Liquidacion Final
Liquidacion Final
Liquidacion Final
RESUMEN VALORIZACIÓN N° 09
CORRESPONDIENTE AL MES DE JULIO : 01 de JULIO al 29 de AGOSTO del 2014
OBRA:
AMPLIACIÓN, REHABILITACIÓN DE AULAS Y AMBIENTES COMPLEMENTARIOS DE LA I.E. SAN RAMÓN – AA.HH. VILLA
DEL TRIUNFO – SAN RAMÓN – CHANCHAMAYO - JUNÍN
VALORIZACION 01 S/. 98,106.17 S/. 49,645.57 S/. 0.00 S/. 48,460.59 S/. 1,132,534.21
VALORIZACION 02 S/. 196,568.58 S/. 116,865.25 S/. 0.00 S/. 79,703.32 S/. 1,052,830.89
VALORIZACION 03 S/. 312,406.20 S/. 94,573.42 S/. 0.00 S/. 217,832.77 S/. 834,998.12
VALORIZACION 04 S/. 202,433.70 S/. 106,022.23 S/. 0.00 S/. 96,411.48 S/. 738,586.64
VALORIZACION 05 S/. 185,170.45 S/. 69,028.75 S/. 0.00 S/. 116,141.70 S/. 622,444.94
VALORIZACION 06 S/. 436,301.16 S/. 118,566.91 S/. 0.00 S/. 317,734.26 S/. 304,710.68
VALORIZACION 07 S/. 126,566.39 S/. 45,507.81 S/. 0.00 S/. 81,058.58 S/. 223,652.10
VALORIZACION 08 S/. 266,173.78 S/. 187,119.94 S/. 0.00 S/. 79,053.84 S/. 144,598.26
VALORIZACION
ADICIONAL 01 S/. 157,441.50 S/. 0.00 S/. 0.00 S/. 157,441.50 S/. 144,597.76
RESUMEN TOTAL A
LA FECHA #REF! S/. 787,329.88 S/. 0.00 S/. 1,968,324.68 S/. 0.00
MONTOS ACUMULADOS
MONTOS
ACUMULADOS #REF! S/. 787,329.88 S/. 0.00 S/. 0.00
GOBIERNO REGIONAL JUNÍN
SUB GERENCIA DE SUPERVISIÓN Y LIQUIDACIÓN DE OBRAS
D). REINTEGROS
Aplicados V
Valorización N° 01 S/. 1,177.27
Valorización N° 02 S/. 2,358.83
Valorización N° 03 S/. 5,935.72
Valorización N° 04 S/. 6,073.01
Valorización N° 05 S/. 7,221.64
Valorización N° 06 S/. 17,888.35
Valorización N° 07 S/. 6,075.19
Valorización N° 08 S/. 23,423.29
Valorización N° 09 S/. 13,592.23
TOTAL S/. 83,745.53
1.2 PAGADO
A). IMPORTE DEL CONTRATO PRINCIPAL
FACTURA N° 001241
CP N° 1223
DETRACCIÓN S/. 1,938.42
PAGO 1RA VAL. S/. 46,522.17
M. FACTURADO 1RA VAL. S/. 48,460.59 + IGV
FACTURA N° 001242
CP N° 1947
DETRACCIÓN S/. 3,188.13
PAGO 1RA VAL. S/. 76,515.19
M. FACTURADO 2DA VAL. S/. 79,703.32 + IGV
FACTURA N° 001251
CP N° 3660
DETRACCIÓN S/. 8,713.31
PAGO 1RA VAL. S/. 209,119.46
M. FACTURADO 3RA VAL. S/. 217,832.77 + IGV
FACTURA N° 001252
CP N° 3658
DETRACCIÓN S/. 3,856.46
PAGO 1RA VAL. S/. 92,555.02
M. FACTURADO 4TA VAL. S/. 96,411.48 + IGV
FACTURA N° 001258
CP N° 4637
DETRACCIÓN 4645.67
PAGO 1RA VAL. S/. 111,496.03
M. FACTURADO 5TA VAL. S/. 116,141.70 + IGV
FACTURA N° 001263
CP N° 5329
DETRACCIÓN S/. 12,709.37
PAGO 1RA VAL. S/. 305,024.89
M. FACTURADO 6TA VAL. S/. 317,734.26 + IGV
FACTURA N° 001272
CP N° 6383
