01.-Cronog. Valorizado Q. II - Io - Ana
01.-Cronog. Valorizado Q. II - Io - Ana
01.-Cronog. Valorizado Q. II - Io - Ana
01.01.01 ALMACEN DE OBRA, OFICINA Y GUARDIANIA m2 30.00 S/. 60.21 S/. 1,806.30 S/. 30.00 S/. 1,806.30 100.00% S/. - S/. -
01.01.02 SERVICIOS HIGIENICOS PARA LA OBRA (BAÑOS QUIMICOS) mes 3.00 S/. 600.00 S/. 1,800.00 S/. 0.99 S/. 594.00 33.00% S/. 0.99 S/. 594.00 33.00%
01.01.03 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m glb 1.00 S/. 1,376.46 S/. 1,376.46 S/. 1.00 S/. 1,376.46 100.00% S/. - S/. -
01.02.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA, EQUIPOS Y HERRAMIENTAS glb 1.00 S/. 6,738.67 S/. 6,738.67 S/. 0.50 S/. 3,369.34 50.00% S/. - S/. -
01.02.02 FLETE TERRESTRE glb 1.00 S/. 39,224.00 S/. 39,224.00 S/. 0.70 S/. 27,456.80 70.00% S/. 0.30 S/. 11,767.20 30.00%
01.02.03 MEJORAMIENTO DE CAMINO DE ACCESO km 0.50 S/. 4,271.69 S/. 2,135.85 S/. 0.50 S/. 2,135.85 100.00% S/. - S/. -
01.03.03 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 S/. 2,000.00 S/. 2,000.00 S/. 1.00 S/. 2,000.00 100.00% S/. - S/. -
01.03.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 S/. 638.10 S/. 638.10 S/. 1.00 S/. 638.10 100.00% S/. - S/. -
01.03.05 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 S/. 2,500.00 S/. 2,500.00 S/. 1.00 S/. 2,500.00 100.00% S/. - S/. -
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN EL
01.03.06 glb 1.00 S/. 762.73 S/. 762.73 S/. 1.00 S/. 762.73 100.00% S/. - S/. -
TRABAJO
01.03.07 PLAN PARA LA VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN EL TRABAJO #DIV/0! #DIV/0!
01.03.07.01.01.01 NIVELACION Y COMPACTADO DE TERRENO m2 161.64 S/. 1.20 S/. 193.97 S/. 161.64 S/. 193.97 100.00% S/. - S/. -
01.03.07.01.02.01 TOLDO DE PREVENCION Y CONTROL DE COVID - 19 glb 3.00 S/. 500.00 S/. 1,500.00 S/. 3.00 S/. 1,500.00 100.00% S/. - S/. -
01.03.07.01.03.01 CIRCULOS DE DISTANCIAMIENTO CON PINTURA glb 1.00 S/. 109.48 S/. 109.48 S/. 1.00 S/. 109.48 100.00% S/. - S/. -
01.03.07.01.04.01 BANNER DE 80 CM DE ALTO x 120 CM DE ANCHO. und 2.00 S/. 100.00 S/. 200.00 S/. 2.00 S/. 200.00 100.00% S/. - S/. -
01.03.07.01.04.02 CARTEL DE 20 CM x 80 CM (FONDO BLANCO, LETRAS NEGRAS) und 6.00 S/. 20.00 S/. 120.00 S/. 6.00 S/. 120.00 100.00% S/. - S/. -
01.03.07.01.05.01. PRUEBA RÁPIDA und 30.00 S/. 118.64 S/. 3,559.20 S/. 30.00 S/. 3,559.20 100.00% S/. - S/. -
01.03.07.01.05.02. FORMATO DE FICHA DE SINTOMATOLOGIA Y DECLARACION JURADA und 30.00 S/. 2.12 S/. 63.60 S/. 30.00 S/. 63.60 100.00% S/. - S/. -
01.03.07.02.01.01. PRUEBA MOLECULAR und 10.00 S/. 300.00 S/. 3,000.00 S/. 10.00 S/. 3,000.00 100.00% S/. - S/. -
01.03.07.02.01.02. FORMATO DE FICHA DE SINTOMATOLOGIA Y DECLARACION JURADA und 11.00 S/. 2.50 S/. 27.50 S/. 11.00 S/. 27.50 100.00% S/. - S/. -
01.03.07.02.01.02. FORMATO DE TOMA DE TEMPERATURA Y PULSO jgo 6.00 S/. 16.95 S/. 101.70 S/. 6.00 S/. 101.70 100.00% S/. - S/. -
01.03.07.02.01.02. INSTRUCTIVOS SST DE LAVADO Y DESINFECCIÓN DE MANOS und 40.00 S/. 2.50 S/. 100.00 S/. 40.00 S/. 100.00 100.00% S/. - S/. -
FORMATO DE REGISTRO PARA EL CONTROL Y DESINFECCIÓN DE UNIDADES
01.03.07.02.01.02. und 40.00 S/. 2.50 S/. 100.00 S/. 40.00 S/. 100.00 100.00% S/. - S/. -
VEHICULARES Y HERRAMIENTAS
01.03.07.02.01.02. FORMATO DE REGISTRO PARA EL CONTROL Y DESINFECCIÓN DE AMBIENTES jgo 6.00 S/. 16.95 S/. 101.70 S/. 6.00 S/. 101.70 100.00% S/. - S/. -
01.03.07.02.01.02. FORMATO DECLARACIÓN JURADA DE CONDICIONES DE SALUD EN EL TRABAJO und 45.00 S/. 2.50 S/. 112.50 S/. 45.00 S/. 112.50 100.00% S/. - S/. -
FORMATO DECLARACIÓN JURADA DE ASUNCIÓN DE RESPONSABILIDAD
01.03.07.02.01.02. und 18.00 S/. 2.50 S/. 45.00 S/. 18.00 S/. 45.00 100.00% S/. - S/. -
VOLUNTARIA
01.03.07.02.02 MATERIALES E INSUMOS PARA PREVENIR CONTAGIOS #DIV/0! #DIV/0!
01.03.07.02.02.01. TERMÓMETRO DIGITAL INFRARROJO und 1.00 S/. 90.00 S/. 90.00 S/. 1.00 S/. 90.00 100.00% S/. - S/. -
PULSIOXÍMETRO DE DEDO PARA MEDIR LA CONCENTRACIÓN DE OXÍGENO EN
01.03.07.02.02.01. und 1.00 S/. 110.00 S/. 110.00 S/. 1.00 S/. 110.00 100.00% S/. - S/. -
SANGRE
01.03.07.02.02.01. JABÓN LÍQUIDO x 20L und 5.00 S/. 45.00 S/. 225.00 S/. 5.00 S/. 225.00 100.00% S/. - S/. -
01.03.07.02.02.01. PAPEL PARA SECADO DE MANOS ROLLO DE 300 METROS und 10.00 S/. 8.31 S/. 83.10 S/. 10.00 S/. 83.10 100.00% S/. - S/. -
01.03.07.02.02.01. DISPENSADOR DE PAPEL DE SECADO DE MANOS und 3.00 S/. 55.00 S/. 165.00 S/. 3.00 S/. 165.00 100.00% S/. - S/. -
01.03.07.02.02.01. ALCOHOL DE 70° l 90.00 S/. 12.00 S/. 1,080.00 S/. 90.00 S/. 1,080.00 100.00% S/. - S/. -
01.03.07.02.02.01. LEJÍA l 90.00 S/. 2.50 S/. 225.00 S/. 90.00 S/. 225.00 100.00% S/. - S/. -
01.03.07.02.02.01. BANDEJAS DESINFECTANTES DE CALZADO und 4.00 S/. 55.00 S/. 220.00 S/. 4.00 S/. 220.00 100.00% S/. - S/. -
01.03.07.02.02.01. CAL VIVA x 5kg bol 20.00 S/. 8.00 S/. 160.00 S/. 20.00 S/. 160.00 100.00% S/. - S/. -
01.03.07.02.02.01. GASOLINA gal 90.00 S/. 12.77 S/. 1,149.30 S/. 90.00 S/. 1,149.30 100.00% S/. - S/. -
01.03.07.02.02.02. MASCARILLA DE TELA und 60.00 S/. 2.00 S/. 120.00 S/. 60.00 S/. 120.00 100.00% S/. - S/. -
01.03.07.02.02.02. ALCOHOL EN GEL x 1L und 90.00 S/. 17.00 S/. 1,530.00 S/. 90.00 S/. 1,530.00 100.00% S/. - S/. -
01.03.07.02.02.02. ATOMIZADOR X1L und 14.00 S/. 16.53 S/. 231.42 S/. 14.00 S/. 231.42 100.00% S/. - S/. -
01.03.07.02.02.02. ESCOBAS und 6.00 S/. 16.00 S/. 96.00 S/. 6.00 S/. 96.00 100.00% S/. - S/. -
01.03.07.02.02.02. RECOGEDORES und 6.00 S/. 15.00 S/. 90.00 S/. 6.00 S/. 90.00 100.00% S/. - S/. -
01.03.07.02.02.02. PAÑOS MULTIUSOS und 60.00 S/. 1.00 S/. 60.00 S/. 60.00 S/. 60.00 100.00% S/. - S/. -
01.03.07.02.02.02. BOLSAS PLASTICAS GRANDES PARA BASURA,COLOR ROJO DE 60X100 CM pqt 4.00 S/. 15.50 S/. 62.00 S/. 4.00 S/. 62.00 100.00% S/. - S/. -
01.03.07.02.02.02. BOLSAS PLASTICAS GRANDES PARA BASURA,COLOR NEGRO DE 60X100 CM pqt 4.00 S/. 15.50 S/. 62.00 S/. 4.00 S/. 62.00 100.00% S/. - S/. -
01.03.07.02.02.02. BOLSAS PLASTICAS MEDIANAS PARA BASURA,COLOR NEGRO DE 40X70 CM pqt 9.00 S/. 12.71 S/. 114.39 S/. 9.00 S/. 114.39 100.00% S/. - S/. -
01.03.07.02.02.02. BALDE DE 20 LT und 6.00 S/. 10.00 S/. 60.00 S/. 6.00 S/. 60.00 100.00% S/. - S/. -
01.03.07.02.02.02. TACHO PARA BASURA DE PEDAL CON TAPA, COLOR NEGRO DE 30X60 CM und 11.00 S/. 45.00 S/. 495.00 S/. 11.00 S/. 495.00 100.00% S/. - S/. -
01.03.07.02.02.02. CILINDROS DE METAL X55 GLN und 4.00 S/. 84.75 S/. 339.00 S/. 4.00 S/. 339.00 100.00% S/. - S/. -
CRONOGRAMA VALORIZADO PROGRAMADO - COMPROM.
REHABILITACION DE LA BOCATOMA QUIRIHUAC II, QUIRIHUAC, DISTRITO DE LAREDO, PROVINCIA DE TRUJILLO, DEPARTAMENTO LA LIBERTAD
PLAZO DE EJECUCION : 3 MESES
COSTO DIRECTO : S/. 1,006,477.20
PRESUPUESTO MES 01 % MES 02 %
ITEM DESCRIPCION
UND. METRADO P. UNIT. MONTO MONTO PROGRAM. MONTO PROGRAM.
