Civ-T030 - 46567714 - T Chávez Pejerrey Daniel Ernesto
Civ-T030 - 46567714 - T Chávez Pejerrey Daniel Ernesto
Civ-T030 - 46567714 - T Chávez Pejerrey Daniel Ernesto
FACULTAD DE INGENIERÍA
PROGRAMA DE TITULACIÓN POR TESIS
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL
TESIS
PARA OPTAR EL TÍTULO PROFESIONAL
DE INGENIERO CIVIL
PRESENTADO POR:
Bach. CHÁVEZ PEJERREY, DANIEL ERNESTO
Bach. RUÍZ CHÁVEZ, FRANKYE
LIMA – PERU
2019
DEDICATORIA
iv
CAPÍTULO III METODOLOGÍA DEL ESTUDIO ...................................................... 30
3.1. Tipo y nivel ....................................................................................................... 30
3.2. Diseño de investigación .................................................................................... 30
3.3. Población y muestra.......................................................................................... 30
3.3.1. Población .......................................................................................................... 30
3.3.2. Muestra ............................................................................................................. 30
3.4. Técnicas de recolección de datos...................................................................... 30
3.4.1. Tipos de técnicas e instrumentos ...................................................................... 30
3.4.2. Técnicas de procesamiento y análisis de datos ................................................. 31
CAPÍTULO IV TRABAJO EXPLORATORIO ............................................................. 32
4.1. Exploración del subsuelo .................................................................................. 32
4.1.1. Plano de ubicación del terreno.......................................................................... 32
4.1.2. Características de edificaciones vecinas ........................................................... 32
4.1.3. Características de la obra a cimentar ................................................................ 34
4.1.4. Número de puntos de exploración .................................................................... 36
4.1.5. Tipo de muestra ................................................................................................ 36
4.1.6. Número de puntos de exploración .................................................................... 37
4.1.7. Profundidad “P” del punto de exploración ....................................................... 37
4.1.8. Ubicación del punto de exploración en el terreno ............................................ 38
4.1.9. Ejecución de calicata C-1 ................................................................................. 39
4.2. Ensayos de laboratorio...................................................................................... 44
4.2.1. Ensayos de análisis granulométrico y límites de Atterberg .............................. 44
4.2.2. Clasificación SUCS .......................................................................................... 47
4.2.3. Perfil estratigráfico ........................................................................................... 47
4.2.4. Cálculo de constantes básicas ........................................................................... 48
4.2.5. Ensayo de Proctor Modificado ......................................................................... 49
4.2.6. Ensayo de corte directo .................................................................................... 51
CAPÍTULO V EVALUACIÓN TÉCNICA ................................................................... 54
5.1. Cálculo de la Capacidad de Carga ..................................................................... 54
5.2. Cálculo de la Capacidad de Carga para el Afirmado ........................................ 56
5.3. Diseño sismorresistente de la estructura............................................................ 57
5.3.1. Descripción de la Estructura.............................................................................. 57
5.3.2. Sistema Estructural ............................................................................................ 57
5.3.3. Normatividad Aplicada ..................................................................................... 57
5.3.4. Procedimiento de Diseño................................................................................... 57
v
5.3.5. Metrado de Cargas............................................................................................. 58
5.3.6. Análisis sismorresistente ................................................................................... 58
5.3.7. Análisis Dinámico Modal Espectral .................................................................. 63
5.3.8. Peso de la Edificación para el Cálculo de la Fuerza Sísmica ............................ 65
5.3.9. Análisis Sísmico Estático .................................................................................. 65
5.3.10.Análisis de Resultados (Análisis Dinámico y Estático) .................................... 67
5.3.11.Distorsiones de Entrepiso .................................................................................. 69
5.3.12.Resultados del diseño sismorresistente de la estructura .................................... 71
5.4. Cálculo de zapata más esforzada ....................................................................... 75
5.4.1. Cálculo del esfuerzo máximo de diseño para cimentaciones superficiales. ....... 76
5.5. Verificación preliminar de cimentaciones superficiales para suelo sin
mejoramiento. ................................................................................................... 79
5.6. Verificación preliminar de cimentaciones superficiales para el suelo sin
mejoramiento, aumentando las dimensiones en planta de la zapata. ................ 82
5.7. Verificación preliminar de análisis de cimentaciones superficiales utilizando
Afirmado ........................................................................................................... 85
5.8. Mejoramiento de suelos con Geomallas ........................................................... 88
5.8.1. Determinación de la tensión ............................................................................. 88
5.8.2. Determinación de la resistencia al arrancamiento del refuerzo ........................ 90
CAPÍTULO VI EVALUACIÓN ECONÓMICA ........................................................... 92
6.1. Costo de Mano de Obra ......................................................................................... 92
6.1.1. Cálculo de los días Laborados en el periodo: 01/06/2019 – 31/05/2020 ........... 93
6.1.2. Cálculo de Porcentajes por Leyes y Beneficios Sociales. .................................. 94
6.1.3. Porcentajes de Leyes y Beneficios Sociales ....................................................... 96
6.1.4. Costo de Hora Hombre ....................................................................................... 97
6.2. Análisis de Precios Unitarios................................................................................. 97
6.3.Presupuesto para Zapata Z-2, utilizando una Geomalla MacGrid WG 65x65 ..... 103
6.4.Presupuesto para Zapata Z-2, utilizando una base de Afirmado .......................... 103
6.5.Presupuesto para Zapata Z-2, con dimensiones: B = 1.50 m y L = 1.50 m ......... 104
CAPÍTULO VII PRESENTACIÓN DE RESULTADOS ............................................ 105
7.1. Resultados de la investigación............................................................................. 105
7.1.1. El aumento de la capacidad de carga del suelo del Lote 37 y el Afirmado en
relación a el Df .................................................................................................. 106
7.1.2. Se calculó que la zapata más esforzada es la Z-2 (Eje 5 – B) .......................... 107
7.1.3. Verificación de factibilidad técnica .................................................................. 109
7.1.4. Evaluación económica ...................................................................................... 111
vi
7.1.5. Discusión de evaluación técnico económica .................................................... 111
CONCLUSIONES ........................................................................................................ 112
RECOMENDACIONES ............................................................................................... 113
REFERENCIAS BIBLIOGRÁFICAS ......................................................................... 114
ANEXOS ...................................................................................................................... 116
Anexo 1: Matriz de consistencia ................................................................................ 117
Anexo 2: Análisis granulométrico por tamizado de muestra M-1 ............................. 118
Anexo 3: Límite líquido y plástico de muestra M-1................................................... 120
Anexo 4: Análisis granulométrico por tamizado de muestra M-2 ............................. 121
Anexo 6: Análisis granulométrico por tamizado de muestra M-3 ............................. 124
Anexo 7: Análisis granulométrico por tamizado de muestra M-4 ............................. 126
Anexo 8: Clasificación SUCS - muestra M-1 ............................................................ 128
Anexo 9: Clasificación SUCS - muestra M-2 ............................................................ 130
Anexo 10: Clasificación SUCS - muestra M-3 .......................................................... 131
Anexo 11: Clasificación SUCS - muestra M-4 .......................................................... 132
Anexo 12: Ensayo de Proctor Modificado al Afirmado ............................................. 133
Anexo 13: Ensayo de corte directo a la muestra M-2 ................................................ 135
Anexo 14: Ensayo de corte directo a muestra M-3 .................................................... 137
Anexo 15: Ensayo de corte directo al Afirmado ........................................................ 139
Anexo 16: Planos........................................................................................................ 141
Anexo 17: Ficha Técnica de Geomalla MacGrid WG 65x65 .................................... 146
Anexo 18: Cotización de Geomalla MacGrid WG 65x65.......................................... 147
vii
ÍNDICE DE TABLAS
Tabla 1: Factores de Capacidad de Carga ....................................................................... 20
Tabla 2: Clasificación SUCS .......................................................................................... 47
Tabla 3: Resultados Ensayo de Proctor Modificado ....................................................... 50
Tabla 4: Valores de Capacidad de Carga del suelo del lote 37, B=1.20 m. .................... 54
Tabla 5: Valores de Capacidad de Carga del suelo del lote 37, B=1.50 m..................... 55
Tabla 6: Valores de Capacidad de Carga para el Afirmado ........................................... 56
Tabla 7: Cargas de Servicio ............................................................................................ 76
Tabla 8: Esfuerzos máximos de diseño de las zapatas evaluadas (σu máx diseño) ........ 78
Tabla 9: Parámetros para reforzamiento con Geomalla.................................................. 88
Tabla 10: Valores para A1 y A2 ..................................................................................... 89
Tabla 11: Valores de T(N) ................................................................................................ 89
Tabla 12: Comparativo de T(N) con Resistencia a la Tracción de Geomalla MacGrid
EGB 40 ........................................................................................................... 89
Tabla 13: Longitudes de empotramiento ........................................................................ 90
Tabla 14: Valores de FB y FS(P) .................................................................................... 91
Tabla 15: Incremento al Jornal Básico ........................................................................... 92
Tabla 16: BUC ................................................................................................................ 93
Tabla 17: Días no laborables en periodo 01/06/2019 – 31/05/2020 ............................... 93
Tabla 18:Incidencia del Salario Dominical .................................................................... 94
Tabla 19: Incidencia por feriados ................................................................................... 95
Tabla 20: Porcentajes de Leyes y Beneficios Sociales ................................................... 96
Tabla 21: Costo de Mano de Obra .................................................................................. 97
Tabla 22: APU para excavación a una profundidad de 1.30 m. ..................................... 97
Tabla 23: APU para excavación a una profundidad de 2.70 m. ..................................... 98
Tabla 24: APU para suministro de Afirmado ................................................................. 98
Tabla 25: APU para base de Afirmado Compactado ...................................................... 98
Tabla 26: APU para instalación de Geomalla MacGrid WG 65x65............................... 99
Tabla 27: APU para eliminación de material.................................................................. 99
Tabla 28: APU para elaboración y vaciado de concreto f´c= 210 kg/cm2 .................... 100
Tabla 29: APU para encofrado y desencofrado ............................................................ 100
Tabla 30: APU para acero de refuerzo de ¾” ............................................................... 101
viii
Tabla 31: APU para acero de refuerzo de 5/8” ............................................................. 101
Tabla 32: APU para relleno con material propio .......................................................... 102
Tabla 33: APU para solado para zapatas ...................................................................... 102
Tabla 34: Presupuesto para Zapata Z-2, utilizando una Geomalla ............................... 103
Tabla 35: Presupuesto para Zapata Z-2, utilizando una sub base de Afirmado............ 103
Tabla 36: Presupuesto para Zapata Z-2, B = 1.50 m y L = 1.50 m............................... 104
Tabla 37: Costos Directos ............................................................................................. 104
Tabla 38: Df (m) para cada caso ................................................................................... 109
Tabla 39: Costos Directos para cada presupuesto ........................................................ 111
ix
ÍNDICE DE FIGURAS
Figura 1: Geotextil no Tejido............................................................................................ 9
