Estimaciones ENTREGA FINAL-1
Estimaciones ENTREGA FINAL-1
Estimaciones ENTREGA FINAL-1
CAS-HAB/007/54
NUMERO DE OBRA:
14875
OFICIO DE ASIGNACION:
HABI-0010/ABDE-305
ESTIMACION NUMERO :
01
ENTIDAD FEDERATIVA: FECHA:
DEL AL
BUENO $ 393,130.65
DEDUCCIONES ESTIMACION
IMPORTE DE LA OBRA EJECUTADA $ 484,151.04
AMORTIZACION DEL ANTICIPO 30%.. $ 168,484.56 16% I.V.A. $ 77,464.17
SUMA $ 561,615.21
IMPORTE CON I.V.A. ………………… $ 561,615.21 MENOS DEDUCCIONES (30% ANTICIPO) $ 168,484.56
1 PRELIMINARES $ 11,651.56
LIM007 DESPALME Y DESENRAIZADO DE TERRENO A MAQUINA Y/O A MANO CON M2 165.00 165.00 0.00 165.00 0.00 11.19 1,846.35
ACARREO DE MATERIAL SOBRANTE PARA DESPLANTE DE EDIFICIO,
INCLUYETRAZO
LIMPIA, MAQUINARIA, MANOPARA
Y NIVELACIÓN DE DESPLANTE
OBRA, EQUIPO, HERRAMIENTA,
DE EDIFICIO, INCLUYE
LIM002 M2 165.00 165.00 0.00 165.00 0.00 9.87 1,628.55
ACARREO DENTRO
LOCALIZACIÓN DE YEJES,
FUERACOTAS,
DE LA OBRA. MATERIAL
NIVELES, MEDIDO
EQUIPO, EN BANCO.Y
HERRAMIENTA
MANO DE OBRA.
EXCAVACIÓN A MANO EN ZANJA, INCLUYE AFINE DE TALUDES Y FONDO.
EXCA001 M3 56.19 56.19 0.00 56.19 0.00 111.94 6,289.82
MATERIAL COMÚN SECO, CUALQUIER ZONA, PROFUNDIDAD DE 0.00 A
2.00 M
ACARREO HORIZONTAL SIN PENDIENTE, DE TIERRA, ARENA, GRAVA,
ACA014-1 CASCAJO, MATERIAL SOBRANTE DE LA EXCAVACIÓN, ETC., EN M3 56.19 56.19 0.00 56.19 0.00 33.58 1,886.84
CARRETILLA DE 3.5 PIES CÚBICOS, A LA PRIMERA ESTACIÓN 20.00
METROS INCLUYE CARGA Y DESCARGA DEL MATERIAL.
2 CIMENTACION $ 63,467.52
PLANTILLA APISONADA AL 85% PROCTOR CON COMPACTADOR
PLAN024 VIBRATORIO CON MATERIAL DE BANCO (TEPETATE). PRESENTANDO LA M3 17.29 17.29 0.00 17.29 0.00 412.72 7,135.52
PRUEBA DE CONTROL DE CALIDAD DE LA COMPACTACIÓN (INCLUYE
ACARREO
PLANTILLADE
DEMATERIAL
CONCRETOA LA ZANJA).
SIMPLE F'C 100 KG/CM2 DE 5 CENTÍMETROS.
PLAN020 DE ESPESOR, CON AGREGADO MÁXIMO DE 19 MM. INCLUYE: M2 86.45 86.45 0.00 86.45 0.00 111.85 9,668.87
MATERIALES, FABRICACIÓN DEL CONCRETO, ACARREOS, EQUIPO,
HERRAMIENTA, MANO DE OBRA Y DESPERDICIOS.
CIM007 CIMIENTOS DE MAMPOSTERÍA DE PIEDRA BRASA ASENTADA CON M3 31.72 31.72 0.00 31.72 0.00 1,348.32 42,768.71
MORTERO CEMENTO-CAL HIDRA-ARENA EN PROPORCIÓN 1:1:6
CIMB002 CIMBRADO Y DESCIMBRADO COMÚN EN ZAPATAS AISLADAS DE M2 1.30 1.30 0.00 1.30 0.00 351.51 456.96
CIMENTACIÓN
SUMINISTRO, HABILITADO, ARMADO Y COLOCADO DE ACERO DE
ACE003 REFUERZO EN ESTRUCTURA RESISTENCIA NOMINAL FY 4,200 KG/CM2 KG 11.70 11.70 0.00 11.70 0.00 40.16 469.87
NÚMERO 3 DIÁMETRO 3/8"
CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON
CON007 CARRETILLA Y BOTES F'C 250 KG/CM2 TAMAÑO MÁXIMO DEL AGREGADO M3 1.30 1.30 0.00 1.30 0.00 2,282.76 2,967.59
3/4”REVENIMIENTO DE 10 CENTÍMETROS AGREGADO MÁXIMO 3/4" EN
CIMENTACIÓN, INCLUYE: ELABORACIÓN, CURADO Y VACIADO.
3 DADO $ 113,711.90
CIMB004 CIMBRADO Y DESCIMBRADO COMÚN EN COLUMNAS M2 0.72 0.72 0.00 0.72 0.00 388.93 280.03
MUTA022 MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 12 X M2 184.54 184.54 0.00 184.54 0.00 290.96 53,693.76
24 CENTÍMETROS EN 12 CENTÍMETROS DE ESPESOR,
ASENTADO CON MORTERO CEMENTO-CAL HIDRA-ARENA
BASECA004 BASE PARA CASTILLO INTERMEDIO CON ARMEX DE 15 X 15- PZA 30.00 30.00 0.00 30.00 0.00 281.54 8,446.20
EN PROPORCIÓNINCLUYE
4CENTÍMETROS., 1:1:6 JUNTAS
ANCLAJEDE 1.5 CENTÍMETROS
Y CONCRETO F'C 200
CAS119 KG/CM2 3/4"
CASTILLO DECON UNA SECCIÓN
CONCRETO DE 3015
SECCIÓN XX4030
X 46.8
CENTÍMETROS M 28.60 28.60 0.00 28.60 0.00 445.45 12,739.87
CONCRETO F'C 200 KG/CM2 TAMAÑO MÁXIMO DEL
CASTILLO DE CONCRETO SECCIÓN 15 X 15 CENTÍMETROS
AGREGADO PÉTREO 3/4”, CIMBRA 2 CARAS REFORZADO
CONCRETO F'C 150 KG/CM2 TAMAÑO MÁXIMO DEL
CAS085 CON 4 VARILLAS R.N. DE 3/8" ESTRIBOS DE 1/4" A CADA 25 M 7.80 7.80 0.00 7.80 0.00 252.31 1,968.02
AGREGADO PÉTREO 3/4”, CIMBRA 2 CARAS, REFORZADO
CON ARMEX DE 15 X 15 - 4
CASTILLO DE CONCRETO SECCIÓN 20 X 15 CENTÍMETROS
CONCRETO F'C 150 KG/CM2 TAMAÑO MÁXIMO DEL
CAS129 AGREGADO PÉTREO 3/4”, CIMBRA 2 CARAS REFORZADO M 61.90 61.90 0.00 61.90 0.00 421.68 26,101.99
CON 4 VARILLAS R.N. DE 3/8" ESTRIBOS DE 1/4" A CADA 25
CENTÍMETROS
CASTILLO DE CONCRETO SECCIÓN 28 X 30 CENTÍMETROS
CONCRETO F'C 200 KG/CM2 TAMAÑO MÁXIMO DEL
CAS205 AGREGADO PÉTREO 3/4”, CIMBRA 2 CARAS REFORZADO M 2.60 2.60 0.00 2.60 0.00 699.03 1,817.48
CON 4 VARILLAS R.N. DE 1/2" ESTRIBOS DE 1/4" A CADA 25
CENTÍMETROS
FIR012 FIRME DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C 150 M2 69.48 0.00 0.00 0.00 69.48 314.17 0.00
KG/CM2 AGREGADO MÁXIMO 3/4" DE 10 CENTÍMETROS DE ESPESOR,
ARMADO CON MALLA DE 6X6-10/10
CONTRATISTA SUPERVISIOR DE OBRA PROPIETARIO
" CASA HABITACION EN EL MUNICIPIO DE XICOTEPEC DE JUAREZ
PUEBLA"
7 ESCALERA 0.00
CONCRETO
ACERO EN ESCALERA,
DE REFUERZO HECHO EN OBRA
EN ESTRUCTURA PARADECONSTRUCCIÓN
F'C=250 KG/CM2,
DE
4030 04 INCLUYE: ACARREOS, COLADO, M3 0.84 0.00 0.00 0.00 0.84 2,503.04 0.00
ESCALERA, VARILLA DEL #3 @ 15VIBRADO,
EN AMBOSMANO DE OBRA,
SENTIDOS EQUIPO
FY=4200 Y
KG/CM2.
HERRAMIENTA.
INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS,
4090 01 HABILITADO, AMARRES, MANO DE OBRA, EQUIPO Y HERRAMIENTA. KG 31.30 0.00 0.00 0.00 31.30 47.90 0.00
4080 04 CIMBRA DE MADERA PARA CONSTRUCCIÓN DE ESCALERA M2 6.88 0.00 0.00 0.00 6.88 355.11 0.00
LOSA002 LOSA PLANA EN ESTRUCTURA, PERALTE 10 M2 136.30 0.00 0.00 0.00 136.30 866.02 0.00
CENTÍMETROS CIMBRA COMÚN REFORZADA CON 74 KG DE
ACERO POR M3 EN AMBOS SENTIDOS A CADA 20
CENTÍMETROS. CONCRETO F'C
CONTRATISTA 250 KG/CM2 TAMAÑO SUPERVISOR DE OBRA PROPIETARIO
" CASA HABITACION EN EL MUNICIPIO DE XICOTEPEC DE JUAREZ
PUEBLA"
ELEC044 SALIDA Y RAMALEO ELÉCTRICO DE ILUMINACIÓN Y SAL 27.00 0.00 0.00 0.00 27.00 763.89 0.00
CONTACTO, CON UN DESARROLLO DE 6.00METROS
PROMEDIO, INCLUYE: APAGADOR, CONTACTO Y SALIDA DE
PLAFÓN, CAJA DE LAMINA, TAPA, CABLE, ALAMBRE, CON
12 INSTALACIÓN HIDROSANITARIA 0.00
SALIDA HIDRÁULICA Y SANITARIA CON TUBO Y
INSHS001 CONEXIONES HIDRÁULICOS DE COBRE TIPO M Y SAL 7.00 0.00 0.00 0.00 7.00 2,284.94 0.00
GALVANIZADOS DE CÉDULA 40 Y TUBOS SANITARIOS DE
PVC Y FOFO INCLUYE: RAMALEO, MATERIALES,
16 HERRERIA 0.00
SUMINISTRO Y COLOCACIÓN, PUERTA DE HERRERÍA
PUHE001 TUBULAR PERFILES "Z", "T" Y "L" TAMBOR DOBLE LAMINA PZA 1.00 0.00 0.00 0.00 1.00 2,615.76 0.00
CALIBRE 18 DE 1.80 M X 0.80 METROS
17 CARPINTERIA 0.00
PUERTA DE 0.90 X 2.10 M CON BASTIDOR DE MADERA DE
PINO DE 38 X 25 MM Y PEINAZOS HORIZONTALES A CADA 30
PTA003 CENTÍMETROS EN SENTIDO HORIZONTAL, FORRADA CON PZA 8.00 0.00 0.00 0.00 8.00 3,243.41 0.00
TRIPLAY DE CEDRO DE 6 MM EN AMBAS CARAS.