01.03.07.02.03.01 MOCHILA MOTO FUMIGADORA und 1.00 S/. 2,000.00 S/. 2,000.00 S/. 1.00 S/. 2,000.00 100.00% S/. - S/. -
01.03.07.02.04.01 MESA REDONDA PARA COMEDOR D=83 cm und 8.00 S/. 59.24 S/. 473.92 S/. 8.00 S/. 473.92 100.00% S/. - S/. -
01.03.07.02.04.02 BANCO DE PLASTICO und 16.00 S/. 15.30 S/. 244.80 S/. 16.00 S/. 244.80 100.00% S/. - S/. -
02.01.01 TRAZO, NIVELACION Y REPLANTEO m2 176.86 S/. 1.16 S/. 205.16 S/. 176.86 S/. 205.16 100.00% S/. - S/. -
02.01.02 DESVIO PROVISIONAL DE CAUCE DEL RIO m3 202.50 S/. 4.38 S/. 886.95 S/. 202.50 S/. 886.95 100.00% S/. - S/. -
02.02.01 EXCAVACION EN MATERIAL CONGLOMERADO SATURADO PARA ESTRUCTURAS m3 814.08 S/. 4.38 S/. 3,565.67 S/. 814.08 S/. 3,565.67 100.00% S/. - S/. -
02.02.02 EXCAVACION DE MATERIAL SUELTO A MANO m3 20.29 S/. 15.00 S/. 304.35 S/. 20.29 S/. 304.35 100.00% S/. - S/. -
02.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO m3 28.05 S/. 10.00 S/. 280.50 S/. 28.05 S/. 280.50 100.00% S/. - S/. -
02.02.04 ENROCADO ACOMODADO Ø 1.10 A 1.50 m m3 153.45 S/. 76.59 S/. 11,752.74 S/. 153.45 S/. 11,752.74 100.00% S/. - S/. -
02.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 886.94 S/. 7.39 S/. 6,554.49 S/. 886.94 S/. 6,554.49 100.00% S/. - S/. -
02.03.01 CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 128.97 S/. 14.91 S/. 1,922.94 S/. 128.97 S/. 1,922.94 100.00% S/. - S/. -
02.03.02 CONCRETO CICLOPEO f'c=210 kg/cm2 + 70% P.G. m3 148.80 S/. 113.03 S/. 16,818.86 S/. 29.76 S/. 3,363.77 20.00% S/. 119.04 S/. 13,455.09 80.00%
02.03.03 CONCRETO ARMADO f'c=210 kg/cm2 PARA ESTRUCTURAS m3 159.03 S/. 336.09 S/. 53,448.39 S/. 31.81 S/. 10,689.68 20.00% S/. 127.22 S/. 42,758.71 80.00%
02.03.04 ENCOFRADO Y DESENCOFRADO PLANO VERTICAL CARAVISTA m2 525.85 S/. 61.33 S/. 32,250.38 S/. 525.85 S/. 32,250.38 100.00% S/. - S/. -
02.03.05 ENCOFRADO Y DESENCOFRADO PLANO HORIZONTAL CARAVISTA m2 23.76 S/. 66.59 S/. 1,582.18 S/. 23.76 S/. 1,582.18 100.00% S/. - S/. -
02.03.06 ENCOFRADO Y DESENCOFRADO SIMPLE m2 18.00 S/. 30.95 S/. 557.10 S/. 18.00 S/. 557.10 100.00% S/. - S/. -
02.03.07 ENCOFRADO Y DESENCOFRADO CURVO m2 23.46 S/. 29.52 S/. 692.54 S/. 23.46 S/. 692.54 100.00% S/. - S/. -
CRONOGRAMA VALORIZADO PROGRAMADO - COMPROM.
REHABILITACION DE LA BOCATOMA QUIRIHUAC II, QUIRIHUAC, DISTRITO DE LAREDO, PROVINCIA DE TRUJILLO, DEPARTAMENTO LA LIBERTAD
PLAZO DE EJECUCION : 3 MESES
COSTO DIRECTO : S/. 1,006,477.20
PRESUPUESTO MES 01 % MES 02 %
ITEM DESCRIPCION
UND. METRADO P. UNIT. MONTO MONTO PROGRAM. MONTO PROGRAM.
02.03.08 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 14,242.19 S/. 5.17 S/. 73,632.12 S/. 11,393.75 S/. 58,905.70 80.00% S/. 2,848.44 S/. 14,726.42 20.00%
ALBAÑILERIA DE PIEDRA ASENTADA Y EMBOQUILLADO CON CONCRETO f'c=175 KG/CM2,
02.03.09 m2 109.16 S/. 356.69 S/. 38,936.28 S/. 54.58 S/. 19,468.14 50.00% S/. 54.58 S/. 19,468.14 50.00%
e=0.25m
02.04 JUNTAS Y SELLOS #DIV/0! #DIV/0!
02.04.01 JUNTA DE WATER STOP DE 6" m 4.00 S/. 30.02 S/. 120.08 S/. - S/. - S/. 4.00 S/. 120.08 100.00%
02.04.02 JUNTA DE WATER STOP DE 9" m 33.60 S/. 34.55 S/. 1,160.88 S/. - S/. - S/. 33.60 S/. 1,160.88 100.00%
02.04.03 SELLADO DE JUNTAS CON MATERIAL ELASTOMERICO DE POLIURETANO m 37.60 S/. 38.91 S/. 1,463.02 S/. - S/. - S/. 37.60 S/. 1,463.02 100.00%
02.05.01 COMPUERTA RADIAL OWERFLOW 3.60 x 1.55m MOD. 400 ARMCO INC. MEC. IZAJE und 2.00 S/. 55,550.84 S/. 111,101.68 S/. - S/. - S/. 0.30 S/. 16,665.25 15.00%
02.05.02 COMPUERTA PLANA DESLIZANTE 0.60 x 0.75m TIPO ARMCO MEC. IZAJE und 1.00 S/. 3,220.34 S/. 3,220.34 S/. - S/. - S/. 0.15 S/. 483.05 15.00%
02.05.03 BARANDA METALICA DE F°G° DIAMETRO 2" m 28.30 S/. 113.09 S/. 3,200.45 S/. - S/. - S/. - S/. -
02.05.04 ESCALERA DE GATO DE FIERRO GALVANIZADO 3/4" SIMPLE m 31.20 S/. 29.89 S/. 932.57 S/. - S/. - S/. - S/. -
02.05.05 RANURA PARA ATAGUIA (Pln. Metalica 1/4", Anclaje 1/2") m 17.80 S/. 65.37 S/. 1,163.59 S/. - S/. - S/. - S/. -
03.01.01 TRAZO, NIVELACION Y REPLANTEO m2 1,120.98 S/. 1.16 S/. 1,300.34 S/. 1,120.98 S/. 1,300.34 100.00% S/. - S/. -
03.01.02 DESVIO PROVISIONAL DE CAUCE DEL RIO m3 337.50 S/. 4.38 S/. 1,478.25 S/. 337.50 S/. 1,478.25 100.00% S/. - S/. -
03.01.03 LIMPIEZA Y DESBROCE DE TERRENO NATURAL m2 1,120.98 S/. 4.73 S/. 5,302.24 S/. 1,120.98 S/. 5,302.24 100.00% S/. - S/. -
03.02.01 EXCAVACION DE MATERIAL SUELTO A MAQUINARIA PARA ESTRUCTURAS m3 9,359.29 S/. 4.35 S/. 40,712.91 S/. 5,147.61 S/. 22,392.10 55.00% S/. 4,211.68 S/. 18,320.81 45.00%
03.02.02 EXCAVACION DE MATERIAL SUELTO A MANO m3 100.67 S/. 15.00 S/. 1,510.05 S/. 55.37 S/. 830.53 55.00% S/. 45.30 S/. 679.52 45.00%
03.02.03 OVER SIDE 6"-8", e=0.40m m3 398.41 S/. 30.91 S/. 12,314.85 S/. 318.73 S/. 9,851.88 80.00% S/. 79.68 S/. 2,462.97 20.00%
03.02.04 ENROCADO ACOMODADO Ø 1.10 A 1.50 m m3 1,892.10 S/. 65.80 S/. 124,500.18 S/. - S/. - 0.00% S/. 756.84 S/. 49,800.07 40.00%
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 10,405.96 S/. 4.62 S/. 48,075.54 S/. 5,723.28 S/. 26,441.55 55.00% S/. 4,682.68 S/. 21,633.99 45.00%
CRONOGRAMA VALORIZADO PROGRAMADO - COMPROM.
REHABILITACION DE LA BOCATOMA QUIRIHUAC II, QUIRIHUAC, DISTRITO DE LAREDO, PROVINCIA DE TRUJILLO, DEPARTAMENTO LA LIBERTAD
PLAZO DE EJECUCION : 3 MESES
COSTO DIRECTO : S/. 1,006,477.20
PRESUPUESTO MES 01 % MES 02 %
ITEM DESCRIPCION
UND. METRADO P. UNIT. MONTO MONTO PROGRAM. MONTO PROGRAM.
03.03.01 CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 142.80 S/. 14.91 S/. 2,129.15 S/. 142.80 S/. 2,129.15 100.00% S/. - S/. -
03.03.02 CONCRETO CICLOPEO f'c=210 kg/cm2 + 70% P.G. m3 1,993.50 S/. 113.03 S/. 225,325.31 S/. 598.05 S/. 67,597.59 30.00% S/. 1,395.45 S/. 157,727.72 70.00%
03.03.03 ENCOFRADO Y DESENCOFRADO m2 371.28 S/. 28.19 S/. 10,466.38 S/. 111.38 S/. 3,139.91 30.00% S/. 259.90 S/. 7,326.47 70.00%
03.03.04 ENCOFRADO Y DESENCOFRADO CURVO m2 340.58 S/. 29.52 S/. 10,053.92 S/. 3,016.18 30.00% S/. 238.41 S/. 7,037.74 70.00%
03.04.01 JUNTA DE WATER STOP DE 9" m 142.80 S/. 34.55 S/. 4,933.74 S/. 2,960.24 60.00% S/. 57.12 S/. 1,973.50 40.00%
03.05.01 TUBERIA DE DRENAJE (Lloradores) und 188.00 S/. 17.88 S/. 3,361.44 S/. - S/. 75.20 S/. 1,344.58 40.00%
04.01.01 TRAZO, NIVELACION Y REPLANTEO m2 118.63 S/. 1.16 S/. 137.61 S/. 137.61 100.00% S/. - S/. -
04.01.02 LIMPIEZA Y DESBROCE DE TERRENO NATURAL m2 118.63 S/. 4.73 S/. 561.12 S/. 561.12 100.00% S/. - S/. -
04.02.01 EXCAVACION EN MATERIAL CONGLOMERADO SATURADO PARA ESTRUCTURAS m3 283.84 S/. 4.38 S/. 1,243.22 S/. 1,243.22 100.00% S/. - S/. -
04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 245.10 S/. 10.00 S/. 2,451.00 S/. 2,451.00 100.00% S/. - S/. -
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 42.61 S/. 3.71 S/. 158.08 S/. 158.08 100.00% S/. - S/. -
04.03.01 CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 43.84 S/. 14.87 S/. 651.90 S/. 651.90 100.00% S/. - S/. -
04.03.02 CONCRETO ARMADO f'c=210 kg/cm2 PARA ESTRUCTURAS m3 60.15 S/. 336.09 S/. 20,215.81 S/. - S/. 60.15 S/. 20,215.81 100.00%
04.03.03 ENCOFRADO Y DESENCOFRADO m2 156.28 S/. 28.19 S/. 4,405.53 S/. 3,524.42 80.00% S/. 31.26 S/. 881.11 20.00%
04.03.04 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4,647.62 S/. 5.17 S/. 24,028.20 S/. - S/. 4,647.62 S/. 24,028.20 100.00%
04.04.01 JUNTA DE WATER STOP DE 9" m 10.60 S/. 34.55 S/. 366.23 S/. - S/. 366.23 100.00%
04.04.02 SELLADO DE JUNTAS CON MATERIAL ELASTOMERICO DE POLIURETANO m 10.60 S/. 38.91 S/. 412.45 S/. - S/. -
04.05 OTROS
04.05.01 DOWELS - ANCLAJE EN MUROS und 4.76 S/. 20.78 S/. 98.91 S/. - S/. 98.91 100.00%
05 OTROS
05.01 MONITOREO DE PLAN DE MANEJO AMBIENTAL glb 1.00 S/. 8,998.86 S/. 8,998.86 S/. - S/. 4,499.43 50.00%
OBRAS PROVISIONALES
ALMACEN DE OBRA, OFICINA Y GUARDIANIA m2 30.00 S/. 60.21 S/. 1,806.30 S/. 30.00 S/. 1,806.30 100.00% S/. - S/. - S/. - S/.
SERVICIOS HIGIENICOS PARA LA OBRA (BAÑOS QUIMICOS) mes 3.00 S/. 600.00 S/. 1,800.00 S/. 0.99 S/. 594.00 33.00% S/. 0.99 S/. 594.00 33.00% S/. 1.02 S/. 61
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m glb 1.00 S/. 1,376.46 S/. 1,376.46 S/. 1.00 S/. 1,376.46 100.00% S/. - S/. - S/. - S/.
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA, EQUIPOS Y HERRAMIENTAS glb 1.00 S/. 6,738.67 S/. 6,738.67 S/. 0.50 S/. 3,369.34 50.00% S/. - S/. - S/. 0.50 S/. 3,36
FLETE TERRESTRE glb 1.00 S/. 39,224.00 S/. 39,224.00 S/. 0.70 S/. 27,456.80 70.00% S/. 0.30 S/. 11,767.20 30.00% S/. - S/.
MEJORAMIENTO DE CAMINO DE ACCESO km 0.50 S/. 4,271.69 S/. 2,135.85 S/. 0.50 S/. 2,135.85 100.00% S/. - S/. - S/. - S/.
EQUIPOS DE PROTECCION COLECTIVA glb 1.00 S/. 2,000.00 S/. 2,000.00 S/. 1.00 S/. 2,000.00 100.00% S/. - S/. - S/. - S/.
SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 S/. 638.10 S/. 638.10 S/. 1.00 S/. 638.10 100.00% S/. - S/. - S/. - S/.
CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 S/. 2,500.00 S/. 2,500.00 S/. 1.00 S/. 2,500.00 100.00% S/. - S/. - S/. - S/.
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN EL
glb 1.00 S/. 762.73 S/. 762.73 S/. 1.00 S/. 762.73 100.00% S/. - S/. - S/. - S/.
RABAJO
PLAN PARA LA VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN EL TRABAJO #DIV/0! #DIV/0! #DIV/0!