DETRACCIÓN S/. 3,242.34
PAGO 1RA VAL. S/. 77,816.24
M. FACTURADO 7MA VAL. S/. 81,058.58 + IGV
FACTURA N° 001285
CP N° 7491
DETRACCIÓN S/. 3,162.15
PAGO 1RA VAL. S/. 75,891.69
M. FACTURADO 8VA VAL. S/. 79,053.84 + IGV
FACTURA N° 001291
CP N° 12646
DETRACCIÓN S/. 5,783.93
PAGO 1RA VAL. S/. 138,814.33
M. FACTURADO 9NA VAL. S/. 144,598.26 + IGV
C. REINTEGROS APROBADOS
FACTURA N° -
CP N° -
PAGO VAL. S/. 0.00 + IGV
AMORTIZADO
FACTURA N° 001241
CP N° 1223
VAL. N°01 S/. 19,621.23
FACTURA N° 001242
CP N° 1947
VAL. N°02 S/. 39,313.72
FACTURA N° 001251
CP N° 3660
VAL. N°03 S/. 62,481.24
FACTURA N° 001252
CP N° 3658
VAL. N°04 S/. 40,486.74
FACTURA N° 001258
CP N° 4637
VAL. N°05 S/. 37,034.09
FACTURA N° 001263
CP N° 5329
VAL. N°06 S/. 87,260.23
FACTURA N° 001272
CP N° 6383
VAL. N°07 S/. 25,313.28
FACTURA N° 001285
CP N° 7491
VAL. N°08 S/. 82,154.41
RESUMEN
N° D° AUTORIZADO PAGADO
1 DEL CONTRATO PRINCIPAL S/. 1,968,324.68 S/. 1,180,994.80
2 DE LOS ADICIONALES S/. 119,023.19 S/. 119,023.19
3 DE LOS DEDUCTIVOS -S/. 119,023.19 -S/. 119,023.19
4 DE LOS REINTEGROS S/. 83,745.53 S/. 0.00
5 DEL ADELANTO EN EFECTIVO S/. 393,664.94
6 DEL ADELANTO DE MATERIALES S/. 393,664.94
SALDO A FAVOR DEL CONTRATISTA
S/. 1,968,324.68
MONTOS ACUMULADOS
MONTOS
ACUMULADOS S/. 1,968,324.68 S/. 787,329.88 S/. 0.00
K = 0.148*(Mr / Mo) + 0.130*(Cr / Co) + 0.180*(AMr / AMo) + 0.109*(Ar / Ao) + 0.325*(Mr / Mo) + 0.108*(GUr / GUo)
Io Ir * Ir * Ir * Ir * Ir * Ir * Ir * Ir
NOV SET 2013 OCT 2013 NOV 2013 MAY 2014 JUN 2014 JUL 2014 AGO 2014 AGO 2013
IU DESCRIPCION 2012
SIMB. MON. INCID. INDICE VAL N° 01 VAL N° 02 VAL N° 03 VAL N° 04 VAL N° 05 VAL N° 06 VAL N° 07 AD.DIRECTO
BASE INDICE K INDICE K INDICE K INDICE K INDICE K INDICE K INDICE K INDICE K
47 MANO DE OBRA INC. LEYES SOCIALES M 0.148 100.00% 470.79 497.55 0.156 497.55 0.156 497.55 0.156 498.10 0.157 523.70 0.165 523.70 0.165 523.70 0.165 497.55 0.156
21 CEMENTO PORTLAND TIPO I C 0.130 100.00% 354.74 354.74 0.130 354.74 0.130 354.74 0.130 354.74 0.130 354.74 0.130 354.74 0.130 366.81 0.134 354.74 0.130
09 ALCANTARILLA METALICA AM 0.180 78.33% 276.43 294.62 0.190 297.70 0.191 296.32 0.190 297.28 0.192 296.43 0.192 299.40 0.192 304.72 0.194 298.02 0.191
43 MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA 21.67% 755.29 785.03 784.27 779.29 797.19 795.70 791.25 789.51 784.65
05 AGREGADO GRUESO A 0.109 100.00% 361.27 381.91 0.115 384.46 0.116 387.00 0.117 393.67 0.119 392.81 0.119 393.59 0.119 392.69 0.118 379.17 0.114
