,378.07 S/10,935.88
03.02.02.03 RELLENO CON GRAVA DE 1/2" A 1" (DRENAJE) m3 1,959.51 S/118,060.48 S/88,993.27 S/8,039.42 S/8,238.56 S/8,123.82 S/1,569.38 S/3,096.03
03.02.02.04 RELLENO CON GRAVA DE 2" A 4"(DRENAJE) m3 217.30 S/15,519.57 S/15,463.56 S/56.01
03.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO CON MAQUINARIA Y TRANSPORTE
m3 VOLQUETE DE 10 M3)S/57,989.69
6,782.42 REND.= 272 M3/DIA S/14,497.42 S/14,497.42 S/14,497.42 S/14,497.42
03.02.03 CONCRETO SIMPLE S/87,862.32 S/0.00 S/0.00 S/36,917.98 S/34,094.18 S/16,850.16 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
03.02.03.01 SOLADOS S/87,862.32 S/0.00 S/0.00 S/36,917.98 S/34,094.18 S/16,850.16 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
03.02.03.01.01 SOLADO DE E = 4" MEZCLA C:H 1:12 CEMENTO:HORMIGON m2 1,176.00 S/51,367.68 S/36,917.98 S/14,449.70
03.02.03.01.02 CONCRETO SIMPLE F'C=140 KG/CM2 - BASE TUBERIA DE DREN m3 100.80 S/36,494.64 S/19,644.48 S/16,850.16
03.02.04 CONCRETO ARMADO S/1,416,645.03 S/0.00 S/0.00 S/0.00 S/469,278.65 S/430,628.99 S/168,024.26 S/43,741.30 S/174,349.60 S/121,397.58 S/8,529.60 S/695.05 S/0.00
03.02.04.01 CONCRETO F'C=280 KG/CM2 EN ZAPATAS m3 588.00 S/259,696.08 S/211,550.30 S/45,019.93 S/3,125.85
03.02.04.02 CONCRETO F'C=280 KG/CM2 EN PANTALLA m3 637.88 S/290,318.32 S/115,771.93 S/148,325.00 S/26,221.39
03.02.04.03 ENCOFRADO Y DESENCOFRADO EN MUROS DE CONTENCION m2 5,974.00 S/381,320.42 S/141,956.42 S/119,682.00 S/119,682.00
03.02.04.04 ACERO EN MUROS DE CONTENCION GRADO 60 kg 77,898.91 S/485,310.21 S/117,602.06 S/18,995.02 S/43,741.30 S/174,349.60 S/121,397.58 S/8,529.60 S/695.05
03.02.05 DRENAJE S/36,647.55 S/0.00 S/0.00 S/0.00 S/0.00 S/6,856.51 S/2,588.48 S/0.00 S/21,578.88 S/5,623.68 S/0.00 S/0.00 S/0.00
03.02.05.01 GEOTEXTIL NO TEJIDO DE POLIPROPILENO 200 gr m2 2,956.80 S/27,202.56 S/21,578.88 S/5,623.68
03.02.05.02 TUBERIA PERFORADA PVC SAL D=4", PARA DRENAJE m 428.15 S/9,444.99 S/6,856.51 S/2,588.48
03.02.06 SELLADO DE JUNTAS S/22,976.80 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/22,976.80 S/0.00 S/0.00 S/0.00
03.02.06.01 JUNTA DE CONSTRUCCION CON TEKNOPOR m 3,080.00 S/22,976.80 S/22,976.80
03.03 MURO DE CONTENCION TIPO III - H=6.00M S/8,450,937.74 S/836.37 S/71,423.36 S/742,106.53 S/228,229.94 S/58,498.04 S/1,131,969.96 S/1,234,838.57 S/1,129,311.75 S/1,136,630.18 S/2,039,105.57 S/603,170.06 S/74,817.41
03.03.01 TRABAJOS PRELIMINARES S/11,158.57 S/836.37 S/5,018.20 S/925.81 S/4,378.19 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
03.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 3,874.50 S/6,780.38 S/836.37 S/5,018.20 S/925.81
03.03.01.02 TRAZO Y REPLANTEO DURANTE LA OBRA m2 3,874.50 S/4,378.19 S/4,378.19