NIVELACION Y COMPACTADO DE TERRENO m2 161.64 S/. 1.20 S/. 193.97 S/. 161.64 S/. 193.97 100.00% S/. - S/. - S/. - S/.
TOLDO DE PREVENCION Y CONTROL DE COVID - 19 glb 3.00 S/. 500.00 S/. 1,500.00 S/. 3.00 S/. 1,500.00 100.00% S/. - S/. - S/. - S/.
BANNER DE 80 CM DE ALTO x 120 CM DE ANCHO. und 2.00 S/. 100.00 S/. 200.00 S/. 2.00 S/. 200.00 100.00% S/. - S/. - S/. - S/.
CARTEL DE 20 CM x 80 CM (FONDO BLANCO, LETRAS NEGRAS) und 6.00 S/. 20.00 S/. 120.00 S/. 6.00 S/. 120.00 100.00% S/. - S/. - S/. - S/.
PRUEBA RÁPIDA und 30.00 S/. 118.64 S/. 3,559.20 S/. 30.00 S/. 3,559.20 100.00% S/. - S/. - S/. - S/.
FORMATO DE FICHA DE SINTOMATOLOGIA Y DECLARACION JURADA und 30.00 S/. 2.12 S/. 63.60 S/. 30.00 S/. 63.60 100.00% S/. - S/. - S/. - S/.
PRUEBA MOLECULAR und 10.00 S/. 300.00 S/. 3,000.00 S/. 10.00 S/. 3,000.00 100.00% S/. - S/. - S/. - S/.
FORMATO DE FICHA DE SINTOMATOLOGIA Y DECLARACION JURADA und 11.00 S/. 2.50 S/. 27.50 S/. 11.00 S/. 27.50 100.00% S/. - S/. - S/. - S/.
FORMATO DE TOMA DE TEMPERATURA Y PULSO jgo 6.00 S/. 16.95 S/. 101.70 S/. 6.00 S/. 101.70 100.00% S/. - S/. - S/. - S/.
INSTRUCTIVOS SST DE LAVADO Y DESINFECCIÓN DE MANOS und 40.00 S/. 2.50 S/. 100.00 S/. 40.00 S/. 100.00 100.00% S/. - S/. - S/. - S/.
FORMATO DE REGISTRO PARA EL CONTROL Y DESINFECCIÓN DE UNIDADES
und 40.00 S/. 2.50 S/. 100.00 S/. 40.00 S/. 100.00 100.00% S/. - S/. - S/. - S/.
EHICULARES Y HERRAMIENTAS
FORMATO DE REGISTRO PARA EL CONTROL Y DESINFECCIÓN DE AMBIENTES jgo 6.00 S/. 16.95 S/. 101.70 S/. 6.00 S/. 101.70 100.00% S/. - S/. - S/. - S/.
FORMATO DECLARACIÓN JURADA DE CONDICIONES DE SALUD EN EL TRABAJO und 45.00 S/. 2.50 S/. 112.50 S/. 45.00 S/. 112.50 100.00% S/. - S/. - S/. - S/.
FORMATO DECLARACIÓN JURADA DE ASUNCIÓN DE RESPONSABILIDAD
und 18.00 S/. 2.50 S/. 45.00 S/. 18.00 S/. 45.00 100.00% S/. - S/. - S/. - S/.
OLUNTARIA
MATERIALES E INSUMOS PARA PREVENIR CONTAGIOS #DIV/0! #DIV/0! #DIV/0!
PAPEL PARA SECADO DE MANOS ROLLO DE 300 METROS und 10.00 S/. 8.31 S/. 83.10 S/. 10.00 S/. 83.10 100.00% S/. - S/. - S/. - S/.
DISPENSADOR DE PAPEL DE SECADO DE MANOS und 3.00 S/. 55.00 S/. 165.00 S/. 3.00 S/. 165.00 100.00% S/. - S/. - S/. - S/.
ALCOHOL DE 70° l 90.00 S/. 12.00 S/. 1,080.00 S/. 90.00 S/. 1,080.00 100.00% S/. - S/. - S/. - S/.
LEJÍA l 90.00 S/. 2.50 S/. 225.00 S/. 90.00 S/. 225.00 100.00% S/. - S/. - S/. - S/.
BANDEJAS DESINFECTANTES DE CALZADO und 4.00 S/. 55.00 S/. 220.00 S/. 4.00 S/. 220.00 100.00% S/. - S/. - S/. - S/.
CAL VIVA x 5kg bol 20.00 S/. 8.00 S/. 160.00 S/. 20.00 S/. 160.00 100.00% S/. - S/. - S/. - S/.
GASOLINA gal 90.00 S/. 12.77 S/. 1,149.30 S/. 90.00 S/. 1,149.30 100.00% S/. - S/. - S/. - S/.
MASCARILLA DE TELA und 60.00 S/. 2.00 S/. 120.00 S/. 60.00 S/. 120.00 100.00% S/. - S/. - S/. - S/.
ALCOHOL EN GEL x 1L und 90.00 S/. 17.00 S/. 1,530.00 S/. 90.00 S/. 1,530.00 100.00% S/. - S/. - S/. - S/.
ATOMIZADOR X1L und 14.00 S/. 16.53 S/. 231.42 S/. 14.00 S/. 231.42 100.00% S/. - S/. - S/. - S/.
ESCOBAS und 6.00 S/. 16.00 S/. 96.00 S/. 6.00 S/. 96.00 100.00% S/. - S/. - S/. - S/.
RECOGEDORES und 6.00 S/. 15.00 S/. 90.00 S/. 6.00 S/. 90.00 100.00% S/. - S/. - S/. - S/.
PAÑOS MULTIUSOS und 60.00 S/. 1.00 S/. 60.00 S/. 60.00 S/. 60.00 100.00% S/. - S/. - S/. - S/.
BOLSAS PLASTICAS GRANDES PARA BASURA,COLOR ROJO DE 60X100 CM pqt 4.00 S/. 15.50 S/. 62.00 S/. 4.00 S/. 62.00 100.00% S/. - S/. - S/. - S/.
BOLSAS PLASTICAS GRANDES PARA BASURA,COLOR NEGRO DE 60X100 CM pqt 4.00 S/. 15.50 S/. 62.00 S/. 4.00 S/. 62.00 100.00% S/. - S/. - S/. - S/.
BOLSAS PLASTICAS MEDIANAS PARA BASURA,COLOR NEGRO DE 40X70 CM pqt 9.00 S/. 12.71 S/. 114.39 S/. 9.00 S/. 114.39 100.00% S/. - S/. - S/. - S/.
BALDE DE 20 LT und 6.00 S/. 10.00 S/. 60.00 S/. 6.00 S/. 60.00 100.00% S/. - S/. - S/. - S/.
TACHO PARA BASURA DE PEDAL CON TAPA, COLOR NEGRO DE 30X60 CM und 11.00 S/. 45.00 S/. 495.00 S/. 11.00 S/. 495.00 100.00% S/. - S/. - S/. - S/.
CILINDROS DE METAL X55 GLN und 4.00 S/. 84.75 S/. 339.00 S/. 4.00 S/. 339.00 100.00% S/. - S/. - S/. - S/.
CRONOGRAMA VALORIZADO PROGRAMADO - COMPROM.
REHABILITACION DE LA BOCATOMA QUIRIHUAC II, QUIRIHUAC, DISTRITO DE LAREDO, PROVINCIA DE TRUJILLO, DEPARTAMENTO LA LIBERTAD
LAZO DE EJECUCION : 3 MESES
COSTO DIRECTO : S/. 1,006,477.20
PRESUPUESTO MES 01 % MES 02 % MES 03
DESCRIPCION
UND. METRADO P. UNIT. MONTO MONTO PROGRAM. MONTO PROGRAM. MONTO
EQUIPOS Y MOBILIARIOS PARA PREVENIR CONTAGIOS #DIV/0! #DIV/0! #DIV/0!
MOCHILA MOTO FUMIGADORA und 1.00 S/. 2,000.00 S/. 2,000.00 S/. 1.00 S/. 2,000.00 100.00% S/. - S/. - S/. - S/.
MESA REDONDA PARA COMEDOR D=83 cm und 8.00 S/. 59.24 S/. 473.92 S/. 8.00 S/. 473.92 100.00% S/. - S/. - S/. - S/.
BANCO DE PLASTICO und 16.00 S/. 15.30 S/. 244.80 S/. 16.00 S/. 244.80 100.00% S/. - S/. - S/. - S/.
TRAZO, NIVELACION Y REPLANTEO m2 176.86 S/. 1.16 S/. 205.16 S/. 176.86 S/. 205.16 100.00% S/. - S/. - S/. - S/.
DESVIO PROVISIONAL DE CAUCE DEL RIO m3 202.50 S/. 4.38 S/. 886.95 S/. 202.50 S/. 886.95 100.00% S/. - S/. - S/. - S/.
EXCAVACION EN MATERIAL CONGLOMERADO SATURADO PARA ESTRUCTURAS m3 814.08 S/. 4.38 S/. 3,565.67 S/. 814.08 S/. 3,565.67 100.00% S/. - S/. - S/. - S/.
EXCAVACION DE MATERIAL SUELTO A MANO m3 20.29 S/. 15.00 S/. 304.35 S/. 20.29 S/. 304.35 100.00% S/. - S/. - S/. - S/.
RELLENO COMPACTADO CON MATERIAL PROPIO m3 28.05 S/. 10.00 S/. 280.50 S/. 28.05 S/. 280.50 100.00% S/. - S/. - S/. - S/.
ENROCADO ACOMODADO Ø 1.10 A 1.50 m m3 153.45 S/. 76.59 S/. 11,752.74 S/. 153.45 S/. 11,752.74 100.00% S/. - S/. - S/. - S/.
ELIMINACION DE MATERIAL EXCEDENTE m3 886.94 S/. 7.39 S/. 6,554.49 S/. 886.94 S/. 6,554.49 100.00% S/. - S/. - S/. - S/.
CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 128.97 S/. 14.91 S/. 1,922.94 S/. 128.97 S/. 1,922.94 100.00% S/. - S/. - S/. - S/.
CONCRETO CICLOPEO f'c=210 kg/cm2 + 70% P.G. m3 148.80 S/. 113.03 S/. 16,818.86 S/. 29.76 S/. 3,363.77 20.00% S/. 119.04 S/. 13,455.09 80.00% S/. - S/.
CONCRETO ARMADO f'c=210 kg/cm2 PARA ESTRUCTURAS m3 159.03 S/. 336.09 S/. 53,448.39 S/. 31.81 S/. 10,689.68 20.00% S/. 127.22 S/. 42,758.71 80.00% S/. - S/.
ENCOFRADO Y DESENCOFRADO PLANO VERTICAL CARAVISTA m2 525.85 S/. 61.33 S/. 32,250.38 S/. 525.85 S/. 32,250.38 100.00% S/. - S/. - S/. - S/.
ENCOFRADO Y DESENCOFRADO PLANO HORIZONTAL CARAVISTA m2 23.76 S/. 66.59 S/. 1,582.18 S/. 23.76 S/. 1,582.18 100.00% S/. - S/. - S/. - S/.
ENCOFRADO Y DESENCOFRADO SIMPLE m2 18.00 S/. 30.95 S/. 557.10 S/. 18.00 S/. 557.10 100.00% S/. - S/. - S/. - S/.
ENCOFRADO Y DESENCOFRADO CURVO m2 23.46 S/. 29.52 S/. 692.54 S/. 23.46 S/. 692.54 100.00% S/. - S/. - S/. - S/.
CRONOGRAMA VALORIZADO PROGRAMADO - COMPROM.
REHABILITACION DE LA BOCATOMA QUIRIHUAC II, QUIRIHUAC, DISTRITO DE LAREDO, PROVINCIA DE TRUJILLO, DEPARTAMENTO LA LIBERTAD
LAZO DE EJECUCION : 3 MESES
COSTO DIRECTO : S/. 1,006,477.20
PRESUPUESTO MES 01 % MES 02 % MES 03
DESCRIPCION
UND. METRADO P. UNIT. MONTO MONTO PROGRAM. MONTO PROGRAM. MONTO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 14,242.19 S/. 5.17 S/. 73,632.12 S/. 11,393.75 S/. 58,905.70 80.00% S/. 2,848.44 S/. 14,726.42 20.00% S/. - S/.
ALBAÑILERIA DE PIEDRA ASENTADA Y EMBOQUILLADO CON CONCRETO f'c=175 KG/CM2,
m2 109.16 S/. 356.69 S/. 38,936.28 S/. 54.58 S/. 19,468.14 50.00% S/. 54.58 S/. 19,468.14 50.00% S/. - S/.
=0.25m
JUNTAS Y SELLOS #DIV/0! #DIV/0! #DIV/0!
JUNTA DE WATER STOP DE 6" m 4.00 S/. 30.02 S/. 120.08 S/. - S/. - S/. 4.00 S/. 120.08 100.00% S/. - S/.