49 MAQUINARIA Y EQUIPO IMPORTADO M 0.325 100.00% 228.18 245.55 0.350 248.12 0.353 246.97 0.352 248.68 0.354 248.34 0.354 250.83 0.357 255.29 0.364 248.02 0.353
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR GU 0.108 100.00% 380.33 392.43 0.111 391.57 0.111 392.22 0.111 400.98 0.114 402.72 0.114 402.37 0.114 403.02 0.114 391.85 0.111
∑= 1.000 1.053 1.058 1.056 1.065 1.073 1.077 1.090 1.056
(*) Los Indices Unificados (IU) en cada valorizacion corresponden al mes en que deberia de ser pagada dicha valorizacion, es decir, corresponden al mes siguiente de cada una.
REAJUSTE POR CADA VALORIZACION
OBRA : "MEJORAMIENTO DEL CAMINO VECINAL TRAMO SAN MARTIN DE PANGOA – JOSE LEAL – UNION CHAVINI, LONG. 29 + 600 KM., DISTRITO DE PANGOA, PROVINCIA DE SATIPO – JUNIN"
PROCESO DE SELECCIÓN : LICITACIÓN PÚBLICA N° 002-2013-CEP/MPS-I
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE SATIPO
EJECUTOR : CONSORCIO FELICITA RESIDENTE DE OBRA : ING. MIGUEL DARIO NUÑEZ CORILLOCLLA
MODALIDAD : A SUMA ALZADA SUPERVISOR DE OBRA : ING. LUIS GABRIEL FERNANDEZ SARMIENTO
FECHA DE PRESUPUESTO : NOVIEMBRE 2012 PLAZO DE EJECUCION : 210 DIAS CALENDARIOS
AREA GEOGRAFICA :3 PRESUP. BASE : S/. 3,728,750.61
FACTOR DE RELACIÓN : 0.90
REAJUSTE = V (K-1) PRESUP. CONTRATADO : S/. 3,355,875.55
001 SETIEMBRE 2013 VALORIZACION N° 01 S/.217,668.61 S/.13,060.12 S/.13,060.12 S/.243,788.85 S/.43,881.99 S/.287,670.84 0.90 S/.258,903.76 1.053 S/.13,721.90 S/.13,721.90
002 OCTUBRE 2013 VALORIZACION N° 02 S/.281,060.15 S/.16,863.61 S/.16,863.61 S/.314,787.37 S/.56,661.73 S/.371,449.09 0.90 S/.334,304.18 1.058 S/.19,389.64 S/.33,111.54
003 NOVIEMBRE 2013 VALORIZACION N° 03 S/.0.00 S/.0.00 S/.0.00 S/.0.00 S/.0.00 S/.0.00 0.90 S/.0.00 1.056 S/.0.00 S/.33,111.54
004 MAYO 2014 VALORIZACION N° 04 S/.368,526.51 S/.22,111.59 S/.22,111.59 S/.412,749.69 S/.74,294.94 S/.487,044.64 0.90 S/.438,340.17 1.065 S/.28,492.11 S/.61,603.65
005 JUNIO 2014 VALORIZACION N° 05 S/.361,138.08 S/.21,668.28 S/.21,668.28 S/.404,474.64 S/.72,805.44 S/.477,280.08 0.90 S/.429,552.07 1.073 S/.31,357.30 S/.92,960.95
006 JULIO 2014 VALORIZACION N° 06 S/.297,643.84 S/.17,858.63 S/.17,858.63 S/.333,361.10 S/.60,005.00 S/.393,366.10 0.90 S/.354,044.87 1.077 S/.27,261.45 S/.120,222.41
007 AGOSTO 2014 VALORIZACION N° 07 S/.351,241.06 S/.21,074.46 S/.21,074.46 S/.393,389.98 S/.70,810.20 S/.464,200.18 0.90 S/.417,780.16 1.090 S/.37,600.21 S/.157,822.62
RESUMEN DE SUB-PRESUPUESTOS
#REF!