RESUMEN
1 PRELIMINARES $ 11,651.56
2 CIMENTACION $ 63,467.52
3 DADO $ 113,711.90
SUBTOTAL $ 405,544.38
INDIRECTOS 10% $ 40,554.44
SUBTOTAL $ 446,098.81
UTILIDAD 8,53% $ 38,052.23
SUBTOTAL $ 484,151.04
IVA 16% $ 77,464.17
SUBTOTAL $ 561,615.21
MENOS AMORTIZACION DEL ANTICIPO 30% $ 168,484.56
TOTAL A PAGAR $ 393,130.65
PERIODO
MUNICIPIO . XICOTEPEC DOMICILIO: CALLE CENTRO S/N TELÉFONO: 764-105-25-45
5/29/2023
A
XICOTEPEC DE JUAREZ,
OBRA : CASA HABITACION UBICACIÓN:
PUEBLA PARTIDA: RESUMEN
7/1/2023
FECHA
ESTIMACIÓN Nº uno CONVENIO No: CAS-HAB/007/54 HOJA: 1 DE 1
7/2/2023
RESUMEN IMPORTE
No. CONCEPTO
PRESUPUESTO PRESENTE ACUMULADO POR COMPROBAR ESTIMACIÓN
PRELIMINARES
1 $ 11,651.56 $ 11,651.56 $ 11,651.56 $ - $ 11,651.56
CIMENTACION
2 $ 63,467.52 $ 63,467.52 $ 63,467.52 $ - $ 63,467.52
DADO
3 $113,711.90 $ 113,711.90 $ 113,711.90 -$ 0.00 $ 113,711.90
ALBAÑILERIA PLANTA BAJA
4 $104,767.32 $ 104,767.32 $ 104,767.32 $ 0.00 $ 104,767.32
ACABADOS PLANTA BAJA
5 $ 90,667.66 $ - $ - $ 90,667.66 $ -
LOSA DE ENTREPISO
6 $111,946.08 $ 111,946.08 $ 111,946.08 $ 0.00 $ 111,946.08
ESCALERA
7 $ 6,045.14 $ - $ - $ 6,045.14 $ -
ALBAÑILERIA PLANTA ALTA
8 $ 71,494.20 $ - $ - $ 71,494.20 $ -
ACABADOS PLANTA ALTA
9 $ 52,192.37 $ - $ - $ 52,192.37 $ -
LOSA DE AZOTEA
10 $118,038.53 $ - $ - $118,038.53 $ -
INSTALACIÓN ELECTRICA
11 $ 20,625.03 $ - $ - $ 20,625.03 $ -
INSTALACIÓN HIDROSANITARIA
12 $ 15,994.58 $ - $ - $ 15,994.58 $ -
INSTALACIÓN DE GAS
13 $ 8,209.12 $ - $ - $ 8,209.12 $ -
MUEBLES DE BAÑO Y COCINA
14 $ 16,646.38 $ - $ - $ 16,646.38 $ -
CANCELERIA
15 $ 25,439.80 $ - $ - $ 25,439.80 $ -
HERRERIA
16 $ 2,615.76 $ - $ - $ 2,615.76 $ -
CARPINTERIA
17 $ 68,724.87 $ - $ - $ 68,724.87 $ -
CASA HABITACION
CALLE,CENTRO DE XICOTEPE
JUAREZ
OBRA: UBICACIÓN:
IMPORTE DE
IMPORTE DE CONTRATO PERIODO DE CONTRATO IMPORTE DE CONVENIO PERIODO DE CONVENIO ANTICIPO
$1,249,457.16 NOVENTA DIAS $1,249,457.16 NOVENTA DIAS $374,837.15
CAS-HAB/007/54
CALLE,CENTRO DE XICOTEPEC DE
JUAREZ
FECHA
7/2/2023
LIQUIDO A PAGAR
$ 374,837.15
$ 393,130.65
$ 767,967.79
MUNICIPIO DE XICOTEPEC,PUEBLA
2023-2024
N° OBRA REPORTE N°
DATOS GENERALES
MUNICIPIO: XICOTEPEC LOCALIDAD: XICOTEPEC DE JUAREZ, PUEBLA
1 PRELIMINARES
DESPALME Y DESENRAIZADO DE TERRENO A MAQUINA Y/O A MANO
0.93% 11,651.56 11,651.56 0.93%
LIM007 CON ACARREO DE MATERIAL SOBRANTE PARA DESPLANTE DE
EDIFICIO, INCLUYE MAQUINARIA, MANO DE OBRA, EQUIPO, 0.15% 1,846.35 1,846.35 0.15% 100%
HERRAMIENTA, ACARREO DENTRO Y FUERA DE LA OBRA. MATERIAL
MEDIDO EN BANCO.
LIM002 LIMPIA, TRAZO Y NIVELACIÓN PARA DESPLANTE DE EDIFICIO, INCLUYE
LOCALIZACIÓN DE EJES, COTAS, NIVELES, EQUIPO, HERRAMIENTA Y 0.13% 1,628.55 1,628.55 0.13% 100%
MANO DE OBRA.
2 CIMENTACIÓN
PLANTILLA APISONADA AL 85% PROCTOR CON COMPACTADOR
5.08% 63,467.52 63,467.52 5.08%
VIBRATORIO CON MATERIAL DE BANCO (TEPETATE). PRESENTANDO LA
PLAN024
PRUEBA DE 0.57% 7,135.52 7,135.52 0.57% 100%
PLANTILLA DECONTROL
CONCRETODESIMPLE
CALIDAD DE
F'C LAKG/CM2
100 COMPACTACIÓN (INCLUYE
DE 5 CENTÍMETROS.
ACARREO
DE ESPESOR, DE MATERIAL
CON AGREGADO A LADE
MÁXIMO ZANJA).
19 MM. INCLUYE:
PLAN020
MATERIALES, FABRICACIÓN DEL CONCRETO, ACARREOS, EQUIPO, 0.77% 9,668.87 9,668.87 0.77% 100%
HERRAMIENTA, MANO DE OBRA Y DESPERDICIOS.
CIMIENTOS DE MAMPOSTERÍA DE PIEDRA BRASA ASENTADA CON
CIM007
MORTERO CEMENTO-CAL HIDRA-ARENA EN PROPORCIÓN 1:1:6 3.42% 42,768.71 42,768.71 3.42% 100%
CIMB004 CIMBRADO Y DESCIMBRADO COMÚN EN COLUMNAS 0.02% 280.03 280.03 0.02% 100%
DATOS GENERALES
MUNICIPIO: XICOTEPEC LOCALIDAD: XICOTEPEC DE JUAREZ, PUEBLA
4080 04 CIMBRA DE MADERA PARA CONSTRUCCIÓN DE ESCALERA 0.20% 2,443.16 0.00 0.00% 0%
14 MUEBLESDE
SUMINISTRO Y COLOCACION DELAVABO
BAÑOMARCA
Y COCINA
CATO O SIMILAR, 1.33% 16,646.38 0.00 0.00%
AMACIZADO CON MORTERO CEMENTO-ARENA 1:3 INCLUYE: (UNA
PARTE PROPORCIONAL DE PZAS. ESPECIALES Y TUBERÍA DEL RAMAL
6008 01 GRAL. EN COBRE ASI COMO SU INSTALACION EN PVC
SUMINISTRO Y COLOCACION DE TARJA O VERTEDERO DE ACERO 0.35% 4,408.78 0.00 0%
SANITARIO).CONTRA, CESPOL, TUBO
INOXIDABLE PARA FREGADERO, GALAVANIZADO
INCLUYE: (UNA PARTEPARA SU
FIJACION, LLAVE DE
PROPORCIONAL MEZCLADORA COMERCIAL
PZAS. ESPECIALES Y TODO
Y TUBERÍA LORAMAL
DEL NECESARIO
GRAL.
6008 02 PARA SU CORRECTA
EN COBRE ASI COMO INSTALACION.
SU INSTALACION EN PVC SANITARIO). LLAVE 0.38% 4,776.85 0.00 0.00% 0%
MEZCLADORA COMERCIAL CUELLO DE GANZO. Y TODO LO
NECESARIO PARA SU CORRECTA INSTALACION.
SUMINISTRO Y COLOCACION DE REGADERA Y MANERALES
ECONOMICOS MCA. URREA O SIMILAR. INCLUYE: ( PARTE
6008 03 PROPORCIONAL DE PZAS. ESPECIALES Y TUBERÍA DE COBRE DEL 0.18% 2,193.39 0.00 0.00% 0%
RAMAL GRAL.) INCLUYE: TODO LO NECESARIO PARA SU CORRECTA
COLOCACION.
15 CANCELERIA
VENTANA CORREDIZA DE 1.60 X 2.00 CON UNA HOJA CORREDIZA DE 2.04% 25,439.80 0.00 0.00%
ALUMINIO ANODIZADO NATURAL DE 3" ALUMINIO NATURAL, INCLUYE:
VEES005 SUMINISTRO Y COLOCACIÓN
VENTANA CORREDIZA DE 0.60DE VIDRIO
X 0.50 CONDE 6 MM.
UNA CLARO,
HOJA CORREDIZA DE 0.46% 5,737.70 0.00 0.00% 0%
MOSQUITERO, HERRAJES Y TODO
ALUMINIO ANODIZADO NATURAL DE LO3"NECESARIO PARA SU INCLUYE:
ALUMINIO NATURAL, CORRECTA
INSTALACIÓN.
VEES003 SUMINISTRO
VENTANA Y COLOCACIÓN
CORREDIZA DE 0.90DE VIDRIO
X 1.20 CONDE 6 MM.
UNA CLARO,
HOJA CORREDIZA DE 0.09% 1,169.52 0.00 0.00% 0%
MOSQUITERO,
ALUMINIO HERRAJES
ANODIZADO Y TODO
NATURAL DELO3"NECESARIO PARA SU INCLUYE:
ALUMINIO NATURAL, CORRECTA
INSTALACIÓN.
VEES004 SUMINISTRO
VENTANA Y COLOCACIÓN
CORREDIZA DE 1.80DE VIDRIO
X 2.00 CONDE 6 MM.
UNA CLARO,
HOJA CORREDIZA DE 1.01% 12,630.96 0.00 0.00% 0%
MOSQUITERO,
ALUMINIO HERRAJES
ANODIZADO Y TODO
NATURAL DELO3"NECESARIO PARA SU INCLUYE:
ALUMINIO NATURAL, CORRECTA
INSTALACIÓN.
VEES002 SUMINISTRO Y COLOCACIÓN DE VIDRIO DE 6 MM. CLARO, 0.47% 5,901.62 0.00 0.00% 0%
MOSQUITERO, HERRAJES Y TODO LO NECESARIO PARA SU CORRECTA
INSTALACIÓN.
16 HERRERIA 0.21% 2,615.76 0.00 0.00%
SUMINISTRO Y COLOCACIÓN, PUERTA DE HERRERÍA TUBULAR
PUHE001 PERFILES "Z", "T" Y "L" TAMBOR DOBLE LAMINA CALIBRE 18 DE 1.80 M X
CLOSET DE MADERA DE 1.15 X 2.40 X 0.70 A BASE DE BASTIDOR
0.21% 2,615.76 0.00 0.00% 0%
0.80 METROS
PERIMETRAL
ELABORACIÓN DEY 25X37 MM. PARA
COLOCACIÓN DEENTREPAÑOS
CLOSET DE MADERAY MALETERO,
A BASE DE
17 PEINAZOS
BASTIDOR HORIZONTALES
PERIMETRAL DEDE CARPINTERIA
25 15 X 37
X 35 MM.MM.
PARAA CADA 25 CENTÍMETROS.
ENTREPAÑOS Y 5.50% 68,724.87 0.00 0.00%
PUERTA
PARA DE 0.90
SEPARADOR
MALETERO, X 2.10
PEINAZOS M CON
DE GUARDA BASTIDOR
ROPA YDE
HORIZONTALES DE MADERA
PUERTAS DE PINO
25 X 35 CORREDIZAS, DE
MM. A CADA 25 38 X
25 MM Y PEINAZOS HORIZONTALES AMM.
CADA 30 CENTÍMETROS EN
PTA003 PEINAZOS HORIZONTALES
CENTÍMETROS.
SENTIDO
PARA
HORIZONTAL,
DE 25X37
SEPARADOR DE A CADA
GUARDARROPA 40 CENTÍMETROS.
Y PUERTAS 2.08% 25,947.28 0.00 0.00% 0%
MADERA DE
CORREDIZAS, PINO DE 2A.FORRADA
PEINAZOS UNIDOS ACON
BASE
HORIZONTALES TRIPLAY
25 XDE
DE ESPIGA35CEDRO
Y CAJA
MM. DE
CON
A CADA6 MM
40 EN
AMBAS CARAS.
RESISTOL 850 OMADERA
CENTÍMETROS. SIMILAR DEY CLAVOS
PINO DESIN
2A.CABEZA
UNIDOSDE 19 MM,
A BASE DESOBRE
ESPIGA ELY
CLOSET001 BASTIDOR SE TERMINARA
CAJA CON RESISTOL 850 ODE TRIPLAY
SIMILAR DE MADERA
Y CLAVOS DE PINODE
SIN CABEZA DE191A. DE
MM. 1.09% 13,664.21 0.00 0.00% 0%
6 MM DEEL
SOBRE ESPESOR
BASTIDOR, TERMINADA AMBAS
SE TERMINARA DECARAS
TRIPLAYCON DOS
DE MANOS
MADERA DEDE
PINO
BARNIZ NATURAL
DE 1A. DE 6 MM. EN MATE,
AMBAS DEJANDO
CARAS,ELCONÁREA LIBRE DE BARNIZ
2 MANOS GRIETASINCLUYE:
Y
CLOSET002
POLVO. INCLUYE:
TORNILLOS, SUMINISTROS,
HERRAJES, FLETES,
CHAMBRANAS, RESANADO,
TUBO CROMADO ACARREOS,
DE 19 MM. 2.33% 29,113.38 0.00 0.00% 0%
COLOCACIÓN,
PARA ROPA, RIEL AJUSTE,
LIBRELIMPIEZA
DOBLE T PARA
CALIBREENTREGA, TORNILLOS,
18, CARRETILLAS, TAPA
HERRAJES,
RIEL. MATERIAL, EQUIPO, HERRAMIENTA Y MANO DE OBRA,
TOTAL
CHAMBRANAS DE MADERA DE PINO DE 2A. PARA DESARROLLO DE LA
100.00% 1,249,457.64 405,544.38 32.46%
MISMA A 10 CENTÍMETROS. PEINAZOS DE 2.5X3.7X40 CENTÍMETROS.
PARA SOSTÉN DE ENTREPAÑOS Y MALETERO, TUBO CROMADO DE 19
MM. PARA COLGAR LA ROPA, CABEZAL DE MADERA AVANCE DEL PERIODO (%)
DE 0.02X0.10X1.45 AVANCE ACUMULADO PREVIO (%) ACUMULADO AL PERIODO
METROS RIEL LIBRE NÚMERO 18, CARRETILLAS, TAPARRIEL, DOS
PUERTAS CORREDIZAS DE 0.60 X 1.80 METROS Y DOS PUERTAS
FISICO
CORREDIZAS 0.60 X 0.60 METROS
32.46% FISICO 0.00% 32.46%
FINANCIERO 32.46% FINANCIERO 30.00% 62.46%
AUXILIAR CONTABLE
CARGOS
N° DOCUMENTACION COMPROBATORIA MONTO FISCAL DOCUMENTO DE PAGO
OTROS
FORTAMUN FISM
DATOS GENERALES
MUNICIPIO: XICOTEPEC LOCALIDAD: XICOTEPEC DE JUAREZ, PUEBLA
1 PRELIMINARES $11,651.56
DESPALME Y DESENRAIZADO DE TERRENO A MAQUINA Y/O A MANO CON
LIM007 ACARREO DE MATERIAL SOBRANTE PARA DESPLANTE DE EDIFICIO, INCLUYE M2 165 11.19
MAQUINARIA, MANO DE OBRA, EQUIPO, HERRAMIENTA, ACARREO DENTRO Y $1,846.35
FUERA DE LA OBRA. MATERIAL MEDIDO EN BANCO.