03.03.02 MOVIMIENTO DE TIERRAS S/1,031,437.63 S/0.00 S/66,405.16 S/741,180.72 S/223,851.75 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
03.03.02.01 EXCAVACION MASIVA CON MAQUINARIA EN TERRENO NORMAL m3 33,949.83 S/142,928.78 S/66,405.16 S/73,468.14 S/3,055.48
03.03.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 14,760.03 S/246,640.10 S/246,640.10
03.03.02.03 RELLENO CON GRAVA DE 1/2" A 1" (DRENAJE) m3 6,490.04 S/391,024.91 S/391,024.91
03.03.02.04 RELLENO CON GRAVA DE 2" A 4"(DRENAJE) m3 492.90 S/35,202.92 S/30,047.57 S/5,155.35
03.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO CON MAQUINARIA Y TRANSPORTE
m3 VOLQUETE
25,221.16
DE 10 M3)S/215,640.92
REND.= 272 M3/DIA S/215,640.92
03.03.03 CONCRETO SIMPLE S/251,351.10 S/0.00 S/0.00 S/0.00 S/0.00 S/58,498.04 S/75,682.41 S/117,170.65 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
03.03.03.01 SOLADOS S/251,351.10 S/0.00 S/0.00 S/0.00 S/0.00 S/58,498.04 S/75,682.41 S/117,170.65 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
03.03.03.01.01 SOLADO DE E = 4" MEZCLA C:H 1:12 CEMENTO:HORMIGON m2 3,874.50 S/169,238.16 S/58,498.04 S/48,311.43 S/62,428.69
03.03.03.01.02 CONCRETO SIMPLE F'C=140 KG/CM2 - BASE TUBERIA DE DREN m3 226.80 S/82,112.94 S/27,370.98 S/54,741.96
03.03.04 CONCRETO ARMADO S/6,970,701.87 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/1,056,287.55 S/1,110,426.36 S/1,122,427.99 S/1,081,705.57 S/2,010,987.51 S/524,556.95 S/64,309.94
03.03.04.01 CONCRETO F'C=280 KG/CM2 EN ZAPATAS m3 2,921.25 S/1,290,199.28 S/1,056,287.55 S/78,678.56 S/77,309.67 S/77,923.50
03.03.04.02 CONCRETO F'C=280 KG/CM2 EN PANTALLA m3 3,762.00 S/1,712,199.06 S/576,462.69 S/41,951.37 S/43,289.78 S/1,050,495.22
03.03.04.03 ENCOFRADO Y DESENCOFRADO EN MUROS DE CONTENCION m2 26,506.00 S/1,691,877.98 S/563,959.33 S/521,284.67 S/521,284.67 S/85,349.32
03.03.04.04 ACERO EN MUROS DE CONTENCION GRADO 60 kg 365,397.36 S/2,276,425.55 S/455,285.11 S/439,207.63 S/439,207.63 S/439,207.63 S/439,207.63 S/64,309.94
03.03.05 DRENAJE S/107,376.69 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/7,241.56 S/6,883.75 S/35,434.42 S/28,118.05 S/27,402.43 S/2,296.47
03.03.05.01 GEOTEXTIL NO TEJIDO DE POLIPROPILENO 200 gr m2 9,310.00 S/85,652.00 S/28,550.67 S/27,402.43 S/27,402.43 2296.467
03.03.05.02 TUBERIA PERFORADA PVC SAL D=4", PARA DRENAJE m 984.80 S/21,724.69 S/7,241.56 S/6,883.75 S/6,883.75 S/715.62
03.03.06 SELLADO DE JUNTAS S/78,911.88 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/19,490.19 S/0.00 S/51,210.69 S/8,211.01
03.03.06.01 JUNTA DE CONSTRUCCION CON TEKNOPOR m 10,578.00 S/78,911.88 S/19,490.19 S/51,210.69 S/8,211.01