Figura 2: Geotextil Tejido............................................................................................... 10
Figura 3: Geomalla Uniaxial (a) Extruida; (b) Soldada .................................................. 11
Figura 4: Geomalla Biaxiales (a) Extruida; (b) Tejida ................................................... 12
Figura 5: Contenido de humedad Vs Peso unitario (en proceso de compactación) ....... 13
Figura 6: Equipamiento para ensayo de Proctor estándar............................................... 14
Figura 7: Condición de compactación más económica .................................................. 18
Figura 8: Tipos de falla de la capacidad de carga ........................................................... 21
Figura 9: Tipos de zapatas. ............................................................................................. 25
Figura 10: Métodos para reforzar losas de cimentación. ................................................ 26
Figura 11: Tipos de losa de cimentación. ....................................................................... 27
Figura 12: Comparativo entre losa de cimentación y zapata aislada .............................. 28
Figura 13: Plano de Ubicación........................................................................................ 32
Figura 14: Colindancia inmediata del terreno................................................................. 33
Figura 15: Colindancia del terreno ................................................................................. 33
Figura 16: Edificación cercana ....................................................................................... 34
Figura 17: Planos (a) Plano de Cimentación (b) Plano del Primer Piso ......................... 35
Figura 18: Plano de Corte ............................................................................................... 35
Figura 19: Tipo de edificación para el número de puntos de exploración ...................... 36
Figura 20: Tipos de muestra ........................................................................................... 36
Figura 21: Números de puntos de exploración ............................................................... 37
Figura 22: Plano de Corte y Elevación de Zapata-2 ....................................................... 38
Figura 23: Profundidad de Cimentación ......................................................................... 38
Figura 24: Excavación (a) Inicio de Excavación (b) Excavación a 1.50 m de Prof. ...... 39
Figura 25: (a) Extracción Mib M-1 (b) Primer estrato 1.20 m de longitud. ................... 39
Figura 26: (a) Muestra M-1 recubierta de fill (b) Extracciones de Mib M-2 y M-3 ...... 40
Figura 27: (a) Muestra M-2 recubierta de fill (b) Muestra M-3 recubierta de fill .......... 40
Figura 28: (a) Muestra M-4 Mab (b) Calicata a 3.00 m de profundidad ........................ 41
Figura 29: (a) Calicata C-1 a 3.00 m de profundidad (b) Muestras embaladas .............. 41
Figura 30: Distancia entre la Cantera y la Urb. Brisas de Oquendo. .............................. 42
Figura 31: Obtención de muestra de 30 Kg. de afirmado ............................................... 42
x
Figura 32: Obtención de muestra de 30 Kg. de afirmado ............................................... 43
Figura 33: Curva Granulométrica de Muestra M-1 ........................................................ 44
Figura 34: Límite líquido y plástico de muestra M-1 ..................................................... 44
Figura 35: Curva granulométrica de muestra M-2.......................................................... 45
Figura 36: Límite líquido de muestra M-2...................................................................... 45
Figura 37: Curva granulométrica de muestra M-3.......................................................... 46
Figura 38: Curva granulométrica de muestra M-4.......................................................... 46
Figura 39: Perfil estratigráfico. ....................................................................................... 47
Figura 40: Contenido de Humedad ................................................................................. 48
Figura 41: Peso específico ............................................................................................. 48
Figura 42: Gravedad especifica ...................................................................................... 48
Figura 43: (a) Tamizado y divido (b) Modificación de humedad muestral .................... 49
Figura 44: (a) Compactación 5 capas de 56 golpes (b) 3 muestras ................................ 49
Figura 45: Curva de compactación del Afirmado ........................................................... 50
Figura 46: Equipamiento para el ensayo......................................................................... 51
Figura 47: Desarrollo y obtención de datos de deformaciones ………………………..51
Figura 48: Cohesión y Ángulo de Fricción de Muestra M-2 .......................................... 52
Figura 49: Cohesión y Ángulo de Fricción de Muestra M-3 .......................................... 52
Figura 50: Cohesión y Ángulo de Fricción de Muestra de Afirmado ............................ 53
Figura 51: Valores de Z. ................................................................................................. 59
Figura 52: Zonas Sísmicas .............................................................................................. 59
Figura 53: Coeficiente de uso e importancia. ................................................................. 60
Figura 54: Factor de suelo S=1.10 para un Suelo tipo S3 y Z4 ....................................... 60
Figura 55: TP=1.0 y TL=1.6 para un perfil de suelo S3 ................................................... 61
Figura 56: Valor de R0=7 para un sistema de concreto armado dual. ............................ 61
Figura 57: Izquierda: Vista 3D de la estructura, Derecha: Vista en elevación ............... 62
Figura 58: Izquierda: Vista en planta del techo 1° piso, Derecha: Vista en planta de
techo típico del 2°, 3° y 4°piso .................................................................... 62
Figura 59: Espectro de Aceleraciones - Eje X y Eje Y ................................................... 64
Figura 60: Valores de Aceleración Espectral (Sa), Ejes X e Y. ..................................... 64
Figura 61: Participación del 100% Carga Muerta más Sobrecarga. ............................... 65
Figura 62: Coeficiente de Cortante Basal Eje X – ETABS (Análisis Estático) ............. 66
Figura 63: Coeficiente de Cortante Basal Eje Y – ETABS (Análisis Estático) ............. 67
Figura 64: Caso de Carga Sísmica Amplificada- Dirección X ....................................... 68
xi
Figura 65: Caso de Carga Sísmica Amplificada- Eje Y ................................................. 68
Figura 66: Cortante Basal Mínima - Eje X e Y. ............................................................. 69
Figura 67: Distorsión Máxima permisible ...................................................................... 69
Figura 68: Distorsión de entrepiso en la dirección X ..................................................... 70
Figura 69: Distorsión de entrepiso en la dirección Y ..................................................... 70
Figura 70: Distorsión de entrepiso, Eje X e Y expresada en forma gráfica ................... 70
Figura 71: Cargas de servicio generadas por la estructura 1 .......................................... 72
Figura 72: Cargas de servicio generadas por la estructura 2 .......................................... 73
Figura 73: Izquierda: Vista en planta del techo, Derecha: Visualización de Nodos ...... 74
Figura 74: Mayores cargas de servicio por zapata .......................................................... 75
Figura 75: Dimensiones en planta de la zapata............................................................... 77
Figura 76: Caso 1 - Solo Cargas de Gravedad (sin sismo) ............................................. 79
Figura 77: Caso 2 - Cargas de Gravedad + Sismo X-X .................................................. 80
Figura 78: Caso 3 - Cargas de Gravedad + Sismo Y-Y .................................................. 81
Figura 79: Caso 1 - Solo Cargas de Gravedad (sin sismo) ............................................. 82
Figura 80: Caso 2 - Cargas de Gravedad + Sismo X-X .................................................. 83
Figura 81: Caso 3 - Cargas de Gravedad + Sismo Y-Y .................................................. 84
Figura 82: Caso 1 - Solo Cargas de Gravedad (sin sismo), para Afirmado .................... 85
Figura 83: Caso 2 - Cargas de Gravedad + Sismo X-X, para Afirmado ........................ 86
Figura 84: Caso 3 - Cargas de Gravedad + Sismo Y-Y, para Afirmado ........................ 87
Figura 85: Curvas para valores de A1 y A2 para Geomallas ........................................... 88
Figura 86: Curvas para valores de X0/B y L0/B .............................................................. 90
Figura 87: Longitudes de empotramiento de la Geomalla .............................................. 91
Figura 88: Df Vs Capacidad de carga del suelo del Lote 37 ........................................ 106
Figura 89: Df Vs Capacidad de carga del Afirmado .................................................... 106
Figura 90: Zapata más esforzada .................................................................................. 107
Figura 91: Ubicación de la zapata más esforzada ......................................................... 108
Figura 92: Reforzamiento con Geomalla ...................................................................... 109
Figura 93: Reforzamiento con Afirmado ...................................................................... 110
Figura 94: Incrementado dimensiones de zapata .......................................................... 110
xii
RESUMEN
La investigación tuvo por objetivo principal realizar una evaluación técnica – económico
de dos alternativas de solución: Geomallas y Afirmado, en cimentaciones superficiales.
A fin de realizar un mejoramiento de suelos, con el propósito de que dicho suelo pueda
tolerar los esfuerzos transmitidos por la estructura de una edificación para vivienda de 4
pisos. El suelo en estudio está ubicado en el Lote 37 de Urbanización Brisas de Oquendo,
Ventanilla – Callao.
Para ello, se desarrolló una metodología de investigación del tipo cuantitativa, tipo y nivel
de investigación descriptiva y de orientación aplicada.
xiii
ABSTRACT
The main objective of the research was to carry out a technical – economic evaluation of
two solution alternatives: Geogrids and Affirmed, in shallow foundations.
For the purpose of improving soils, so that this land can tolerate the efforts transmitted
by the structure of a 4 story housing building. The land studied is located in Lot 37 of
Urbanization Brisas de Oquendo, Ventanilla - Callao.
For this, a research methodology of the quantitative type, type and level of descriptive
research and applied guidance was developed.
The technical evaluation allowed to determine that both solution alternatives are feasible.
Using Geogrids, it was concluded that it is feasible to lay at 0.70 meters deep and
Affirmed as a replacement material, at 1.90 meters deep.
The economic evaluation allowed to determine that the least expensive option is to use
Affirmed. The Direct Cost for building the Z-2 foundation using a Geogrid was S/.
3,241.98 and using Affirmed S/. 2,599.24.
Therefore, the economic technical evaluation between Geogrids and Affirmed allowed to
determine that using Affirmed is the best option in surface foundations for the case
studied.
xiv
INTRODUCCIÓN
1
En el capítulo 6, se realiza la evaluación económica, que comprende el análisis de precios
unitarios: Para la excavación, suministro de afirmado, el relleno con material propio y
compactación, eliminación del material producto de la excavación, colocación de
Geomalla, dando como resultado dos presupuestos uno por mejoramiento de suelo
utilizando material de reemplazo y el otro presupuesto por mejoramiento de suelo
utilizando una Geomalla.
2
CAPÍTULO I PLANTEAMIENTO DEL PROBLEMA
La explosión demográfica que viene experimentando el Perú desde hace unas décadas
se acentúa en mayor porcentaje en la capital, y adicionalmente en algunos distritos de
la Provincia Constitucional del Callao que se ubican en las zonas periféricas, como es
el caso del distrito de Ventanilla. Dicha explosión demográfica viene acompañada de
necesidades básicas de la población, como son agua potable, luz, carreteras y
vivienda.
3
1.2. Formulación del problema
¿De qué manera es posible evaluar la mejor opción técnico económica entre
Geomallas y Afirmado en cimentaciones superficiales, Caso: Lote 37 de la
Urbanización Brisas de Oquendo – Callao?
a) ¿De qué manera es posible hacer una evaluación técnica entre Geomallas
y Afirmado en cimentaciones superficiales, Caso: Lote 37 de la
urbanización Brisas de Oquendo – Callao?
1.4.1. Conveniencia
4
1.4.2. Relevancia social
5
CAPÍTULO II MARCO TEÓRICO
6
vibración se incrementan en un 32.77% en el eje X y en un 7.85% en el eje Y
con respecto al suelo rígido.
7
2.2. Bases teóricas
2.2.1. Geosintéticos
2.2.1.1. Introducción
a) Geotextil
8
Según el desarrollo de manufacturación se clasifican en:
Geotextil no tejido
Geotextil Tejido
9
- Geotextiles tejidos por filamentos únicos (monofilamentos).
- Geotextiles tejidos por filamentos múltiples.
- Fibrilados.
b) Geomallas
10
Por lo general, las geomallas son más resistentes que los geotextiles, siendo
utilizadas casi exclusivamente como elementos de refuerzo en suelos y se
pueden clasificar como:
Geomalla Uniaxial
Geomalla Biaxial
11
través de las aberturas transmitiendo carga de los elementos transversales a
los longitudinales vía las uniones.
Los principales polímeros utilizados para la elaboración de geomallas
uniaxiales son el Polipropileno (PP) y el Poliéster de Alta Tenacidad (PET).
(Egoavil, 2012, p.7)
Los tipos de geomalla uniaxial se muestran en la figura 4.
12
La compactación se mide en función de su peso unitario seco, se debe incluir
agua al suelo durante el proceso, ya que este se comporta como elemento
aglutinante entre las partículas del suelo.
γ = γd (w=0) = γ …… (1)
w = contenido de humedad
γ = peso unitario húmedo
γd = peso unitario seco
Para W = 0, el peso unitario húmedo es igual al peso unitario seco (γ = γd).
14
con el fin de hallar el peso unitario seco máximo y su correspondiente
contenido de humedad óptimo.
“Para un grado de saturación ideal, es decir a un nivel de compactación del
100 %, se obtiene un peso unitario seco máximo teórico” (Das, B., 2001, p.94)
ℽw
γcva = 1 …… (5)
𝑤+𝐺𝑠
𝑎𝑥𝑏𝑥𝑐𝑥𝑑
𝐸= …… (6)
𝑒
15
Cuando se incremente el esfuerzo de compactación, se reduce el contenido
óptimo de humedad y se incrementa el peso unitario seco máximo de
compactación.