LIMPIA, TRAZO Y NIVELACIÓN PARA DESPLANTE DE EDIFICIO, INCLUYE
LOCALIZACIÓN DE EJES, COTAS, NIVELES, EQUIPO, HERRAMIENTA Y MANO DE
LIM002 OBRA. M2 165 9.87
$1,628.55
EXCA001 EXCAVACIÓN A MANO EN ZANJA, INCLUYE AFINE DE TALUDES Y FONDO. M3 56.18925 111.94
MATERIAL COMÚN SECO, CUALQUIER ZONA, PROFUNDIDAD DE 0.00 A 2.00 M $6,289.82
ACARREO HORIZONTAL SIN PENDIENTE, DE TIERRA, ARENA, GRAVA, CASCAJO,
ACA014-1 MATERIAL SOBRANTE DE LA EXCAVACIÓN, ETC., EN CARRETILLA DE 3.5 PIES M3 56.18925 33.58
CÚBICOS, A LA PRIMERA ESTACIÓN 20.00 METROS INCLUYE CARGA Y $1,886.84
DESCARGA DEL MATERIAL.
2 CIMENTACIÓN $63,467.52
PLAN024 PLANTILLA APISONADA AL 85% PROCTOR CON COMPACTADOR VIBRATORIO M3 17.289 412.72 $7,135.52
CON MATERIAL DE BANCO (TEPETATE). PRESENTANDO LA PRUEBA DE
PLAN020 PLANTILLA
CONTROL DEDE CONCRETO SIMPLE
CALIDAD DE F'C 100 KG/CM2 (INCLUYE
LA COMPACTACIÓN DE 5 CENTÍMETROS.
ACARREO DE
DE M2 86.445 111.85
ESPESOR,
MATERIAL ACON AGREGADO MÁXIMO DE 19 MM. INCLUYE: MATERIALES,
LA ZANJA).
$9,668.87
FABRICACIÓN
CIMIENTOS DEDEL CONCRETO, DE
MAMPOSTERÍA ACARREOS, EQUIPO,ASENTADA
PIEDRA BRASA HERRAMIENTA, MANO DE
CON MORTERO
OBRA Y DESPERDICIOS.
CEMENTO-CAL HIDRA-ARENA EN PROPORCIÓN 1:1:6
CIM007 M3 31.72 1348.32
$42,768.71
CIMBRADO Y DESCIMBRADO COMÚN EN ZAPATAS AISLADAS DE CIMENTACIÓN
CIMB002 M2 1.3 351.51
$456.96
ACE003 SUMINISTRO, HABILITADO, ARMADO Y COLOCADO DE ACERO DE REFUERZO EN KG 11.7 40.16 $469.87
ESTRUCTURA RESISTENCIA NOMINAL FY 4,200 KG/CM2 NÚMERO 3 DIÁMETRO
CON007 CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON M3 1.3 2282.76
3/8" $2,967.59
CARRETILLA Y BOTES F'C 250 KG/CM2 TAMAÑO MÁXIMO DEL AGREGADO
3 3/4”REVENIMIENTO DE 10 CENTÍMETROS
DADO AGREGADO MÁXIMO 3/4" EN $113,711.90
CIMENTACIÓN, INCLUYE: ELABORACIÓN, CURADO Y VACIADO.
CIMB004 CIMBRADO Y DESCIMBRADO COMÚN EN COLUMNAS M2 0.72 388.93
$280.03
SUMINISTRO, HABILITADO, ARMADO Y COLOCADO DE ACERO DE REFUERZO EN
ACE004 ESTRUCTURA RESISTENCIA NOMINAL FY 4,200 KG/CM2 NÚMERO 4 DIÁMETRO KG 9.57 40.16
1/2" $384.33
CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON
CARRETILLA Y BOTES F'C 250 KG/CM2 TAMAÑO MÁXIMO DEL AGREGADO
CON007 3/4”REVENIMIENTO DE 10 CENTÍMETROS AGREGADO MÁXIMO 3/4" EN M3 0.5 2282.76
CIMENTACIÓN, INCLUYE: ELABORACIÓN, CURADO Y VACIADO.
$1,141.38
SUMINISTRO, HABILITADO, ARMADO Y COLOCADO DE ACERO DE REFUERZO EN
ACE003 ESTRUCTURA RESISTENCIA NOMINAL FY 4,200 KG/CM2 NÚMERO 3 DIÁMETRO KG 3.2 40.16
3/8" $128.51
DALA O CADENA DE DESPLANTE, INCLUYE CIMBRA Y DESCIMBRA SECCIÓN 15 X
DALA025 20 CENTÍMETROS CONCRETO F'C 150 KG/CM2 TAMAÑO MÁXIMO DEL M 96.05 338.26
AGREGADO PÉTREO 3/4”, REFORZADA CON 4 VARILLAS R.N. DE 3/8" ESTRIBOS $32,489.87
DE 1/4" A CADA
RELLENO 30 CENTÍMETROS
Y COMPACTACIÓN EN CIMENTACIÓN EN CAPAS DE 20 CENTÍMETROS.
RELL004 CON PISÓN DE MANO UTILIZANDO EL MATERIAL PRODUCTO DE M3 17.289 124.58
$2,153.86
EXCAVACIÓN .INCLUYE: TRASPALEOS AGUA PARA HOMOGENEIZAR EL
IMPERMEABILIZACIÓN EN MANO
MATERIAL, HERRAMIENTA, CIMENTACIÓN,
DE OBRA YDALAS Y CONTRA
ACARREOS, TRABES
MATERIAL MEDIDOCON
EN
IMP004 EMULSIÓN ASFÁLTICA MICROFEST Y MALLA FLEXIBLE FESTERFLEX, SISTEMA M2 192.1 401.53
MULTICAPA O SISTEMA SIMILAR: ELABORADO CON 1 MANO DE MICROPRIMER, 4
CAPAS DE MICROFEST, 3 CAPAS DE FESTERFLEX, ACABADO CON ARENA. $77,133.91
4 ALBAÑILERIA PLANTA BAJA $104,767.32
"CASA HABITACION EN EL MUNICIPIO DE XICOTEPEC DE XICOTEPEC DE
OBRA: 1° ESTIMACION
JUAREZ,PUEBLA JUAREZ ,PUEBLA
SUB-TOTAL: 405,544.38
SUB-TOTAL: 446,098.81
SUB-TOTAL: 484,151.03
B I.V.A.: 77,464.17
TOTAL: 561,615.20
Calendario mensual de ejecución de obra
Municipio: XICOTEPEC Fecha de Inicio: 29-may-23
Localidad: XICOTEPEC DE JUAREZ, PUEBLA Fecha de Estimación: 1-jul-23
7 ESCALERA $ - 0.00%
15 CANCELERIA $ - 0.00%
16 HERRERIA $ - 0.00%
17 CARPINTERIA $ - 0.00%
Monto Total de la Obra $ 405,544.38 100% 5,825.78 94,415.49 123,512.15 34,922.44 146,868.51 0.00
CAS-HAB/007/54
NUMERO DE OBRA:
14875
OFICIO DE ASIGNACION:
HABI-0010/ABDE-305
ESTIMACION NUMERO :
02
ENTIDAD FEDERATIVA: FECHA:
DEL AL
BUENO $ 316,524.77
DEDUCCIONES ESTIMACION
IMPORTE DE LA OBRA EJECUTADA $ 389,808.83
AMORTIZACION DEL ANTICIPO 30%.. $ 135,653.47 16% I.V.A. $ 62,369.41
SUMA $ 452,178.24
IMPORTE CON I.V.A. ………………… $ 452,178.24 MENOS DEDUCCIONES (30% ANTICIPO) $ 135,653.47
1 PRELIMINARES $ 0.00
LIM007 DESPALME Y DESENRAIZADO DE TERRENO A MAQUINA Y/O A MANO CON M2 165.00 0.00 165.00 165.00 0.00 11.19 0.00
ACARREO DE MATERIAL SOBRANTE PARA DESPLANTE DE EDIFICIO,
INCLUYETRAZO
LIMPIA, MAQUINARIA, MANOPARA
Y NIVELACIÓN DE DESPLANTE
OBRA, EQUIPO, HERRAMIENTA,
DE EDIFICIO, INCLUYE
LIM002 M2 165.00 0.00 165.00 165.00 0.00 9.87 0.00
ACARREO DENTRO
LOCALIZACIÓN DE YEJES,
FUERACOTAS,
DE LA OBRA. MATERIAL
NIVELES, MEDIDO
EQUIPO, EN BANCO.Y
HERRAMIENTA
MANO DE OBRA.
EXCAVACIÓN A MANO EN ZANJA, INCLUYE AFINE DE TALUDES Y FONDO.
EXCA001 M3 56.19 0.00 56.19 56.19 0.00 111.94 0.00
MATERIAL COMÚN SECO, CUALQUIER ZONA, PROFUNDIDAD DE 0.00 A
2.00 M
ACARREO HORIZONTAL SIN PENDIENTE, DE TIERRA, ARENA, GRAVA,
ACA014-1 CASCAJO, MATERIAL SOBRANTE DE LA EXCAVACIÓN, ETC., EN M3 56.19 0.00 56.19 56.19 0.00 33.58 0.00
CARRETILLA DE 3.5 PIES CÚBICOS, A LA PRIMERA ESTACIÓN 20.00
METROS INCLUYE CARGA Y DESCARGA DEL MATERIAL.
2 CIMENTACION $0.00
PLANTILLA APISONADA AL 85% PROCTOR CON COMPACTADOR
PLAN024 VIBRATORIO CON MATERIAL DE BANCO (TEPETATE). PRESENTANDO LA M3 17.29 0.00 17.29 17.29 0.00 412.72 0.00
PRUEBA DE CONTROL DE CALIDAD DE LA COMPACTACIÓN (INCLUYE
ACARREO
PLANTILLADE
DEMATERIAL
CONCRETOA LA ZANJA).
SIMPLE F'C 100 KG/CM2 DE 5 CENTÍMETROS.
PLAN020 DE ESPESOR, CON AGREGADO MÁXIMO DE 19 MM. INCLUYE: M2 86.45 0.00 86.45 86.45 0.00 111.85 0.00
MATERIALES, FABRICACIÓN DEL CONCRETO, ACARREOS, EQUIPO,
HERRAMIENTA, MANO DE OBRA Y DESPERDICIOS.
CIM007 CIMIENTOS DE MAMPOSTERÍA DE PIEDRA BRASA ASENTADA CON M3 31.72 0.00 31.72 31.72 0.00 1,348.32 0.00
MORTERO CEMENTO-CAL HIDRA-ARENA EN PROPORCIÓN 1:1:6
CIMB002 CIMBRADO Y DESCIMBRADO COMÚN EN ZAPATAS AISLADAS DE M2 1.30 0.00 1.30 1.30 0.00 351.51 0.00
CIMENTACIÓN
SUMINISTRO, HABILITADO, ARMADO Y COLOCADO DE ACERO DE
ACE003 REFUERZO EN ESTRUCTURA RESISTENCIA NOMINAL FY 4,200 KG/CM2 KG 11.70 0.00 11.70 11.70 0.00 40.16 0.00
NÚMERO 3 DIÁMETRO 3/8"
CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON
CON007 CARRETILLA Y BOTES F'C 250 KG/CM2 TAMAÑO MÁXIMO DEL AGREGADO M3 1.30 0.00 1.30 1.30 0.00 2,282.76 0.00
3/4”REVENIMIENTO DE 10 CENTÍMETROS AGREGADO MÁXIMO 3/4" EN
CIMENTACIÓN, INCLUYE: ELABORACIÓN, CURADO Y VACIADO.