OBRA: #REF!
EJECUTA: #REF!
SUPERVISOR: #REF!
MES VALORIZADO: #REF!
MONTO DEL PRESUPUESTO BASE: #REF! (incl. I.G.V.)
FECHA PRESUPUESTO BASE: #REF!
MONTO DEL PRESUP. CONTRATADO: #REF! (incl. I.G.V.)
FACTOR DE RELACION (F.R.): #REF!
COSTO DIRECTO 974,430.41 950,968.83 97.59% 2,766.43 0.28% 953,735.26 97.88% 20,695.15 2.12%
GASTOS GENERALES 10.00% 97,443.04 95,096.88 276.64 95,373.53 2,069.52
UTILIDAD 8.00% 77,954.43 76,077.51 221.31 76,298.82 1,655.61
SUBTOTAL 1,149,827.88 1,122,143.22 3,264.38 1,125,407.61 24,420.28
FACTOR DE RELACION #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL VALORIZADO MENSUAL #REF! #REF! #REF! #REF! #REF!
GOBIERNO REGIONAL JUNÍN
SUB GERENCIA DE SUPERVISIÓN Y LIQUIDACIÓN DE OBRAS
COSTO DIRECTO 262,433.07 176,580.70 67.29% -12,475.69 -4.75% 164,105.00 62.53% 98,328.04 37.47%
GASTOS GENERALES 10.00% 26,243.31 17,658.07 -1,247.57 16,410.50 9,832.80
UTILIDAD 8.00% 20,994.65 14,126.46 -998.06 13,128.40 7,866.24
GOBIERNO REGIONAL JUNÍN
SUB GERENCIA DE SUPERVISIÓN Y LIQUIDACIÓN DE OBRAS
COSTO DIRECTO 251,157.72 251,157.72 100.00% 0.00 0.00% 251,157.72 100.00% 0.00 0.00%
GASTOS GENERALES 10.00% 25,115.77 25,115.77 0.00 25,115.77 0.00
UTILIDAD 8.00% 20,092.62 20,092.62 0.00 20,092.62 0.00
SUBTOTAL 296,366.11 296,366.11 0.00 296,366.11 0.00
FACTOR DE RELACION #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL VALORIZADO MENSUAL #REF! #REF! #REF! #REF! #REF!
CURVA "S"
#REF!
OBRA :
EJECUTA : #REF!
FINANCIA : GOBIERNO REGIONAL JUNÍN 0.00
MOD. EJECUCION : CONTRATO A SUMA ALZADA MONTO CONTRATADO #REF!
SUPERVISOR #REF! Inicio de Obra : 14/Noviembre/2013
Plazo de Ejec.ofertada 180 dias cal.
Fin de Obra ofertada : 12/Mayo/2014
100.0%
C ALEN D AR IO CON TR AC TU AL
C ALEN D AR IO IN TERN O
AVAN C E REAL
80.0%
79.13%
72.70%
60.0%
61.80%
56.13%
50.53%
41.13%
40.0% 40.99%
30.84%
24.00%
20.0%
14.97%
15.16%
4.98% 7.19%
2.92%
0.0%
Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14
OBRA #REF!
FINANCIA : MUNICIPALIDAD PROVINCIAL DE PASCO
EJECUTA CONSORCIO AFRODITA S.A. C
MOD. EJEC : A SUMA ALZADA
SUPERVISOR #REF!