𝑎𝑥𝑏𝑥𝑐𝑥𝑑
𝐸= …… (7)
𝑒
16
2.2.2.3. Compactación realizada en campo
17
Figura 7: Condición de compactación más económica
Fuente: Fundamentos de ingeniería geotécnica, Braja M. Das
18
2.2.3. Teoría de la capacidad de carga de Terzaghi
Para una cimentación cuadra, para falla por corte lo cal según Nij (2009):
𝑞𝜇 = 0.867𝑐𝑁𝑐 + 𝑞𝑁𝑞 + 0.4𝛾𝐵𝑁𝛾 ………. (13)
19
Tabla 1: Factores de Capacidad de Carga
20
Figura 8: Tipos de falla de la capacidad de carga
Fuente: Fundamentos de ingeniería geotécnica, Braja M. Das
a) Estructura
b) Superestructura
21
c) Subestructura
d) Afirmado
Material granular o procesado que se utiliza como capa compactada para soporte
directo de cargas y esfuerzos. Debe poseer la cantidad apropiada de material fino
cohesivo para mantener aglutinadas sus partículas.
e) Asentamiento
Movimiento descendente del terreno, debido al sometimiento a cargas que
originan modificaciones en las tensiones del suelo. Es posible ser calculado por
diferentes procedimientos: consolidación unidimensional, modelo elástico y
constitutivos.
f) Calicata
Aptitud del suelo para tolerar cargas aplicadas sobre él, dichas cargas generan
asentamientos permanentes en el terreno. Se conoce que es la máxima presión
promedio de contacto entre el suelo y la cimentación tal que no se origine un
fallo por cortante y/o asentamientos excesivos.
Presión máxima que la cimentación puede producir al suelo sin que se presenten
asentamientos excesivos.
i) Punto de exploración
∅ = á𝑛𝑔𝑢𝑙𝑜 tan(𝛼𝑡𝑎𝑛∅∗ )
22
Donde ∅∗ , es el ángulo con la horizontalidad de la envolvente de los círculos de
Mohr a la falla en la prueba de resistencia que se considere más representativa
del comportamiento del suelo en condiciones de trabajo. Esta prueba debe
considerar la posibilidad de que el suelo pierda parte de su resistencia.
l) Cohesión, C
m) Área de cimentación
n) Nivel freático
o) Geomalla
p) Bulbo de presiones
Área del suelo donde se presentan incrementos de carga vertical por efecto de
una carga aplicada. Se conforma por isobaras, que son curvas que representan
puntos de un mismo valor de esfuerzo.
23
2.4. Estructura teórica y científica que sustenta la investigación
2.4.1.1. Introducción
“Una cimentación idónea es la que transmite las cargas a través del terreno
sin sobrecargarlo, ya que dicho efecto produce asentamientos fuera del
rango permitido y falla cortante del suelo, generando daños en la
estructura.” (Das, B., 2001, p.221)
Zapatas
Las zapatas aisladas y combinadas son aquellas que soportan una sola y
varias columnas respectivamente, mientras que las zapatas que
corresponden a la continuación de muro portante se les denominan zapatas
corridas. Una zapata poco convencional es la denominada zapata en
voladizo o cantiliver, que se utiliza cuando una columna soporta un muro
exterior. Lo descrito se ilustra en la figura 9. (Peck, R., Thornburn, T.,
Hanson, W., 1982, p. 221).
24
Figura 9: Tipos de zapatas, a) Zapata aislada, b) Zapata corrida, c) y d) Zapatas
combinadas, e) Zapata en voladizo.
Fuente: Ingeniería de cimentaciones, Peck & Hanson & Thornburn
Losas de cimentación
25
Existen varias consideraciones importantes acerca de las losas de
cimentación:
- Se proyectan construir como losas planas sin nervaduras.
- En el caso que el centroide de la losa coincide con el centro de
gravedad de cargas, se considera como una presión uniforme a la
carga hacia arriba e igual al cociente de la sumatoria de las cargas
hacia abajo y su área.
- No se considera el peso de la losa de cimentación en el diseño
estructural, ya que se asume que es soportada directamente por el
suelo.
- Al no considerarse las fuerzas y momentos cortantes producidos
por asentamientos diferenciales, es una práctica común
sobredimensionar el acero de la losa como medida de seguridad.
- Cuando existe la posibilidad de que el suelo sea tal que se presenten
asentamientos diferenciales grandes y las cargas de las columnas no
están simétricamente distribuidas, las losas deben reforzarse para
evitar deformaciones excesivas. Esta manera de reforzamiento se
realiza utilizando muros divisorios como nervaduras de vigas T
conectadas a la losa, construyendo marcos rígidos para la
cimentación, como se muestra en la figura 10a y 10b y algunos casos
usando la rigidez de una superestructura de concreto armado. Si la
losa de es grandes dimensiones, puede ser muy costoso implementar
estos procedimientos y en ese caso entrar a tallar la posibilidad de
utilizar pilotes.
Figura 10: Métodos para reforzar losas de cimentación, a) Uso de muros como
vigas T, b) Marcos rígidos.
Fuente: Ingeniería de cimentaciones, Peck & Hanson & Thornburn
26
Los tipos más comunes de losas de cimentación se muestran en la figura 11 y la
figura 12 grafica como varia el Df y B para zapatas aisladas y una losa de
cimentación. (Df = profundidad, B = ancho)
Figura 11: Tipos de losa de cimentación a) Losa de espesor uniforme. b) Losa de mayor espesor
bajo columnas. c) Losa con vigas en ambas direcciones. d) Losa con pedestales. e) Losa con muros
de sótano como refuerzo.
Fuente: Fundamentos de ingeniería geotécnica, Braja M. Das
27
Figura 12: Comparativo entre losa de cimentación y zapata aislada
Fuente: Fundamentos de ingeniería geotécnica, Braja M. Das
(Peck, R., Thornburn, T., Hanson, W., 1982) Adicionalmente, se sabe qué se utilizan
pilotes como cimentación cuando se requiere que la estructura se apoye en un
estrato de suelo que se encuentra a mayor profundidad y cuando se proyecta
construir una estructura muy pesada. Pueden estar fabricados de concreto,
acero y algunos casos madera. Según su funcionamiento relacionado a la forma
de transmitir cargas de la estructura al suelo, es que se dividen en dos
categorías: pilotes de punta y pilotes de fricción. En el caso de los pilotes de
punta, se les denomina así porque transmiten la carga a través de su punta a un
espacio firme del subsuelo, mientras que los pilotes de fricción lo realizan a
través de los esfuerzos cortantes producidos a lo largo de la superficie lateral
del pilote.
28
2.5. Formulación de Hipótesis
2.6. Variables
Geomalla
Afirmado
29
CAPÍTULO III METODOLOGÍA DEL ESTUDIO
3.3.1. Población
3.3.2. Muestra
3.4.1.1. Técnicas
- Ensayos de laboratorio.
- Investigaciones pasadas.
30
3.4.2. Técnicas de procesamiento y análisis de datos
- Contenido de humedad
- Granulometría por tamizado
- Limite líquido y plástico
- Proctor modificado
- Ensayo de corte directo
31
CAPÍTULO IV TRABAJO EXPLORATORIO
32
Figura 14: Colindancia inmediata del terreno
Fuente: Elaboración propia
33
Figura 16: Edificación cercana
Fuente: Elaboración propia
34
Figura 17: Planos (a) Plano de Cimentación (b) Plano del Primer Piso
Fuente: Elaboración Técnica
35
4.1.4. Número de puntos de exploración
36
4.1.6. Número de puntos de exploración
37
Figura 22: Plano de Corte y Elevación de Zapata-2
Fuente: Elaboración Técnica
Df = 1.20 m
Z = 1.5*1.2 = 1.80 m
P = 1.20 + 1.80
P = 3.00 m, profundidad para el punto de exploración.
38
4.1.9. Ejecución de calicata C-1
Figura 24: Excavación (a) Inicio de Excavación (b) Excavación a 1.50 m de Prof.
Fuente Elaboración Propia
Figura 25: (a) Extracción Mib M-1 (b) Primer estrato 1.20 m de longitud.
Fuente: Elaboración Propia
39
Figura 26: (a) Muestra M-1 recubierta de fill (b) Extracciones de Mib M-2 y M-3
Fuente: Elaboración Propia
Figura 27: (a) Muestra M-2 recubierta de fill (b) Muestra M-3 recubierta de fill
Fuente: Elaboración Propia
40
Figura 28: (a) Muestra M-4 recubierta de fill Mab (b) Calicata a 3.00 m de profundidad
Fuente: Elaboración Propia
Figura 29: (a) Calicata C-1 a 3.00 m de profundidad (b) Muestras embaladas
Fuente: Elaboración Propia
41
4.1.10. Obtención de muestra de Afirmado
Se designó al Afirmado como material de reemplazo para cimentaciones
superficiales, por ser un material granular que se obtiene por el proceso de
trituración y zarandeo, y posee un buen comportamiento para recibir cargas
transmitidas por cimentaciones cuando este es sometido a procesos de
compactación a un óptimo porcentaje de humedad y energía de
compactación.
La muestra para fines de estudio, se obtuvo de una cantera cercana a la Urb.
Brisas de Oquendo (Cantera Romaña S.A.C), tal como se muestra en la
figura 30, 31 y 32.
Figura 30: Distancia entre la Cantera y la Urb. Brisas de Oquendo: 7.7 kilómetros.
Fuente: Elaboración propia
42
Figura 32: Obtención de muestra de 30 Kg. de afirmado
Fuente: Elaboración Propia
43
4.2. Ensayos de laboratorio
Muestra M-1
Curva Granulométrica
100
90
80
60
50
40
30
20
10
0
0.01 0.10 1.00 10.00 100.00
Diám e tr o de las Par tículas (mm)
0.07 0.4 2.0 4.7 19.0 75.
Fin Med Grue Fin Grues
Lim o y Ar cilla
Ar e na Gr ava
Diagrama de Fluidez
Contenido de Hum edad (%)
27.50
26.50
25.50
24.50
10 20 25 30 40 50 60 70 100
44
Muestra M-2
Curva Granulométrica
100
90
80
% Acumulado Que Pasa
70
60
50
40
30
20
10
0
0.01 0.10 1.00 10.00 100.00
Diám etro de las Partículas (mm)
0.075 0.42 2.00 4.75 19.00 75.0
Fina Medi Grues Fina Gruesa
Lim o y Arcilla
Arena Grav
Diagrama de Fluidez
44.00
Contenido de Hum edad (%)
43.00
21.
42.00
41.00
10 20 25 30 40 50 60 70 80 100
45
Muestra M-3
Curva Granulométrica
100
90
80
% Acumulado Que Pasa
70
60
50
40
30
20
10
0
0.01 0.10 1.00 10.00 100.00
Diám etro de las Partículas (mm)
0.07 0.42 2.0 4.75 19.00 75.0
Fina Medi Grues Fina Gruesa
Lim o y Arcilla
Arena Grava
40
30
20
10
0
0.01 0.10 1.00 10.00 100.00
Diám etro de las Partículas (mm)
0.07 0.42 2.00 4.75 19.00 75.0
Fina Medi Grues Fina Gruesa
Lim o y Arcilla
Arena Grava
46
4.2.2. Clasificación SUCS
47
4.2.4. Cálculo de constantes básicas
Se realizaron los ensayos a cada muestra para obtener sus contenidos de humedad
(Figura 40), peso específico natural (Figura 41) y gravedad especifica (Figura 42).
Contenido de Humedad (w %)
N° De Ensayo 1 2 3 4
1.00 N° de Recipiente gr R- A R- B R- C R- D
2.00 W Recipiente gr 32.76 34.35 37.52 32.52
3.00 W Recipiente sw gr 318.46 258.63 413.95 404.7
4.00 W Recipiente s gr 303.22 243.49 397.7 394.94
5.00 Ww: 3 - 4 gr 15.24 15.14 16.25 9.76
6.00 Ws: 4 - 2 gr 270.46 209.14 360.18 362.42
7.00 w: 100 * 5/6 % 5.63 7.24 4.51 2.69
8.00 w Promedio % 5.02
48
4.2.5. Ensayo de Proctor Modificado
Figura 43: (a) Tamizado y divido en 3 muestras (b) Modificación de humedad muestral
Fuente: Elaboración Propia
Figura 44: (a) Compactación 5 capas de 56 golpes (b) 3 muestras luego de compactación
Fuente: Elaboración Propia
49
Curva de Compactación
2.35
2.30
2.25
Peso Específico Seco (gr/cc)
2.20
2.15
2.10
2.05
4.00 4.60 5.20 5.80 6.40 7.00
Contenido de Hum edad (%)
100% Saturación
Del ensayo de Proctor Modificado se obtuvo que para obtener el Peso Específico
Seco Máximo (gd max) de 2.24 gr/cc se necesita trabajar con un óptimo contenido
de humedad del 5.55 %. Según Tabla 3.