3 DADO $0.00
CIMB004 CIMBRADO Y DESCIMBRADO COMÚN EN COLUMNAS M2 0.72 0.00 0.72 0.72 0.00 388.93 0.00
MUTA022 MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 12 X M2 184.54 0.00 184.54 184.54 0.00 290.96 0.00
24 CENTÍMETROS EN 12 CENTÍMETROS DE ESPESOR,
ASENTADO CON MORTERO CEMENTO-CAL HIDRA-ARENA
BASECA004 BASE PARA CASTILLO INTERMEDIO CON ARMEX DE 15 X 15- PZA 30.00 0.00 30.00 30.00 0.00 281.54 0.00
EN PROPORCIÓNINCLUYE
4CENTÍMETROS., 1:1:6 JUNTAS
ANCLAJEDE 1.5 CENTÍMETROS
Y CONCRETO F'C 200
CAS119 KG/CM2 3/4"
CASTILLO DECON UNA SECCIÓN
CONCRETO DE 3015
SECCIÓN XX4030
X 46.8
CENTÍMETROS M 28.60 0.00 28.60 28.60 0.00 445.45 0.00
CONCRETO F'C 200 KG/CM2 TAMAÑO MÁXIMO DEL
CASTILLO DE CONCRETO SECCIÓN 15 X 15 CENTÍMETROS
AGREGADO PÉTREO 3/4”, CIMBRA 2 CARAS REFORZADO
CONCRETO F'C 150 KG/CM2 TAMAÑO MÁXIMO DEL
CAS085 CON 4 VARILLAS R.N. DE 3/8" ESTRIBOS DE 1/4" A CADA 25 M 7.80 0.00 7.80 7.80 0.00 252.31 0.00
AGREGADO PÉTREO 3/4”, CIMBRA 2 CARAS, REFORZADO
CON ARMEX DE 15 X 15 - 4
CASTILLO DE CONCRETO SECCIÓN 20 X 15 CENTÍMETROS
CONCRETO F'C 150 KG/CM2 TAMAÑO MÁXIMO DEL
CAS129 AGREGADO PÉTREO 3/4”, CIMBRA 2 CARAS REFORZADO M 61.90 0.00 61.90 61.90 0.00 421.68 0.00
CON 4 VARILLAS R.N. DE 3/8" ESTRIBOS DE 1/4" A CADA 25
CENTÍMETROS
CASTILLO DE CONCRETO SECCIÓN 28 X 30 CENTÍMETROS
CONCRETO F'C 200 KG/CM2 TAMAÑO MÁXIMO DEL
CAS205 AGREGADO PÉTREO 3/4”, CIMBRA 2 CARAS REFORZADO M 2.60 0.00 2.60 2.60 0.00 699.03 0.00
CON 4 VARILLAS R.N. DE 1/2" ESTRIBOS DE 1/4" A CADA 25
CENTÍMETROS
FIR012 FIRME DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C 150 M2 69.48 69.48 0.00 69.48 0.00 314.17 21,828.53
KG/CM2 AGREGADO MÁXIMO 3/4" DE 10 CENTÍMETROS DE ESPESOR,
ARMADO CON MALLA DE 6X6-10/10
CONTRATISTA SUPERVISIOR DE OBRA PROPIETARIO
" CASA HABITACION EN EL MUNICIPIO DE XICOTEPEC DE JUAREZ
PUEBLA"
7 ESCALERA $6,045.14
CONCRETO
ACERO EN ESCALERA,
DE REFUERZO HECHO EN OBRA
EN ESTRUCTURA PARADECONSTRUCCIÓN
F'C=250 KG/CM2,
DE
4030 04 INCLUYE: ACARREOS, COLADO, M3 0.84 0.84 0.00 0.84 0.00 2,503.04 2,102.55
ESCALERA, VARILLA DEL #3 @ 15VIBRADO,
EN AMBOSMANO DE OBRA,
SENTIDOS EQUIPO
FY=4200 Y
KG/CM2.
HERRAMIENTA.
INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS,
4090 01 HABILITADO, AMARRES, MANO DE OBRA, EQUIPO Y HERRAMIENTA. KG 31.30 31.30 0.00 31.30 0.00 47.90 1,499.43
4080 04 CIMBRA DE MADERA PARA CONSTRUCCIÓN DE ESCALERA M2 6.88 6.88 0.00 6.88 0.00 355.11 2,443.16
LOSA002 LOSA PLANA EN ESTRUCTURA, PERALTE 10 M2 136.30 136.30 0.00 136.30 0.00 866.02 118,038.53
CENTÍMETROS CIMBRA COMÚN REFORZADA CON 74 KG DE
ACERO POR M3 EN AMBOS SENTIDOS A CADA 20
CENTÍMETROS. CONCRETO F'C
CONTRATISTA 250 KG/CM2 TAMAÑO SUPERVISOR DE OBRA PROPIETARIO
" CASA HABITACION EN EL MUNICIPIO DE XICOTEPEC DE JUAREZ
PUEBLA"
ELEC044 SALIDA Y RAMALEO ELÉCTRICO DE ILUMINACIÓN Y SAL 27.00 14.00 0.00 14.00 13.00 763.89 10,694.46
CONTACTO, CON UN DESARROLLO DE 6.00METROS
PROMEDIO, INCLUYE: APAGADOR, CONTACTO Y SALIDA DE
PLAFÓN, CAJA DE LAMINA, TAPA, CABLE, ALAMBRE, CON
12 INSTALACIÓN HIDROSANITARIA $9,139.76
SALIDA HIDRÁULICA Y SANITARIA CON TUBO Y
INSHS001 CONEXIONES HIDRÁULICOS DE COBRE TIPO M Y SAL 7.00 4.00 0.00 4.00 3.00 2,284.94 9,139.76
GALVANIZADOS DE CÉDULA 40 Y TUBOS SANITARIOS DE
PVC Y FOFO INCLUYE: RAMALEO, MATERIALES,
16 HERRERIA $2,615.76
SUMINISTRO Y COLOCACIÓN, PUERTA DE HERRERÍA
PUHE001 TUBULAR PERFILES "Z", "T" Y "L" TAMBOR DOBLE LAMINA PZA 1.00 1.00 0.00 1.00 0.00 2,615.76 2,615.76
CALIBRE 18 DE 1.80 M X 0.80 METROS
17 CARPINTERIA $0.00
PUERTA DE 0.90 X 2.10 M CON BASTIDOR DE MADERA DE
PINO DE 38 X 25 MM Y PEINAZOS HORIZONTALES A CADA 30
PTA003 CENTÍMETROS EN SENTIDO HORIZONTAL, FORRADA CON PZA 8.00 0.00 0.00 0.00 8.00 3,243.41 0.00
TRIPLAY DE CEDRO DE 6 MM EN AMBAS CARAS.
RESUMEN
1 PRELIMINARES $0.00
2 CIMENTACION $0.00
3 DADO $0.00
SUBTOTAL $326,519.55
INDIRECTOS 10% $ 32,651.95
SUBTOTAL $ 359,171.50
UTILIDAD 8,53% $ 30,637.33
SUBTOTAL $ 389,808.83
IVA 16% $ 62,369.41
SUBTOTAL $ 452,178.24
MENOS AMORTIZACION DEL ANTICIPO 30% $ 135,653.47
TOTAL A PAGAR $ 316,524.77
"CASA HABITACION EN EL MUNICIPIO DE XICOTEPEC DE XICOTEPEC DE
OBRA: 2° ESTIMACION
JUAREZ,PUEBLA JUAREZ ,PUEBLA
1 PRELIMINARES $0.00
DESPALME Y DESENRAIZADO DE TERRENO A MAQUINA Y/O A MANO CON
LIM007 ACARREO DE MATERIAL SOBRANTE PARA DESPLANTE DE EDIFICIO, INCLUYE M2 165 11.19
MAQUINARIA, MANO DE OBRA, EQUIPO, HERRAMIENTA, ACARREO DENTRO Y $0.00
FUERA DE LA OBRA. MATERIAL MEDIDO EN BANCO.
LIMPIA, TRAZO Y NIVELACIÓN PARA DESPLANTE DE EDIFICIO, INCLUYE
LOCALIZACIÓN DE EJES, COTAS, NIVELES, EQUIPO, HERRAMIENTA Y MANO DE
LIM002 OBRA. M2 165 9.87
$0.00
EXCA001 EXCAVACIÓN A MANO EN ZANJA, INCLUYE AFINE DE TALUDES Y FONDO. M3 56.18925 111.94
MATERIAL COMÚN SECO, CUALQUIER ZONA, PROFUNDIDAD DE 0.00 A 2.00 M $0.00
ACARREO HORIZONTAL SIN PENDIENTE, DE TIERRA, ARENA, GRAVA, CASCAJO,
ACA014-1 MATERIAL SOBRANTE DE LA EXCAVACIÓN, ETC., EN CARRETILLA DE 3.5 PIES M3 56.18925 33.58
CÚBICOS, A LA PRIMERA ESTACIÓN 20.00 METROS INCLUYE CARGA Y $0.00
DESCARGA DEL MATERIAL.
2 CIMENTACIÓN $0.00
PLAN024 PLANTILLA APISONADA AL 85% PROCTOR CON COMPACTADOR VIBRATORIO M3 17.289 412.72 $0.00
CON MATERIAL DE BANCO (TEPETATE). PRESENTANDO LA PRUEBA DE
PLAN020 PLANTILLA
CONTROL DEDE CONCRETO SIMPLE
CALIDAD DE F'C 100 KG/CM2 (INCLUYE
LA COMPACTACIÓN DE 5 CENTÍMETROS.
ACARREO DE
DE M2 86.445 111.85
ESPESOR,
MATERIAL ACON AGREGADO MÁXIMO DE 19 MM. INCLUYE: MATERIALES,
LA ZANJA).
$0.00
FABRICACIÓN
CIMIENTOS DEDEL CONCRETO, DE
MAMPOSTERÍA ACARREOS, EQUIPO,ASENTADA
PIEDRA BRASA HERRAMIENTA, MANO DE
CON MORTERO
OBRA Y DESPERDICIOS.
CEMENTO-CAL HIDRA-ARENA EN PROPORCIÓN 1:1:6
CIM007 M3 31.72 1348.32
$0.00
CIMBRADO Y DESCIMBRADO COMÚN EN ZAPATAS AISLADAS DE CIMENTACIÓN
CIMB002 M2 1.3 351.51
$0.00
ACE003 SUMINISTRO, HABILITADO, ARMADO Y COLOCADO DE ACERO DE REFUERZO EN KG 11.7 40.16 $0.00
ESTRUCTURA RESISTENCIA NOMINAL FY 4,200 KG/CM2 NÚMERO 3 DIÁMETRO
CON007 CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON M3 1.3 2282.76
3/8" $0.00
CARRETILLA Y BOTES F'C 250 KG/CM2 TAMAÑO MÁXIMO DEL AGREGADO
3 3/4”REVENIMIENTO DE 10 CENTÍMETROS
DADO AGREGADO MÁXIMO 3/4" EN $0.00
CIMENTACIÓN, INCLUYE: ELABORACIÓN, CURADO Y VACIADO.
CIMB004 CIMBRADO Y DESCIMBRADO COMÚN EN COLUMNAS M2 0.72 388.93
$0.00
SUMINISTRO, HABILITADO, ARMADO Y COLOCADO DE ACERO DE REFUERZO EN
ACE004 ESTRUCTURA RESISTENCIA NOMINAL FY 4,200 KG/CM2 NÚMERO 4 DIÁMETRO KG 9.57 40.16
1/2" $0.00
CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON
CARRETILLA Y BOTES F'C 250 KG/CM2 TAMAÑO MÁXIMO DEL AGREGADO
CON007 3/4”REVENIMIENTO DE 10 CENTÍMETROS AGREGADO MÁXIMO 3/4" EN M3 0.5 2282.76
CIMENTACIÓN, INCLUYE: ELABORACIÓN, CURADO Y VACIADO.
$0.00
SUMINISTRO, HABILITADO, ARMADO Y COLOCADO DE ACERO DE REFUERZO EN
ACE003 ESTRUCTURA RESISTENCIA NOMINAL FY 4,200 KG/CM2 NÚMERO 3 DIÁMETRO KG 3.2 40.16
3/8" $0.00
DALA O CADENA DE DESPLANTE, INCLUYE CIMBRA Y DESCIMBRA SECCIÓN 15 X
DALA025 20 CENTÍMETROS CONCRETO F'C 150 KG/CM2 TAMAÑO MÁXIMO DEL M 96.05 338.26
AGREGADO PÉTREO 3/4”, REFORZADA CON 4 VARILLAS R.N. DE 3/8" ESTRIBOS $0.00
DE 1/4" A CADA
RELLENO 30 CENTÍMETROS
Y COMPACTACIÓN EN CIMENTACIÓN EN CAPAS DE 20 CENTÍMETROS.