AVANCE ACTUAL
ITEM DESCRIPCION PARTIDA
UNIDAD METRADO VALORIZADO %
1 AMBIENTE ADMINISTRATIVO
1.01 ESTRUCTURAS
01.01.02 TRABAJOS PRELIMINARES 0.00 0.00 0.00%
01.01.02.02 TRAZO Y REPLANTEO PRELIMIMAR m2 0.00 0.00 0.00%
01.01.03 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00%
01.01.03.02 EXCAVACION DE ZANJAS PARA ZAPATAS(H) prom=1.80 m3 0.00 0.00 0.00%
01.01.03.03 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 0.00 0.00 0.00%
01.01.03.04 ACARREO DE MATERIAL EXCEDENTE Dist. PROMEDIO=30 M m3 0.00 0.00 0.00%
01.01.04 CONCRETO SIMPLE 0.00 0.00 0.00%
01.01.04.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 0.00 0.00 0.00%
01.01.04.02 CONCRETO 1:10+25% PM PARA SOBRECIMIENTOS m3 0.00 0.00 0.00%
01.01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 m m2 0.00 0.00 0.00%
01.01.05 CONCRETO ARMADO 0.00 0.00 0.00%
01.01.05.01 ZAPATAS 0.00 0.00 0.00%
01.01.05.01.01 CONCRETO f'c= 210 kg/cm2 EN ZAPATAS m3 0.00 0.00 0.00%
01.01.05.02 COLUMNAS 0.00 0.00 0.00%
01.01.05.02.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 0.00 0.00 0.00%
01.01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 0.00 0.00 0.00%
01.01.05.02.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 0.00 0.00 0.00%
01.01.05.03 VIGAS 0.00 0.00 0.00%
01.01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 0.00 0.00 0.00%
01.01.05.04 LOSA ALIGERADA 0.00 0.00 0.00%
01.01.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 0.00 0.00 0.00%
TOTAL: AMBIENTE ADMINISTRATIVO 0.00 0.00 0.00%
0.00 0.00 0.00%
2 CONSTRUCCION DE AULAS NUEVAS (8 AULAS) 0.00 0.00 0.00%
2.01 ESTRUCTURAS 0.00 0.00 0.00%
02.01.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00%
02.01.01.02 TRAZO Y REPLANTEO PRELIMIMAR m2 0.00 0.00 0.00%
02.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00%
02.01.02.03 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 0.00 0.00 0.00%
02.01.02.04 ACARREO DE MATERIAL EXCEDENTE Dist. PROMEDIO=30 M m3 0.00 0.00 0.00%
02.01.03 CONCRETO SIMPLE 0.00 0.00 0.00%
02.01.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 0.00 0.00 0.00%
02.01.03.02 CONCRETO 1:10+25% PM PARA SOBRECIMIENTOS m3 0.00 0.00 0.00%
02.01.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 m m2 0.00 0.00 0.00%
02.01.04 CONCRETO ARMADO 0.00 0.00 0.00%
02.01.04.01 ZAPATAS 0.00 0.00 0.00%
02.01.04.01.01 CONCRETO f'c= 210 kg/cm2 EN ZAPATAS m3 0.00 0.00 0.00%
02.01.04.02 COLUMNAS 0.00 0.00 0.00%
MUNICIPALIDAD PROVINCIAL DE PASCO
Gerencia de Desarrollo Urbano y Rural
Sub Gerencia de Estudios, Obras - Maquinarias y Equipos Pesados
Fórmula Polinómica 01 : k = 0.356 Jr/Jo + 0.201ALr/ALo + .209CABr/CABo + 0.038ATTr/ATTo + 0.161MMr/Mmo + 0.028Fr/Fo + 0.007GGUr/GGUo
1 2 3 4 5 6 7 8
I.U. BASE 01 02
Nov-06 Dec-06 Jan-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07
2 411.34 445.90 -
3 408.84 443.56
5 262.18 279.01 -
12 241.50 245.71 -
17 486.56 511.16 -
21 350.43 350.43 -
32 382.01 386.13 -
39 313.29 313.51 -
40 310.70 312.13 -
43 531.16 543.11 -
45 265.65 270.88
47 361.10 361.10 -
48 327.22 328.24 -
65 285.52 291.77 -
72 360.16 361.46 -
OBRA: #REF!