04 ESTRUCTURAS DE MURO DISIPADOR DE ENERGÍA S/531,445.35 S/0.00 S/0.00 S/78,787.77 S/193,630.17 S/227,355.36 S/31,672.05 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.01 MURO DISIPADOR DE ENERGÍA TIPO I - H=5.90M S/456,004.73 S/0.00 S/0.00 S/74,721.89 S/168,943.08 S/203,903.47 S/8,436.29 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.01.01 TRABAJOS PRELIMINARES S/1,524.18 S/0.00 S/0.00 S/1,524.18 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 529.23 S/926.15 S/926.15
04.01.01.02 TRAZO Y REPLANTEO DURANTE LA OBRA m2 529.23 S/598.03 S/598.03
04.01.02 MOVIMIENTO DE TIERRAS S/6,304.18 S/0.00 S/0.00 S/6,304.18 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.01.02.01 EXCAVACION MASIVA CON MAQUINARIA EN TERRENO NORMAL m3 320.37 S/1,348.76 S/1,348.76
04.01.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 271.59 S/4,538.27 S/4,538.27
ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO CON MAQUINARIA Y
04.01.02.03 m3 48.79 S/417.15 S/417.15
TRANSPORTE VOLQUETE DE 10 M3) REND.= 272 M3/DIA
04.01.03 CONCRETO SIMPLE S/21,160.78 S/0.00 S/0.00 S/12,102.42 S/9,058.36 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.01.03.01 SOLADOS S/21,160.78 S/0.00 S/0.00 S/12,102.42 S/9,058.36 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.01.03.01.01 SOLADO DE E = 4" MEZCLA C:H 1:12 CEMENTO:HORMIGON m2 484.45 S/21,160.78 S/12,102.42 S/9,058.36
04.01.04 CONCRETO ARMADO S/425,366.11 S/0.00 S/0.00 S/53,691.45 S/159,334.89 S/203,903.47 S/8,436.29 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.01.04.01 CONCRETO F'C=280 KG/CM2 EN ZAPATAS m3 48.85 S/21,575.09 S/14,383.39 S/7,191.70
04.01.04.02 CONCRETO F'C=280 KG/CM2 EN PANTALLA m3 259.10 S/117,924.18 S/39,308.06 S/35,089.91 S/35,089.91 S/8,436.29
04.01.04.03 ENCOFRADO Y DESENCOFRADO EN MUROS DISIPADORES m2 576.68 S/39,271.91 S/34,854.97 S/4,416.94
04.01.04.04 ACERO EN MUROS DE CONTENCION GRADO 60 kg 39,581.85 S/246,594.93 S/82,198.31 S/164,396.62
04.01.05 JUNTAS DE DILATACION S/1,649.48 S/0.00 S/0.00 S/1,099.65 S/549.83 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.01.05.01 JUNTAS ASFALTICAS 1" m 86.00 S/1,649.48 S/1,099.65 S/549.83
CRONOGRAMA VALORIZADO DE PROGRAMACIÓN DE OBRA (360 DIAS CALENDARIOS)
"MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DE PROTECCIÓN CONTRA DESBORDES DE AGUA EN EL CENTRO POBLADO URBANO DE LLICUA, MARGEN DERECHO E IZQUIERDA DE LA QUEBRADA AGORAGRA (LONG. 1395ML), DISTRITO DE AMARILIS,
PROYECTO : PROVINCIA Y REGIÓN HUÁNUCO"
CLIENTE : GOBIERNO REGIONAL DE HUANUCO
REGIÓN : HUANUCO PROVINCIA: HUANUCO DISTRITO: AMARILIS
FECHA : NOVIEMBRE DEL 2021 CONSULTOR : ING. EMILIO FELIX VELASQUEZ VASQUEZ
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12
Item Descripción Und. Metrado Parcial (S/.)
PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL
04.02 MURO DISIPADOR DE ENERGÍA TIPO II - H=5.00M S/75,440.62 S/0.00 S/0.00 S/4,065.88 S/24,687.10 S/23,451.88 S/23,235.76 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.02.01 TRABAJOS PRELIMINARES S/201.60 S/0.00 S/0.00 S/201.60 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 70.00 S/122.50 S/122.50
04.02.01.02 TRAZO Y REPLANTEO DURANTE LA OBRA m2 70.00 S/79.10 S/79.10
04.02.02 MOVIMIENTO DE TIERRAS S/1,053.11 S/0.00 S/0.00 S/225.74 S/791.42 S/35.96 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.02.02.01 EXCAVACION MASIVA CON MAQUINARIA EN TERRENO NORMAL m3 53.62 S/225.74 S/225.74
04.02.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 45.21 S/755.46 S/755.46
04.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO CON MAQUINARIA Y TRANSPORTE
m3 VOLQUETE
8.41DE 10 M3) REND.=
S/71.91272 M3/DIA S/35.96 S/35.96
04.02.03 CONCRETO SIMPLE S/3,638.54 S/0.00 S/0.00 S/3,638.54 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.02.03.01 SOLADOS S/3,638.54 S/0.00 S/0.00 S/3,638.54 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.02.03.01.01 SOLADO DE E = 4" MEZCLA C:H 1:12 CEMENTO:HORMIGON m2 83.30 S/3,638.54 S/3,638.54
04.02.04 CONCRETO ARMADO S/70,095.49 S/0.00 S/0.00 S/0.00 S/23,895.68 S/23,114.67 S/23,085.13 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.02.04.01 CONCRETO F'C=280 KG/CM2 EN ZAPATAS m3 8.40 S/3,709.94 S/4,068.77 -S/358.83
04.02.04.02 CONCRETO F'C=280 KG/CM2 EN PANTALLA m3 42.12 S/19,170.08 S/4,792.52 S/9,481.59 S/4,895.98
04.02.04.03 ENCOFRADO Y DESENCOFRADO EN MUROS DISIPADORES m2 124.07 S/8,449.17 S/2,112.29 S/9,482.59 -S/3,145.71
04.02.04.04 ACERO EN MUROS DE CONTENCION GRADO 60 kg 6,222.52 S/38,766.30 S/12,922.10 S/4,509.33 S/21,334.87
04.02.05 JUNTAS DE DILATACION S/451.88 S/0.00 S/0.00 S/0.00 S/0.00 S/301.25 S/150.63 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
04.02.05.01 JUNTAS ASFALTICAS 1" m 23.56 S/451.88 S/301.25 S/150.63
05 SISTEMA DE CONFINAMIENTO CELULAR (GEOCELDA) PARA PROTECCION CONTRA EROSION DE TALUDES Y PLATAFORMA
S/11,021,266.91ESTABILIZADO
S/34,306.58 S/130,873.26 S/130,873.26 S/746,687.36 S/1,100,699.71 S/1,263,146.80 S/1,403,308.40 S/1,594,875.93 S/1,648,385.60 S/1,382,816.33 S/764,868.97 S/820,424.70
05.01 TRABAJOS PRELIMINARES S/236,685.79 S/0.00 S/0.00 S/0.00 S/14,692.47 S/80,220.18 S/56,231.77 S/52,712.10 S/27,490.49 S/5,338.78 S/0.00 S/0.00 S/0.00