RELL004 CON PISÓN DE MANO UTILIZANDO EL MATERIAL PRODUCTO DE M3 17.289 124.58
$0.00
EXCAVACIÓN .INCLUYE: TRASPALEOS AGUA PARA HOMOGENEIZAR EL
IMPERMEABILIZACIÓN EN MANO
MATERIAL, HERRAMIENTA, CIMENTACIÓN,
DE OBRA YDALAS Y CONTRA
ACARREOS, TRABES
MATERIAL MEDIDOCON
EN
IMP004 EMULSIÓN ASFÁLTICA MICROFEST Y MALLA FLEXIBLE FESTERFLEX, SISTEMA M2 192.1 401.53
MULTICAPA O SISTEMA SIMILAR: ELABORADO CON 1 MANO DE MICROPRIMER, 4
CAPAS DE MICROFEST, 3 CAPAS DE FESTERFLEX, ACABADO CON ARENA. $0.00
4 ALBAÑILERIA PLANTA BAJA $0.00
"CASA HABITACION EN EL MUNICIPIO DE XICOTEPEC DE XICOTEPEC DE
OBRA: 2° ESTIMACION
JUAREZ,PUEBLA JUAREZ ,PUEBLA
SUB-TOTAL: 326,519.55
SUB-TOTAL: 359,171.50
SUB-TOTAL: 389,808.83
B I.V.A.: 62,369.41
TOTAL: 452,178.24
PERIODO
MUNICIPIO . XICOTEPEC DOMICILIO: CALLE CENTRO S/N TELÉFONO: 764-105-25-45
7/3/2023
A
XICOTEPEC DE JUAREZ,
OBRA : CASA HABITACION UBICACIÓN:
PUEBLA PARTIDA: RESUMEN
8/5/2023
FECHA
ESTIMACIÓN Nº DOS CONVENIO No: CAS-HAB/007/54 HOJA: 1 DE 1
8/6/2023
RESUMEN IMPORTE
No. CONCEPTO
PRESUPUESTO PRESENTE ACUMULADO POR COMPROBAR ESTIMACIÓN
PRELIMINARES
1 $11,651.56 $0.00 $11,651.56 $0.00 $ -
CIMENTACION
2 $63,467.52 $0.00 $63,467.52 $0.00 $ -
DADO
3 $113,711.90 $0.00 $113,711.90 $0.00 $ -
ALBAÑILERIA PLANTA BAJA
4 $104,767.32 $0.00 $104,767.32 $0.00 $ -
ACABADOS PLANTA BAJA
5 $90,667.66 $90,667.66 $90,667.66 $0.00 $ 90,667.66
LOSA DE ENTREPISO
6 $111,946.08 $0.00 $111,946.08 $0.00 $ -
ESCALERA
7 $6,045.14 $6,045.14 $6,045.14 $0.00 $ 6,045.14
ALBAÑILERIA PLANTA ALTA
8 $71,494.20 $71,494.20 $71,494.20 $0.00 $ 71,494.20
ACABADOS PLANTA ALTA
9 $52,192.37 $0.00 $0.00 $52,192.37 $ -
LOSA DE AZOTEA
10 $118,038.53 $118,038.53 $118,038.53 $0.00 $ 118,038.53
INSTALACIÓN ELECTRICA
11 $20,625.03 $10,694.46 $10,694.46 $9,930.57 $ 10,694.46
INSTALACIÓN HIDROSANITARIA
12 $15,994.58 $9,139.76 $9,139.76 $6,854.82 $ 9,139.76
INSTALACIÓN DE GAS
13 $8,209.12 $8,209.12 $8,209.12 $0.00 $ 8,209.12
MUEBLES DE BAÑO Y COCINA
14 $16,646.38 $9,614.92 $9,614.92 $7,031.46 $ 9,614.92
CANCELERIA
15 $25,439.80 $0.00 $0.00 $25,439.80 $ -
HERRERIA
16 $2,615.76 $2,615.76 $2,615.76 $0.00 $ 2,615.76
CARPINTERIA
17 $68,724.87 $0.00 $0.00 $68,724.87 $ -
CASA HABITACION
CALLE,CENTRO DE XICOTEPE
JUAREZ
OBRA: UBICACIÓN:
IMPORTE DE
IMPORTE DE CONTRATO PERIODO DE CONTRATO IMPORTE DE CONVENIO PERIODO DE CONVENIO ANTICIPO
$1,249,457.16 NOVENTA DIAS $1,249,457.16 NOVENTA DIAS $374,837.15
CAS-HAB/007/54
CALLE,CENTRO DE XICOTEPEC DE
JUAREZ
FECHA
8/6/2023
LIQUIDO A PAGAR
$ 374,837.15
$ 393,130.65
$ 316,524.77
$ 1,084,492.57
MUNICIPIO DE XICOTEPEC,PUEBLA
2023-2024
N° OBRA REPORTE N°
DATOS GENERALES
MUNICIPIO: XICOTEPEC LOCALIDAD: XICOTEPEC DE JUAREZ, PUEBLA
1 PRELIMINARES
DESPALME Y DESENRAIZADO DE TERRENO A MAQUINA Y/O A MANO
0.93% 11,651.56 0.00 0.00%
LIM007 CON ACARREO DE MATERIAL SOBRANTE PARA DESPLANTE DE
EDIFICIO, INCLUYE MAQUINARIA, MANO DE OBRA, EQUIPO, 0.15% 1,846.35 0.00 0.00% 0%
HERRAMIENTA, ACARREO DENTRO Y FUERA DE LA OBRA. MATERIAL
MEDIDO EN BANCO.
LIM002 LIMPIA, TRAZO Y NIVELACIÓN PARA DESPLANTE DE EDIFICIO, INCLUYE
LOCALIZACIÓN DE EJES, COTAS, NIVELES, EQUIPO, HERRAMIENTA Y 0.13% 1,628.55 0.00 0.00% 0%
MANO DE OBRA.
2 CIMENTACIÓN
PLANTILLA APISONADA AL 85% PROCTOR CON COMPACTADOR
5.08% 63,467.52 0.00 0.00%
VIBRATORIO CON MATERIAL DE BANCO (TEPETATE). PRESENTANDO LA
PLAN024
PRUEBA DE 0.57% 7,135.52 0.00 0.00% 0%
PLANTILLA DECONTROL
CONCRETODESIMPLE
CALIDAD DE
F'C LAKG/CM2
100 COMPACTACIÓN (INCLUYE
DE 5 CENTÍMETROS.
ACARREO
DE ESPESOR, DE MATERIAL
CON AGREGADO A LADE
MÁXIMO ZANJA).
19 MM. INCLUYE:
PLAN020
MATERIALES, FABRICACIÓN DEL CONCRETO, ACARREOS, EQUIPO, 0.77% 9,668.87 0.00 0.00% 0%
HERRAMIENTA, MANO DE OBRA Y DESPERDICIOS.
CIMIENTOS DE MAMPOSTERÍA DE PIEDRA BRASA ASENTADA CON
CIM007
MORTERO CEMENTO-CAL HIDRA-ARENA EN PROPORCIÓN 1:1:6 3.42% 42,768.71 0.00 0.00% 0%
DATOS GENERALES
MUNICIPIO: XICOTEPEC LOCALIDAD: XICOTEPEC DE JUAREZ, PUEBLA
4080 04 CIMBRA DE MADERA PARA CONSTRUCCIÓN DE ESCALERA 0.20% 2,443.16 2,443.16 0.20% 100%
14 MUEBLESDE
SUMINISTRO Y COLOCACION DELAVABO
BAÑOMARCA
Y COCINA
CATO O SIMILAR, 1.33% 16,646.38 9,614.92 0.77%
AMACIZADO CON MORTERO CEMENTO-ARENA 1:3 INCLUYE: (UNA
PARTE PROPORCIONAL DE PZAS. ESPECIALES Y TUBERÍA DEL RAMAL
6008 01 GRAL. EN COBRE ASI COMO SU INSTALACION EN PVC
SUMINISTRO Y COLOCACION DE TARJA O VERTEDERO DE ACERO 0.35% 4,408.78 2,204.39 0.18% 50%
SANITARIO).CONTRA, CESPOL, TUBO
INOXIDABLE PARA FREGADERO, GALAVANIZADO
INCLUYE: (UNA PARTEPARA SU
FIJACION, LLAVE DE
PROPORCIONAL MEZCLADORA COMERCIAL
PZAS. ESPECIALES Y TODO
Y TUBERÍA LORAMAL
DEL NECESARIO
GRAL.
6008 02 PARA SU CORRECTA
EN COBRE ASI COMO INSTALACION.
SU INSTALACION EN PVC SANITARIO). LLAVE 0.38% 4,776.85 4,776.85 0.38% 100%
MEZCLADORA COMERCIAL CUELLO DE GANZO. Y TODO LO
NECESARIO PARA SU CORRECTA INSTALACION.
SUMINISTRO Y COLOCACION DE REGADERA Y MANERALES
ECONOMICOS MCA. URREA O SIMILAR. INCLUYE: ( PARTE
6008 03 PROPORCIONAL DE PZAS. ESPECIALES Y TUBERÍA DE COBRE DEL 0.18% 2,193.39 0.00 0.00% 0%
RAMAL GRAL.) INCLUYE: TODO LO NECESARIO PARA SU CORRECTA
COLOCACION.
15 CANCELERIA
VENTANA CORREDIZA DE 1.60 X 2.00 CON UNA HOJA CORREDIZA DE 2.04% 25,439.80 0.00 0.00%
ALUMINIO ANODIZADO NATURAL DE 3" ALUMINIO NATURAL, INCLUYE:
VEES005 SUMINISTRO Y COLOCACIÓN
VENTANA CORREDIZA DE 0.60DE VIDRIO
X 0.50 CONDE 6 MM.
UNA CLARO,
HOJA CORREDIZA DE 0.46% 5,737.70 0.00 0.00% 0%
MOSQUITERO, HERRAJES Y TODO
ALUMINIO ANODIZADO NATURAL DE LO3"NECESARIO PARA SU INCLUYE:
ALUMINIO NATURAL, CORRECTA
INSTALACIÓN.
VEES003 SUMINISTRO
VENTANA Y COLOCACIÓN
CORREDIZA DE 0.90DE VIDRIO
X 1.20 CONDE 6 MM.
UNA CLARO,
HOJA CORREDIZA DE 0.09% 1,169.52 0.00 0.00% 0%
MOSQUITERO,
ALUMINIO HERRAJES
ANODIZADO Y TODO
NATURAL DELO3"NECESARIO PARA SU INCLUYE:
ALUMINIO NATURAL, CORRECTA
INSTALACIÓN.
VEES004 SUMINISTRO
VENTANA Y COLOCACIÓN
CORREDIZA DE 1.80DE VIDRIO
X 2.00 CONDE 6 MM.
UNA CLARO,
HOJA CORREDIZA DE 1.01% 12,630.96 0.00 0.00% 0%
MOSQUITERO,
ALUMINIO HERRAJES
ANODIZADO Y TODO
NATURAL DELO3"NECESARIO PARA SU INCLUYE:
ALUMINIO NATURAL, CORRECTA
INSTALACIÓN.
VEES002 SUMINISTRO Y COLOCACIÓN DE VIDRIO DE 6 MM. CLARO, 0.47% 5,901.62 0.00 0.00% 0%
MOSQUITERO, HERRAJES Y TODO LO NECESARIO PARA SU CORRECTA
INSTALACIÓN.
16 HERRERIA 0.21% 2,615.76 2,615.76 0.21%
SUMINISTRO Y COLOCACIÓN, PUERTA DE HERRERÍA TUBULAR
PUHE001 PERFILES "Z", "T" Y "L" TAMBOR DOBLE LAMINA CALIBRE 18 DE 1.80 M X
CLOSET DE MADERA DE 1.15 X 2.40 X 0.70 A BASE DE BASTIDOR
0.21% 2,615.76 2,615.76 0.21% 100%
0.80 METROS
PERIMETRAL
ELABORACIÓN DEY 25X37 MM. PARA
COLOCACIÓN DEENTREPAÑOS
CLOSET DE MADERAY MALETERO,
A BASE DE
17 PEINAZOS
BASTIDOR HORIZONTALES
PERIMETRAL DEDE CARPINTERIA
25 15 X 37
X 35 MM.MM.
PARAA CADA 25 CENTÍMETROS.
ENTREPAÑOS Y 5.50% 68,724.87 0.00 0.00%
PUERTA
PARA DE 0.90
SEPARADOR
MALETERO, X 2.10
PEINAZOS M CON
DE GUARDA BASTIDOR
ROPA YDE
HORIZONTALES DE MADERA
PUERTAS DE PINO
25 X 35 CORREDIZAS, DE
MM. A CADA 25 38 X
25 MM Y PEINAZOS HORIZONTALES AMM.
CADA 30 CENTÍMETROS EN
PTA003 PEINAZOS HORIZONTALES
CENTÍMETROS.
SENTIDO
PARA
HORIZONTAL,
DE 25X37
SEPARADOR DE A CADA
GUARDARROPA 40 CENTÍMETROS.
Y PUERTAS 2.08% 25,947.28 0.00 0.00% 0%
MADERA DE
CORREDIZAS, PINO DE 2A.FORRADA
PEINAZOS UNIDOS ACON
BASE
HORIZONTALES TRIPLAY
25 XDE
DE ESPIGA35CEDRO
Y CAJA
MM. DE
CON
A CADA6 MM
40 EN
AMBAS CARAS.
RESISTOL 850 OMADERA
CENTÍMETROS. SIMILAR DEY CLAVOS
PINO DESIN
2A.CABEZA
UNIDOSDE 19 MM,
A BASE DESOBRE
ESPIGA ELY
CLOSET001 BASTIDOR SE TERMINARA
CAJA CON RESISTOL 850 ODE TRIPLAY
SIMILAR DE MADERA
Y CLAVOS DE PINODE
SIN CABEZA DE191A. DE
MM. 1.09% 13,664.21 0.00 0.00% 0%
6 MM DEEL
SOBRE ESPESOR
BASTIDOR, TERMINADA AMBAS
SE TERMINARA DECARAS
TRIPLAYCON DOS
DE MANOS
MADERA DEDE
PINO
BARNIZ NATURAL
DE 1A. DE 6 MM. EN MATE,
AMBAS DEJANDO
CARAS,ELCONÁREA LIBRE DE BARNIZ
2 MANOS GRIETASINCLUYE:
Y
CLOSET002
POLVO. INCLUYE:
TORNILLOS, SUMINISTROS,
HERRAJES, FLETES,
CHAMBRANAS, RESANADO,
TUBO CROMADO ACARREOS,
DE 19 MM. 2.33% 29,113.38 0.00 0.00% 0%
COLOCACIÓN,
PARA ROPA, RIEL AJUSTE,
LIBRELIMPIEZA
DOBLE T PARA
CALIBREENTREGA, TORNILLOS,
18, CARRETILLAS, TAPA
HERRAJES,
RIEL. MATERIAL, EQUIPO, HERRAMIENTA Y MANO DE OBRA,
TOTAL
CHAMBRANAS DE MADERA DE PINO DE 2A. PARA DESARROLLO DE LA
100.00% 1,249,457.64 326,519.55 19.86%
MISMA A 10 CENTÍMETROS. PEINAZOS DE 2.5X3.7X40 CENTÍMETROS.
