ESTIMACION

Obra: CENTRO JOYERO NUMERO


8

Periodo del: DEL 22 AL 26 DE JULIO DEL 2024 Fecha 22/07/2024

Clave PAGOS ANTERIORES PAGO SOLICITADO


CONTRATISTA PRESUPUESTO
PAGO A CONTRATISTA RETENCION TOTAL PAGADO SALDO PAGO A CONTRATISTA RETENCION TOTAL A PAGAR SALDO

CONTRATISTA
1.- ELIAS AMKIE SEGURO $4,582.00

2.- ARMANDO GALINDO POSIBLE DEMOLICION $33,500.00 $24,225.00 $1,275.00 $25,500.00 $8,000.00 $4,000.00 $200.00 $4,200.00 $3,800.00

2.1 ARMANDO GALINDO POSIBLE HERRERIA $195,897.00 $158,925.00 $2,825.00 $161,750.00 $34,147.00 $12,000.00 $600.00 $12,600.00 $21,547.00

2.2 ARMANDO POSIBLE TABLAROCA $42,667.00 $10,000.00 $500.00 $28,500.00 $14,167.00 $5,000.00 $250.00 $5,250.00 $8,917.00

2.3 ARMANDO GALINDO POSIBLE PUERTAS ( herrerias ) $27,400.00 $27,400.00 $10,000.00 $500.00 $10,500.00 $16,900.00

2.4 ARMANDO GALINDO POSIBLE VIDRIO TEMPLADO $13,500.00 $13,500.00

3.- ISRAEL ESTRADA ESTRADA ELECTRICO $63,100.00 $10,000.00 $500.00 $63,100.00 $0.00

3.1 ISRAEL ESTRADA ESTRADA ELECTRICO $42,800.00 $42,800.00 $25,000.00 $1,250.00 $26,250.00 $16,550.00

4.- ARTURO VALADEZ AIRE ACONDICIONADO $82,869.72 $71,773.10 $1,075.00 $72,848.10 $10,021.62 $3,500.00 $175.00 $3,675.00 $6,346.62

5.- FLORENTINO GRANADOS CANCELERIA $59,400.00 $55,000.00 $2,750.00 $55,000.00 $4,400.00

6.- FLORENTINO GRANADOS CRISTAL CRAQUELADO

DICTAMEN
7.- MARLEN GONZALEZ ESTRUCTURAL
COLOCADOR
7.- GONZALO PORCELANATO
$23,000.00 $5,000.00 $18,000.00 $9,000.00 $450.00 $9,450.00 $8,550.00
COMPRA DE MATERIAL
PAGO A PATRULLA 2
1.- ARMANDO POSIBLE EVENTOS
2.-
3.-

4.-
VARIOS
1.- HONORARIOS AR+K 15% $10,788.75

TOTAL A PAGAR $82,713.75

Elaboró: Revisó Contratista Revisó D.O. Autorizó