05.01.01 DESQUINCHE Y LIMPIEZA DE TALUDES m2 88,979.62 S/136,138.82 S/14,692.47 S/36,851.36 S/37,935.52 S/34,202.32 S/12,457.15
05.01.02 TRAZO Y REPLANTEO DURANTE LA OBRA m2 88,979.62 S/100,546.97 S/43,368.82 S/18,296.25 S/18,509.78 S/15,033.34 S/5,338.78
05.02 MOVIMIENTO DE TIERRAS S/6,169,402.29 S/34,306.58 S/130,873.26 S/130,873.26 S/443,510.25 S/443,510.25 S/574,383.51 S/756,147.25 S/801,889.36 S/1,040,552.38 S/926,335.67 S/443,510.25 S/443,510.25
05.02.01 EXCAVACION MASIVA CON MAQUINARIA EN TERRENO NORMAL m3 381,184.24 S/1,604,785.65 S/34,306.58 S/130,873.26 S/130,873.26 S/130,873.26 S/130,873.26 S/261,746.51 S/130,873.26 S/130,873.26 S/130,873.26 S/130,873.26 S/130,873.26 S/130,873.26
05.02.02 PERFILADO DEL TERRENO PARA LA INSTALACION DE GEOCELDAS m2 381,184.24 S/487,915.83 S/45,742.11 S/277,983.56 S/164,190.16
05.02.03 RELLENO EXTENDIDO Y COLOCACION DE TIERRA SELECCIONADA m2 900.64 S/12,419.83 S/6,421.57 S/5,998.26
06.02.01.01.06 TRANSPORTE Y DISPOSICION FINAL DE RS PELIGROSOS POR UNA EO-RS kg 467.50 S/2,103.75 S/2,103.75
CRONOGRAMA VALORIZADO DE PROGRAMACIÓN DE OBRA (360 DIAS CALENDARIOS)
"MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DE PROTECCIÓN CONTRA DESBORDES DE AGUA EN EL CENTRO POBLADO URBANO DE LLICUA, MARGEN DERECHO E IZQUIERDA DE LA QUEBRADA AGORAGRA (LONG. 1395ML), DISTRITO DE AMARILIS,
PROYECTO : PROVINCIA Y REGIÓN HUÁNUCO"
CLIENTE : GOBIERNO REGIONAL DE HUANUCO
REGIÓN : HUANUCO PROVINCIA: HUANUCO DISTRITO: AMARILIS
FECHA : NOVIEMBRE DEL 2021 CONSULTOR : ING. EMILIO FELIX VELASQUEZ VASQUEZ
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12
Item Descripción Und. Metrado Parcial (S/.)
PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL
06.02.01.02 MANEJO DE EFLUENTES S/3,348.60 S/3,348.60 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
06.02.01.02.01 INSTALACION DE BAÑOS PORTATILES EN EL FRENTE DE OBRA und 4.00 S/3,348.60 S/3,348.60
06.02.01.03 CAPACITACION, EDUCACION AMBIENTAL Y SEGURIDAD S/11,906.96 S/11,906.96
06.02.01.03.01 CAPACITACION Y CHARLAS PARA LOS TRABAJADORES mes 12.00 S/4,908.48 S/4,908.48
06.02.01.03.02 CAPACITACION AL PERSONAL mes 12.00 S/4,908.48 S/4,908.48
06.02.01.03.03 CHARLA AL PERSONAL mes 12.00 S/1,200.00 S/1,200.00
06.02.01.03.04 MATERIALES PARA LAS CHARLAS Y LAS CAPACITACIONES GLB 1.00 S/890.00 S/890.00
06.02.01.04 CAPACITACION A LA POBLACION S/1,736.16 S/1,736.16
06.02.01.04.01 CAPACITACION A LOS POBLADORES mes 4.00 S/1,636.16 S/1,636.16