50
4.2.6. Ensayo de corte directo
51
Ensayo de corte directo a muestra M-2
Los resultados de la M-2 (Anexo 13), son la Cohesión y el Ángulo de Fricción, tal
como se muestra en la figura 48.
PARAMETROS DE RESISTENCIA
ESF. NORMAL (kg/cm²) 0.50 1.00 2.00
ESF.CORTANTE (kg/cm²) 0.35 0.70 1.31
COHESION (C) (kg/cm²) 0.10
A.DE FRICCION (F ) (º) 31.38
0.20
0.00
0.00 0.50 1.00 1.50 2.00 2.50
Esfuerzo Normal (kg/cm²)
1.8
Límite inferior Eje X 0.00
1.6 Límite superior Eje X 4.28
Esfuerzo Cortante (kg/cm²)
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5
Esfuerzo Normal (kg/cm²)
52
Ensayo de corte directo a muestra Afirmado
PARAMETROS DE RESISTENCIA
ESFUERZO NORMAL (kg/cm²) 0.50 1.00 2.00 -
ESFUERZO CORTANTE (kg/cm²) 0.45 0.83 1.66 -
COHESION (C) (kg/cm²) 0.10
ANGULO DE FRICCION (F) (º) 37.95
PARAMETROS DE RESISTENCIA
Esfuerzo Cortante Vs Esfuerzo Normal
2.50
COHESION (C) 0.10
A. DE FRICCION (F) 37.95
2.00
0.50
0.00
0.00 0.50 1.00 1.50 2.00 2.50
Esfuerzo Normal (kg/cm²)
53
CAPÍTULO V EVALUACIÓN TÉCNICA
Tabla 4: Valores de Capacidad de Carga del suelo del lote 37, B=1.20 m.
General Local
Df C γ F.General F.Local
Estrato 𝜙 Nq Nc Nᵧ Nq Nc Nᵧ
(m) (kN/m2) (kN/m3) (Kg/cm2) (Kg/cm2)
ML 0.70 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 2.98 0.95
ML 0.80 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.09 0.99
ML 0.90 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.20 1.03
ML 1.00 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.31 1.07
ML 1.10 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.41 1.11
ML 1.20 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.52 1.14
ML 1.30 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.63 1.18
ML 1.40 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.74 1.22
ML 1.50 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.85 1.26
SM 1.60 32.34 18.63 18.63 28.52 44.04 26.87 9.82 21.16 5.51 7.33 2.32
SM 1.70 32.34 18.63 18.63 28.52 44.04 26.87 9.82 21.16 5.51 7.51 2.39
SM 1.80 32.34 18.63 18.63 28.52 44.04 26.87 9.82 21.16 5.51 7.69 2.45
SM 1.90 32.34 18.63 18.63 28.52 44.04 26.87 9.82 21.16 5.51 7.87 2.51
SM 2.00 32.34 18.63 18.63 28.52 44.04 26.87 9.82 21.16 5.51 8.06 2.57
SM 2.10 32.34 18.63 18.63 28.52 44.04 26.87 9.82 21.16 5.51 8.24 2.64
GW 2.20 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 10.00 2.71
GW 2.30 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 10.36 2.82
GW 2.40 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 10.72 2.93
GW 2.50 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 11.09 3.04
GW 2.60 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 11.45 3.14
GW 2.70 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 11.81 3.25
GW 2.80 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 12.18 3.36
GW 2.90 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 12.54 3.47
GW 3.00 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 12.90 3.57
Fuente: Elaboración propia
54
Tabla 5: Valores de Capacidad de Carga del suelo del lote 37, B=1.50 m.
General Local
Df C γ F.General F.Local
Estrato 𝜙 Nq Nc Nᵧ Nq Nc Nᵧ
(m) (kN/m2) (kN/m3) (Kg/cm2) (Kg/cm2)
ML 0.70 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.10 0.98
ML 0.80 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.21 1.01
ML 0.90 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.31 1.05
ML 1.00 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.42 1.09
ML 1.10 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.53 1.13
ML 1.20 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.64 1.17
ML 1.30 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.75 1.21
ML 1.40 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.86 1.25
ML 1.50 31.38 9.81 12.65 25.28 40.41 22.65 9.03 20.03 4.83 3.97 1.29
SM 1.60 32.34 18.63 18.63 28.52 44.04 26.87 9.82 21.16 5.51 7.54 2.30
SM 1.70 32.34 18.63 18.63 28.52 44.04 26.87 9.82 21.16 5.51 7.72 2.36
SM 1.80 32.34 18.63 18.63 28.52 44.04 26.87 9.82 21.16 5.51 7.90 2.42
SM 1.90 32.34 18.63 18.63 28.52 44.04 26.87 9.82 21.16 5.51 8.08 2.48
SM 2.00 32.34 18.63 18.63 28.52 44.04 26.87 9.82 21.16 5.51 8.26 2.54
SM 2.10 32.34 18.63 18.63 28.52 44.04 26.87 9.82 21.16 5.51 8.44 2.61
GW 2.20 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 10.50 2.73
GW 2.30 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 10.86 2.84
GW 2.40 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 11.23 2.95
GW 2.50 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 11.59 3.05
GW 2.60 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 11.95 3.16
GW 2.70 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 12.32 3.27
GW 2.80 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 12.68 3.38
GW 2.90 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 13.04 3.48
GW 3.00 36.00 0.00 22.65 47.16 63.53 54.36 13.97 26.77 9.41 13.41 3.59
Fuente: Elaboración propia
55
5.2. Cálculo de la Capacidad de Carga para el Afirmado
Utilizando los mismos criterios que se usaron para calcular la capacidad de carga para el
suelo sin mejora, se realizaron los cálculos de capacidad de carga para el material de
reemplazo (Afirmado) haciendo uso de los datos técnicos obtenidos luego de ensayar la
muestra obtenida de la cantera Romaña S.A.C., los resultados se muestran en la tabla 6.
Para el cálculo se utilizó un valor de peso específico de γ = 2.235 gr/cc, debido a que es
el valor que se obtuvo del ensayo de proctor modificado como γd max, a un valor de
optimo contenido de humedad de 5.55%.
General Local
σ σ
Df C γ
Estrato 𝜙 Nq Nc Nᵧ Nq Nc Nᵧ F.General F.Local
(m) (kN/m2) (kN/m3) (Kg/cm2) (Kg/cm2)
AFIRMADO 0.70 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 8.17 2.01
AFIRMADO 0.80 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 8.57 2.13
AFIRMADO 0.90 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 8.98 2.24
AFIRMADO 1.00 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 9.38 2.36
AFIRMADO 1.10 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 9.78 2.47
AFIRMADO 1.20 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 10.18 2.58
AFIRMADO 1.30 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 10.58 2.70
AFIRMADO 1.40 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 10.98 2.81
AFIRMADO 1.50 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 11.38 2.93
AFIRMADO 1.60 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 11.78 3.04
AFIRMADO 1.70 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 12.18 3.15
AFIRMADO 1.80 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 12.58 3.27
AFIRMADO 1.90 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 12.98 3.38
AFIRMADO 2.00 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 13.38 3.50
AFIRMADO 2.10 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 13.78 3.61
AFIRMADO 2.20 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 14.19 3.72
AFIRMADO 2.30 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 14.59 3.84
AFIRMADO 2.40 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 14.99 3.95
AFIRMADO 2.50 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 15.39 4.07
AFIRMADO 2.60 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 15.79 4.18
AFIRMADO 2.70 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 16.19 4.30
AFIRMADO 2.80 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 16.59 4.41
AFIRMADO 2.90 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 16.99 4.52
AFIRMADO 3.00 37.95 9.81 21.92 53.80 70.01 65.27 15.32 28.51 10.90 17.39 4.64
Fuente: elaboración propia.
56
5.3. Diseño sismorresistente de la estructura
57
propósito se generó un modelo matemático para el análisis respectivo, este modelo
fue realizado empleando el programa de cálculo estructural ETABS 2016.
Carga Muerta
Acabados
Acabados 50 kg/m2
Sobrecargas
La sobrecarga de entrepiso es de 200 kg/m2 en todos los niveles a excepción de
la azotea que se consideró 100 kg/m2.
Sobrecargas en entrepisos 200 kg/m2
(Vivienda)
Sobrecargas en azotea 100 kg/m2
Parámetros Sísmicos
Para realizar el análisis sísmico de la estructura descrita debemos de tener en
cuenta los parámetros sísmicos según la Norma Técnica E.030 Diseño
Sismorresistente, los cuales son:
Z: Factor que se interpreta como la aceleración máxima del terreno con una
probabilidad de 10% de ser excedida en 50 años. En la figura 51 y 52 se puede
ver los valores que tiene el factor Z según la Norma E. 030. Según la
ubicación del proyecto, se utilizó una Zona 4 y un factor de zona Z=0.45.
58
Figura 51: Valores de Z.
Fuente: Norma E.030 Diseño Sismorresistente (2016)
59
Categoría de la edificación y factor U: Según el uso para vivienda de la edificación se
tiene una categoría de edificación común y un factor U igual a 1. Ver la figura 53:
S: Factor suelo. Se define según el tipo de suelo donde está ubicada la estructura. El valor
de S, se define según la figura 54:
60
TP y TL: Periodo del suelo. Se define según el tipo de suelo donde está ubicada la
estructura. El valor de TP y TL, se define según la figura 55:
61
De acuerdo al análisis realizado en el software Etabs se obtiene la figura 57 y 58.
Figura 58: Izquierda: Vista en planta del techo 1° piso, Derecha: Vista en planta de techo típico del 2°, 3°
y 4°piso
Fuente: Elaboración propia (ETABS, 2016)
62
5.3.7. Análisis Dinámico Modal Espectral
63
En la figura 59 se muestra el gráfico del espectro de diseño.
2.50
2.00
Aceleración (m/s2)
1.50
1.00
0.50
0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
Periodo ( s )
64
5.3.8. Peso de la Edificación para el Cálculo de la Fuerza Sísmica
Se considerará la participación del 100% del peso propio y cargas muertas, el 25%
de las sobrecargas en los entrepisos, tal como se muestra en la figura 61.
Figura 61: Participación del 100% Carga Muerta (Peso propio) más 25% de Sobrecarga.
Fuente: Elaboración propia
Una vez calculado el peso total del edificio, podemos calcular la cortante en la base
de una forma sencilla, y es usando el coeficiente de la cortante basal. En la norma
peruana, el coeficiente de la cortante basal, Cb, será igual a:
.……. (25)
65
Z=0.45 Zona sísmica (Z): Zona sísmica 4
66
Figura 63: Coeficiente de Cortante Basal Eje Y – ETABS (Análisis Estático)
Fuente: Elaboración propia
Una vez realizados los Análisis Dinámico y Estático se comparó las cortantes
basales, para el presente proyecto (debido a que la estructura presenta
Irregularidad) se corroboró que el Cortante Basal Dinámico fue mayor que el
90% del Análisis Estático en las direcciones X e Y. Para ello, en una primera
iteración se calculó un factor de escala de 1.30 en el Eje X y un factor de escala
de 1.19 en el Eje Y para el Análisis Dinámico. Para realizar el diseño de las
secciones, los casos sísmicos dinámicos fueron escalados por un factor de 1.30
en la dirección “X” y 1.19 en la dirección “Y”. Estos valores escalados se usaron
para el diseño por estados límites, según figura 64, 65 y 66.
67
Figura 64: Caso de Carga Sísmica Amplificada- Dirección X
Fuente: Elaboración propia
68
CORTANTE BASAL EJE X - 2° ITERACIÓN CORTANTE BASAL EJE Y - 2° ITERACIÓN
69
Del Análisis Dinámico Modal Espectral se tiene:
RX= 7 ANÁLISIS SÍSMICO EJE X
PISO U. Abs X(m) Δ. Relat X(m) Altura(m) Distorsión X
Story4 0.0039 0.0012 2.70 0.0023 CUMPLE
Story3 0.0027 0.0012 2.70 0.0023 CUMPLE
Story2 0.0015 0.0010 2.70 0.0020 CUMPLE
Story1 0.0005 0.0005 2.70 0.0009 CUMPLE
Figura 68: Distorsión de entrepiso en la dirección X
Fuente: Elaboración propia
70
5.3.12. Resultados del diseño sismorresistente de la estructura
Por Resistencia:
Por Rigidez:
71
En la figura 71 y 72 se aprecian las cargas y momentos de servicio generadas
por la estructura.