JUNTA DE WATER STOP DE 9" m 33.60 S/. 34.55 S/. 1,160.88 S/. - S/. - S/. 33.60 S/. 1,160.88 100.00% S/. - S/.
SELLADO DE JUNTAS CON MATERIAL ELASTOMERICO DE POLIURETANO m 37.60 S/. 38.91 S/. 1,463.02 S/. - S/. - S/. 37.60 S/. 1,463.02 100.00% S/. - S/.
COMPUERTA RADIAL OWERFLOW 3.60 x 1.55m MOD. 400 ARMCO INC. MEC. IZAJE und 2.00 S/. 55,550.84 S/. 111,101.68 S/. - S/. - S/. 0.30 S/. 16,665.25 15.00% S/. 1.70 S/. 94,43
COMPUERTA PLANA DESLIZANTE 0.60 x 0.75m TIPO ARMCO MEC. IZAJE und 1.00 S/. 3,220.34 S/. 3,220.34 S/. - S/. - S/. 0.15 S/. 483.05 15.00% S/. 0.85 S/. 2,73
BARANDA METALICA DE F°G° DIAMETRO 2" m 28.30 S/. 113.09 S/. 3,200.45 S/. - S/. - S/. - S/. - S/. 28.30 S/. 3,20
ESCALERA DE GATO DE FIERRO GALVANIZADO 3/4" SIMPLE m 31.20 S/. 29.89 S/. 932.57 S/. - S/. - S/. - S/. - S/. 31.20 S/. 93
RANURA PARA ATAGUIA (Pln. Metalica 1/4", Anclaje 1/2") m 17.80 S/. 65.37 S/. 1,163.59 S/. - S/. - S/. - S/. - S/. 17.80 S/. 1,16
TRAZO, NIVELACION Y REPLANTEO m2 1,120.98 S/. 1.16 S/. 1,300.34 S/. 1,120.98 S/. 1,300.34 100.00% S/. - S/. - S/. - S/.
DESVIO PROVISIONAL DE CAUCE DEL RIO m3 337.50 S/. 4.38 S/. 1,478.25 S/. 337.50 S/. 1,478.25 100.00% S/. - S/. - S/. - S/.
LIMPIEZA Y DESBROCE DE TERRENO NATURAL m2 1,120.98 S/. 4.73 S/. 5,302.24 S/. 1,120.98 S/. 5,302.24 100.00% S/. - S/. - S/. - S/.
EXCAVACION DE MATERIAL SUELTO A MAQUINARIA PARA ESTRUCTURAS m3 9,359.29 S/. 4.35 S/. 40,712.91 S/. 5,147.61 S/. 22,392.10 55.00% S/. 4,211.68 S/. 18,320.81 45.00% S/. - S/.
EXCAVACION DE MATERIAL SUELTO A MANO m3 100.67 S/. 15.00 S/. 1,510.05 S/. 55.37 S/. 830.53 55.00% S/. 45.30 S/. 679.52 45.00% S/. - S/.
OVER SIDE 6"-8", e=0.40m m3 398.41 S/. 30.91 S/. 12,314.85 S/. 318.73 S/. 9,851.88 80.00% S/. 79.68 S/. 2,462.97 20.00% S/. - S/.
ENROCADO ACOMODADO Ø 1.10 A 1.50 m m3 1,892.10 S/. 65.80 S/. 124,500.18 S/. - S/. - 0.00% S/. 756.84 S/. 49,800.07 40.00% S/. 1,135.26 S/. 74,70
ELIMINACION DE MATERIAL EXCEDENTE m3 10,405.96 S/. 4.62 S/. 48,075.54 S/. 5,723.28 S/. 26,441.55 55.00% S/. 4,682.68 S/. 21,633.99 45.00% S/. - S/.
CRONOGRAMA VALORIZADO PROGRAMADO - COMPROM.
REHABILITACION DE LA BOCATOMA QUIRIHUAC II, QUIRIHUAC, DISTRITO DE LAREDO, PROVINCIA DE TRUJILLO, DEPARTAMENTO LA LIBERTAD
LAZO DE EJECUCION : 3 MESES
COSTO DIRECTO : S/. 1,006,477.20
PRESUPUESTO MES 01 % MES 02 % MES 03
DESCRIPCION
UND. METRADO P. UNIT. MONTO MONTO PROGRAM. MONTO PROGRAM. MONTO
OBRAS DE CONCRETO #DIV/0! #DIV/0! #DIV/0!
CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 142.80 S/. 14.91 S/. 2,129.15 S/. 142.80 S/. 2,129.15 100.00% S/. - S/. - S/. - S/.
CONCRETO CICLOPEO f'c=210 kg/cm2 + 70% P.G. m3 1,993.50 S/. 113.03 S/. 225,325.31 S/. 598.05 S/. 67,597.59 30.00% S/. 1,395.45 S/. 157,727.72 70.00% S/. - S/.
ENCOFRADO Y DESENCOFRADO m2 371.28 S/. 28.19 S/. 10,466.38 S/. 111.38 S/. 3,139.91 30.00% S/. 259.90 S/. 7,326.47 70.00% S/. - S/.
ENCOFRADO Y DESENCOFRADO CURVO m2 340.58 S/. 29.52 S/. 10,053.92 S/. 3,016.18 30.00% S/. 238.41 S/. 7,037.74 70.00% S/. - S/.
JUNTA DE WATER STOP DE 9" m 142.80 S/. 34.55 S/. 4,933.74 S/. 2,960.24 60.00% S/. 57.12 S/. 1,973.50 40.00% S/. - S/.
TUBERIA DE DRENAJE (Lloradores) und 188.00 S/. 17.88 S/. 3,361.44 S/. - S/. 75.20 S/. 1,344.58 40.00% S/. 112.80 S/. 2,01
TRAZO, NIVELACION Y REPLANTEO m2 118.63 S/. 1.16 S/. 137.61 S/. 137.61 100.00% S/. - S/. - S/. - S/.
LIMPIEZA Y DESBROCE DE TERRENO NATURAL m2 118.63 S/. 4.73 S/. 561.12 S/. 561.12 100.00% S/. - S/. - S/.
EXCAVACION EN MATERIAL CONGLOMERADO SATURADO PARA ESTRUCTURAS m3 283.84 S/. 4.38 S/. 1,243.22 S/. 1,243.22 100.00% S/. - S/. - S/.
RELLENO COMPACTADO CON MATERIAL PROPIO m3 245.10 S/. 10.00 S/. 2,451.00 S/. 2,451.00 100.00% S/. - S/. - S/.
ELIMINACION DE MATERIAL EXCEDENTE m3 42.61 S/. 3.71 S/. 158.08 S/. 158.08 100.00% S/. - S/. - S/.
CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 43.84 S/. 14.87 S/. 651.90 S/. 651.90 100.00% S/. - S/. - S/.
CONCRETO ARMADO f'c=210 kg/cm2 PARA ESTRUCTURAS m3 60.15 S/. 336.09 S/. 20,215.81 S/. - S/. 60.15 S/. 20,215.81 100.00% S/.
ENCOFRADO Y DESENCOFRADO m2 156.28 S/. 28.19 S/. 4,405.53 S/. 3,524.42 80.00% S/. 31.26 S/. 881.11 20.00% S/.
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4,647.62 S/. 5.17 S/. 24,028.20 S/. - S/. 4,647.62 S/. 24,028.20 100.00% S/.
JUNTAS Y SELLOS
CRONOGRAMA VALORIZADO PROGRAMADO - COMPROM.
REHABILITACION DE LA BOCATOMA QUIRIHUAC II, QUIRIHUAC, DISTRITO DE LAREDO, PROVINCIA DE TRUJILLO, DEPARTAMENTO LA LIBERTAD
LAZO DE EJECUCION : 3 MESES
COSTO DIRECTO : S/. 1,006,477.20
PRESUPUESTO MES 01 % MES 02 % MES 03
DESCRIPCION
UND. METRADO P. UNIT. MONTO MONTO PROGRAM. MONTO PROGRAM. MONTO
JUNTA DE WATER STOP DE 9" m 10.60 S/. 34.55 S/. 366.23 S/. - S/. 366.23 100.00% S/.
SELLADO DE JUNTAS CON MATERIAL ELASTOMERICO DE POLIURETANO m 10.60 S/. 38.91 S/. 412.45 S/. - S/. - S/. 41
OTROS
DOWELS - ANCLAJE EN MUROS und 4.76 S/. 20.78 S/. 98.91 S/. - S/. 98.91 100.00% S/.
TROS
MONITOREO DE PLAN DE MANEJO AMBIENTAL glb 1.00 S/. 8,998.86 S/. 8,998.86 S/. - S/. 4,499.43 50.00% S/. 4,49
OSTO DIRECTO S/. 1,006,477.20 S/. 377,337.79 S/. 441,058.90 S/. 188,08
ASTOS GENERALES 7.00% S/. 70,453.40 S/. 26,413.65 S/. 30,874.12 S/. 13,16
TILIDAD 0.00% S/. - S/. - S/. - S/.
UB TOTAL S/. 1,076,930.60 S/. 403,751.44 S/. 471,933.02 S/. 201,24
GV 18.00% S/. 193,847.51 S/. 72,675.26 S/. 84,947.94 S/. 36,22
RESUPUESTO REFERENCIAL S/. 1,270,778.11 S/. 476,426.70 S/. 556,880.96 S/. 237,47
PTO REF. SIN IGV S/. 1,076,930.60 37.49% 43.82% 18.69%
37.49% 81.31% 100.00%
CRONOGRAMA
CRONOGRAMA
VALORIZADO
VALORIZADO
PROGRAMADO
PROGRAMADO
- COMPROM.
- COMPROM.
REHABILITACION
REHABILITACION
DE LA BOCATOMA
DE LA BOCATOMA
QUIRIHUAC II,
QUIRIHUAC
QUIRIHUAC,
II, QUIRIHUAC,
DISTRITO DEDISTRITO
LAREDO,DE
PROVINCIA
LAREDO, DE
PROVINCIA
TRUJILLO,
DEDEPARTAMENTO
TRUJILLO, DEPARTAMENTO
LA LIBERTADLA LIBERTAD
ZO DE EJECUCION : 3 MESES
STO DIRECTO : S/. 1,006,477.20
PRESUPUESTO MES 01 % MES 02 % MES 03
DESCRIPCION
UND. METRADO P. UNIT. MONTO MONTO PROGRAM. MONTO PROGRAM. MONTO
AS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
RAS PROVISIONALES
ALMACEN DE OBRA, OFICINA Y GUARDIANIA m2 30.00 S/. 60.21 S/. 1,806.30 S/. 30.00 S/. 1,806.30 100.00% S/. - S/. - S/. - S/. -
SERVICIOS HIGIENICOS PARA LA OBRA (BAÑOS QUIMICOS) mes 3.00 S/. 600.00 S/. 1,800.00 S/. 0.99 S/. 594.00 33.00% S/. 0.99 S/. 594.00 33.00% S/. 1.02 S/. 612.00
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m glb 1.00 S/. 1,376.46 S/. 1,376.46 S/. 1.00 S/. 1,376.46 100.00% S/. - S/. - S/. - S/. -
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA, EQUIPOS Y HERRAMIENTAS glb 1.00 S/. 6,738.67 S/. 6,738.67 S/. 0.50 S/. 3,369.34 50.00% S/. - S/. - S/. 0.50 S/. 3,369.34
LETE TERRESTRE glb 1.00 S/. 39,224.00 S/. 39,224.00 S/. 0.70 S/. 27,456.80 70.00% S/. 0.30 S/. 11,767.20 30.00% S/. - S/. -
MEJORAMIENTO DE CAMINO DE ACCESO km 0.50 S/. 4,271.69 S/. 2,135.85 S/. 0.50 S/. 2,135.85 100.00% S/. - S/. - S/. - S/. -
EQUIPOS DE PROTECCION COLECTIVA glb 1.00 S/. 2,000.00 S/. 2,000.00 S/. 1.00 S/. 2,000.00 100.00% S/. - S/. - S/. - S/. -
SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 S/. 638.10 S/. 638.10 S/. 1.00 S/. 638.10 100.00% S/. - S/. - S/. - S/. -
CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 S/. 2,500.00 S/. 2,500.00 S/. 1.00 S/. 2,500.00 100.00% S/. - S/. - S/. - S/. -
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN EL
glb 1.00 S/. 762.73 S/. 762.73 S/. 1.00 S/. 762.73 100.00% S/. - S/. - S/. - S/. -
BAJO
PLAN PARA LA VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN EL TRABAJO #DIV/0! #DIV/0! #DIV/0!