06.02.01.04.02 MATERIALES PARA LAS CAPACITACIONES GLB 1.00 S/100.00 S/100.00
06.02.01.05 CONSTRUCCION DE ALMACENAMIENTO DE RESIDUOS SOLIDOS S/4,500.00 S/4,500.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
06.02.01.05.01 CONSTRUCCION DE INFRAESTRUCTURA DE ALMACENAMIENTO EN EL PATIO DE MAQUINAS
GLB 1.00 S/4,500.00 S/4,500.00
06.02.02 PROTECCION DE RECURSOS NATURALES S/7,362.72 S/7,362.72
06.02.02.01 LETREROS DE SEÑALIZACION AMBIENTAL und 6.00 S/2,454.24 S/2,454.24
06.02.02.02 CAPACITACION Y CHARLAS A LOS TRABAJADORES und 12.00 S/4,908.48 S/4,908.48
06.03 PROGRAMA DE ASUNTOS SOCIALES S/31,752.39 S/26,098.39 S/3,200.00 S/2,454.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
06.03.01 SUBPROGRAMA RELACIONES COMUNITARIAS S/6,400.00 S/3,200.00 S/3,200.00
06.03.01.01 CHARLAS DE INDUCCION A TODO EL PERSONAL (codigo de conducta) und 12.00 S/6,000.00 S/266.67 S/133.33 S/1,227.00 S/3,540.27 S/832.73
06.03.01.02 CARTILLAS DE LINEAMIENTO DEL CODIGO DE CONDUCTA mll 1.00 S/200.00 S/66.67 S/133.33
06.03.01.03 FORMULARIO DE QUEJAS Y RECLAMOS mll 1.00 S/200.00 S/200.00
06.03.02 SUBPROGRAMA DE CONTRATACION DE MANO DE OBRA LOCAL S/1,227.00 S/1,227.00
06.03.02.01 REUNIONES INFORMATIVA PARA LA CONTRATACION DE MANO DE OBRA mes 3.00 S/1,227.00 S/1,227.00
06.03.03 SUBPROGRAMA DE PARTICIPACION CIUDADANA S/2,427.00 S/1,200.00 S/0.00 S/1,227.00
06.03.03.01 CREACION DE COMITE DE VIGILANCIA und 3.00 S/1,227.00 S/1,227.00
06.03.03.02 REUNIONES INFORMATIVAS und 3.00 S/1,200.00 S/1,200.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00 S/0.00
06.03.04 SUBPROGRAMA DE MONITOREO DE DEUDAS LOCALES S/3,143.00 S/3,143.00
06.03.04.01 MATERIALES PARA LA DIFUSION mll 4.00 S/280.00 S/280.00
06.03.04.02 CHARLAS A TRABAJADORES E INFORMACION DE DEUDAS LOCALES und 7.00 S/2,863.00 S/2,863.00
06.03.05 SEGURIDAD S/7,624.68 S/7,624.68
06.03.05.01 SEÑALIZACION DE SEGURIDAD VIAL PARTICULARES S/7,624.68 S/7,624.68
06.03.05.01.01 LETREROS DE SEÑALIZACION DE PREVENCION und 6.00 S/1,577.52 S/1,577.52
06.03.05.01.02 LETRERO DE ZONA DE TRABAJO und 6.00 S/1,577.52 S/1,577.52
06.03.05.01.03 MAQUINARIA EN LA VIA und 2.00 S/525.84 S/525.84
06.03.05.01.04 LETREROS DE SEÑALIZACION INFORMATIVA und 10.00 S/2,629.20 S/2,629.20
06.03.05.01.05 LETRERO DE PROBIHICION (PERSONAS NO AUTORIZADAS) und 5.00 S/1,314.60 S/1,314.60
06.03.06 SEÑALIZACION AMBIENTAL S/10,930.71 S/10,930.71
06.03.06.01 SEÑALIZACION AMBIENTAL-TEMPORAL und 14.00 S/2,029.44 S/2,029.44
