CC Metrados
CC Metrados
CC Metrados
M2 890.00 1,408.61
M2 890.00 1,408.61
Ml 247.00 199.64
Ml 247.00 199.64
Ml 247.00 199.64
ML 247.00 110.70
UND 71.00 36.00
UND 45.00
M3 98.87 70.89
M2 152.12 86.69
M2 128.36 69.66
M2 128.36 148.92
M3 75.40 60.58
M2 213.92 104.54
M2 116.10 190.56
M2 116.10 282.97
M3 11.07 7.58
M2 123.55 51.77
M2 11.59 11.87
M2 123.55 63.64
M3 231.61 197.21
M2 827.19 1,408.61
M2 827.19 1,408.61
M3 45.48 356.31
M2 366.21 712.62
M2 366.21 712.62
M2 366.21 712.62
M3 305.73 221.94
M2 2,818.73 1,080.60
M2 2,818.73 1,080.60
M2 2,818.73 1,080.60
M3 90.62 91.01
M2 885.75 284.98
M2 885.75 284.98
M2 885.75 284.98
M3 372.65 101.31
M2 3,457.19 1,096.29
M2 3,457.19 1,096.29
M2 3,343.48 1,096.29
M3 201.16 166.79
M2 2,302.08 2,284.80
M2 2,302.08 2,284.80
M2 2,302.08 2,284.80
M3 353.76 259.67
M2 1,637.51 1,119.07
M2 1,637.51 1,119.07
M2 1,637.51 1,119.07
M2 3,502.82
M3 92.46 37.35
M2 136.27 268.16
M2 136.27 268.16
M2 136.27 268.16
M3 89.89 57.45
M2 489.34 273.68
M2 489.34 273.68
M2 601.05 273.68
ML 148.45 36.47
M2 309.62
M3 19.87 28.96
M2 140.80 154.23
M2 140.80 154.23
M3 3.70
M3 3.70
M2 34.96
M2 38.56
M2 21.61
M3 74.94 91.25
M2 421.27 571.00
ML 124.48 127.06
ML 32.26 208.06
ML 120.00 174.71
ML 130.00 127.06
ML 5,200.00
M2 1,653.98
ITEMS DESCRIPCION
1.00.0 ESTRUCTURA - MANO DE OBRA Y EQUIPOS
1.00.1 CASCO ESTRUCTURAL
1.00.2 ESTABILIZACION DE TERRENO CON MUROS ANCLADOS
1.00.3 PERFILADO DE TALUD EN MURO PANTALLA
1.00.4 PAÑETEO CON LECHADA DE CEMENTO EN SUPERFICIE VERTICAL DE BANQUETAS
1.00.5 PICADO DE CACHIMBA EN MUROS
1.00.6 ESCARIFICADO DE MECHAS DE FONDO DE MURO
1.00.7 RELLENO MANUAL DE MECHAS DE ACERO
1.00.8 LIMPIEZA, ESCARIFICADO Y PUENTE DE ADHERENCIA PARA ENCUENTRO LOSA-MURO
1.00.9 LIMPIEZA, ESCARIFICADOY COLOCACION DE TECNOPOR VIGA-MURO
1.00.10 RESANE DE CABEZALES MURO ANCLADO M.O
2.00.00 OBRAS DE CONCRETO ARMADO
2.00.01 ZAPATAS ARMADA
2.00.02 ZAPATA - CONCRETO
2.00.03 ZAPATAS - ENCOFRADO Y DESENCOFRADO
2.00.04 SOLADO PARA ZAPATA
2.00.05 CURADO DE ZAPATAS M.O
3.00.00 CIMENTACION ARMADA
3.00.02 CIMENTACION ARMADA - CONCRETO 280 KG/CM2
3.00.03 CIMENTACION ARMADA - ENCOFRADO Y DESENCOFRADO
3.00.04 SOLADO PARA CIMENTACION ARMADA
3.00.05 CURADO DE CIMENTACION ARMADA M.O
4.00.00 VIGAS DE CIMENTACION
4.00.02 VIGAS DE CIMENTACION - CONCRETO 280 KG/CM2
4.00.03 VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
4.00.04 SOLADO PARA CIMENTACION ARMADA
4.00.05 CURADO DE VIGAS DE CIMENTACION M.O
5.00.00 MUROS DE SOSTENIMIENTO (PANTALLA)
5.00.01 MURO DE SOSTENIMIENTO - CONCRETO
5.00.02 MURO DE SOSTENIMIENTO - ENCOFRADO Y DESENCOFRADO (NORMAL) INCL. COMPUERTAS
5.00.03 CURADO DE MURO SOSTENIMIENTO
6.00.00 MUROS AZOTEA
6.01.01 MURO - CONCRETO
6.01.02 MURO - ENCOFRADO Y DESENCOFRADO (NORMAL)
6.01.03 LIMPIEZA MÈCANICA
6.01.04 CURADO DE MURO M.O
7.00.00 PLACAS
7.00.01 PLACAS - CONCRETO
7.00.02 PLACAS - ENCOFRADO Y DESENCOFRADO (NORMAL)
7.00.03 LIMPIEZA MÈCANICA
7.00.04 CURADO DEMURO PANTALLA M.O
8.00.00 COLUMNAS
8.00.01 COLUMNAS - CONCRETO
8.00.02 COLUMNAS - ENCOFRADO Y DESENCOFRADO (NORMAL)
8.00.03 LIMPIEZA MÈCANICA
8.00.04 CURADO DE COLUMNAS M.O
9.00.00 VIGAS
9.00.01 VIGAS - CONCRETO (INCLUYE JARDINERAS)
