TA2 Jorge Jimenez Italo Julian Deivi Norabuena Joaquin Ruiz
TA2 Jorge Jimenez Italo Julian Deivi Norabuena Joaquin Ruiz
TA2 Jorge Jimenez Italo Julian Deivi Norabuena Joaquin Ruiz
%Participacion x Area
% Participacion
MC Ponderado
x 6 dias
x 4.2 semanas
MANO DE OBRA
COSTOS FIJOS(CF+MO)
TOTAL
MO x producto
MO X producto unitario
CF X porducto
CF X producto unitario
Costo total unitario
Margen de Contribucion
P.E.
UNIDADES
COMPROBACIÓN
PLATILLOS
VENTAS
MENOS:CV
MARGEN DE CONTRIBUCION TOTAL
MENOS:COSTOS FIJOS
UTILIDAD
PLATO PRINCIPAL
PACHAMANCA
S/ 27.71
S/ 11.77
26%
8%
S/ 0.66
70
18
111
466
S/ 5,481.24
S/ 5,481.24
S/ 18,305.00
S/ 26,085.00
S/ 31,566.24
S/ 1,464.40
S/ 3.14
S/ 2,086.80
S/ 4.48
S/ 19.40
S/ 8.31
COSTOS FIJOS
SUMA DE MCP
9617
Pachamanca
S/ 230,599.40
S/ 204,514.40
DE CONTRIBUCION TOTAL
NOS:COSTOS FIJOS
UTILIDAD
8.00%
S/ 0.22
1
466
120214
9617
TOTAL
S/ 230,599.40
S/ 204,514.40
S/ 26,085.00
S/ 26,085.00
S/ 0.00
100
S/ 0.00
S/ 0.00 S/ 0.00
S/ 0.00 S/ 0.00 S/ 0.00
S/ 0.00 S/ 0.00
S/ 0.00 S/ 0.00
S/ 0.00
S/ 0.00 S/ 0.00 S/ 0.00
S/ 0.00
PACHAMANCA 1
especerias 0.5
arroz 1/4
choclo 1
papa arenosa 2
ajo 1/4
pollo 1/4
aceite 0.1
sal 0.1
kg 1 0.50
Kg 2 0.50
Kg 1 1.00
kg 2 4.00
Kg 10 2.50
Kg 8 2.00
Kg 1 0.10
unid. 1.00 0.10
MANO DE OBRA
PLANILLA POR
TRABAJADOR PLANILLA TOTAL
S/ 2,520.00 S/ 2,520.00
S/ 1,435.00 S/ 1,435.00
S/ 1,435.00 S/ 1,435.00
S/ 5,390.00
PLANILLA POR
TRABAJADOR PLANILLA TOTAL
S/ 2,380.00 S/ 2,380.00
S/ 1,680.00 S/ 3,360.00
S/ 1,435.00 S/ 2,870.00
S/ 1,435.00 S/ 4,305.00
S/ 12,915.00
S/ 18,305.00
COSTOS FIJOS
CF GASTO CANTIDAD
Alquiler de Local S/4,500.00 1
Luz x kw-H S/850.00 1
Agua S/ 1,100.00 1
Gas S/ 850.00 1
Internet S/130.00 1
Mantenimiento de local S/ 350.00 1
S
COSTO TOTAL MENSUAL
S/4,500.00
S/850.00
S/1,100.00
S/850.00
S/130.00
S/ 350.00
S/7,780.00
Pronóstico mediante Regresión Lineal
44 41 45 42 45 44 42 44
44 41 45 42 45 44 42 44
e la Cevicheria
25
10 12 14
Noviembre Diciembre
484 489
0 0
484 489
0 0
45 45
45 45