PARA SOSTÉN DE ENTREPAÑOS Y MALETERO, TUBO CROMADO DE 19
MM. PARA COLGAR LA ROPA, CABEZAL DE MADERA AVANCE DEL PERIODO (%)
DE 0.02X0.10X1.45 AVANCE ACUMULADO PREVIO (%) ACUMULADO AL PERIODO
METROS RIEL LIBRE NÚMERO 18, CARRETILLAS, TAPARRIEL, DOS
PUERTAS CORREDIZAS DE 0.60 X 1.80 METROS Y DOS PUERTAS
FISICO
CORREDIZAS 0.60 X 0.60 METROS
19.86% FISICO 32.46% 52.32%
FINANCIERO 19.86% FINANCIERO 62.46% 82.32%
AUXILIAR CONTABLE
CARGOS
N° DOCUMENTACION COMPROBATORIA MONTO FISCAL DOCUMENTO DE PAGO
OTROS
FORTAMUN FISM
DATOS GENERALES
MUNICIPIO: XICOTEPEC LOCALIDAD: XICOTEPEC DE JUAREZ, PUEBLA
1 PRELIMINARES $ - 0.00%
2 CIMENTACIÓN $ - 0.00%
3 DADO $ - 0.00%
15 CANCELERIA $ - 0.00%
17 CARPINTERIA $ - 0.00%
Monto Total de la Obra $ 326,519.55 100% 32,838.31 45,407.45 74,178.77 56,056.48 118,038.53 0.00
CAS-HAB/007/54
NUMERO DE OBRA:
14875
OFICIO DE ASIGNACION:
HABI-0010/ABDE-305
ESTIMACION NUMERO :
FINIQUITO
ENTIDAD FEDERATIVA: FECHA:
DEL AL
BUENO $ 316,524.77
DEDUCCIONES ESTIMACION
IMPORTE DE LA OBRA EJECUTADA $ 203,158.69
AMORTIZACION DEL ANTICIPO 30%.. $ 70,699.23 16% I.V.A. $ 32,505.39
SUMA $ 235,664.08
IMPORTE CON I.V.A. ………………… $ 235,664.08 MENOS DEDUCCIONES (40% ANTICIPO) $ 70,699.23
1 PRELIMINARES $ 0.00
LIM007 DESPALME Y DESENRAIZADO DE TERRENO A MAQUINA Y/O A MANO CON M2 165.00 0.00 165.00 165.00 0.00 11.19 0.00
ACARREO DE MATERIAL SOBRANTE PARA DESPLANTE DE EDIFICIO,
INCLUYETRAZO
LIMPIA, MAQUINARIA, MANOPARA
Y NIVELACIÓN DE DESPLANTE
OBRA, EQUIPO, HERRAMIENTA,
DE EDIFICIO, INCLUYE
LIM002 M2 165.00 0.00 165.00 165.00 0.00 9.87 0.00
ACARREO DENTRO
LOCALIZACIÓN DE YEJES,
FUERACOTAS,
DE LA OBRA. MATERIAL
NIVELES, MEDIDO
EQUIPO, EN BANCO.Y
HERRAMIENTA
MANO DE OBRA.
EXCAVACIÓN A MANO EN ZANJA, INCLUYE AFINE DE TALUDES Y FONDO.
EXCA001 M3 56.19 0.00 56.19 56.19 0.00 111.94 0.00
MATERIAL COMÚN SECO, CUALQUIER ZONA, PROFUNDIDAD DE 0.00 A
2.00 M
ACARREO HORIZONTAL SIN PENDIENTE, DE TIERRA, ARENA, GRAVA,
ACA014-1 CASCAJO, MATERIAL SOBRANTE DE LA EXCAVACIÓN, ETC., EN M3 56.19 0.00 56.19 56.19 0.00 33.58 0.00
CARRETILLA DE 3.5 PIES CÚBICOS, A LA PRIMERA ESTACIÓN 20.00
METROS INCLUYE CARGA Y DESCARGA DEL MATERIAL.
2 CIMENTACION $0.00
PLANTILLA APISONADA AL 85% PROCTOR CON COMPACTADOR
PLAN024 VIBRATORIO CON MATERIAL DE BANCO (TEPETATE). PRESENTANDO LA M3 17.29 0.00 17.29 17.29 0.00 412.72 0.00
PRUEBA DE CONTROL DE CALIDAD DE LA COMPACTACIÓN (INCLUYE
ACARREO
PLANTILLADE
DEMATERIAL
CONCRETOA LA ZANJA).
SIMPLE F'C 100 KG/CM2 DE 5 CENTÍMETROS.
PLAN020 DE ESPESOR, CON AGREGADO MÁXIMO DE 19 MM. INCLUYE: M2 86.45 0.00 86.45 86.45 0.00 111.85 0.00
MATERIALES, FABRICACIÓN DEL CONCRETO, ACARREOS, EQUIPO,
HERRAMIENTA, MANO DE OBRA Y DESPERDICIOS.
CIM007 CIMIENTOS DE MAMPOSTERÍA DE PIEDRA BRASA ASENTADA CON M3 31.72 0.00 31.72 31.72 0.00 1,348.32 0.00
MORTERO CEMENTO-CAL HIDRA-ARENA EN PROPORCIÓN 1:1:6
CIMB002 CIMBRADO Y DESCIMBRADO COMÚN EN ZAPATAS AISLADAS DE M2 1.30 0.00 1.30 1.30 0.00 351.51 0.00
CIMENTACIÓN
SUMINISTRO, HABILITADO, ARMADO Y COLOCADO DE ACERO DE
ACE003 REFUERZO EN ESTRUCTURA RESISTENCIA NOMINAL FY 4,200 KG/CM2 KG 11.70 0.00 11.70 11.70 0.00 40.16 0.00
NÚMERO 3 DIÁMETRO 3/8"
CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON
CON007 CARRETILLA Y BOTES F'C 250 KG/CM2 TAMAÑO MÁXIMO DEL AGREGADO M3 1.30 0.00 1.30 1.30 0.00 2,282.76 0.00
3/4”REVENIMIENTO DE 10 CENTÍMETROS AGREGADO MÁXIMO 3/4" EN
CIMENTACIÓN, INCLUYE: ELABORACIÓN, CURADO Y VACIADO.
3 DADO $0.00
CIMB004 CIMBRADO Y DESCIMBRADO COMÚN EN COLUMNAS M2 0.72 0.00 0.72 0.72 0.00 388.93 0.00
MUTA022 MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 12 X M2 184.54 0.00 184.54 184.54 0.00 290.96 0.00
24 CENTÍMETROS EN 12 CENTÍMETROS DE ESPESOR,
ASENTADO CON MORTERO CEMENTO-CAL HIDRA-ARENA
BASECA004 BASE PARA CASTILLO INTERMEDIO CON ARMEX DE 15 X 15- PZA 30.00 0.00 30.00 30.00 0.00 281.54 0.00
EN PROPORCIÓNINCLUYE
4CENTÍMETROS., 1:1:6 JUNTAS
ANCLAJEDE 1.5 CENTÍMETROS
Y CONCRETO F'C 200
CAS119 KG/CM2 3/4"
CASTILLO DECON UNA SECCIÓN
CONCRETO DE 3015
SECCIÓN XX4030
X 46.8
CENTÍMETROS M 28.60 0.00 28.60 28.60 0.00 445.45 0.00
CONCRETO F'C 200 KG/CM2 TAMAÑO MÁXIMO DEL
CASTILLO DE CONCRETO SECCIÓN 15 X 15 CENTÍMETROS
AGREGADO PÉTREO 3/4”, CIMBRA 2 CARAS REFORZADO
CONCRETO F'C 150 KG/CM2 TAMAÑO MÁXIMO DEL
CAS085 CON 4 VARILLAS R.N. DE 3/8" ESTRIBOS DE 1/4" A CADA 25 M 7.80 0.00 7.80 7.80 0.00 252.31 0.00
AGREGADO PÉTREO 3/4”, CIMBRA 2 CARAS, REFORZADO
CON ARMEX DE 15 X 15 - 4
CASTILLO DE CONCRETO SECCIÓN 20 X 15 CENTÍMETROS
CONCRETO F'C 150 KG/CM2 TAMAÑO MÁXIMO DEL
CAS129 AGREGADO PÉTREO 3/4”, CIMBRA 2 CARAS REFORZADO M 61.90 0.00 61.90 61.90 0.00 421.68 0.00
CON 4 VARILLAS R.N. DE 3/8" ESTRIBOS DE 1/4" A CADA 25
CENTÍMETROS
CASTILLO DE CONCRETO SECCIÓN 28 X 30 CENTÍMETROS
CONCRETO F'C 200 KG/CM2 TAMAÑO MÁXIMO DEL
CAS205 AGREGADO PÉTREO 3/4”, CIMBRA 2 CARAS REFORZADO M 2.60 0.00 2.60 2.60 0.00 699.03 0.00
CON 4 VARILLAS R.N. DE 1/2" ESTRIBOS DE 1/4" A CADA 25
CENTÍMETROS
FIR012 FIRME DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C 150 M2 69.48 0.00 69.48 69.48 0.00 314.17 0.00
KG/CM2 AGREGADO MÁXIMO 3/4" DE 10 CENTÍMETROS DE ESPESOR,
ARMADO CON MALLA DE 6X6-10/10
CONTRATISTA SUPERVISIOR DE OBRA PROPIETARIO
" CASA HABITACION EN EL MUNICIPIO DE XICOTEPEC DE JUAREZ
PUEBLA"
7 ESCALERA $0.00
CONCRETO
ACERO EN ESCALERA,
DE REFUERZO HECHO EN OBRA
EN ESTRUCTURA PARADECONSTRUCCIÓN
F'C=250 KG/CM2,
DE
4030 04 INCLUYE: ACARREOS, COLADO, M3 0.84 0.00 0.84 0.84 0.00 2,503.04 0.00
ESCALERA, VARILLA DEL #3 @ 15VIBRADO,
EN AMBOSMANO DE OBRA,
SENTIDOS EQUIPO
FY=4200 Y
KG/CM2.
HERRAMIENTA.
INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS,
4090 01 HABILITADO, AMARRES, MANO DE OBRA, EQUIPO Y HERRAMIENTA. KG 31.30 0.00 31.30 31.30 0.00 47.90 0.00
4080 04 CIMBRA DE MADERA PARA CONSTRUCCIÓN DE ESCALERA M2 6.88 0.00 6.88 6.88 0.00 355.11 0.00
LOSA002 LOSA PLANA EN ESTRUCTURA, PERALTE 10 M2 136.30 0.00 136.30 136.30 0.00 866.02 0.00
CENTÍMETROS CIMBRA COMÚN REFORZADA CON 74 KG DE
ACERO POR M3 EN AMBOS SENTIDOS A CADA 20
CENTÍMETROS. CONCRETO F'C
CONTRATISTA 250 KG/CM2 TAMAÑO SUPERVISOR DE OBRA PROPIETARIO
" CASA HABITACION EN EL MUNICIPIO DE XICOTEPEC DE JUAREZ
PUEBLA"
ELEC044 SALIDA Y RAMALEO ELÉCTRICO DE ILUMINACIÓN Y SAL 27.00 13.00 14.00 27.00 0.00 763.89 9,930.57
CONTACTO, CON UN DESARROLLO DE 6.00METROS
PROMEDIO, INCLUYE: APAGADOR, CONTACTO Y SALIDA DE
PLAFÓN, CAJA DE LAMINA, TAPA, CABLE, ALAMBRE, CON
12 INSTALACIÓN HIDROSANITARIA $6,854.82
SALIDA HIDRÁULICA Y SANITARIA CON TUBO Y
INSHS001 CONEXIONES HIDRÁULICOS DE COBRE TIPO M Y SAL 7.00 3.00 4.00 7.00 0.00 2,284.94 6,854.82
GALVANIZADOS DE CÉDULA 40 Y TUBOS SANITARIOS DE
PVC Y FOFO INCLUYE: RAMALEO, MATERIALES,
16 HERRERIA $0.00
SUMINISTRO Y COLOCACIÓN, PUERTA DE HERRERÍA
PUHE001 TUBULAR PERFILES "Z", "T" Y "L" TAMBOR DOBLE LAMINA PZA 1.00 0.00 1.00 1.00 0.00 2,615.76 0.00
CALIBRE 18 DE 1.80 M X 0.80 METROS
17 CARPINTERIA $68,724.87
PUERTA DE 0.90 X 2.10 M CON BASTIDOR DE MADERA DE
PINO DE 38 X 25 MM Y PEINAZOS HORIZONTALES A CADA 30
PTA003 CENTÍMETROS EN SENTIDO HORIZONTAL, FORRADA CON PZA 8.00 8.00 0.00 8.00 0.00 3,243.41 25,947.28
TRIPLAY DE CEDRO DE 6 MM EN AMBAS CARAS.
RESUMEN
1 PRELIMINARES $0.00
2 CIMENTACION $0.00
3 DADO $0.00
SUBTOTAL $170,173.89
INDIRECTOS 10% $ 17,017.39
SUBTOTAL $ 187,191.28
UTILIDAD 8,53% $ 15,967.42
SUBTOTAL $ 203,158.69
IVA 16% $ 32,505.39
SUBTOTAL $ 235,664.08
MENOS AMORTIZACION DEL ANTICIPO 30% $ 70,699.23
TOTAL A PAGAR $ 164,964.86
"CASA HABITACION EN EL MUNICIPIO DE XICOTEPEC DE XICOTEPEC DE
OBRA: FINIQUITO
JUAREZ,PUEBLA JUAREZ ,PUEBLA
1 PRELIMINARES $0.00
DESPALME Y DESENRAIZADO DE TERRENO A MAQUINA Y/O A MANO CON
LIM007 ACARREO DE MATERIAL SOBRANTE PARA DESPLANTE DE EDIFICIO, INCLUYE M2 165 11.19
MAQUINARIA, MANO DE OBRA, EQUIPO, HERRAMIENTA, ACARREO DENTRO Y $0.00
FUERA DE LA OBRA. MATERIAL MEDIDO EN BANCO.