9.00.02 VIGAS - ENCOFRADO Y DESENCOFRADO
9.00.03 LIMPIEZA MÈCANICA
9.00.04 CURADO DE VIGAS M.O
10.00.00 LOSA ALIGERADA
10.00.01 LOSAS ALIGERADAS - CONCRETO F´C=210 KG/CM2
10.00.02 ENCOFRADO Y APUNTALAMIENTO DE LOSAS ALIGERADAS
10.00.03 LIMPIEZA MÈCANICA
10.00.04 CURADO DE LOSAS ALIGERADAS
11.00.00 SISTEMA DE VIGUETAS CONCREMAX
11.00.01 SUMINISTRO E INSTALACION DE BANDEJAS
11.00.02 SUMINISTRO DE VIGUETAS
12.00.00 LOSA MACIZA
12.00.01 LOSAS MACIZAS - CONCRETO F´C=210 KG/CM2
12.00.02 LOSAS MACIZAS - APUNTAMILENTO
12.00.03 LIMPIEZA MÈCANICA
12.00.04 CURADO DE LOSAS MACIZAS
13.00.00 LIMPIEZA DE LOSA DE PISOS SUPERIORES
13.00.01 NIVELACION PARA RECIBIR PISO LAMINADO Y ENCHAPE M.O
14.00.00 ESCALERA
14.00.01 ESCALERAS - CONCRETO
14.00.02 ESCALERAS - ENCOFRADO Y DESENCOFRADO (NORMAL)
14.00.03 LIMPIEZA MÈCANICA
14.00.04 CURADO DE ESCALERAS
15.00.00 CISTERNA ACI Y CONSUMO
15.00.01 CISTERNA - CONCRETO
15.00.02 CISTERNA - ENCOFRADO Y DESENCOFRADO (NORMAL)
15.00.03 LIMPIEZA MÈCANICA
15.00.04 CURADO DE CISTERNA M.O
15.00.05 COLOCACION DE WATRER STOP M.O X ML
15.00.06 IMPERMEABILIZACIÒN DE CISTERNAS CON TARRAJEO M.O
16.00.00 MUROS DE CUARTO DE MAQUINAS
16.00.01 MURO - CONCRETO
16.00.02 MURO - ENCOFRADO Y DESENCOFRADO (NORMAL)
16.00.03 CURADO DE MURO M.O
17.00.00 POZO SEPTICO
17.00.01 EXCAVACION MANUAL y PERFILADO
17.00.02 CONCRETO
17.00.03 ENCOFRADO
17.00.04 CURADO
17.00.05 IMPERMEABILIZACIÒN DE POZO SEPTICO CON TARRAJEO M.O
18.00.00 LOSA CONTRA TERRENO
18.00.01 CONCRETO PREMEZCLADO f'c=210kg/cm2 PARA LOSA DE PISO TIPO I H=0.20 m
18.00.02 CURADO DE CONCRETO
18.00.03 ENCOFRADO DE LOSA SOBRE TERRENO h=0.20 m.
18.00.05 JUNTA ALREDEDOR DE COLUMNAS (JAC) M.O
18.00.06 JUNTA DE CONSTRUCCIÓN (J.C) M.O
18.00.07 JUNTA DE DILATACIÓN (J.D) M.O
18.00.08 CORTES PARA RANURADO EN LOSAS
18.00.09 PISO TERMMINADO (AREAS DE LOS SOTANOS) ACABADOS
UND METRADO METRADO
TANTALEAN YOVANI
REV.03
M2 890.00 902.71
M2 890.00 902.71
Ml 247.00 199.84
Ml 247.00 199.84
Ml 247.00 199.64
ML 247.00 199.84
UND 71.00 43.00
UND 45.00 37.00
M3 98.87 115.99
M2 152.12 161.63
M2 128.36 108.37
M2 128.36 242.88
M3 75.40 60.58
M2 213.92 104.54
M2 116.10 190.56
M2 116.10 282.97
M3 11.07 6.66
M2 123.55 43.01
M2 11.59 10.77
M2 123.55 53.78
M3 231.61 252.76
M2 827.19 902.71
M2 827.19 902.71
M3 45.48 44.97
M2 366.21 702.78
M2 366.21 702.78
M2 366.21 702.78
M3 305.73 271.05
M2 2,818.73 2,464.34
M2 2,818.73 2,464.34
M2 2,818.73 2,464.34
M3 90.62 89.36
M2 885.75 776.74
M2 885.75 776.74
M2 885.75 776.74
M3 372.65 355.31
M2 3,457.19 2,328.36
M2 3,457.19 2,328.36
M2 3,343.48 2,328.36
M3 201.16 170.62
M2 2,302.08 2,337.20
M2 2,302.08 2,337.20
M2 2,302.08 2,337.20
M3 353.76 326.98
M2 1,637.51 1,512.75
M2 1,637.51 1,512.75
M2 1,637.51 1,512.75
M2 3,502.82
M3 92.46 37.35
M2 136.27 268.16
M2 136.27 268.16
M2 136.27 268.16
M3 89.89 122.84
M2 489.34 707.08
M2 489.34 111.53
M2 601.05 707.08
ML 148.45 36.47
M2 309.62
M3 19.87 28.96
M2 140.80 154.23
M2 140.80 154.23
M3 3.70 9.65
M3 3.70 5.55
M2 34.96 54.57
M2 38.56 54.57
M2 21.61 54.57
M3 74.94 55.64
M2 421.27 370.93
ML 124.48 127.06
ML 32.26 208.06
ML 120.00 174.71
ML 130.00 127.06
ML 5,200.00
M2 1,653.98