NIVELACION Y COMPACTADO DE TERRENO m2 161.64 S/. 1.20 S/. 193.97 S/. 161.64 S/. 193.97 100.00% S/. - S/. - S/. - S/. -
TOLDO DE PREVENCION Y CONTROL DE COVID - 19 glb 3.00 S/. 500.00 S/. 1,500.00 S/. 3.00 S/. 1,500.00 100.00% S/. - S/. - S/. - S/. -
BANNER DE 80 CM DE ALTO x 120 CM DE ANCHO. und 2.00 S/. 100.00 S/. 200.00 S/. 2.00 S/. 200.00 100.00% S/. - S/. - S/. - S/. -
CARTEL DE 20 CM x 80 CM (FONDO BLANCO, LETRAS NEGRAS) und 6.00 S/. 20.00 S/. 120.00 S/. 6.00 S/. 120.00 100.00% S/. - S/. - S/. - S/. -
PRUEBA RÁPIDA und 30.00 S/. 118.64 S/. 3,559.20 S/. 30.00 S/. 3,559.20 100.00% S/. - S/. - S/. - S/. -
FORMATO DE FICHA DE SINTOMATOLOGIA Y DECLARACION JURADA und 30.00 S/. 2.12 S/. 63.60 S/. 30.00 S/. 63.60 100.00% S/. - S/. - S/. - S/. -
PRUEBA MOLECULAR und 10.00 S/. 300.00 S/. 3,000.00 S/. 10.00 S/. 3,000.00 100.00% S/. - S/. - S/. - S/. -
FORMATO DE FICHA DE SINTOMATOLOGIA Y DECLARACION JURADA und 11.00 S/. 2.50 S/. 27.50 S/. 11.00 S/. 27.50 100.00% S/. - S/. - S/. - S/. -
FORMATO DE TOMA DE TEMPERATURA Y PULSO jgo 6.00 S/. 16.95 S/. 101.70 S/. 6.00 S/. 101.70 100.00% S/. - S/. - S/. - S/. -
INSTRUCTIVOS SST DE LAVADO Y DESINFECCIÓN DE MANOS und 40.00 S/. 2.50 S/. 100.00 S/. 40.00 S/. 100.00 100.00% S/. - S/. - S/. - S/. -
FORMATO DE REGISTRO PARA EL CONTROL Y DESINFECCIÓN DE UNIDADES
und 40.00 S/. 2.50 S/. 100.00 S/. 40.00 S/. 100.00 100.00% S/. - S/. - S/. - S/. -
ICULARES Y HERRAMIENTAS
FORMATO DE REGISTRO PARA EL CONTROL Y DESINFECCIÓN DE AMBIENTES jgo 6.00 S/. 16.95 S/. 101.70 S/. 6.00 S/. 101.70 100.00% S/. - S/. - S/. - S/. -
FORMATO DECLARACIÓN JURADA DE CONDICIONES DE SALUD EN EL TRABAJO und 45.00 S/. 2.50 S/. 112.50 S/. 45.00 S/. 112.50 100.00% S/. - S/. - S/. - S/. -
FORMATO DECLARACIÓN JURADA DE ASUNCIÓN DE RESPONSABILIDAD
und 18.00 S/. 2.50 S/. 45.00 S/. 18.00 S/. 45.00 100.00% S/. - S/. - S/. - S/. -
UNTARIA
MATERIALES E INSUMOS PARA PREVENIR CONTAGIOS #DIV/0! #DIV/0! #DIV/0!
PAPEL PARA SECADO DE MANOS ROLLO DE 300 METROS und 10.00 S/. 8.31 S/. 83.10 S/. 10.00 S/. 83.10 100.00% S/. - S/. - S/. - S/. -
DISPENSADOR DE PAPEL DE SECADO DE MANOS und 3.00 S/. 55.00 S/. 165.00 S/. 3.00 S/. 165.00 100.00% S/. - S/. - S/. - S/. -
ALCOHOL DE 70° l 90.00 S/. 12.00 S/. 1,080.00 S/. 90.00 S/. 1,080.00 100.00% S/. - S/. - S/. - S/. -
LEJÍA l 90.00 S/. 2.50 S/. 225.00 S/. 90.00 S/. 225.00 100.00% S/. - S/. - S/. - S/. -
BANDEJAS DESINFECTANTES DE CALZADO und 4.00 S/. 55.00 S/. 220.00 S/. 4.00 S/. 220.00 100.00% S/. - S/. - S/. - S/. -
CAL VIVA x 5kg bol 20.00 S/. 8.00 S/. 160.00 S/. 20.00 S/. 160.00 100.00% S/. - S/. - S/. - S/. -
GASOLINA gal 90.00 S/. 12.77 S/. 1,149.30 S/. 90.00 S/. 1,149.30 100.00% S/. - S/. - S/. - S/. -
MASCARILLA DE TELA und 60.00 S/. 2.00 S/. 120.00 S/. 60.00 S/. 120.00 100.00% S/. - S/. - S/. - S/. -
ALCOHOL EN GEL x 1L und 90.00 S/. 17.00 S/. 1,530.00 S/. 90.00 S/. 1,530.00 100.00% S/. - S/. - S/. - S/. -
ATOMIZADOR X1L und 14.00 S/. 16.53 S/. 231.42 S/. 14.00 S/. 231.42 100.00% S/. - S/. - S/. - S/. -
ESCOBAS und 6.00 S/. 16.00 S/. 96.00 S/. 6.00 S/. 96.00 100.00% S/. - S/. - S/. - S/. -
RECOGEDORES und 6.00 S/. 15.00 S/. 90.00 S/. 6.00 S/. 90.00 100.00% S/. - S/. - S/. - S/. -
PAÑOS MULTIUSOS und 60.00 S/. 1.00 S/. 60.00 S/. 60.00 S/. 60.00 100.00% S/. - S/. - S/. - S/. -
BOLSAS PLASTICAS GRANDES PARA BASURA,COLOR ROJO DE 60X100 CM pqt 4.00 S/. 15.50 S/. 62.00 S/. 4.00 S/. 62.00 100.00% S/. - S/. - S/. - S/. -
BOLSAS PLASTICAS GRANDES PARA BASURA,COLOR NEGRO DE 60X100 CM pqt 4.00 S/. 15.50 S/. 62.00 S/. 4.00 S/. 62.00 100.00% S/. - S/. - S/. - S/. -
BOLSAS PLASTICAS MEDIANAS PARA BASURA,COLOR NEGRO DE 40X70 CM pqt 9.00 S/. 12.71 S/. 114.39 S/. 9.00 S/. 114.39 100.00% S/. - S/. - S/. - S/. -
BALDE DE 20 LT und 6.00 S/. 10.00 S/. 60.00 S/. 6.00 S/. 60.00 100.00% S/. - S/. - S/. - S/. -
TACHO PARA BASURA DE PEDAL CON TAPA, COLOR NEGRO DE 30X60 CM und 11.00 S/. 45.00 S/. 495.00 S/. 11.00 S/. 495.00 100.00% S/. - S/. - S/. - S/. -
CILINDROS DE METAL X55 GLN und 4.00 S/. 84.75 S/. 339.00 S/. 4.00 S/. 339.00 100.00% S/. - S/. - S/. - S/. -
CRONOGRAMA
CRONOGRAMA
VALORIZADO
VALORIZADO
PROGRAMADO
PROGRAMADO
- COMPROM.
- COMPROM.
REHABILITACION
REHABILITACION
DE LA BOCATOMA
DE LA BOCATOMA
QUIRIHUAC II,
QUIRIHUAC
QUIRIHUAC,
II, QUIRIHUAC,
DISTRITO DEDISTRITO
LAREDO,DE
PROVINCIA
LAREDO, DE
PROVINCIA
TRUJILLO,
DEDEPARTAMENTO
TRUJILLO, DEPARTAMENTO
LA LIBERTADLA LIBERTAD
ZO DE EJECUCION : 3 MESES
STO DIRECTO : S/. 1,006,477.20
PRESUPUESTO MES 01 % MES 02 % MES 03
DESCRIPCION
UND. METRADO P. UNIT. MONTO MONTO PROGRAM. MONTO PROGRAM. MONTO
EQUIPOS Y MOBILIARIOS PARA PREVENIR CONTAGIOS #DIV/0! #DIV/0! #DIV/0!
MOCHILA MOTO FUMIGADORA und 1.00 S/. 2,000.00 S/. 2,000.00 S/. 1.00 S/. 2,000.00 100.00% S/. - S/. - S/. - S/. -
MESA REDONDA PARA COMEDOR D=83 cm und 8.00 S/. 59.24 S/. 473.92 S/. 8.00 S/. 473.92 100.00% S/. - S/. - S/. - S/. -
BANCO DE PLASTICO und 16.00 S/. 15.30 S/. 244.80 S/. 16.00 S/. 244.80 100.00% S/. - S/. - S/. - S/. -
RAZO, NIVELACION Y REPLANTEO m2 176.86 S/. 1.16 S/. 205.16 S/. 176.86 S/. 205.16 100.00% S/. - S/. - S/. - S/. -
DESVIO PROVISIONAL DE CAUCE DEL RIO m3 202.50 S/. 4.38 S/. 886.95 S/. 202.50 S/. 886.95 100.00% S/. - S/. - S/. - S/. -
EXCAVACION EN MATERIAL CONGLOMERADO SATURADO PARA ESTRUCTURAS m3 814.08 S/. 4.38 S/. 3,565.67 S/. 814.08 S/. 3,565.67 100.00% S/. - S/. - S/. - S/. -
EXCAVACION DE MATERIAL SUELTO A MANO m3 20.29 S/. 15.00 S/. 304.35 S/. 20.29 S/. 304.35 100.00% S/. - S/. - S/. - S/. -
RELLENO COMPACTADO CON MATERIAL PROPIO m3 28.05 S/. 10.00 S/. 280.50 S/. 28.05 S/. 280.50 100.00% S/. - S/. - S/. - S/. -
ENROCADO ACOMODADO Ø 1.10 A 1.50 m m3 153.45 S/. 76.59 S/. 11,752.74 S/. 153.45 S/. 11,752.74 100.00% S/. - S/. - S/. - S/. -
ELIMINACION DE MATERIAL EXCEDENTE m3 886.94 S/. 7.39 S/. 6,554.49 S/. 886.94 S/. 6,554.49 100.00% S/. - S/. - S/. - S/. -
CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 128.97 S/. 14.91 S/. 1,922.94 S/. 128.97 S/. 1,922.94 100.00% S/. - S/. - S/. - S/. -
CONCRETO CICLOPEO f'c=210 kg/cm2 + 70% P.G. m3 148.80 S/. 113.03 S/. 16,818.86 S/. 29.76 S/. 3,363.77 20.00% S/. 119.04 S/. 13,455.09 80.00% S/. - S/. -
CONCRETO ARMADO f'c=210 kg/cm2 PARA ESTRUCTURAS m3 159.03 S/. 336.09 S/. 53,448.39 S/. 31.81 S/. 10,689.68 20.00% S/. 127.22 S/. 42,758.71 80.00% S/. - S/. -
ENCOFRADO Y DESENCOFRADO PLANO VERTICAL CARAVISTA m2 525.85 S/. 61.33 S/. 32,250.38 S/. 525.85 S/. 32,250.38 100.00% S/. - S/. - S/. - S/. -
ENCOFRADO Y DESENCOFRADO PLANO HORIZONTAL CARAVISTA m2 23.76 S/. 66.59 S/. 1,582.18 S/. 23.76 S/. 1,582.18 100.00% S/. - S/. - S/. - S/. -
ENCOFRADO Y DESENCOFRADO SIMPLE m2 18.00 S/. 30.95 S/. 557.10 S/. 18.00 S/. 557.10 100.00% S/. - S/. - S/. - S/. -
ENCOFRADO Y DESENCOFRADO CURVO m2 23.46 S/. 29.52 S/. 692.54 S/. 23.46 S/. 692.54 100.00% S/. - S/. - S/. - S/. -
CRONOGRAMA
CRONOGRAMA
VALORIZADO
VALORIZADO
PROGRAMADO
PROGRAMADO
- COMPROM.
- COMPROM.
REHABILITACION
REHABILITACION
DE LA BOCATOMA
DE LA BOCATOMA
QUIRIHUAC II,
QUIRIHUAC
QUIRIHUAC,
II, QUIRIHUAC,
DISTRITO DEDISTRITO
LAREDO,DE
PROVINCIA
LAREDO, DE
PROVINCIA
TRUJILLO,
DEDEPARTAMENTO
TRUJILLO, DEPARTAMENTO
LA LIBERTADLA LIBERTAD
ZO DE EJECUCION : 3 MESES
STO DIRECTO : S/. 1,006,477.20
PRESUPUESTO MES 01 % MES 02 % MES 03
DESCRIPCION
UND. METRADO P. UNIT. MONTO MONTO PROGRAM. MONTO PROGRAM. MONTO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 14,242.19 S/. 5.17 S/. 73,632.12 S/. 11,393.75 S/. 58,905.70 80.00% S/. 2,848.44 S/. 14,726.42 20.00% S/. - S/. -
ALBAÑILERIA DE PIEDRA ASENTADA Y EMBOQUILLADO CON CONCRETO f'c=175 KG/CM2,
m2 109.16 S/. 356.69 S/. 38,936.28 S/. 54.58 S/. 19,468.14 50.00% S/. 54.58 S/. 19,468.14 50.00% S/. - S/. -
25m
NTAS Y SELLOS #DIV/0! #DIV/0! #DIV/0!