Load FZ MX MY
Story Joint Label
Case/Combo tonf tonf-m tonf-m
Base 5 Dead 6.7523 -0.0894 0.1815
Base 5 Live 0.6188 -0.0240 0.0374
Base 5 SSX Max 10.2451 0.4765 0.6578
Base 5 SSY Max 3.6358 0.5430 0.0564
Base 6 Dead 14.8398 -0.3371 -0.1993
Base 6 Live 3.2332 -0.1218 -0.0595
Base 6 SSX Max 2.5716 0.2705 0.6060
Base 6 SSY Max 1.0822 0.4663 0.0384
Base 7 Dead 9.8174 -0.0183 0.0288
Base 7 Live 1.6564 -0.0051 0.0137
Base 7 SSX Max 14.7203 0.0612 0.3642
Base 7 SSY Max 6.7273 0.0951 0.0148
Base 8 Dead 8.5116 -0.0543 0.1515
Base 8 Live 1.1839 -0.0113 0.0261
Base 8 SSX Max 10.9390 0.5319 0.0863
Base 8 SSY Max 0.3643 0.5674 0.1771
Base 9 Dead 20.2855 0.2570 -0.3050
Base 9 Live 5.0383 0.0922 -0.1085
Base 9 SSX Max 1.5484 0.3641 0.4973
Base 9 SSY Max 1.7050 0.5773 0.0068
Base 10 Dead 19.9168 -0.0101 0.2344
Base 10 Live 4.3806 -0.0052 0.1097
Base 10 SSX Max 8.3847 0.1097 1.7169
Base 10 SSY Max 4.1543 0.3973 0.0690
Base 11 Dead 21.3418 -0.2050 0.0020
Base 11 Live 2.7319 -0.0491 0.0009
Base 11 SSX Max 11.6726 1.5184 0.6529
Base 11 SSY Max 31.5100 3.2850 0.0307
Base 12 Dead 24.1769 -0.1250 0.1798
Base 12 Live 6.2543 -0.0475 0.0743
Base 12 SSX Max 1.2889 0.0650 0.5137
Base 12 SSY Max 1.1040 0.5520 0.0114
Base 13 Dead 17.6799 -0.0078 -0.5105
Base 13 Live 4.4521 -0.0064 -0.1785
Base 13 SSX Max 11.3341 2.2509 0.6494
Base 13 SSY Max 5.1271 3.7546 0.0262
Base 14 Dead 18.5019 0.3459 -0.0208
Base 14 Live 2.5478 0.1156 0.0060
Base 14 SSX Max 16.4068 0.2585 3.5245
Base 14 SSY Max 5.7211 0.6373 0.6383
Base 15 Dead 5.5013 0.2605 -0.0060
Base 15 Live 0.8689 0.0730 -0.0015
Base 15 SSX Max 7.6816 0.0168 0.1002
Base 15 SSY Max 1.4765 0.1281 0.0182
Figura 71: Cargas de servicio generadas por la estructura 1
Fuente: Elaboración propia
72
Joint Load FZ MX MY
Story
Label Case/Combo tonf tonf-m tonf-m
Base 16 Dead 29.0989 -0.1576 0.1173
Base 16 Live 7.2439 -0.0358 0.0335
Base 16 SSX Max 0.7263 0.0199 0.2536
Base 16 SSY Max 1.4906 0.1719 0.0218
Base 17 Dead 20.0886 -0.2765 0.0941
Base 17 Live 2.8756 -0.0628 0.0317
Base 17 SSX Max 18.2822 1.4707 0.5128
Base 17 SSY Max 32.9924 3.2463 0.0523
Base 18 Dead 8.1801 0.0213 -0.2626
Base 18 Live 1.2936 0.0069 -0.0737
Base 18 SSX Max 8.1758 0.2992 0.2713
Base 18 SSY Max 11.8081 0.4993 0.0139
Base 19 Dead 18.4732 0.0121 2.4644
Base 19 Live 3.1513 -0.0003 0.4574
Base 19 SSX Max 38.2358 0.0583 3.8244
Base 19 SSY Max 3.3012 0.0155 0.5289
Base 20 Dead 21.8867 -0.0428 -0.1840
Base 20 Live 3.6650 -0.0127 -0.0226
Base 20 SSX Max 30.2752 0.1147 4.7341
Base 20 SSY Max 2.8004 0.4043 0.1548
Base 21 Dead 19.0456 0.2348 -0.3794
Base 21 Live 2.8717 0.0662 -0.1001
Base 21 SSX Max 28.3851 0.0170 3.0052
Base 21 SSY Max 5.5087 0.1211 0.5505
Base 24 Dead 20.3958 0.2606 -0.2485
Base 24 Live 3.2609 0.0778 -0.0745
Base 24 SSX Max 15.0253 1.5549 0.2664
Base 24 SSY Max 21.8349 2.6261 0.0104
Base 141 Dead 0.6474 0.0167 0.0249
Base 141 Live 0.0920 0.0012 0.0036
Base 141 SSX Max 0.6858 0.0738 0.0853
Base 141 SSY Max 0.8153 0.1647 0.0416
Base 143 Dead 1.8279 -0.0016 0.0422
Base 143 Live 0.3148 -0.0032 0.0055
Base 143 SSX Max 1.6452 0.0306 0.1352
Base 143 SSY Max 2.7473 0.1098 0.0080
73
En la figura 73 vemos la vista en planta del techo y visualización de nodos.
Figura 73: Izquierda: Vista en planta del techo, Derecha: Visualización de Nodos
Fuente: Elaboración propia
74
5.4. Cálculo de zapata más esforzada
75
5.4.1. Cálculo del esfuerzo máximo de diseño para cimentaciones superficiales.
Procedimiento que se siguió para el cálculo del esfuerzo máximo de diseño (σu máx
diseño) de cada zapata es el siguiente:
Donde:
Para: σ adm igual o mayor 4 kg/cm2 (Suelo bueno), % Pp = 5 %
Para: σ adm igual o mayor 2.5 kg/cm2 (Suelo intermedio), % Pp = 7.5 %
Para: σ adm igual o mayor 1 kg/cm2 (Suelo malo), % Pp = 10 %
PCM es el peso debido a la carga muerta, PCV es el peso debido a carga viva, PP es
el peso propio de la zapata y PCS es el peso debido a la carga sísmica.
76
c) Capacidad portante del suelo: σadm= Varia según cada estrato kg/cm2
77
Se calcula el: σu 2= 1.25 x σ máx (ton), amplificando con un factor de 1.25
la presión del suelo calculada (Morocho, 2016).
Caso 3, considerando cargas de gravedad + Sismo Y-Y:
𝑃 6𝑀𝑥𝑥 6𝑀𝑦𝑦
𝜎= ± ± 2 ….. (36)
𝐴 𝐿𝐵 2 𝐿𝐵
σ máx < σ neto
σ mín > 0
Se calcula el: σu 3= 1.25 x σ máx (ton), amplificando con un factor de 1.25
la presión del suelo calculada (Morocho, 2016).
i) σu máx diseño= Valor máximo entre σu 1, σu 2 y σu 3 (ton/ m2).
σu máx diseño
Zapata Ubicación
ton/m2
Z-1 (1.25x1.3) Ejes 7 y A 42.31
Z-2 (1.2x1.2) Ejes 5 y B 45.10
Z-2 (1.2x1.2) Ejes 4 y B 39.11
Z-4 (1.0x1.5) Ejes 4 y D 38.44
Fuente: Elaboración propia
Se concluyó que la Z-2, ubicada entre los ejes 5 y B, es la cimentación que
presenta el esfuerzo más crítico de toda la estructura.
78
5.5. Verificación preliminar de cimentaciones superficiales para suelo sin
mejoramiento.
79
Caso 2. Cargas de gravedad + Sismo X-X
σneto
Estrato Df (m) σmáx Verificación σmín Verificación
(Ton/m2)
(Ton/m2) σmáx < σneto (Ton/m2) σmáx > 0
ML 0.70 8.10 29.05 NO CUMPLE 25.36 CUMPLE
ML 0.80 8.36 29.17 NO CUMPLE 25.48 CUMPLE
ML 0.90 8.62 29.29 NO CUMPLE 25.60 CUMPLE
ML 1.00 8.88 29.41 NO CUMPLE 25.73 CUMPLE
ML 1.10 9.14 29.54 NO CUMPLE 25.85 CUMPLE
ML 1.20 9.40 29.66 NO CUMPLE 25.97 CUMPLE
ML 1.30 9.66 29.78 NO CUMPLE 26.09 CUMPLE
ML 1.40 9.92 29.90 NO CUMPLE 26.22 CUMPLE
ML 1.50 21.32 30.39 NO CUMPLE 26.70 CUMPLE
SM 1.60 19.70 30.73 NO CUMPLE 27.04 CUMPLE
SM 1.70 20.14 30.91 NO CUMPLE 27.22 CUMPLE
SM 1.80 20.57 31.09 NO CUMPLE 27.40 CUMPLE
SM 1.90 21.00 31.27 NO CUMPLE 27.58 CUMPLE
SM 2.00 21.43 31.45 NO CUMPLE 27.76 CUMPLE
SM 2.10 21.86 31.63 NO CUMPLE 27.94 CUMPLE
GW 2.20 21.56 32.43 NO CUMPLE 28.74 CUMPLE
GW 2.30 22.41 32.65 NO CUMPLE 28.96 CUMPLE
GW 2.40 23.25 32.87 NO CUMPLE 29.18 CUMPLE
GW 2.50 24.10 33.09 NO CUMPLE 29.40 CUMPLE
GW 2.60 24.94 33.31 NO CUMPLE 29.62 CUMPLE
GW 2.70 25.78 33.52 NO CUMPLE 29.84 CUMPLE
GW 2.80 26.63 33.74 NO CUMPLE 30.05 CUMPLE
GW 2.90 27.47 33.96 NO CUMPLE 30.27 CUMPLE
GW 3.00 28.32 34.18 NO CUMPLE 30.49 CUMPLE
80
Caso 3. Cargas de gravedad + Sismo Y-Y
σneto
Estrato Df (m) σmáx Verificación σmín Verificación
(Ton/m2)
(Ton/m2) σmáx < σneto (Ton/m2) σmáx > 0
ML 0.70 8.10 28.41 NO CUMPLE 26.85 CUMPLE
ML 0.80 8.36 28.53 NO CUMPLE 26.97 CUMPLE
ML 0.90 8.62 28.65 NO CUMPLE 27.09 CUMPLE
ML 1.00 8.88 28.77 NO CUMPLE 27.22 CUMPLE
ML 1.10 9.14 28.90 NO CUMPLE 27.34 CUMPLE
ML 1.20 9.40 29.02 NO CUMPLE 27.46 CUMPLE
ML 1.30 9.66 29.14 NO CUMPLE 27.58 CUMPLE
ML 1.40 9.92 29.26 NO CUMPLE 27.71 CUMPLE
ML 1.50 21.32 29.75 NO CUMPLE 28.20 CUMPLE
SM 1.60 19.70 30.09 NO CUMPLE 28.53 CUMPLE
SM 1.70 20.14 30.27 NO CUMPLE 28.71 CUMPLE
SM 1.80 20.57 30.45 NO CUMPLE 28.89 CUMPLE
SM 1.90 21.00 30.63 NO CUMPLE 29.07 CUMPLE
SM 2.00 21.43 30.81 NO CUMPLE 29.25 CUMPLE
SM 2.10 21.86 30.99 NO CUMPLE 29.43 CUMPLE
GW 2.20 21.56 31.79 NO CUMPLE 30.23 CUMPLE
GW 2.30 22.41 32.01 NO CUMPLE 30.45 CUMPLE
GW 2.40 23.25 32.23 NO CUMPLE 30.67 CUMPLE
GW 2.50 24.10 32.44 NO CUMPLE 30.89 CUMPLE
GW 2.60 24.94 32.66 NO CUMPLE 31.11 CUMPLE
GW 2.70 25.78 32.88 NO CUMPLE 31.33 CUMPLE
GW 2.80 26.63 33.10 NO CUMPLE 31.55 CUMPLE
GW 2.90 27.47 33.32 NO CUMPLE 31.76 CUMPLE
Existe cumplimiento del σ mínimo, ya que este valor para todos los casos es mayor a
cero, lo que asegura que no se generan tracciones en la zapata. Sin embargo, para
ningún caso, aun cimentando a una profundidad de 3.00 m sobre el estrato de suelos
clasificado como GW, se da cumplimiento al realizar un comparativo entre el σ neto y
σ máximo.