ENTIDAD: GOBIERNO REGIONAL JUNÍN
FECHA : 10/31/2008
Medidas
Part. Descripción Cant. Parcial Total Und
Largo Ancho Altura
Página 32 de 37
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO DIRECTO (A.D.)
OBRA : "MEJORAMIENTO DEL CAMINO VECINAL TRAMO SAN MARTIN DE PANGOA – JOSE LEAL – UNION CHAVINI, LONG. 29 + 600 KM., DISTRITO DE PANGOA, PROVINCIA DE SATIPO – JUNIN"
PROCESO DE SELECCIÓN : LICITACIÓN PÚBLICA N° 002-2013-CEP/MPS-I
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE SATIPO
EJECUTOR : CONSORCIO FELICITA RESIDENTE DE OBRA : ING. MIGUEL DARIO NUÑEZ CORILLOCLLA
MODALIDAD : A SUMA ALZADA SUPERVISOR DE OBRA : ING. LUIS GABRIEL FERNANDEZ SARMIENTO
FECHA DE PRESUPUESTO : NOVIEMBRE 2012 PLAZO DE EJECUCION : 210 DIAS CALENDARIOS
AREA GEOGRAFICA :3 PRESUP. BASE : S/. 3,728,750.61
FACTOR DE RELACIÓN : 0.90
DEDUCCION = (A x Ko / Ka) x (K - Ka) / Ko PRESUP. CONTRATADO : S/. 3,355,875.55
001 SETIEMBRE 2013 VALORIZACION N° 01 S/.217,668.61 S/.13,060.12 S/.13,060.12 S/.243,788.85 S/.43,881.99 S/.287,670.84 S/.258,903.76 S/. 0.00 1.053 1.056 S/.0.00 S/.0.00
002 OCTUBRE 2013 VALORIZACION N° 02 S/.281,060.15 S/.16,863.61 S/.16,863.61 S/.314,787.37 S/.56,661.73 S/.371,449.09 S/.334,304.18 S/. 42,414.37 1.058 1.056 S/.80.33 S/.80.33
003 NOVIEMBRE 2013 VALORIZACION N° 03 S/.0.00 S/.0.00 S/.0.00 S/.0.00 S/.0.00 S/.0.00 S/.0.00 S/. 0.00 1.056 1.056 S/.0.00 S/.80.33
004 MAYO 2014 VALORIZACION N° 04 S/.368,526.51 S/.22,111.59 S/.22,111.59 S/.412,749.69 S/.74,294.94 S/.487,044.64 S/.438,340.17 S/. 0.00 1.065 1.056 S/.0.00 S/.80.33
005 JUNIO 2014 VALORIZACION N° 05 S/.361,138.08 S/.21,668.28 S/.21,668.28 S/.404,474.64 S/.72,805.44 S/.477,280.08 S/.429,552.07 S/. 0.00 1.073 1.056 S/.0.00 S/.80.33
006 JULIO 2014 VALORIZACION N° 06 S/.297,643.84 S/.17,858.63 S/.17,858.63 S/.333,361.10 S/.60,005.00 S/.393,366.10 S/.354,044.87 S/. 87,382.70 1.077 1.056 S/.1,737.72 S/.1,818.05
007 AGOSTO 2014 VALORIZACION N° 07 S/.351,241.06 S/.21,074.46 S/.21,074.46 S/.393,389.98 S/.70,810.20 S/.464,200.18 S/.417,780.16 S/. 29,871.28 1.090 1.056 S/.961.76 S/.2,779.82
A. AVANCE EJECUTADO
A.1. DEL CONTRATO PRINCIPAL
VALORIZACIÓN N°01 - PRESUPUESTO PRINCIPAL S/172,557.69 S/172,557.69 S/. 0.00