UNTA DE WATER STOP DE 6" m 4.00 S/. 30.02 S/. 120.08 S/. - S/. - S/. 4.00 S/. 120.08 100.00% S/. - S/. -
UNTA DE WATER STOP DE 9" m 33.60 S/. 34.55 S/. 1,160.88 S/. - S/. - S/. 33.60 S/. 1,160.88 100.00% S/. - S/. -
SELLADO DE JUNTAS CON MATERIAL ELASTOMERICO DE POLIURETANO m 37.60 S/. 38.91 S/. 1,463.02 S/. - S/. - S/. 37.60 S/. 1,463.02 100.00% S/. - S/. -
COMPUERTA RADIAL OWERFLOW 3.60 x 1.55m MOD. 400 ARMCO INC. MEC. IZAJE und 2.00 S/. 55,550.84 S/. 111,101.68 S/. - S/. - S/. 0.30 S/. 16,665.25 15.00% S/. 1.70 S/. 94,436.43
COMPUERTA PLANA DESLIZANTE 0.60 x 0.75m TIPO ARMCO MEC. IZAJE und 1.00 S/. 3,220.34 S/. 3,220.34 S/. - S/. - S/. 0.15 S/. 483.05 15.00% S/. 0.85 S/. 2,737.29
BARANDA METALICA DE F°G° DIAMETRO 2" m 28.30 S/. 113.09 S/. 3,200.45 S/. - S/. - S/. - S/. - S/. 28.30 S/. 3,200.45
ESCALERA DE GATO DE FIERRO GALVANIZADO 3/4" SIMPLE m 31.20 S/. 29.89 S/. 932.57 S/. - S/. - S/. - S/. - S/. 31.20 S/. 932.57
RANURA PARA ATAGUIA (Pln. Metalica 1/4", Anclaje 1/2") m 17.80 S/. 65.37 S/. 1,163.59 S/. - S/. - S/. - S/. - S/. 17.80 S/. 1,163.59
RAZO, NIVELACION Y REPLANTEO m2 1,120.98 S/. 1.16 S/. 1,300.34 S/. 1,120.98 S/. 1,300.34 100.00% S/. - S/. - S/. - S/. -
DESVIO PROVISIONAL DE CAUCE DEL RIO m3 337.50 S/. 4.38 S/. 1,478.25 S/. 337.50 S/. 1,478.25 100.00% S/. - S/. - S/. - S/. -
IMPIEZA Y DESBROCE DE TERRENO NATURAL m2 1,120.98 S/. 4.73 S/. 5,302.24 S/. 1,120.98 S/. 5,302.24 100.00% S/. - S/. - S/. - S/. -
EXCAVACION DE MATERIAL SUELTO A MAQUINARIA PARA ESTRUCTURAS m3 9,359.29 S/. 4.35 S/. 40,712.91 S/. 5,147.61 S/. 22,392.10 55.00% S/. 4,211.68 S/. 18,320.81 45.00% S/. - S/. -
EXCAVACION DE MATERIAL SUELTO A MANO m3 100.67 S/. 15.00 S/. 1,510.05 S/. 55.37 S/. 830.53 55.00% S/. 45.30 S/. 679.52 45.00% S/. - S/. -
OVER SIDE 6"-8", e=0.40m m3 398.41 S/. 30.91 S/. 12,314.85 S/. 318.73 S/. 9,851.88 80.00% S/. 79.68 S/. 2,462.97 20.00% S/. - S/. -
ENROCADO ACOMODADO Ø 1.10 A 1.50 m m3 1,892.10 S/. 65.80 S/. 124,500.18 S/. - S/. - 0.00% S/. 756.84 S/. 49,800.07 40.00% S/. 1,135.26 S/. 74,700.11
ELIMINACION DE MATERIAL EXCEDENTE m3 10,405.96 S/. 4.62 S/. 48,075.54 S/. 5,723.28 S/. 26,441.55 55.00% S/. 4,682.68 S/. 21,633.99 45.00% S/. - S/. -
CRONOGRAMA
CRONOGRAMA
VALORIZADO
VALORIZADO
PROGRAMADO
PROGRAMADO
- COMPROM.
- COMPROM.
REHABILITACION
REHABILITACION
DE LA BOCATOMA
DE LA BOCATOMA
QUIRIHUAC II,
QUIRIHUAC
QUIRIHUAC,
II, QUIRIHUAC,
DISTRITO DEDISTRITO
LAREDO,DE
PROVINCIA
LAREDO, DE
PROVINCIA
TRUJILLO,
DEDEPARTAMENTO
TRUJILLO, DEPARTAMENTO
LA LIBERTADLA LIBERTAD
ZO DE EJECUCION : 3 MESES
STO DIRECTO : S/. 1,006,477.20
PRESUPUESTO MES 01 % MES 02 % MES 03
DESCRIPCION
UND. METRADO P. UNIT. MONTO MONTO PROGRAM. MONTO PROGRAM. MONTO
RAS DE CONCRETO #DIV/0! #DIV/0! #DIV/0!
CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 142.80 S/. 14.91 S/. 2,129.15 S/. 142.80 S/. 2,129.15 100.00% S/. - S/. - S/. - S/. -
CONCRETO CICLOPEO f'c=210 kg/cm2 + 70% P.G. m3 1,993.50 S/. 113.03 S/. 225,325.31 S/. 598.05 S/. 67,597.59 30.00% S/. 1,395.45 S/. 157,727.72 70.00% S/. - S/. -
ENCOFRADO Y DESENCOFRADO m2 371.28 S/. 28.19 S/. 10,466.38 S/. 111.38 S/. 3,139.91 30.00% S/. 259.90 S/. 7,326.47 70.00% S/. - S/. -
ENCOFRADO Y DESENCOFRADO CURVO m2 340.58 S/. 29.52 S/. 10,053.92 S/. 3,016.18 30.00% S/. 238.41 S/. 7,037.74 70.00% S/. - S/. -
UNTA DE WATER STOP DE 9" m 142.80 S/. 34.55 S/. 4,933.74 S/. 2,960.24 60.00% S/. 57.12 S/. 1,973.50 40.00% S/. - S/. -
UBERIA DE DRENAJE (Lloradores) und 188.00 S/. 17.88 S/. 3,361.44 S/. - S/. 75.20 S/. 1,344.58 40.00% S/. 112.80 S/. 2,016.86
RAZO, NIVELACION Y REPLANTEO m2 118.63 S/. 1.16 S/. 137.61 S/. 137.61 100.00% S/. - S/. - S/. - S/. -
IMPIEZA Y DESBROCE DE TERRENO NATURAL m2 118.63 S/. 4.73 S/. 561.12 S/. 561.12 100.00% S/. - S/. - S/. -
EXCAVACION EN MATERIAL CONGLOMERADO SATURADO PARA ESTRUCTURAS m3 283.84 S/. 4.38 S/. 1,243.22 S/. 1,243.22 100.00% S/. - S/. - S/. -
RELLENO COMPACTADO CON MATERIAL PROPIO m3 245.10 S/. 10.00 S/. 2,451.00 S/. 2,451.00 100.00% S/. - S/. - S/. -
ELIMINACION DE MATERIAL EXCEDENTE m3 42.61 S/. 3.71 S/. 158.08 S/. 158.08 100.00% S/. - S/. - S/. -
CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 43.84 S/. 14.87 S/. 651.90 S/. 651.90 100.00% S/. - S/. - S/. -
CONCRETO ARMADO f'c=210 kg/cm2 PARA ESTRUCTURAS m3 60.15 S/. 336.09 S/. 20,215.81 S/. - S/. 60.15 S/. 20,215.81 100.00% S/. -
ENCOFRADO Y DESENCOFRADO m2 156.28 S/. 28.19 S/. 4,405.53 S/. 3,524.42 80.00% S/. 31.26 S/. 881.11 20.00% S/. -
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4,647.62 S/. 5.17 S/. 24,028.20 S/. - S/. 4,647.62 S/. 24,028.20 100.00% S/. -
NTAS Y SELLOS
CRONOGRAMA
CRONOGRAMA
VALORIZADO
VALORIZADO
PROGRAMADO
PROGRAMADO
- COMPROM.
- COMPROM.
REHABILITACION
REHABILITACION
DE LA BOCATOMA
DE LA BOCATOMA
QUIRIHUAC II,
QUIRIHUAC
QUIRIHUAC,
II, QUIRIHUAC,
DISTRITO DEDISTRITO
LAREDO,DE
PROVINCIA
LAREDO, DE
PROVINCIA
TRUJILLO,
DEDEPARTAMENTO
TRUJILLO, DEPARTAMENTO
LA LIBERTADLA LIBERTAD
ZO DE EJECUCION : 3 MESES
STO DIRECTO : S/. 1,006,477.20
PRESUPUESTO MES 01 % MES 02 % MES 03
DESCRIPCION
UND. METRADO P. UNIT. MONTO MONTO PROGRAM. MONTO PROGRAM. MONTO
UNTA DE WATER STOP DE 9" m 10.60 S/. 34.55 S/. 366.23 S/. - S/. 366.23 100.00% S/. -
SELLADO DE JUNTAS CON MATERIAL ELASTOMERICO DE POLIURETANO m 10.60 S/. 38.91 S/. 412.45 S/. - S/. - S/. 412.45
ROS
DOWELS - ANCLAJE EN MUROS und 4.76 S/. 20.78 S/. 98.91 S/. - S/. 98.91 100.00% S/. -
OS
ONITOREO DE PLAN DE MANEJO AMBIENTAL glb 1.00 S/. 8,998.86 S/. 8,998.86 S/. - S/. 4,499.43 50.00% S/. 4,499.43
01.01.01 ALMACEN DE OBRA, OFICINA Y GUARDIANIA m2 30.00 S/. 60.53 S/. 1,815.90 S/. 1,815.90 ###
01.01.02 SERVICIOS HIGIENICOS PARA LA OBRA (BAÑOS QUIMICOS) mes 3.00 S/. 350.00 S/. 1,050.00 S/. 306.74 S/. 353.93 S/. 365.73 S/. 23.60
01.01.03 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m glb 1.00 S/. 1,404.56 S/. 1,404.56 S/. 1,404.56 ###
01.02.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA, EQUIPOS Y HERRAMIENTAS glb 1.00 S/. 2,100.00 S/. 2,100.00 S/. 640.24 S/. 768.29 S/. 345.74 S/. 345.74
01.02.02 FLETE TERRESTRE glb 1.00 S/. 7,836.56 S/. 7,836.56 S/. 3,628.04 S/. 2,104.26 S/. 2,104.26 ###
01.02.03 MEJORAMIENTO DE CAMINO DE ACCESO km 0.50 S/. 4,322.05 S/. 2,161.03 S/. 2,161.03 ###
01.03.03 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 S/. 1,000.00 S/. 1,000.00 S/. 1,000.00 ###
01.03.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 S/. 638.10 S/. 638.10 S/. 638.10 ###
01.03.05 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 S/. 1,500.00 S/. 1,500.00 S/. 1,500.00 ###
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN EL
01.03.06 glb 1.00 S/. 762.73 S/. 762.73 S/. 762.73 ###
TRABAJO
01.03.07 PLAN PARA LA VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN EL TRABAJO
01.03.07.01.01.01 NIVELACION Y COMPACTADO DE TERRENO m2 161.64 S/. 2.34 S/. 378.24 S/. 378.24 ###
01.03.07.01.02.01 TOLDO DE PREVENCION Y CONTROL DE COVID - 19 glb 3.00 S/. 350.00 S/. 1,050.00 S/. 1,050.00 ###
01.03.07.01.03 PINTURA
01.03.07.01.03.01 CIRCULOS DE DISTANCIAMIENTO CON PINTURA glb 1.00 S/. 111.51 S/. 111.51 S/. 111.51 ###
01.03.07.01.04.01 BANNER DE 80 CM DE ALTO x 120 CM DE ANCHO. und 2.00 S/. 150.00 S/. 300.00 S/. 300.00 ###
01.03.07.01.04.02 CARTEL DE 20 CM x 80 CM (FONDO BLANCO, LETRAS NEGRAS) und 6.00 S/. 30.00 S/. 180.00 S/. 180.00 ###
01.03.07.01.05.01. PRUEBA RÁPIDA und 30.00 S/. 118.64 S/. 3,559.20 S/. 3,559.20 ###
01.03.07.01.05.02. FORMATO DE FICHA DE SINTOMATOLOGIA Y DECLARACION JURADA und 30.00 S/. 2.12 S/. 63.60 S/. 63.60 ###
01.03.07.02.01.01. PRUEBA MOLECULAR und 10.00 S/. 300.00 S/. 3,000.00 S/. 3,000.00 ###
01.03.07.02.01.02. FORMATO DE FICHA DE SINTOMATOLOGIA Y DECLARACION JURADA und 11.00 S/. 2.50 S/. 27.50 S/. 27.50 ###
01.03.07.02.01.02. FORMATO DE TOMA DE TEMPERATURA Y PULSO jgo 6.00 S/. 16.95 S/. 101.70 S/. 101.70 ###