81
5.6. Verificación preliminar de cimentaciones superficiales para el suelo sin
mejoramiento, aumentando las dimensiones en planta de la zapata.
82
Caso 2. Cargas de gravedad + Sismo X-X
σneto
Estrato Df (m) σmáx Verificación σmín Verificación
(Ton/m2)
(Ton/m2) σmáx < σneto (Ton/m2) σmáx > 0
ML 0.70 8.35 18.92 NO CUMPLE 17.03 CUMPLE
ML 0.80 8.61 19.04 NO CUMPLE 17.16 CUMPLE
ML 0.90 8.87 19.17 NO CUMPLE 17.28 CUMPLE
ML 1.00 9.13 19.29 NO CUMPLE 17.41 CUMPLE
ML 1.10 9.39 19.42 NO CUMPLE 17.53 CUMPLE
ML 1.20 9.65 19.54 NO CUMPLE 17.65 CUMPLE
ML 1.30 9.91 19.67 NO CUMPLE 17.78 CUMPLE
ML 1.40 10.16 19.79 NO CUMPLE 17.90 CUMPLE
ML 1.50 10.42 19.92 NO CUMPLE 18.03 CUMPLE
SM 1.60 19.41 20.63 NO CUMPLE 18.74 CUMPLE
SM 1.70 19.84 20.82 NO CUMPLE 18.93 CUMPLE
SM 1.80 20.27 21.00 NO CUMPLE 19.11 CUMPLE
SM 1.90 20.71 21.18 NO CUMPLE 19.29 CUMPLE
SM 2.00 21.14 21.37 NO CUMPLE 19.48 CUMPLE
SM 2.10 21.57 22.14 NO CUMPLE 19.66 CUMPLE
GW 2.20 21.72 22.37 NO CUMPLE 20.48 CUMPLE
GW 2.30 22.56 22.59 NO CUMPLE 20.70 CUMPLE
GW 2.40 23.41 22.81 CUMPLE 20.93 CUMPLE
GW 2.50 24.25 23.04 CUMPLE 21.15 CUMPLE
GW 2.60 25.10 23.26 CUMPLE 21.37 CUMPLE
GW 2.70 25.94 23.48 CUMPLE 21.60 CUMPLE
GW 2.80 26.78 23.71 CUMPLE 21.82 CUMPLE
GW 2.90 27.63 23.93 CUMPLE 22.04 CUMPLE
83
Caso 3. Cargas de gravedad + Sismo Y-Y
σneto
Estrato Df (m) σmáx Verificación σmín Verificación
(Ton/m2)
(Ton/m2) σmáx < σneto (Ton/m2) σmáx > 0
ML 0.70 8.35 18.65 NO CUMPLE 17.85 CUMPLE
ML 0.80 8.61 18.77 NO CUMPLE 17.97 CUMPLE
ML 0.90 8.87 18.89 NO CUMPLE 18.10 CUMPLE
ML 1.00 9.13 19.02 NO CUMPLE 18.22 CUMPLE
ML 1.10 9.39 19.14 NO CUMPLE 18.35 CUMPLE
ML 1.20 9.65 19.27 NO CUMPLE 18.47 CUMPLE
ML 1.30 9.91 19.39 NO CUMPLE 18.60 CUMPLE
ML 1.40 10.16 19.52 NO CUMPLE 18.72 CUMPLE
ML 1.50 10.42 19.64 NO CUMPLE 18.85 CUMPLE
SM 1.60 19.41 20.36 NO CUMPLE 19.56 CUMPLE
SM 1.70 19.84 20.54 NO CUMPLE 19.74 CUMPLE
SM 1.80 20.27 20.72 NO CUMPLE 19.93 CUMPLE
SM 1.90 20.71 20.91 NO CUMPLE 20.11 CUMPLE
SM 2.00 21.14 21.09 CUMPLE 20.30 CUMPLE
SM 2.10 21.57 21.28 CUMPLE 20.48 CUMPLE
GW 2.20 21.72 22.09 NO CUMPLE 21.30 CUMPLE
GW 2.30 22.56 22.32 CUMPLE 21.52 CUMPLE
GW 2.40 23.41 22.54 CUMPLE 21.74 CUMPLE
GW 2.50 24.25 22.76 CUMPLE 21.97 CUMPLE
GW 2.60 25.10 22.99 CUMPLE 22.19 CUMPLE
GW 2.70 25.94 23.21 CUMPLE 22.41 CUMPLE
GW 2.80 26.78 23.43 CUMPLE 22.64 CUMPLE
GW 2.90 27.63 23.66 CUMPLE 22.86 CUMPLE
84
5.7. Verificación preliminar de análisis de cimentaciones superficiales utilizando
Afirmado
Figura 82: Caso 1 - Solo Cargas de Gravedad (sin sismo), para Afirmado
85
Caso 2. Cargas de gravedad + Sismo X-X
σneto
Estrato Df (m) σmáx Verificación σmín Verificación
(Ton/m2)
(Ton/m2) σmáx < σneto (Ton/m2) σmáx > 0
AFIRMADO 0.70 18.72 29.05 NO CUMPLE 25.36 CUMPLE
AFIRMADO 0.80 19.74 29.17 NO CUMPLE 25.48 CUMPLE
AFIRMADO 0.90 20.75 29.29 NO CUMPLE 25.60 CUMPLE
AFIRMADO 1.00 21.76 29.41 NO CUMPLE 25.73 CUMPLE
AFIRMADO 1.10 22.77 29.54 NO CUMPLE 25.85 CUMPLE
AFIRMADO 1.20 23.79 29.66 NO CUMPLE 25.97 CUMPLE
AFIRMADO 1.30 24.80 29.78 NO CUMPLE 26.09 CUMPLE
AFIRMADO 1.40 25.81 29.90 NO CUMPLE 26.22 CUMPLE
AFIRMADO 1.50 26.82 30.03 NO CUMPLE 26.34 CUMPLE
AFIRMADO 1.60 27.83 30.15 NO CUMPLE 26.46 CUMPLE
AFIRMADO 1.70 28.85 30.27 NO CUMPLE 26.58 CUMPLE
AFIRMADO 1.80 29.86 30.39 NO CUMPLE 26.70 CUMPLE
AFIRMADO 1.90 30.87 30.52 CUMPLE 26.83 CUMPLE
AFIRMADO 2.00 31.88 30.64 CUMPLE 26.95 CUMPLE
AFIRMADO 2.10 32.90 30.76 CUMPLE 27.07 CUMPLE
AFIRMADO 2.20 33.91 30.88 CUMPLE 27.19 CUMPLE
AFIRMADO 2.30 34.92 31.00 CUMPLE 27.32 CUMPLE
AFIRMADO 2.40 35.93 31.13 CUMPLE 27.44 CUMPLE
AFIRMADO 2.50 36.95 31.25 CUMPLE 27.56 CUMPLE
AFIRMADO 2.60 37.96 31.37 CUMPLE 27.68 CUMPLE
AFIRMADO 2.70 38.97 31.49 CUMPLE 27.81 CUMPLE
AFIRMADO 2.80 39.98 31.62 CUMPLE 27.93 CUMPLE
AFIRMADO 2.90 40.99 31.74 CUMPLE 28.05 CUMPLE
AFIRMADO 3.00 42.01 31.86 CUMPLE 28.17 CUMPLE
86
Caso 3. Cargas de gravedad + Sismo Y-Y
σneto
Estrato Df (m) σmáx Verificación σmín Verificación
(Ton/m2)
(Ton/m2) σmáx < σneto (Ton/m2) σmáx > 0
AFIRMADO 0.70 18.72 28.41 NO CUMPLE 26.85 CUMPLE
AFIRMADO 0.80 19.74 28.53 NO CUMPLE 26.97 CUMPLE
AFIRMADO 0.90 20.75 28.65 NO CUMPLE 27.09 CUMPLE
AFIRMADO 1.00 21.76 28.77 NO CUMPLE 27.22 CUMPLE
AFIRMADO 1.10 22.77 28.90 NO CUMPLE 27.34 CUMPLE
AFIRMADO 1.20 23.79 29.02 NO CUMPLE 27.46 CUMPLE
AFIRMADO 1.30 24.80 29.14 NO CUMPLE 27.58 CUMPLE
AFIRMADO 1.40 25.81 29.26 NO CUMPLE 27.71 CUMPLE
AFIRMADO 1.50 26.82 29.38 NO CUMPLE 27.83 CUMPLE
AFIRMADO 1.60 27.83 29.51 NO CUMPLE 27.95 CUMPLE
AFIRMADO 1.70 28.85 29.63 NO CUMPLE 28.07 CUMPLE
AFIRMADO 1.80 29.86 29.75 CUMPLE 28.20 CUMPLE
AFIRMADO 1.90 30.87 29.87 CUMPLE 28.32 CUMPLE
AFIRMADO 2.00 31.88 30.00 CUMPLE 28.44 CUMPLE
AFIRMADO 2.10 32.90 30.12 CUMPLE 28.56 CUMPLE
AFIRMADO 2.20 33.91 30.24 CUMPLE 28.68 CUMPLE
AFIRMADO 2.30 34.92 30.36 CUMPLE 28.81 CUMPLE
AFIRMADO 2.40 35.93 30.49 CUMPLE 28.93 CUMPLE
AFIRMADO 2.50 36.95 30.61 CUMPLE 29.05 CUMPLE
AFIRMADO 2.60 37.96 30.73 CUMPLE 29.17 CUMPLE
AFIRMADO 2.70 38.97 30.85 CUMPLE 29.30 CUMPLE
AFIRMADO 2.80 39.98 30.97 CUMPLE 29.42 CUMPLE
AFIRMADO 2.90 40.99 31.10 CUMPLE 29.54 CUMPLE
AFIRMADO 3.00 42.01 31.22 CUMPLE 29.66 CUMPLE
87
5.8. Mejoramiento de suelos con Geomallas
1 𝑞𝑅
𝑇(𝑁) = [𝑞0 ( − 1) (𝐴1 𝐵 − 𝐴2 𝛥𝐻)] ……... (37)
𝑁 𝑞0
Donde los valores de A1 y A2 se obtuvieron contrastando los valores de Z/B con sus
respectivas curvas: Según figura 85.
88
Resultados de la interpretación de la figura 85, para obtener los valores de A1 y A2
se encuentran en la tabla 10.
Tabla 12: Comparativo de T(N) con Resistencia a la Tracción de Geomalla MacGrid EGB 40
89
5.8.2. Determinación de la resistencia al arrancamiento del refuerzo
N° DE CAPAS
Valor 1 2 3 4
Z/B 0.13 0.25 0.38 0.50
Xo/B 0.63 0.62 0.62 0.64
Lo/B 0.56 0.95 1.30 1.63
B(m) 1.20 1.20 1.20 1.20
Xo(m) 0.76 0.74 0.75 0.77
Lo(m) 0.67 1.14 1.56 1.95
Z(m) 0.15 0.30 0.45 0.60
ΔH 0.15 0.15 0.15 0.15
Z+Df 0.85 1.00 1.15 1.30
90
Tabla 14: Valores de FB y FS(P)
Valores
FB(KN/m) 56.82 66.73 77.52 88.89
T(N)(KN/m) 32.12 32.43 32.70 32.92
FS(P)=FB/T(N) 1.77 2.06 2.37 2.70
FS(P)>1.5 Cumple Cumple Cumple Cumple
Fuente: Elaboración propia
De la tabla 14, se observó que el Factor de Seguridad FS(P) que se obtiene por el
cociente entre los valores de FB y el esfuerzo a la tracción de la Geomalla calculado
es mayor a 1.
Según figura 87, donde se muestran las diferentes longitudes de empotramiento que
componen la utilización de la cimentación con Geomalla.