06.03.06.02 SEÑALIZACION AMBIENTAL-PERMANENTE und 7.00 S/8,901.27 S/8,901.27
06.04 PLAN DE SEGUIMIENTO Y CONTROL S/47,420.00 S/47,420.00
06.04.01 MONITOREO DE CALIDAD DE AIRE und 15.00 S/37,500.00 S/37,500.00
06.04.02 MONITOREO DE CALIDAD DE RUIDOS und 21.00 S/6,720.00 S/6,720.00
06.04.03 MONITOREO HIDROBIOLOGICO und 1.00 S/3,200.00 S/3,200.00
06.05 PLAN DE CONTINGENCIA S/9,200.00 S/9,200.00
06.05.01 SUMINISTRO DE BOTIQUINES und 1.00 S/500.00 S/500.00
06.05.02 EQUIPOS DE PRIMEROS AUXILIOS Y SOCORRO GLB 1.00 S/200.00 S/200.00
06.05.03 EQUIPOS PARA LOS DERRAMES DE SUSTANCIAS GLB 1.00 S/1,000.00 S/1,000.00
06.05.04 SIMULACROS DE EVACUACION EN CASOS DE SISMOS Y OTRO GLB 1.00 S/2,500.00 S/2,500.00
06.05.05 MONITOREO DE SUELO pto 2.00 S/2,400.00 S/2,400.00
06.05.06 MONITOREO DE AGUA pto 2.00 S/2,600.00 S/2,600.00
06.06 PLAN DE CIERRE Y ABANDONO S/46,000.00 S/46,000.00
06.06.01 DESMANTELAMIENTO Y/O DESMONTAJE DE AREAS OCUPADAS POR INSTALACIONES GLB
PROVISIONALES
1.00 S/1,000.00 S/1,000.00
06.06.02 ADQUISICION DE PLANTONES GLB 1.00 S/45,000.00 S/45,000.00
07 PLAN DE MONITOREO ARQUEOLOGICO S/26,800.00 S/26,800.00
07.01 ELABORACION DEL PLAN DE MONITOREO ARQUEOLOGICO GLB 1.00 S/4,300.00 S/4,300.00
07.02 IMPLEMENTACION DEL PLAN DE MONITOREO mes 3.00 S/22,500.00 S/22,500.00
% DE AVANCE PROGRAMADO 2.78% 2.01% 4.84% 7.85% 8.65% 11.44% 11.87% 12.94% 12.99% 14.85% 5.92% 3.87%
COSTO DIRECTO 23,132,469.21 644,169.06 463,972.03 1,119,050.30 1,816,320.92 1,999,899.31 2,647,139.27 2,745,924.29 2,992,227.87 3,004,327.00 3,435,346.28 1,368,792.42 895,300.45
GASTOS GENERALES (8% del CD) 1,850,597.54 51,533.52 37,117.76 89,524.02 145,305.67 159,991.95 211,771.14 219,673.94 239,378.23 240,346.16 274,827.70 109,503.39 71,624.04
UTILIDAD (7% del CD) 1,619,272.84 45,091.83 32,478.04 78,333.52 127,142.46 139,992.95 185,299.75 192,214.70 209,455.95 210,302.89 240,474.24 95,815.47 62,671.03
SUB TOTAL 26,602,339.59 740,794.42 533,567.83 1,286,907.84 2,088,769.06 2,299,884.21 3,044,210.16 3,157,812.94 3,441,062.06 3,454,976.05 3,950,648.22 1,574,111.28 1,029,595.52
I.G.V. (18%) 4,788,421.13 133,343.00 96,042.21 231,643.41 375,978.43 413,979.16 547,957.83 568,406.33 619,391.17 621,895.69 711,116.68 283,340.03 185,327.19
COSTO TOTAL 31,390,760.72 874,137.41 629,610.04 1,518,551.25 2,464,747.49 2,713,863.37 3,592,167.99 3,726,219.26 4,060,453.23 4,076,871.73 4,661,764.90 1,857,451.32 1,214,922.72