01.03.07.02.01.02. INSTRUCTIVOS SST DE LAVADO Y DESINFECCIÓN DE MANOS und 40.00 S/. 2.50 S/. 100.00 S/. 100.00 ###
FORMATO DE REGISTRO PARA EL CONTROL Y DESINFECCIÓN DE UNIDADES
01.03.07.02.01.02. und 40.00 S/. 2.50 S/. 100.00 S/. 100.00 ###
VEHICULARES Y HERRAMIENTAS
01.03.07.02.01.02. FORMATO DE REGISTRO PARA EL CONTROL Y DESINFECCIÓN DE AMBIENTES jgo 6.00 S/. 16.95 S/. 101.70 S/. 101.70 ###
01.03.07.02.01.02. FORMATO DECLARACIÓN JURADA DE CONDICIONES DE SALUD EN EL TRABAJO und 45.00 S/. 2.50 S/. 112.50 S/. 112.50 ###
FORMATO DECLARACIÓN JURADA DE ASUNCIÓN DE RESPONSABILIDAD
01.03.07.02.01.02. und 18.00 S/. 2.50 S/. 45.00 S/. 45.00 ###
VOLUNTARIA
01.03.07.02.02 MATERIALES E INSUMOS PARA PREVENIR CONTAGIOS
01.03.07.02.02.01. TERMÓMETRO DIGITAL INFRARROJO und 1.00 S/. 350.00 S/. 350.00 S/. 350.00 ###
PULSIOXÍMETRO DE DEDO PARA MEDIR LA CONCENTRACIÓN DE OXÍGENO EN
01.03.07.02.02.01. und 1.00 S/. 150.00 S/. 150.00 S/. 150.00 ###
SANGRE
01.03.07.02.02.01. JABÓN LÍQUIDO x 20L und 5.00 S/. 80.00 S/. 400.00 S/. 400.00 ###
01.03.07.02.02.01. PAPEL PARA SECADO DE MANOS ROLLO DE 300 METROS und 10.00 S/. 8.31 S/. 83.10 S/. 83.10 ###
01.03.07.02.02.01. DISPENSADOR DE PAPEL DE SECADO DE MANOS und 3.00 S/. 85.50 S/. 256.50 S/. 256.50 ###
01.03.07.02.02.01. ALCOHOL DE 70° l 90.00 S/. 12.00 S/. 1,080.00 S/. 1,080.00 ###
01.03.07.02.02.01. LEJÍA l 90.00 S/. 2.50 S/. 225.00 S/. 225.00 ###
01.03.07.02.02.01. BANDEJAS DESINFECTANTES DE CALZADO und 4.00 S/. 90.00 S/. 360.00 S/. 360.00 ###
"REHABILITACION DE LA BOCATOMA QUIRIHUAC II, QUIRIHUAC, DISTRITO DE LAREDO, PROVINCIA DE TRUJILLO, DEPARTAMENTO LA LIBERTAD"
PLAZO DE EJECUCION : 90 Días
COSTO DIRECTO : S/. 1,418,441.88
05 - 31 01 - 30 01 - 31 01 - 02
PRESUPUESTO
ITEM DESCRIPCION OCTUBRE NOVIEMBRE DICIEMBRE ENERO
UND. METRADO P. UNIT. MONTO MONTO MONTO MONTO MONTO
01.03.07.02.02.01. CAL VIVA x 5kg bol 20.00 S/. 10.00 S/. 200.00 S/. 200.00 ###
01.03.07.02.02.01. GASOLINA gal 90.00 S/. 12.77 S/. 1,149.30 S/. 1,149.30 ###
01.03.07.02.02.02. MASCARILLA DE TELA und 60.00 S/. 14.00 S/. 840.00 S/. 840.00 ###
01.03.07.02.02.02. ALCOHOL EN GEL x 1L und 90.00 S/. 11.00 S/. 990.00 S/. 990.00 ###
01.03.07.02.02.02. ATOMIZADOR X1L und 14.00 S/. 16.53 S/. 231.42 S/. 231.42 ###
01.03.07.02.02.02. ESCOBAS und 6.00 S/. 10.00 S/. 60.00 S/. 60.00 ###
01.03.07.02.02.02. RECOGEDORES und 6.00 S/. 6.00 S/. 36.00 S/. 36.00 ###
01.03.07.02.02.02. PAÑOS MULTIUSOS und 60.00 S/. 1.00 S/. 60.00 S/. 60.00 ###
01.03.07.02.02.02. BOLSAS PLASTICAS GRANDES PARA BASURA,COLOR ROJO DE 60X100 CM pqt 4.00 S/. 21.19 S/. 84.76 S/. 84.76 ###
01.03.07.02.02.02. BOLSAS PLASTICAS GRANDES PARA BASURA,COLOR NEGRO DE 60X100 CM pqt 4.00 S/. 21.19 S/. 84.76 S/. 84.76 ###
01.03.07.02.02.02. BOLSAS PLASTICAS MEDIANAS PARA BASURA,COLOR NEGRO DE 40X70 CM pqt 9.00 S/. 12.71 S/. 114.39 S/. 114.39 ###
01.03.07.02.02.02. BALDE DE 20 LT und 6.00 S/. 15.00 S/. 90.00 S/. 90.00 ###
01.03.07.02.02.02. TACHO PARA BASURA DE PEDAL CON TAPA, COLOR NEGRO DE 30X60 CM und 11.00 S/. 45.00 S/. 495.00 S/. 495.00 ###
01.03.07.02.02.02. CILINDROS DE METAL X55 GLN und 4.00 S/. 84.75 S/. 339.00 S/. 339.00 ###
01.03.07.02.03.01 MOCHILA MOTO FUMIGADORA und 1.00 S/. 350.00 S/. 350.00 S/. 350.00 ###
01.03.07.02.04.01 MESA REDONDA PARA COMEDOR D=83 cm und 8.00 S/. 59.24 S/. 473.92 S/. 473.92 ###
01.03.07.02.04.02 BANCO DE PLASTICO und 16.00 S/. 10.93 S/. 174.88 S/. 174.88 ###
02 BOCATOMA
02.01.01 TRAZO, NIVELACION Y REPLANTEO m2 176.86 S/. 1.86 S/. 328.96 S/. 328.96 ###
02.01.02 DESVIO PROVISIONAL DE CAUCE DEL RIO m3 202.50 S/. 4.24 S/. 858.60 S/. 858.60 ###
02.02.01 EXCAVACION EN MATERIAL CONGLOMERADO SATURADO PARA ESTRUCTURAS m3 814.08 S/. 7.34 S/. 5,975.35 S/. 5,975.35 ###
02.02.02 EXCAVACION DE MATERIAL SUELTO A MANO m3 20.29 S/. 27.82 S/. 564.47 S/. 564.47 ###
02.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO m3 28.05 S/. 33.20 S/. 931.26 S/. 931.26 ###
02.02.04 ENROCADO ACOMODADO Ø 1.10 A 1.50 m m3 153.45 S/. 81.24 S/. 12,466.28 S/. 12,466.28 ###
02.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 886.94 S/. 8.45 S/. 7,494.64 S/. 7,494.64 ###
02.03.01 CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 128.97 S/. 23.56 S/. 3,038.53 S/. 3,038.53 ###
02.03.02 CONCRETO CICLOPEO f'c=210 kg/cm2 + 70% P.G. m3 148.80 S/. 259.63 S/. 38,632.94 S/. 3,863.29 S/. 34,769.65 ###
02.03.03 CONCRETO ARMADO f'c=210 kg/cm2 PARA ESTRUCTURAS m3 159.03 S/. 396.13 S/. 62,996.55 S/. 6,299.65 S/. 56,696.90 ###
02.03.04 ENCOFRADO Y DESENCOFRADO PLANO VERTICAL CARAVISTA m2 525.85 S/. 97.04 S/. 51,028.48 S/. 51,028.48 ###
02.03.05 ENCOFRADO Y DESENCOFRADO PLANO HORIZONTAL CARAVISTA m2 23.76 S/. 129.65 S/. 3,080.48 S/. 3,080.48 ###
02.03.06 ENCOFRADO Y DESENCOFRADO SIMPLE m2 18.00 S/. 69.70 S/. 1,254.60 S/. 1,254.60 ###
02.03.07 ENCOFRADO Y DESENCOFRADO CURVO m2 23.46 S/. 103.67 S/. 2,432.10 S/. 2,432.10 ###
02.03.08 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 14,242.19 S/. 6.29 S/. 89,583.38 S/. 46,336.23 S/. 43,247.15 ###
ALBAÑILERIA DE PIEDRA ASENTADA Y EMBOQUILLADO CON CONCRETO f'c=175 KG/CM2,
02.03.09 m2 109.16 S/. 390.21 S/. 42,595.32 S/. 13,219.24 S/. 29,376.08 ###
e=0.25m
02.04 JUNTAS Y SELLOS
02.04.01 JUNTA DE WATER STOP DE 6" m 4.00 S/. 33.28 S/. 133.12 S/. 14.79 S/. 118.33 ###
02.04.02 JUNTA DE WATER STOP DE 9" m 33.60 S/. 38.52 S/. 1,294.27 S/. 143.81 S/. 1,150.46 ###
02.04.03 SELLADO DE JUNTAS CON MATERIAL ELASTOMERICO DE POLIURETANO m 37.60 S/. 45.13 S/. 1,696.89 S/. 1,696.89 ###
02.05.01 COMPUERTA RADIAL OWERFLOW 3.60 x 1.55m MOD. 400 ARMCO INC. MEC. IZAJE und 2.00 S/. 19,500.74 S/. 39,001.48 S/. 19,132.80 S/. 19,868.68 ###
02.05.02 COMPUERTA PLANA DESLIZANTE 0.60 x 0.75m TIPO ARMCO MEC. IZAJE und 1.00 S/. 2,020.34 S/. 2,020.34 S/. 1,029.98 S/. 693.25 S/. 297.11
02.05.03 BARANDA METALICA DE F°G° DIAMETRO 2" m 28.30 S/. 113.09 S/. 3,200.45 S/. 3,200.45 ###
02.05.04 ESCALERA DE GATO DE FIERRO GALVANIZADO 3/4" SIMPLE m 31.20 S/. 29.89 S/. 932.57 S/. 932.57 ###
02.05.05 RANURA PARA ATAGUIA (Pln. Metalica 1/4", Anclaje 1/2") m 17.80 S/. 65.37 S/. 1,163.59 S/. 1,163.59 ###
03 BARRAJE FIJO
03.01.01 TRAZO, NIVELACION Y REPLANTEO m2 1,120.98 S/. 1.86 S/. 2,085.02 S/. 2,085.02 ###
03.01.02 DESVIO PROVISIONAL DE CAUCE DEL RIO m3 337.50 S/. 4.24 S/. 1,431.00 S/. 1,431.00 ###
03.01.03 LIMPIEZA Y DESBROCE DE TERRENO NATURAL m2 1,120.98 S/. 2.36 S/. 2,645.51 S/. 2,645.51 ###
"REHABILITACION DE LA BOCATOMA QUIRIHUAC II, QUIRIHUAC, DISTRITO DE LAREDO, PROVINCIA DE TRUJILLO, DEPARTAMENTO LA LIBERTAD"
PLAZO DE EJECUCION : 90 Días
COSTO DIRECTO : S/. 1,418,441.88
05 - 31 01 - 30 01 - 31 01 - 02
PRESUPUESTO
ITEM DESCRIPCION OCTUBRE NOVIEMBRE DICIEMBRE ENERO
UND. METRADO P. UNIT. MONTO MONTO MONTO MONTO MONTO
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION DE MATERIAL SUELTO A MAQUINARIA PARA ESTRUCTURAS m3 9,359.29 S/. 6.78 S/. 63,455.99 S/. 39,659.99 S/. 23,796.00 ###
03.02.02 EXCAVACION DE MATERIAL SUELTO A MANO m3 100.67 S/. 27.82 S/. 2,800.64 S/. 1,768.83 S/. 1,031.81 ###
03.02.03 OVER SIDE 6"-8", e=0.40m m3 398.41 S/. 30.30 S/. 12,071.82 S/. 7,830.37 S/. 4,241.45 ###
03.02.04 ENROCADO ACOMODADO Ø 1.10 A 1.50 m m3 1,892.10 S/. 81.24 S/. 153,714.20 S/. 84,294.88 S/. 69,419.32 ###
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 10,405.96 S/. 8.45 S/. 87,930.36 S/. 52,282.92 S/. 35,647.44 ###
03.03.01 CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 142.80 S/. 23.56 S/. 3,364.37 S/. 3,364.37 ###
03.03.02 CONCRETO CICLOPEO f'c=210 kg/cm2 + 70% P.G. m3 1,993.50 S/. 259.63 S/. 517,572.41 S/. 135,018.89 S/. 382,553.52 ###
03.03.03 ENCOFRADO Y DESENCOFRADO m2 371.28 S/. 84.95 S/. 31,540.24 S/. 11,081.71 S/. 20,458.53 ###
03.03.04 ENCOFRADO Y DESENCOFRADO CURVO m2 340.58 S/. 103.67 S/. 35,307.93 S/. 12,405.49 S/. 22,902.44 ###