91
CAPÍTULO VI EVALUACIÓN ECONÓMICA
Para la elaboración del presupuesto se consideró análisis de precios unitarios, para cada
una de las partidas que intervienen en la construcción del cimiento: Excavación,
eliminación, relleno con material de préstamo, proceso de compactación, colocación de
geomallas, acero de refuerzo, concreto y encofrado.
Los costos por mano de obra que intervinieron en la evaluación económica, se tipifican
según la caracterización siguiente:
- Operario
- Oficial
- Peón
- Capataz: 1.30 del Jornal Básico del Operario
92
La Bonificación Unificada de Construcción (Tabla 16) otorga bonificaciones por:
Desgaste de herramientas, agua potable, vestimenta y especialización, esta última
únicamente se le adjudica al operario.
93
6.1.2. Cálculo de Porcentajes por Leyes y Beneficios Sociales.
Tasa para ESSALUD del 1.30 % y 1.70 % para la ONP o con cualquier
empresa de seguros.
94
6.1.2.5. Vacaciones
Por decreto legislativo No 713, Art. 10, determina que los trabajadores
poseen el derecho a 30 días de descanso por cada 260 días de labor
efectiva.
Días laborados = 260
Incidencia = 30 x 100 / 260 = 11.54 %
95
Incidencia diaria = (2 x 90) / 301.688 = S/. 0.60
6.1.3. Porcentajes de Leyes y Beneficios Sociales
96
6.1.4. Costo de Hora Hombre
En la tabla 21 se realiza el cálculo de los costos por hora hombre para cada
categoría.
Tabla 21: Costo de Mano de Obra
97
Tabla 23: APU para excavación a una profundidad de 2.70 m.
98
Tabla 26: APU para instalación de Geomalla MacGrid WG 65x65
99
Tabla 28: APU para elaboración y vaciado de concreto f´c= 210 kg/cm2
100
Tabla 30: APU para acero de refuerzo de ¾”
101
Tabla 32: APU para relleno con material propio
EQUIPO 0.71
37 HERRAMIENTAS MANUALES(% MANO DE OBRA) 3% 23.70 0.71
102
6.3. Presupuesto para Zapata Z-2, utilizando una Geomalla MacGrid WG 65x65
Tabla 34: Presupuesto para Zapata Z-2, utilizando una Geomalla MacGrid WG 65x65
Tabla 35: Presupuesto para Zapata Z-2, utilizando una sub base de Afirmado
Presupuesto para construcción de zapata Z-2 utilizando una sub base de Afirmado
Metr
Ítem Descripción Und. P.U. Parcial Sub Total
ado
A Zapata Z-2 Eje 5 - B
1.00 Movimiento de tierras S/1,673.32
1.01 Excavacion para zapata m3 13.07 S/69.31 S/905.80
1.02 Suministro de afirmado desde cantera Romaña SAC m3 5.03 S/35.72 S/179.79
1.03 Conformación y compactación de sub base con Afirmado m3 3.87 S/24.57 S/95.14
1.04 Relleno con material propio m3 8.23 S/24.41 S/201.00
1.05 Acarreo y Eliminación de material producto de las excavación m3 6.28 S/46.40 S/291.59
2.00 Concreto simple S/45.50
2.01 Solado para zapata m2 1.44 S/31.60 S/45.50
3.00 Concreto armado S/880.43
3.01 Zapata de Concreto F´c=210 kg/cm2
3.01.01 Concreto para zapata f´c=210 kg/cm2 m3 0.86 S/367.44 S/317.47
3.01.02 Encofrado y desencofrado de Zapata m2 2.88 S/57.86 S/166.63
3.01.03 Acero para zapatas fy = 4200 kg/cm2 kg 28.16 S/5.22 S/146.89
3.02 Columa de Concreto F´c=210 kg/cm2
3.02.01 Concreto f´c=210 kg/cm2 m3 0.10 S/367.44 S/35.83
3.02.02 Encofrado y desencofrado m2 1.43 S/57.86 S/82.74
3.02.03 Acero fy = 4200 kg/cm2 kg 25.41 S/5.15 S/130.87
COSTO DIRECTO S/2,599.24
103
6.5. Presupuesto para Zapata Z-2, con dimensiones: B = 1.50 m y L = 1.50 m
Se realizaron tres presupuestos (Tablas 34, 35 y 36), obteniéndose el Costo Directo para
cada caso, y se compilaron los resultados en la tabla 37:
104
CAPÍTULO VII PRESENTACIÓN DE RESULTADOS
A partir de los resultados obtenidos, aceptamos la hipótesis principal que determina que
la evaluación técnico económica entre Geomallas y Afirmado permitirá determinar la
mejor opción en cimentaciones superficiales, Caso: Lote 37 de la urbanización Brisas de
Oquendo – Callao.
Así mismo, estos resultados coinciden con lo que sostiene Mera (2017), en “Evaluación
técnico - económico del uso de geomalla multiaxial como refuerzo en la subrasante de la
carretera santa Cruz Bellavista, Distrito Bellavista-Jaén-Cajamarca”, donde determina
que al utilizar una Geomalla como reforzamiento reduce el espesor del estrato de soporte,
sin disminuir la capacidad de carga.
105
7.1.1. El aumento de la capacidad de carga del suelo del Lote 37 y el Afirmado en
relación a el Df
Df Vs Capacidad de Carga
3.75
3.50
3.25
3.00
2.75
2.50
Df (m)
2.25
2.00
1.75
1.50
1.25
1.00
0.75
0.50
0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.25
Capacidad de Carga Local (kg/cm2)
3.25
3.00
2.75
2.50
2.25
2.00
1.75
0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.25
Capacidad de Carga del Afirmado
106
7.1.2. Se calculó que la zapata más esforzada es la Z-2 (Eje 5 – B)
45.10
42.31
39.11
38.44
1 2 3 4
Zapatas
Se calculó que la zapata más esforzada es la zapata Z-2 (σu máx diseño= 45.10
ton/m2), ubicada entre los ejes 5 y B del plano de cimentaciones el cual se aprecia
en la figura 91. Con los datos de dicha zapata, se realizaron las verificaciones
preliminares de diseño de cimentaciones para los demás casos en estudio, puesto que,
al darse cumplimiento de los comparativos de capacidad de carga neta y esfuerzos
máximos para esta zapata, se dedujo que dicho cumplimiento se da en las demás.
107
Ubicación de la zapata más esforzada en el plano de cimentación
108
7.1.3. Verificación de factibilidad técnica
Caso Df (m)
Suelo sin mejoramiento: Z-2 (B=1.20 y B=1.20 m) No cumple
Suelo con afirmado Z-2: (B=1.20 y B=1.20 m) 1.90
Suelo con Geomalla Z-2: (B=1.20 y B=1.20 m) 0.70
Suelo sin mejoramiento: Z-2 (B=1.50 y B=1.50 m) 2.40
109
En la figura 93, se aprecia las dimensiones del estrato compuesto por Afirmado
compactado y las dimensiones de la zapata.
110
7.1.4. Evaluación económica
111
CONCLUSIONES
112
RECOMENDACIONES
2) A fin de realizar una comparación económica adecuada se debe considerar trabajar con
la cantera certificada más cercana, a fin de reducir los valores de precios unitarios.
3) Realizar un análisis que evalúe las variaciones deformacionales para futuros proyectos
de investigación.
4) Se recomienda realizar un estudio que incluya y compare los datos obtenidos por un
ensayo de placa de carga y los datos de capacidad de carga obtenidos en la presente
investigación.
113
REFERENCIAS BIBLIOGRÁFICAS
Beltrán, J., Diaz, D. (2018). Análisis de la capacidad de carga admisible de los suelos de
cimentación del Complejo Arqueológico Chan Chan debido al ascenso del nivel
Perú.
Chorres, M. (2017). Uso de geotextiles para la mejora del suelo de las cimentaciones
Mera, J. (2017). Evaluación técnico - económico del uso de geomalla multiaxial como
114
Morocho, F. (2016). Diseño estructural de un edificio de concreto armado de siete pisos
2016. (Tesis de Pregrado). Pontificia Universidad Católica del Perú. Lima, Perú.
Guatemala.
London.
115
ANEXOS
116
Anexo 1: Matriz de consistencia
FORMULACION
PROBLEMAS OBJETIVOS HIPÓTESIS VARIABLES INDICADORES METODOLOGIA
DEL PROBLEMA
El método de
¿De qué manera es posible Evaluar la mejor opción 1. V. Independientes:
La evaluación técnico económica investigación es
evaluar la mejor opción técnico técnico económica entre
entre Geomallas y Afirmado permitirá Resistencia a la cuantitativo, ya que se
económica entre Geomallas y Geomallas y Afirmado en 1.1. Geomalla
determinar la mejor opción en tracción obtienen datos numéricos
PRINCIPAL Afirmado en cimentaciones cimentaciones superficiales,
cimentaciones superficiales, Caso: como conclusiones, los
superficiales, Caso: Lote 37 de la Caso: Lote 37 de la
Lote 37 de la urbanización Brisas de mismos que serán
urbanización Brisas de Oquendo urbanización Brisas de
Oquendo – Callao. 1.2. Afirmado Capacidad Portante utilizados para lograr el
– Callao? Oquendo – Callao.
objetivo de determinar la
mejor opción técnica –
La evaluación técnica entre 2. V. Dependientes:
económica para
¿De qué manera es posible Evaluar técnicamente las Geomallas y Afirmado permite mejoramiento de suelo de
hacer una evaluación técnica Geomallas y Afirmado en determinar cuál de las dos Capacidad Portante
cimentaciones
entre Geomallas y Afirmado en cimentaciones superficiales, alternativas de solución es la más 2.1. Evaluación tecnica Esfuerzo Máximo superficiales en la
cimentaciones superficiales, Caso: Lote 37 de la adecuada en cimentaciones utilizando Geomallas y de diseño urbanización Brisas de
Caso: Lote 37 de la urbanización urbanización Brisas de superficiales, Caso: Lote 37 de la Afirmado Oquendo – Callao.
Brisas de Oquendo – Callao? Oquendo – Callao urbanización Brisas de Oquendo – Esfuerzo a la
Callao. tracción
SECUNDARIOS
La evaluación económica entre
¿De qué manera es posible Evaluar económicamente Geomallas y Afirmado permite Analisis de Precios
hacer una evaluación económica las Geomallas y Afirmado determinar cuál de las dos Unitarios.
2.2. Evaluación
entre Geomallas y Afirmado en en cimentaciones alternativas de solución es la más
económica utilizando
cimentaciones superficiales, superficiales, Caso: Lote 37 adecuada en cimentaciones
Geomallas y Afirmado Costo directo por
Caso: Lote 37 de la urbanización de la urbanización Brisas de superficiales, Caso: Lote 37 de la
construccion de
Brisas de Oquendo – Callao? Oquendo – Callao urbanización Brisas de Oquendo –
zapatas
Callao.
117
Anexo 2: Análisis granulométrico por tamizado de muestra M-1
CONTENIDO DE HUMEDAD
ANALISIS GRANULOMETRICO POR TAMIZADO
ANALISIS GRANULOMETRICO
8 W recipiente s (lavado) (gr) 382.13
9 W s (lavado) : 8-2 (gr) 211.21
10 W s fino (platillo) (gr) 1.78
11 W Total Parcial Retenido (gr) 210.34 D10 (mm) 0.00
12 DW : 9-11 (gr) 0.87 D30 (mm) 0.00
13 W s fino (total) (gr) 407.07 D60 (mm) 0.02
14 % finos : 100*13/6 (%) 66.03 Cu >99
15 Error : 100*12/9 (%) 0.41 Cc 0.14
118
Curva granulométrica de muestra M-1
Curva Granulométrica
100
90
80
60
50
40
30
20
10
0
0.01 0.10 1.00 10.00 100.00
Diám e tro de las Partículas (mm)
0.07 0.4 2.0 4.7 19.0 75.
