T Anual : 365.00
D.NORMALES 272.00 22.67
DOMINGOS 52.00
Basico 31 1,500.00 DESC.MEDICO 4.00
Asig. Fam. 1.367 75.00 FERIADOS 11.00
32.70 1,541.00 VACAC. 26.00
INGRESO: MENSUAL ANUAL
Obreros Empleados Obreros Empleados Obreros Conceptos
Cálculo de Leyes Sociales
% Obreros
Mensual: 741.13 1,541.00 8,893.58 18,492.00
14/12/12*365/27
CTS 96.69 0.00 1,160.28 0.00 13.05% 1
VACACIONES 81.74 0.00 980.88 0.00 11.03% (30/271)
GRATIFICACIONES 163.49 0.00 1,961.88 0.00 22.06% (60/271)
DOMINGOS & FERIADOS 171.66 0.00 2,059.92 0.00 23.16% (64/271)
Costos indirectos
Supervisión
Residente 1 Pers. 6000 65% 2,506 2,506
Jefe de seguridad 1 Pers. 4000 65% 1,671 1,671
Administrador 0 Pers. 3500 65% 1,462 1,462
Alquiler de trailer 300 horas 60 50% 9000 9,000
Alimentación 37 Personas 5.06 2000% 3747 3,747
Utiles de oficina 1 Glb 200.00 100% 200 200
Formatos 1 Glb 150.00 100% 150 150
Internet 1 Glb 300.00 100% 300 300
Celular 3 Glb 100.00 100% 300 300
Transporte de personal 37 Personas 7.00 100% 259 259
Gastos administrativos 1 Glb 3000.00 100% 3000 3,000
Subtotal costos indirectos 22,595
390 390 390 390 390 390 390 390 390 390 390 390
MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16
144,987 144,987 144,987 144,987 144,987 144,987 144,987 144,987 144,987 144,987 144,987 144,987
-22,595 -22,595 -22,595 -22,595 -22,595 -22,595 -22,595 -22,595 -22,595 -22,595 -22,595 -22,595
-80,981 -80,981 -80,981 -80,981 -80,981 -80,981 -80,981 -80,981 -80,981 -80,981 -80,981 -80,981
-841 -841 -841 -841 -841 -841 -841 -841 -841 -841 -841 -841
40,570 40,570 40,570 40,570 40,570 40,570 40,570 40,570 40,570 40,570 40,570 40,570
-12,171 -12,171 -12,171 -12,171 -12,171 -12,171 -12,171 -12,171 -12,171 -12,171 -12,171 -12,171
28,399 28,399 28,399 28,399 28,399 28,399 28,399 28,399 28,399 28,399 28,399 28,399
841 841 841 841 841 841 841 841 841 841 841 841
29,240 29,240 29,240 29,240 29,240 29,240 29,240 29,240 29,240 29,240 29,240 29,240
390 390 390 390 390 390 390 390
MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24
Recursos A B C
GAL Perforista 1 1 1 3
Ay. Perforista 1 1 1 3
Carronero 1 1 1 3
GAL Perforista 1 1 1 3
Ay. Perforista 1 1 1 3
Carronero 1 1 1 3
TAJO Perforista 1 1 1 3
Ay. Perforista 1 1 1 3
Carronero 1 1 1 3
Perforista 9
Total Ay. Perforista 9
Carronero 9
DATOS TÉCNICOS MENSUAL
DIA 6 DIA 7 DIA 8 DIA 9 DIA 10 DIA 11 DIA 12 DIA 13 DIA 14 DIA 15 DIA 16 DIA 17 DIA 18 DIA 19 DIA 20
2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4
2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4
10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
15.4 15.4 15.4 15.4 15.4 15.4 15.4 15.4 15.4 15.4 15.4 15.4 15.4 15.4 15.4
102.0 102.0 102.0 102.0 102.0 102.0 102.0 102.0 102.0 102.0 102.0 102.0 102.0 102.0 102.0
5,707 5,707 5,707 5,707 5,707 5,707 5,707 5,707 5,707 5,707 5,707 5,707 5,707 5,707 5,707
DIA 21 DIA 22 DIA 23 DIA 24 DIA 25 DIA 26 DIA 27 DIA 28 DIA 29 DIA 30
2.4 2.4 2.4 2.4 2.4
2.4 2.4 2.4 2.4 2.4
10 10 10 10 10 10 10 10 10 10
15.4 15.4 15.4 15.4 15.4 1.3 1.3 1.3 1.3 1.3
102.0 102.0 102.0 102.0 102.0 8.8 8.8 8.8 8.8 8.8
5,707 5,707 5,707 5,707 5,707 465 465 465 465 465
Pagina: 16 de 17
MATERIALES
ESTANDAR PRECIO COSTO U.S.
DESCRIPCION UNIDAD PIES/DISP VIDA UTIL U.S.$/MT
PIES/DISP U.S.$/PZA $/DISP
BARRAS DE PERFORACION 6' P.P. 199.80 1,820 0.11 90.92 9.98 7.13
BROCAS DE 40 MM P.P. 199.80 350 0.57 23.08 13.18 9.41
ACEITE DE PERFORACIÓN GLN 0.25 7.86 1.96 1.40
MANGUERA DE AIRE 1" MTS 30.00 150 0.20 3.17 0.63 0.45
MANGUERA DE AGUA 1/2" MTS 30.00 150 0.20 1.57 0.31 0.22
SUB-TOTAL 18.62
IMPLEMENTOS SEGURIDAD
COSTO
COSTO U.S.
DESCRIPCION UNIDAD TAR/DISP UNIT U.S. U.S.$/MT
$
$/Per
IMPLEMENTOS SEGURIDAD GLB 3.00 1.62 4.86 3.47
VOLADURA
COSTO U.S. COSTO U.S.
DESCRIPCION UNIDAD CART UNIDAD KG U.S.$/MT
$/Pza $/DISP
EMULNOR 3000 1" X 7" PZAS 56.00 5.38 0.24 13.50 9.64
EMULNOR 1000 1" X 7" PZAS 125.00 11.84 0.21 26.79 19.13
EXADIT 45% 7/8" X 7" PZAS 20.00 1.52 0.20 3.93 2.81
FANEL PZAS 34.00 1.17 39.72 28.37
CORDON DETONANTE 5P $ 10 MTS 10.00 0.27 2.68 1.91
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.86 1.71 1.22
IGNITED CORD $ 0 PZAS 0.20 1.31 0.26 0.19
SUB-TOTAL 63.28
EQUIPOS
COSTO COSTO COSTO
COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. U.S.$/MT
TOTAL U.S.$
U.S.$/HR U.S.$/HR $/HR
SCOOP DIESEL 4.1 YD3 2.00 HORAS 1.83 93.00 170.19 121.56
CAMION DE BAJO PERFIL HORAS 0.00 0.00 0.00
VENTILADOR DE 30,000 CFM HORAS 0.00 0.00 0.00
VENTILADOR DE 20,000 CFM HORAS 0.00 0.00 0.00
BOMBA DE 50 HP HORAS 0.00 0.00 0.00
BOMBA DE 10 HP HORAS 0.00 0.00 0.00
SCISSOR LIFT HORAS 0.00 0.00
PERFORADORA PIES 199.80 0.12 23.98 17.13
SUB-TOTAL 138.69