RELLENO COMPACTADO EN
7.85 CAPAS DE 20 CM RELLENO COMPACTADO EN
CAPAS DE 20 CM
3.25 1.45 2.00 130 cm
0.15
Ø 3/8 @ 20 cm.
1.15 0.15
EN AMBOS SENTIDOS Ø 3/8 @ 20 cm.
EN AMBOS SENTIDOS
CONCRETO
0.15 4.40 3.30 F'c= 250 Kg/cm2
15 cm CONCRETO
F'c= 250 Kg/cm2
15 cm
1
PLANTILLA DE 5 CM
ZM-1 5 cm 80 cm F'c= 100 Kg/cm2 PLANTILLA DE 5 CM
5 cm 80 cm F'c= 100 Kg/cm2
uso de suelo
2.10
ALBERCA
H3U
3.15
15 cm
4 VARILLAS DEL # 4 de 3/8
EST # 2 @ 15
20 cm EST # 2 @ 15
Altura Max Max 3 Niv 10.50 m
ZC-2
ZC-2
H3U
Superficie 100% 160.00 m²
CASTILLO Estribo # 2
CASTILLO Área Libre Min 40 % 76.00 m²
K2 @ 20 cm
2.10
C-D C-D K1 40
COS Max 60 % 84.00 m²
0.55
2.98
ZM-1
Concreto 1
15 cm 15 cm F'c=200 kg/cm2.
3 0.40
C-1 C-1
ZA-1 3
ZA-1
COLUMNA C-1 NPT±0.00
ACOT: CM SIN ESC.
0.50
4 VARILLAS DEL #2
2.00
B
4 0.40
C-1 C-1
ZA-1 CADENA DE DESPLANTE
0.55
CADENA DE CERRAMIENTO
CD
ZA-1 CC
Texto
K1
NPT-1.70
ZC-2
0.55
19.85
C-D
3.67
C-D
ZC-1
K1
n.p.t. n.p.t. n.p.t.
ZM-1
C-D
mamposteria de piedra
K1
#INTEGRAL II
2.85
3.05
variable variable
0.20
C-D
K1
universidad
UNIVERSIDAD TECNOLÓGICA DE MÉXICO
campus
ZC-2 ATIZAPÁN
6 K2 K1 K1 C-D K2
ZC-2
C-D K1
ZC-2
C-D K2 0.50
0.50 materia
ARQUITECTURA INTEGRAL II
profesor
ALFONSO ULLOA
ZM-1 equipo
2.85
alumnos
0.15
ZM-1 ZM-1
objetivo
DISTRIBUCIÓN
proyecto
RIO YUKON CASA HABITACION
0.15
1.85
plano
ESTRUCTURAS
nivel PB
7 K2 K2 K2 escala 1:100
acotación METROS
vista PLANTA
CIMENTACIÓN
clave
EST 01
ciclo 24-02
grupo AR010S
PLANTA BAJA NPT ± 0.00 grado 12° CUATRIMESTRE
actualización