Fin Med Grue Fin Grues
Lim o y Arcilla
Are na Grava
119
Anexo 3: Limite líquido y plástico de muestra M-1
No DE ENSAYO 1 2 3
Diagrama de Fluidez
Contenido de Hum edad (%)
27.50
26.50
25.50
24.50
20 25 30 40 50 60
10 100
120
Anexo 4: Análisis granulométrico por tamizado de muestra M-2
CONTENIDO DE HUMEDAD
ANALISIS GRANULOMETRICO
ANALISIS GRANULOMETRICO
8 W recipiente s (lavado) (gr) 507.78
9 W s (lavado) : 8-2 (gr) 336.14
10 W s fino (platillo) (gr) 2.23
11 W Total Parcial Retenido (gr) 334.96 D10 (mm) 0.01
12 DW : 9-11 (gr) 1.18 D30 (mm) 0.02
13 W s fino (total) (gr) 470.72 D60 (mm) 0.08
14 % finos : 100*13/6 (%) 58.50 Cu 10.71
15 Error : 100*12/9 (%) 0.35 Cc 0.62
Tamiz P. P. P. P. % P. % A. % A.
R. R. C. R. R. Que P.
- (mm) (gr) (gr) (%) (%) (%)
3" 75.000 0.00 0.00 0.00 0.00 100.00
2" 50.000 0.00 0.00 0.00 0.00 100.00
1 1/2" 37.500 0.00 0.00 0.00 0.00 100.00
1" 25.000 0.00 0.00 0.00 0.00 100.00
3/4" 19.000 0.00 0.00 0.00 0.00 100.00
3/8" 09.500 14.79 14.79 1.84 1.84 98.16
No 004 04.750 16.05 16.05 1.99 3.83 96.17
No 010 02.000 25.37 25.37 3.15 6.99 93.01
No 020 00.850 18.49 18.49 2.30 9.28 90.72
No 040 00.425 13.20 13.20 1.64 10.92 89.08
No 060 00.250 33.15 33.15 4.12 15.04 84.96
No 100 00.150 95.27 95.27 11.84 26.88 73.12
No 200 00.075 116.41 117.59 14.61 41.50 58.50
Platillo 2.23 470.72 58.50 100.00 0.00
Total 334.96 804.63 100.00 - -
121
Curva granulométrica de muestra M-2
Curva Granulométrica
100
90
80
% Acumulado Que Pasa
70
60
50
40
30
20
10
0
0.01 0.10 1.00 10.00 100.00
Diám etro de las Partículas (mm)
0.075 0.42 2.00 4.75 19.00 75.0
Fina Medi Grues Fina Gruesa
Lim o y Arcilla
Arena Grava
122
Anexo 5: Limite líquido y plástico de muestra M-2
No DE ENSAYO 1 2 3
Diagrama de Fluidez
30.00
29.00
Contenido de Humedad (%)
28.00
27.00
21
26.00
25.00
24.00
10 20 25 30 40 50 60 100
123
Anexo 6: Análisis granulométrico por tamizado de muestra M-3
CONTENIDO DE HUMEDAD
ANALISIS GRANULOMETRICO
CONTENIDO DE HUMEDAD (w)
1 No recipiente Platillo - C
2 W recipiente (gr) 187.77
3 W recipiente sw (gr) 2768.31
4 W recipiente s (gr) 2656.95
5 W w : 3-4 (gr) 111.36
6 W s : 4-2 (gr) 2469.18
7 w : 100*5/6 (%) 4.51
ANALISIS GRANULOMETRICO
8 W recipiente s (lavado) (gr) 2190.49
9 W s (lavado) : 8-2 (gr) 2002.72
10 W s fino (platillo) (gr) 3.05
11 W Total Parcial Retenido (gr) 1999.82 D10 (mm) 0.01
12 DW : 9-11 (gr) 2.90 D30 (mm) 0.30
13 W s fino (total) : (gr) 469.51 D60 (mm) 5.08
14 % finos : 100*13/6 (%) 19.01 Cu > 99
15 Error : 100*12/9 (%) 0.14 Cc 3.56
124
Curva granulométrica de muestra M-3
Curva Granulométrica
100
90
80
% Acumulado Que Pasa
70
60
50
40
30
20
10
0
0.01 0.10 1.00 10.00 100.00
Diám etro de las Partículas (mm)
0.07 0.42 2.0 4.75 19.00 75.0
Fina Medi Grues Fina Gruesa
Lim o y Arcilla
Arena Grava
125
Anexo 7: Análisis granulométrico por tamizado de muestra M-4
CONTENIDO DE HUMEDAD
ANALISIS GRANULOMETRICO
CONTENIDO DE HUMEDAD (w)
1 No recipiente Platillo - D
2 W recipiente (gr) 176.40
3 W recipiente sw (gr) 4928.50
4 W recipiente s (gr) 4804.02
5 W w : 3-4 (gr) 124.48
6 W s : 4-2 (gr) 4627.62
7 w : 100*5/6 (%) 2.69
ANALISIS GRANULOMETRICO
8 W recipiente s (lavado) (gr) 4760.98
9 W s (lavado) : 8-2 (gr) 4584.58
10 W s fino (platillo) (gr) 1.70
11 W Total Parcial Retenido (gr) 4581.51 D10 (mm) 0.39
12 DW : 9-11 (gr) 3.07 D30 (mm) 3.29
13 W s fino (total) : (gr) 44.74 D60 (mm) 21.46
14 % finos : 100*13/6 (%) 0.97 Cu 55.00
15 Error : 100*12/9 (%) 0.07 Cc 1.29
126
Curva granulométrica de muestra M-4
No 004 #### 452.32 452.32 9.77 66.52 33.48
Curva Granulométrica
100 No 010 #### 378.36 378.36 8.18 74.70 25.30
No 020 #### 320.05 320.05 6.92 81.61 18.39
90
No 040 #### 353.34 353.34 7.64 89.25 10.75
80 No 060 #### 216.65 216.65 4.68 93.93 6.07
% Acum ulado Que Pasa
40
30
20
10
0
0.01 0.10 1.00 10.00 100.00
Diám etro de las Partículas (mm)
0.07 0.42 2.00 4.75 19.00 75.0
Fina Medi Grues Fina Gruesa
Lim o y Arcilla
Arena Grava
127
Anexo 8: Clasificación SUCS - muestra M-1
INFORME : TESIS
SOLICITANTE : DANIEL ERNESTO CHAVEZ PEJERREY
UBICACION : VENTANILLA - CALLAO
FECHA : 16/09/2019
27.0
2
2.000 No 010 84.05 Núm ero de Golpes
0.850 No 020 76.67
0.425 No 040 73.43
0.250 No 060 71.76
Carta de Plasticidad
60
0.150 No 100 69.59
0.075 No 200 66.03
50
CH-OH
D10 (mm) 0.00 Cu > 99
Indice Plastico (IP)
30
PESO ESP. RELATIVO DE SOLIDOS (Gs) 2.70
PESO ESPECIFICO NATURAL (g) (gr/cc) 1.29 MH-
20 CL-OL OH
HUMEDAD NATURAL (w) (%) 5.63
LIMITE LIQUIDO (LL) (%) 26.20 10
ML-
CL- OL
LIMITE PLASTICO (LP) (%) 25.11
INDICE PLASTICO (IP) (%) 1.09 0
0 10 20 30 40 50 60 70 80 90 100 110
LIMITE DE CONTRACCION (LC) (%) 0.00
128
129
Anexo 9: Clasificación SUCS - muestra M-2
INFORME : TESIS
SOLICITANTE : DANIEL ERNESTO CHAVEZ PEJERREY
UBICACION : VENTANILLA - CALLAO
FECHA : SEPTIEMBRE 2019
10 100
25
2.000 No 010 93.01 Número de Golpes
0.850 No 020 90.72
0.425 No 040 89.08
0.250 No 060 84.96
Carta de Plasticidad
0.150 No 100 73.12 60
0.075 No 200 58.50
D10 (mm) 0.01 Cu 10.71 50
CH-OH
Indice Plastico (IP)
30
P. ESP. RELAT.DE SOLIDOS (Gs) 2.67
PESO ESPECIFICO NATURAL (g) (gr/cc) 1.29
MH-OH
20 CL-OL
HUMEDAD NATURAL (w) (%) 7.24
LIMITE LIQUIDO (LL) (%) 27.90
10
LIMITE PLASTICO (LP) (%) 26.40 ML-OL
CL-ML
130
Anexo 10: Clasificación SUCS - muestra M-3
INFORME : TESIS
SOLICITANTE : DANIEL ERNESTO CHAVEZ PEJERREY
UBICACION : VENTANILLA - CALLAO
FECHA : 16/09/2019
30
PESO ESP. RELATIVO DE SOLIDOS (Gs) 2.68
PESO ESPECIFICO NATURAL (g) (gr/cc) 1.90
MH-OH
20 CL-OL
HUMEDAD NATURAL (w) (%) 4.51
LIMITE LIQUIDO (LL) (%) 0.00
10
LIMITE PLASTICO (LP) (%) 0.00 ML-OL
CL-ML
131
Anexo 11: Clasificación SUCS - muestra M-4
INFORME : TESIS
SOLICITANTE : DANIEL ERNESTO CHAVEZ PEJERREY
UBICACION : VENTANILLA - CALLAO
FECHA : 16/09/2019
30
PESO ESP. RELAT. DE SOLIDOS (Gs) 2.73
P.ESPECIFICO NATURAL (g) (gr/cc) 2.31
MH-OH
20 CL-OL
HUMEDAD NATURAL (w) (%) 2.69
LIMITE LIQUIDO (LL) (%) 0.00
10
LIMITE PLASTICO (LP) (%) 0.00 ML-OL
CL-ML
132
Anexo 12: Ensayo de Proctor Modificado al Afirmado
M. DE COMPACTACION MODIFICADO - C
No DE ENSAYO 1 2 3
133
UNIVERSIDAD
RICARDO PALMA
Curva de Compactación
2.35
2.30
2.25
Peso Específico Seco (gr/cc)
2.20
2.15
2.10
2.05
4.00 4.60 5.20 5.80 6.40 7.00
Contenido de Hum edad (%)
100% Saturación
134
Anexo 13: Ensayo de corte directo a la muestra M-2
135
PARAMETROS DE RESISTENCIA
ESF. NORMAL (kg/cm²) 0.50 1.00 2.00
ESF.CORTANTE (kg/cm²) 0.35 0.70 1.31
COHESION (C) (kg/cm²) 0.10
A.DE FRICCION (F) (º) 31.38
0.20
0.00
0.00 0.50 1.00 1.50 2.00 2.50
Esfuerzo Normal (kg/cm²)
136
Anexo 14: Ensayo de corte directo a muestra M-3
137
PARAMETROS DE RESISTENCIA
ESFUERZO NORMAL (kg/cm²) 0.50 1.00 2.00 -
ESFUERZO CORTANTE (kg/cm²) 0.55 0.84 1.48 -
COHESION (C) (kg/cm²) 0.19
ANGULO DE FRICCION (F ) (º) 32.34
1.8
Límite inferior Eje X 0.00
1.6 Límite superior Eje X 4.28
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5
Esfuerzo Normal (kg/cm²)
138
Anexo 15: Ensayo de corte directo al Afirmado
CONDICIONES INICIALES
18 W sw : 9-6 (gr) 123.84 123.84 123.84
19 W w : 18-16 (gr) 7.42 7.42 7.42
20 V swa : 7*15 (cc) 72.00 72.00 72.00
21 V v : 20-17 (cc) 28.88 28.88 28.88
22 V w : 19 (cc) 7.42 7.42 7.42
23 w : 100*19/16 (%) 6.37 6.37 6.37
24 g : 18/20 (gr/cc) 1.72 1.72 1.72
25 g d : 16/20 (gr/cc) 1.62 1.62 1.62
26 e : 21/17 0.67 0.67 0.67
27 Gw : 100*22/21 (%) 25.69 25.69 25.69
139
PARAMETROS DE RESISTENCIA
ESFUERZO NORMAL (kg/cm²) 0.50 1.00 2.00 -
ESFUERZO CORTANTE (kg/cm²) 0.45 0.83 1.66 -
COHESION (C) (kg/cm²) 0.10
ANGULO DE FRICCION (F) (º) 37.95
PARAMETROS DE RESISTENCIA
Esfuerzo Cortante Vs Esfuerzo Normal
2.50
COHESION (C) 0.10
A. DE FRICCION (F) 37.95
2.00
0.50
0.00
0.00 0.50 1.00 1.50 2.00 2.50
Esfuerzo Normal (kg/cm²)
140
Anexo 16: Planos
141
142
143
144
145
Anexo 17: Ficha Técnica de Geomalla MacGrid WG 65x65
146
Anexo 18: Cotización de Geomalla MacGrid WG 65x65
147