LIMPIA, TRAZO Y NIVELACIÓN PARA DESPLANTE DE EDIFICIO, INCLUYE
LOCALIZACIÓN DE EJES, COTAS, NIVELES, EQUIPO, HERRAMIENTA Y MANO DE
LIM002 OBRA. M2 165 9.87
$0.00
EXCA001 EXCAVACIÓN A MANO EN ZANJA, INCLUYE AFINE DE TALUDES Y FONDO. M3 56.18925 111.94
MATERIAL COMÚN SECO, CUALQUIER ZONA, PROFUNDIDAD DE 0.00 A 2.00 M $0.00
ACARREO HORIZONTAL SIN PENDIENTE, DE TIERRA, ARENA, GRAVA, CASCAJO,
ACA014-1 MATERIAL SOBRANTE DE LA EXCAVACIÓN, ETC., EN CARRETILLA DE 3.5 PIES M3 56.18925 33.58
CÚBICOS, A LA PRIMERA ESTACIÓN 20.00 METROS INCLUYE CARGA Y $0.00
DESCARGA DEL MATERIAL.
2 CIMENTACIÓN $0.00
PLAN024 PLANTILLA APISONADA AL 85% PROCTOR CON COMPACTADOR VIBRATORIO M3 17.289 412.72 $0.00
CON MATERIAL DE BANCO (TEPETATE). PRESENTANDO LA PRUEBA DE
PLAN020 PLANTILLA
CONTROL DEDE CONCRETO SIMPLE
CALIDAD DE F'C 100 KG/CM2 (INCLUYE
LA COMPACTACIÓN DE 5 CENTÍMETROS.
ACARREO DE
DE M2 86.445 111.85
ESPESOR,
MATERIAL ACON AGREGADO MÁXIMO DE 19 MM. INCLUYE: MATERIALES,
LA ZANJA).
$0.00
FABRICACIÓN
CIMIENTOS DEDEL CONCRETO, DE
MAMPOSTERÍA ACARREOS, EQUIPO,ASENTADA
PIEDRA BRASA HERRAMIENTA, MANO DE
CON MORTERO
OBRA Y DESPERDICIOS.
CEMENTO-CAL HIDRA-ARENA EN PROPORCIÓN 1:1:6
CIM007 M3 31.72 1348.32
$0.00
CIMBRADO Y DESCIMBRADO COMÚN EN ZAPATAS AISLADAS DE CIMENTACIÓN
CIMB002 M2 1.3 351.51
$0.00
ACE003 SUMINISTRO, HABILITADO, ARMADO Y COLOCADO DE ACERO DE REFUERZO EN KG 11.7 40.16 $0.00
ESTRUCTURA RESISTENCIA NOMINAL FY 4,200 KG/CM2 NÚMERO 3 DIÁMETRO
CON007 CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON M3 1.3 2282.76
3/8" $0.00
CARRETILLA Y BOTES F'C 250 KG/CM2 TAMAÑO MÁXIMO DEL AGREGADO
3 3/4”REVENIMIENTO DE 10 CENTÍMETROS
DADO AGREGADO MÁXIMO 3/4" EN $0.00
CIMENTACIÓN, INCLUYE: ELABORACIÓN, CURADO Y VACIADO.
CIMB004 CIMBRADO Y DESCIMBRADO COMÚN EN COLUMNAS M2 0.72 388.93
$0.00
SUMINISTRO, HABILITADO, ARMADO Y COLOCADO DE ACERO DE REFUERZO EN
ACE004 ESTRUCTURA RESISTENCIA NOMINAL FY 4,200 KG/CM2 NÚMERO 4 DIÁMETRO KG 9.57 40.16
1/2" $0.00
CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON
CARRETILLA Y BOTES F'C 250 KG/CM2 TAMAÑO MÁXIMO DEL AGREGADO
CON007 3/4”REVENIMIENTO DE 10 CENTÍMETROS AGREGADO MÁXIMO 3/4" EN M3 0.5 2282.76
CIMENTACIÓN, INCLUYE: ELABORACIÓN, CURADO Y VACIADO.
$0.00
SUMINISTRO, HABILITADO, ARMADO Y COLOCADO DE ACERO DE REFUERZO EN
ACE003 ESTRUCTURA RESISTENCIA NOMINAL FY 4,200 KG/CM2 NÚMERO 3 DIÁMETRO KG 3.2 40.16
3/8" $0.00
DALA O CADENA DE DESPLANTE, INCLUYE CIMBRA Y DESCIMBRA SECCIÓN 15 X
DALA025 20 CENTÍMETROS CONCRETO F'C 150 KG/CM2 TAMAÑO MÁXIMO DEL M 96.05 338.26
AGREGADO PÉTREO 3/4”, REFORZADA CON 4 VARILLAS R.N. DE 3/8" ESTRIBOS $0.00
DE 1/4" A CADA
RELLENO 30 CENTÍMETROS
Y COMPACTACIÓN EN CIMENTACIÓN EN CAPAS DE 20 CENTÍMETROS.
RELL004 CON PISÓN DE MANO UTILIZANDO EL MATERIAL PRODUCTO DE M3 17.289 124.58
$0.00
EXCAVACIÓN .INCLUYE: TRASPALEOS AGUA PARA HOMOGENEIZAR EL
IMPERMEABILIZACIÓN EN MANO
MATERIAL, HERRAMIENTA, CIMENTACIÓN,
DE OBRA YDALAS Y CONTRA
ACARREOS, TRABES
MATERIAL MEDIDOCON
EN
IMP004 EMULSIÓN ASFÁLTICA MICROFEST Y MALLA FLEXIBLE FESTERFLEX, SISTEMA M2 192.1 401.53
MULTICAPA O SISTEMA SIMILAR: ELABORADO CON 1 MANO DE MICROPRIMER, 4
CAPAS DE MICROFEST, 3 CAPAS DE FESTERFLEX, ACABADO CON ARENA. $0.00
4 ALBAÑILERIA PLANTA BAJA $0.00
"CASA HABITACION EN EL MUNICIPIO DE XICOTEPEC DE XICOTEPEC DE
OBRA: FINIQUITO
JUAREZ,PUEBLA JUAREZ ,PUEBLA
SUB-TOTAL: 170,173.89
SUB-TOTAL: 187,191.28
SUB-TOTAL: 203,158.69
B I.V.A.: 32,505.39
TOTAL: 235,664.08
PERIODO
MUNICIPIO . XICOTEPEC DOMICILIO: CALLE CENTRO S/N TELÉFONO: 764-105-25-45
8/7/2023
A
XICOTEPEC DE JUAREZ,
OBRA : CASA HABITACION UBICACIÓN:
PUEBLA PARTIDA: RESUMEN
9/9/2023
FECHA
ESTIMACIÓN Nº FINIQUITO CONVENIO No: CAS-HAB/007/54 HOJA: 1 DE 1
9/9/2023
RESUMEN IMPORTE
No. CONCEPTO
PRESUPUESTO PRESENTE ACUMULADO POR COMPROBAR ESTIMACIÓN
PRELIMINARES
1 $11,651.56 $0.00 $11,651.56 $0.00 $ -
CIMENTACION
2 $63,467.52 $0.00 $63,467.52 $0.00 $ -
DADO
3 $113,711.90 $0.00 $113,711.90 $0.00 $ -
ALBAÑILERIA PLANTA BAJA
4 $104,767.32 $0.00 $104,767.32 $0.00 $ -
ACABADOS PLANTA BAJA
5 $90,667.66 $0.00 $90,667.66 $0.00 $ -
LOSA DE ENTREPISO
6 $111,946.08 $0.00 $111,946.08 $0.00 $ -
ESCALERA
7 $6,045.14 $0.00 $6,045.14 $0.00 $ -
ALBAÑILERIA PLANTA ALTA
8 $71,494.20 $0.00 $71,494.20 $0.00 $ -
ACABADOS PLANTA ALTA
9 $52,192.37 $52,192.37 $52,192.37 $0.00 $ 52,192.37
LOSA DE AZOTEA
10 $118,038.53 $0.00 $118,038.53 $0.00 $ -
INSTALACIÓN ELECTRICA
11 $20,625.03 $9,930.57 $20,625.03 $0.00 $ 9,930.57
INSTALACIÓN HIDROSANITARIA
12 $15,994.58 $6,854.82 $15,994.58 $0.00 $ 6,854.82
INSTALACIÓN DE GAS
13 $8,209.12 $0.00 $8,209.12 $0.00 $ -
MUEBLES DE BAÑO Y COCINA
14 $16,646.38 $7,031.46 $16,646.38 $0.00 $ 7,031.46
CANCELERIA
15 $25,439.80 $25,439.80 $25,439.80 $0.00 $ 25,439.80
HERRERIA
16 $2,615.76 $0.00 $2,615.76 $0.00 $ -
CARPINTERIA
17 $68,724.87 $68,724.87 $68,724.87 $0.00 $ 68,724.87
CASA HABITACION
CALLE,CENTRO DE XICOTEPE
JUAREZ
OBRA: UBICACIÓN:
IMPORTE DE
IMPORTE DE CONTRATO PERIODO DE CONTRATO IMPORTE DE CONVENIO PERIODO DE CONVENIO ANTICIPO
$1,249,457.16 NOVENTA DIAS $1,249,457.16 NOVENTA DIAS $374,837.15
CAS-HAB/007/54
CALLE,CENTRO DE XICOTEPEC DE
JUAREZ
FECHA
9/9/2023
LIQUIDO A PAGAR
$ 374,837.15
$ 393,130.65
$ 316,524.77
$ 164,964.86
$ 1,249,457.16
MUNICIPIO DE XICOTEPEC,PUEBLA
2023-2024
N° OBRA REPORTE N°
DATOS GENERALES
MUNICIPIO: XICOTEPEC LOCALIDAD: XICOTEPEC DE JUAREZ, PUEBLA
1 PRELIMINARES
DESPALME Y DESENRAIZADO DE TERRENO A MAQUINA Y/O A MANO
0.93% 11,651.56 0.00 0.00%
LIM007 CON ACARREO DE MATERIAL SOBRANTE PARA DESPLANTE DE
EDIFICIO, INCLUYE MAQUINARIA, MANO DE OBRA, EQUIPO, 0.15% 1,846.35 0.00 0.00% 0%
HERRAMIENTA, ACARREO DENTRO Y FUERA DE LA OBRA. MATERIAL
MEDIDO EN BANCO.
LIM002 LIMPIA, TRAZO Y NIVELACIÓN PARA DESPLANTE DE EDIFICIO, INCLUYE
LOCALIZACIÓN DE EJES, COTAS, NIVELES, EQUIPO, HERRAMIENTA Y 0.13% 1,628.55 0.00 0.00% 0%
MANO DE OBRA.
2 CIMENTACIÓN
PLANTILLA APISONADA AL 85% PROCTOR CON COMPACTADOR
5.08% 63,467.52 0.00 0.00%
VIBRATORIO CON MATERIAL DE BANCO (TEPETATE). PRESENTANDO LA
PLAN024
PRUEBA DE 0.57% 7,135.52 0.00 0.00% 0%
PLANTILLA DECONTROL
CONCRETODESIMPLE
CALIDAD DE
F'C LAKG/CM2
100 COMPACTACIÓN (INCLUYE
DE 5 CENTÍMETROS.
ACARREO
DE ESPESOR, DE MATERIAL
CON AGREGADO A LADE
MÁXIMO ZANJA).
19 MM. INCLUYE:
PLAN020
MATERIALES, FABRICACIÓN DEL CONCRETO, ACARREOS, EQUIPO, 0.77% 9,668.87 0.00 0.00% 0%
HERRAMIENTA, MANO DE OBRA Y DESPERDICIOS.
CIMIENTOS DE MAMPOSTERÍA DE PIEDRA BRASA ASENTADA CON
CIM007
MORTERO CEMENTO-CAL HIDRA-ARENA EN PROPORCIÓN 1:1:6 3.42% 42,768.71 0.00 0.00% 0%
DATOS GENERALES
MUNICIPIO: XICOTEPEC LOCALIDAD: XICOTEPEC DE JUAREZ, PUEBLA
4080 04 CIMBRA DE MADERA PARA CONSTRUCCIÓN DE ESCALERA 0.20% 2,443.16 0.00 0.00% 0%
14 MUEBLESDE
SUMINISTRO Y COLOCACION DELAVABO
BAÑOMARCA
Y COCINA
CATO O SIMILAR, 1.33% 16,646.38 7,031.46 0.56%
AMACIZADO CON MORTERO CEMENTO-ARENA 1:3 INCLUYE: (UNA
PARTE PROPORCIONAL DE PZAS. ESPECIALES Y TUBERÍA DEL RAMAL
6008 01 GRAL. EN COBRE ASI COMO SU INSTALACION EN PVC
SUMINISTRO Y COLOCACION DE TARJA O VERTEDERO DE ACERO 0.35% 4,408.78 2,204.39 0.18% 50%
SANITARIO).CONTRA, CESPOL, TUBO
INOXIDABLE PARA FREGADERO, GALAVANIZADO
INCLUYE: (UNA PARTEPARA SU
FIJACION, LLAVE DE
PROPORCIONAL MEZCLADORA COMERCIAL
PZAS. ESPECIALES Y TODO
Y TUBERÍA LORAMAL
DEL NECESARIO
GRAL.
6008 02 PARA SU CORRECTA
EN COBRE ASI COMO INSTALACION.
SU INSTALACION EN PVC SANITARIO). LLAVE 0.38% 4,776.85 0.00 0.00% 0%
MEZCLADORA COMERCIAL CUELLO DE GANZO. Y TODO LO
NECESARIO PARA SU CORRECTA INSTALACION.