VALORIZACIÓN N°02 - PRESUPUESTO PRINCIPAL S/1,217,009.66 S/1,217,009.66 S/. 0.00
VALORIZACIÓN N°03 - PRESUPUESTO PRINCIPAL S/973,144.11 S/973,144.11 S/. 0.00
VALORIZACIÓN N°04 - PRESUPUESTO PRINCIPAL S/1,217,027.42 S/1,217,027.42 S/. 0.00
VALORIZACIÓN N°05 - PRESUPUESTO PRINCIPAL S/1,690,947.12 S/1,690,947.12 S/. 0.00
VALORIZACIÓN N°06 - PRESUPUESTO PRINCIPAL S/886,762.72 S/886,762.72 S/. 0.00
VALORIZACIÓN N°07 - PRESUPUESTO PRINCIPAL S/457,328.23 S/. 457,328.23
VALORIZACIÓN N°08 - PRESUPUESTO PRINCIPAL S/100,635.15 S/. 100,635.15
A.2. DEL CONTRATO ADICIONAL
NO PRESENTA ADICIONALES S/. 0.00 S/. 0.00 S/. 0.00
A.3. DEL CONTRATO DEDUCTIVO
NO PRESENTA DEDUCTIVOS S/. 0.00 S/. 0.00 S/. 0.00
TOTAL A. S/. 6,715,412.10 S/. 6,157,448.72 S/. 557,963.38
B. REAJUSTE POR CADA VALORIZACION
NO PRESENTA REAJUSTES S/. 0.00 S/. 0.00 S/. 0.00
TOTAL B. S/. 0.00 S/. 0.00 S/. 0.00
C. DEDUCCIÓN DEL REAJUSTE Q.N.C. POR ADELANTOS
ADELANTO DIRECTO S/. 0.00 S/. 0.00 S/. 0.00
ADELANTO PARA MATERIALES S/. 0.00 S/. 0.00 S/. 0.00
TOTAL C. S/. 0.00 S/. 0.00 S/. 0.00
D. ADELANTOS OTORGADOS
MULTA POR ATRASO DE OBRA S/. 0.00 S/. 0.00 S/. 0.00
INDEMNIZACIÓN POR ATRASO DE OBRA S/. 0.00 S/. 0.00 S/. 0.00
TOTAL F. S/. 0.00 S/. 0.00 S/. 0.00
G. RETENCIONES
RESUMEN GENERAL (A+B-C+D+E-F-G) inc. IGV S/. 6,715,412.10 S/. 6,157,448.72 S/. 557,963.38
A CANCELAR AL CONTRATISTA: QUINIENTOS CIENCUENTA Y SIETE MIL NOVECIENTOS SESENTA Y TRES CON 38/100 SOLES
RESUMEN DE VALORIZACIONES
"MEJORAMIENTO DEL CAMINO VECINAL TRAMO SAN MARTIN DE PANGOA – JOSE LEAL – UNION CHAVINI,
OBRA
LONG. 29 + 600 KM., DISTRITO DE PANGOA, PROVINCIA DE SATIPO – JUNIN"
PROCESO DE SELECCIÓN LICITACIÓN PÚBLICA N° 002-2013-CEP/MPS-I
ENTIDAD MUNICIPALIDAD PROVINCIAL DE SATIPO
EJECUTOR CONSORCIO FELICITA
MODALIDAD A SUMA ALZADA
MONTO DEL PRESUP. BASE S/. 3,728,750.61 INC. IGV
MONTO DEL PRESUP. CONTRATADO S/. 3,355,875.55 INC. IGV
PRESUPUESTO GENERAL S/. 3,728,750.61 S/. 287,670.84 S/. 371,449.09 0 S/. 487,044.63 S/. 477,280.08 S/. 393,366.10 S/. 464,200.18
FACTOR DE RELACION 0.90 S/. 3,355,875.55 S/. 258,903.76 S/. 334,304.18 0 S/. 438,340.17 S/. 429,552.07 S/. 354,044.87 S/. 417,780.16
MONTO VALORIZADO DEL MES S/. 3,355,875.55 S/. 258,903.76 S/. 334,304.18 0 S/. 438,340.17 S/. 429,552.07 S/. 354,044.87 S/. 417,780.16