SUMINISTRO Y COLOCACION DE REGADERA Y MANERALES
ECONOMICOS MCA. URREA O SIMILAR. INCLUYE: ( PARTE
6008 03 PROPORCIONAL DE PZAS. ESPECIALES Y TUBERÍA DE COBRE DEL 0.18% 2,193.39 2,193.39 0.18% 100%
RAMAL GRAL.) INCLUYE: TODO LO NECESARIO PARA SU CORRECTA
COLOCACION.
15 CANCELERIA
VENTANA CORREDIZA DE 1.60 X 2.00 CON UNA HOJA CORREDIZA DE 2.04% 25,439.80 25,439.80 2.04%
ALUMINIO ANODIZADO NATURAL DE 3" ALUMINIO NATURAL, INCLUYE:
VEES005 SUMINISTRO Y COLOCACIÓN
VENTANA CORREDIZA DE 0.60DE VIDRIO
X 0.50 CONDE 6 MM.
UNA CLARO,
HOJA CORREDIZA DE 0.46% 5,737.70 5,737.70 0.46% 100%
MOSQUITERO, HERRAJES Y TODO
ALUMINIO ANODIZADO NATURAL DE LO3"NECESARIO PARA SU INCLUYE:
ALUMINIO NATURAL, CORRECTA
INSTALACIÓN.
VEES003 SUMINISTRO
VENTANA Y COLOCACIÓN
CORREDIZA DE 0.90DE VIDRIO
X 1.20 CONDE 6 MM.
UNA CLARO,
HOJA CORREDIZA DE 0.09% 1,169.52 1,169.52 0.09% 100%
MOSQUITERO,
ALUMINIO HERRAJES
ANODIZADO Y TODO
NATURAL DELO3"NECESARIO PARA SU INCLUYE:
ALUMINIO NATURAL, CORRECTA
INSTALACIÓN.
VEES004 SUMINISTRO
VENTANA Y COLOCACIÓN
CORREDIZA DE 1.80DE VIDRIO
X 2.00 CONDE 6 MM.
UNA CLARO,
HOJA CORREDIZA DE 1.01% 12,630.96 12,630.96 1.01% 100%
MOSQUITERO,
ALUMINIO HERRAJES
ANODIZADO Y TODO
NATURAL DELO3"NECESARIO PARA SU INCLUYE:
ALUMINIO NATURAL, CORRECTA
INSTALACIÓN.
VEES002 SUMINISTRO Y COLOCACIÓN DE VIDRIO DE 6 MM. CLARO, 0.47% 5,901.62 5,901.62 0.47% 100%
MOSQUITERO, HERRAJES Y TODO LO NECESARIO PARA SU CORRECTA
INSTALACIÓN.
16 HERRERIA 0.21% 2,615.76 0.00 0.00%
SUMINISTRO Y COLOCACIÓN, PUERTA DE HERRERÍA TUBULAR
PUHE001 PERFILES "Z", "T" Y "L" TAMBOR DOBLE LAMINA CALIBRE 18 DE 1.80 M X
CLOSET DE MADERA DE 1.15 X 2.40 X 0.70 A BASE DE BASTIDOR
0.21% 2,615.76 0.00 0.00% 0%
0.80 METROS
PERIMETRAL
ELABORACIÓN DEY 25X37 MM. PARA
COLOCACIÓN DEENTREPAÑOS
CLOSET DE MADERAY MALETERO,
A BASE DE
17 PEINAZOS
BASTIDOR HORIZONTALES
PERIMETRAL DEDE CARPINTERIA
25 15 X 37
X 35 MM.MM.
PARAA CADA 25 CENTÍMETROS.
ENTREPAÑOS Y 5.50% 68,724.87 68,724.87 5.50%
PUERTA
PARA DE 0.90
SEPARADOR
MALETERO, X 2.10
PEINAZOS M CON
DE GUARDA BASTIDOR
ROPA YDE
HORIZONTALES DE MADERA
PUERTAS DE PINO
25 X 35 CORREDIZAS, DE
MM. A CADA 25 38 X
25 MM Y PEINAZOS HORIZONTALES AMM.
CADA 30 CENTÍMETROS EN
PTA003 PEINAZOS HORIZONTALES
CENTÍMETROS.
SENTIDO
PARA
HORIZONTAL,
DE 25X37
SEPARADOR DE A CADA
GUARDARROPA 40 CENTÍMETROS.
Y PUERTAS 2.08% 25,947.28 25,947.28 2.08% 100%
MADERA DE
CORREDIZAS, PINO DE 2A.FORRADA
PEINAZOS UNIDOS ACON
BASE
HORIZONTALES TRIPLAY
25 XDE
DE ESPIGA35CEDRO
Y CAJA
MM. DE
CON
A CADA6 MM
40 EN
AMBAS CARAS.
RESISTOL 850 OMADERA
CENTÍMETROS. SIMILAR DEY CLAVOS
PINO DESIN
2A.CABEZA
UNIDOSDE 19 MM,
A BASE DESOBRE
ESPIGA ELY
CLOSET001 BASTIDOR SE TERMINARA
CAJA CON RESISTOL 850 ODE TRIPLAY
SIMILAR DE MADERA
Y CLAVOS DE PINODE
SIN CABEZA DE191A. DE
MM. 1.09% 13,664.21 13,664.21 1.09% 100%
6 MM DEEL
SOBRE ESPESOR
BASTIDOR, TERMINADA AMBAS
SE TERMINARA DECARAS
TRIPLAYCON DOS
DE MANOS
MADERA DEDE
PINO
BARNIZ NATURAL
DE 1A. DE 6 MM. EN MATE,
AMBAS DEJANDO
CARAS,ELCONÁREA LIBRE DE BARNIZ
2 MANOS GRIETASINCLUYE:
Y
CLOSET002
POLVO. INCLUYE:
TORNILLOS, SUMINISTROS,
HERRAJES, FLETES,
CHAMBRANAS, RESANADO,
TUBO CROMADO ACARREOS,
DE 19 MM. 2.33% 29,113.38 29,113.38 2.33% 100%
COLOCACIÓN,
PARA ROPA, RIEL AJUSTE,
LIBRELIMPIEZA
DOBLE T PARA
CALIBREENTREGA, TORNILLOS,
18, CARRETILLAS, TAPA
HERRAJES,
RIEL. MATERIAL, EQUIPO, HERRAMIENTA Y MANO DE OBRA,
TOTAL
CHAMBRANAS DE MADERA DE PINO DE 2A. PARA DESARROLLO DE LA
100.00% 1,249,457.64 170,173.89 37.54%
MISMA A 10 CENTÍMETROS. PEINAZOS DE 2.5X3.7X40 CENTÍMETROS.
PARA SOSTÉN DE ENTREPAÑOS Y MALETERO, TUBO CROMADO DE 19
MM. PARA COLGAR LA ROPA, CABEZAL DE MADERA AVANCE DEL PERIODO (%)
DE 0.02X0.10X1.45 AVANCE ACUMULADO PREVIO (%) ACUMULADO AL PERIODO
METROS RIEL LIBRE NÚMERO 18, CARRETILLAS, TAPARRIEL, DOS
PUERTAS CORREDIZAS DE 0.60 X 1.80 METROS Y DOS PUERTAS
FISICO
CORREDIZAS 0.60 X 0.60 METROS
37.54% FISICO 62.46% 100.00%
FINANCIERO 37.54% FINANCIERO 62.46% 100.00%
AUXILIAR CONTABLE
CARGOS
N° DOCUMENTACION COMPROBATORIA MONTO FISCAL DOCUMENTO DE PAGO
OTROS
FORTAMUN FISM
DATOS GENERALES
MUNICIPIO: XICOTEPEC LOCALIDAD: XICOTEPEC DE JUAREZ, PUEBLA
1.3729045 11º SEMANA 12º SEMANA 13° SEMANA 14º SEMANA 15º SEMANA 16º SEMANA
1 PRELIMINARES $ - 0.00%
2 CIMENTACIÓN $ - 0.00%
3 DADO $ - 0.00%
7 ESCALERA $ - 0.00%
16 HERRERIA $ - 0.00%
Monto Total de la Obra $ 170,173.89 100% 26,096.18 26,096.18 32,294.62 75,756.33 9,930.57 0.00
Ubicación: Localidad:
NÚMEROS GENERADORES
LOCALIZACIÓN
CLAVE CONCEPTO LARGO ANCHO ALTO PIEZAS RESULTADO UNIDAD OBSERVACIONES
EJE TRAMO TIPO
1 PREELIMINARES
21.00 11.70
12.00 6.68
11.69
11.70
CON007 CONCRETO HECHO EN OBRA RESISTENCIA
NORMAL VACIADO CON CARRETILLA Y BOTES F'C 250
KG/CM2 TAMAÑO MÁXIMO DEL AGREGADO
3/4”REVENIMIENTO DE 10 CENTÍMETROS AGREGADO
MÁXIMO 3/4" EN CIMENTACIÓN, INCLUYE: ELABORACIÓN,
CURADO Y VACIADO.
DADO
CIMB004 CIMBRADO Y DESCIMBRADO COMÚN EN D
COLUMNAS 0.60 4.00 0.72
4 0.30 CUATRO CARAS
3.20
4.20 x 0.23 PESO DE ALAMBRON .225
17.289
184.54
4 ACABADOS
APMU013 APLANADO FINO EN MUROS A PLOMO Y REGLA
CON MORTERO CEMENTO CAL HIDRA-ARENA EN
PROPORCIÓN 1:1:6 ESPESOR PROMEDIO 2.5 1 A -B 2.15 2.85
CENTÍMETROS INCLUYE REPELLADO PULIDO CON
PLANA 2 12.255
1 B -F 9.4 2.6 2 48.88
1 F-H 4.8 2.35 2 22.56
1´ B -C 2.9 2.6 2 15.08
3 B-C 2.9 2.6 2 15.08
5 D -F 4.9 2.6 2 15.2
6 B-D 4.4 2.6 2 20.81
7 A-H 16.5 2.85 2 94.05
A 1a 7 10 2.85 2 48.45
B 1a 6 8.69 2.85 2 40.983
D 5a 6 2.65 2.6 2 11.71
F 1a 5 6.04 2.6 2 24.028
369.09
APPL012 APLANADO FINO EN PLAFONES A REGLA Y NIVEL
MAS
CON MORTERO CEMENTO-CAL HIDRA-ARENA EN
0.50
PROPORCIÓN 1:1:6 ESPESOR PROMEDIO 2.5 1,6 B-D 4.50 8.85 39.82
VOLAD
CENTÍMETROS INCLUYE REPELLADO PULIDO CON O
PLANA
69.47
5 LOSA DE ENTREPISO
LOSA002 LOSA PLANA EN ESTRUCTURA, PERALTE 10
CENTÍMETROS CIMBRA COMÚN REFORZADA CON 74 KG
DE ACERO POR M3 EN AMBOS SENTIDOS A CADA 20
CENTÍMETROS. CONCRETO F'C 250 KG/CM2 TAMAÑO
MÁXIMO DEL AGREGADO PÉTREO 3/4”3/4"
6 ESCALERA
143.56
CAS119 CASTILLO DE CONCRETO SECCIÓN 15 X 30 1 B-E
CENTÍMETROS CONCRETO F'C 200 KG/CM2 TAMAÑO
MÁXIMO DEL AGREGADO PÉTREO 3/4”, CIMBRA 2 CARAS
REFORZADO CON 4 VARILLAS R.N. DE 3/8" ESTRIBOS DE
1/4" A CADA 25 CENTÍMETROS
2.60 3 7.80
3 B-C 2.60 2 5.20
S/E S/E 2.60 2 5.20
5 E 3.00 1 3.00
B 5 2.60 1 2.60
D 5
2.60 1 2.60
26.40
287.12
LOSA DE AZOTEA
LOSA002 LOSA PLANA EN ESTRUCTURA, PERALTE 10
CENTÍMETROS CIMBRA COMÚN REFORZADA CON 74 KG
DE ACERO POR M3 EN AMBOS SENTIDOS A CADA 20
CENTÍMETROS. CONCRETO F'C 250 KG/CM2 TAMAÑO
MÁXIMO DEL AGREGADO PÉTREO 3/4”3/4"
11 INSTALACIÓN ELECTRICA
SALIDA Y RAMALEO ELÉCTRICO DE ILUMINACIÓN Y CONTACTO, CON
UN DESARROLLO DE 6.00METROS PROMEDIO, INCLUYE: APAGADOR,
CONTACTO Y SALIDA DE PLAFÓN, CAJA DE LAMINA, TAPA, CABLE,
ELEC044 ALAMBRE, CON TUBO DE POLIDUCTO O SIMILAR Y TODO LO
NECESARIO PARA SU CORRECTA COLOCACIÓN.
27.00
12 INSTALACIÓN HIDROSANITARIA
SALIDA HIDRÁULICA Y SANITARIA CON TUBO Y CONEXIONES
HIDRÁULICOS DE COBRE TIPO M Y GALVANIZADOS DE CÉDULA 40 Y
TUBOS SANITARIOS DE PVC Y FOFO INCLUYE: RAMALEO, MATERIALES,
6008 04 SOLDADURA, PRUEBAS, VÁLVULAS DE CONTROL ANGULAR, COFLEX,
MANO DE OBRA, FLETES Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCIÓN.
7.00
13 INSTALACIÓN GAS
SALIDA DE GAS CON TUBO DE COBRE TIPO "L” DE 13 MM Y 10 MM.,
INCLUYE: VÁLVULAS DE PASO, PIEZAS ESPECIALES, REGULADOR DE
GA005 BAJA PRESIÓN FISHER 67. (CON UN RECORRIDO APROXIMADO DE
10.00 METROS)
2.00
14 MUEBLES