03.04.01 JUNTA DE WATER STOP DE 9" m 142.80 S/. 38.52 S/. 5,500.66 S/. 1,000.12 S/. 4,500.54 ###
03.05 OTROS
03.05.01 TUBERIA DE DRENAJE (Lloradores) und 188.00 S/. 26.07 S/. 4,901.16 S/. 2,837.51 S/. 2,063.65 ###
04 MUROS DE CONTENCION
04.01.01 TRAZO, NIVELACION Y REPLANTEO m2 118.63 S/. 1.86 S/. 220.65 S/. 220.65 ###
04.01.02 LIMPIEZA Y DESBROCE DE TERRENO NATURAL m2 118.63 S/. 2.36 S/. 279.97 S/. 279.97 ###
04.02.01 EXCAVACION EN MATERIAL CONGLOMERADO SATURADO PARA ESTRUCTURAS m3 283.84 S/. 7.34 S/. 2,083.39 S/. 2,083.39 ###
04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 245.10 S/. 33.20 S/. 8,137.32 S/. 2,503.79 S/. 5,633.53 ###
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 42.61 S/. 8.45 S/. 360.05 S/. 360.05 ###
04.03.01 CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 43.84 S/. 23.56 S/. 1,032.87 S/. 1,032.87 ###
04.03.02 CONCRETO ARMADO f'c=210 kg/cm2 PARA ESTRUCTURAS m3 60.15 S/. 396.13 S/. 23,827.22 S/. 23,827.22 ###
04.03.03 ENCOFRADO Y DESENCOFRADO m2 156.28 S/. 84.95 S/. 13,275.99 S/. 4,248.32 S/. 9,027.67 ###
04.03.04 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4,647.62 S/. 6.29 S/. 29,233.53 S/. 11,959.17 S/. 17,274.36 ###
04.04.01 JUNTA DE WATER STOP DE 9" m 10.60 S/. 38.52 S/. 408.31 S/. 408.31 ###
04.04.02 SELLADO DE JUNTAS CON MATERIAL ELASTOMERICO DE POLIURETANO m 10.60 S/. 45.13 S/. 478.38 S/. 287.03 S/. 191.35 ###
04.05 OTROS
04.05.01 DOWELS - ANCLAJE EN MUROS und 4.76 S/. 24.16 S/. 115.00 S/. 115.00 ###
05 OTROS
05.01 MONITOREO DE PLAN DE MANEJO AMBIENTAL glb 1.00 S/. 1,250.00 S/. 1,250.00 S/. 843.75 S/. 406.25 ###
COSTO DIRECTO S/. 1,418,441.88 S/. 475,606.08 S/. 838,250.89 S/. 103,918.47 S/. 666.44
GASTOS GENERALES 6.12% S/. 86,811.74 S/. 29,108.13 S/. 51,302.78 S/. 6,360.04 S/. 40.79
UTILIDAD 3.06% S/. 43,405.87 S/. 14,554.06 S/. 25,651.39 S/. 3,180.02 S/. 20.39
SUB TOTAL S/. 1,548,659.49 S/. 519,268.27 S/. 915,205.06 S/. 113,458.53 S/. 727.62
IGV 18.00% S/. 278,758.71 S/. 93,468.29 S/. 164,736.91 S/. 20,422.54 S/. 130.97
PRESUPUESTO REFERENCIAL S/. 1,827,418.20 S/. 612,736.56 S/. 1,079,941.97 S/. 133,881.08 S/. 858.60
AVANCE FISICO 33.53% 59.10% 7.33% 0.05%
01.01.01 ALMACEN DE OBRA, OFICINA Y GUARDIANIA m2 30.00 S/. 60.21 S/. 1,806.30 S/. 1,806.30 100.00% S/. - S/. - S/. 1,806.30
01.01.02 SERVICIOS HIGIENICOS PARA LA OBRA (BAÑOS QUIMICOS) mes 3.00 S/. 600.00 S/. 1,800.00 S/. 594.00 33.00% S/. 594.00 33.00% S/. 612.00 34.00% S/. 1,800.00
01.01.03 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m glb 1.00 S/. 1,376.46 S/. 1,376.46 S/. 1,376.46 100.00% S/. - S/. - S/. 1,376.46
01.02.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA, EQUIPOS Y HERRAMIENTAS glb 1.00 S/. 6,738.67 S/. 6,738.67 S/. 3,369.34 50.00% S/. - S/. 3,369.34 50.00% S/. 6,738.67
01.02.02 FLETE TERRESTRE glb 1.00 S/. 39,224.00 S/. 39,224.00 S/. 27,456.80 70.00% S/. 11,767.20 30.00% S/. - S/. 39,224.00
01.02.03 MEJORAMIENTO DE CAMINO DE ACCESO km 0.50 S/. 4,271.69 S/. 2,135.85 S/. 2,135.85 100.00% S/. - S/. - S/. 2,135.85
01.03.03 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 S/. 2,000.00 S/. 2,000.00 S/. 2,000.00 100.00% S/. - S/. - S/. 2,000.00
01.03.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 S/. 638.10 S/. 638.10 S/. 638.10 100.00% S/. - S/. - S/. 638.10
01.03.05 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 S/. 2,500.00 S/. 2,500.00 S/. 2,500.00 100.00% S/. - S/. - S/. 2,500.00
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN EL
01.03.06 glb 1.00 S/. 762.73 S/. 762.73 S/. 762.73 100.00% S/. - S/. - S/. 762.73
TRABAJO
01.03.07 PLAN PARA LA VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN EL TRABAJO
01.03.07.01.01.01 NIVELACION Y COMPACTADO DE TERRENO m2 161.64 S/. 1.20 S/. 193.97 S/. 193.97 100.00% S/. - S/. - S/. 193.97
01.03.07.01.02.01 TOLDO DE PREVENCION Y CONTROL DE COVID - 19 glb 3.00 S/. 500.00 S/. 1,500.00 S/. 1,500.00 100.00% S/. - S/. - S/. 1,500.00
01.03.07.01.03 PINTURA
01.03.07.01.03.01 CIRCULOS DE DISTANCIAMIENTO CON PINTURA glb 1.00 S/. 109.48 S/. 109.48 S/. 109.48 100.00% S/. - S/. - S/. 109.48
01.03.07.01.04.01 BANNER DE 80 CM DE ALTO x 120 CM DE ANCHO. und 2.00 S/. 100.00 S/. 200.00 S/. 200.00 100.00% S/. - S/. - S/. 200.00
01.03.07.01.04.02 CARTEL DE 20 CM x 80 CM (FONDO BLANCO, LETRAS NEGRAS) und 6.00 S/. 20.00 S/. 120.00 S/. 120.00 100.00% S/. - S/. - S/. 120.00
01.03.07.01.05.01. PRUEBA RÁPIDA und 30.00 S/. 118.64 S/. 3,559.20 S/. 3,559.20 100.00% S/. - S/. - S/. 3,559.20
01.03.07.01.05.02. FORMATO DE FICHA DE SINTOMATOLOGIA Y DECLARACION JURADA und 30.00 S/. 2.12 S/. 63.60 S/. 63.60 100.00% S/. - S/. - S/. 63.60
01.03.07.02.01.01. PRUEBA MOLECULAR und 10.00 S/. 300.00 S/. 3,000.00 S/. 3,000.00 100.00% S/. - S/. - S/. 3,000.00
01.03.07.02.01.02. FORMATO DE FICHA DE SINTOMATOLOGIA Y DECLARACION JURADA und 11.00 S/. 2.50 S/. 27.50 S/. 27.50 100.00% S/. - S/. - S/. 27.50
01.03.07.02.01.02. FORMATO DE TOMA DE TEMPERATURA Y PULSO jgo 6.00 S/. 16.95 S/. 101.70 S/. 101.70 100.00% S/. - S/. - S/. 101.70
01.03.07.02.01.02. INSTRUCTIVOS SST DE LAVADO Y DESINFECCIÓN DE MANOS und 40.00 S/. 2.50 S/. 100.00 S/. 100.00 100.00% S/. - S/. - S/. 100.00
FORMATO DE REGISTRO PARA EL CONTROL Y DESINFECCIÓN DE UNIDADES
01.03.07.02.01.02. und 40.00 S/. 2.50 S/. 100.00 S/. 100.00 100.00% S/. - S/. - S/. 100.00
VEHICULARES Y HERRAMIENTAS
01.03.07.02.01.02. FORMATO DE REGISTRO PARA EL CONTROL Y DESINFECCIÓN DE AMBIENTES jgo 6.00 S/. 16.95 S/. 101.70 S/. 101.70 100.00% S/. - S/. - S/. 101.70
01.03.07.02.01.02. FORMATO DECLARACIÓN JURADA DE CONDICIONES DE SALUD EN EL TRABAJO und 45.00 S/. 2.50 S/. 112.50 S/. 112.50 100.00% S/. - S/. - S/. 112.50
FORMATO DECLARACIÓN JURADA DE ASUNCIÓN DE RESPONSABILIDAD
01.03.07.02.01.02. und 18.00 S/. 2.50 S/. 45.00 S/. 45.00 100.00% S/. - S/. - S/. 45.00
VOLUNTARIA
01.03.07.02.02 MATERIALES E INSUMOS PARA PREVENIR CONTAGIOS
01.03.07.02.02.01. TERMÓMETRO DIGITAL INFRARROJO und 1.00 S/. 90.00 S/. 90.00 S/. 90.00 100.00% S/. - S/. - S/. 90.00
PULSIOXÍMETRO DE DEDO PARA MEDIR LA CONCENTRACIÓN DE OXÍGENO EN
01.03.07.02.02.01. und 1.00 S/. 110.00 S/. 110.00 S/. 110.00 100.00% S/. - S/. - S/. 110.00
SANGRE
01.03.07.02.02.01. JABÓN LÍQUIDO x 20L und 5.00 S/. 45.00 S/. 225.00 S/. 225.00 100.00% S/. - S/. - S/. 225.00
01.03.07.02.02.01. PAPEL PARA SECADO DE MANOS ROLLO DE 300 METROS und 10.00 S/. 8.31 S/. 83.10 S/. 83.10 100.00% S/. - S/. - S/. 83.10
01.03.07.02.02.01. DISPENSADOR DE PAPEL DE SECADO DE MANOS und 3.00 S/. 55.00 S/. 165.00 S/. 165.00 100.00% S/. - S/. - S/. 165.00
01.03.07.02.02.01. ALCOHOL DE 70° l 90.00 S/. 12.00 S/. 1,080.00 S/. 1,080.00 100.00% S/. - S/. - S/. 1,080.00
01.03.07.02.02.01. LEJÍA l 90.00 S/. 2.50 S/. 225.00 S/. 225.00 100.00% S/. - S/. - S/. 225.00
01.03.07.02.02.01. BANDEJAS DESINFECTANTES DE CALZADO und 4.00 S/. 55.00 S/. 220.00 S/. 220.00 100.00% S/. - S/. - S/. 220.00
01.03.07.02.02.01. CAL VIVA x 5kg bol 20.00 S/. 8.00 S/. 160.00 S/. 160.00 100.00% S/. - S/. - S/. 160.00
01.03.07.02.02.01. GASOLINA gal 90.00 S/. 12.77 S/. 1,149.30 S/. 1,149.30 100.00% S/. - S/. - S/. 1,149.30
CRONOGRAMA VALORIZADO PROGRAMADO - COMPROM.
REHABILITACION DE LA BOCATOMA QUIRIHUAC II, QUIRIHUAC, DISTRITO DE LAREDO, PROVINCIA DE TRUJILLO, DEPARTAMENTO LA LIBERTAD
PLAZO DE EJECUCION : 3 MESES
COSTO DIRECTO : S/. 1,006,477.20
PRESUPUESTO MES 01 % MES 02 % MES 03 %
ITEM DESCRIPCION TOTAL
UND. METRADO P. UNIT. MONTO MONTO PROGRAM. MONTO PROGRAM. MONTO PROGRAM.
01.03.07.02.02.02. MASCARILLA DE TELA und 60.00 S/. 2.00 S/. 120.00 S/. 120.00 100.00% S/. - S/. - S/. 120.00
01.03.07.02.02.02. ALCOHOL EN GEL x 1L und 90.00 S/. 17.00 S/. 1,530.00 S/. 1,530.00 100.00% S/. - S/. - S/. 1,530.00
01.03.07.02.02.02. ATOMIZADOR X1L und 14.00 S/. 16.53 S/. 231.42 S/. 231.42 100.00% S/. - S/. - S/. 231.42
01.03.07.02.02.02. ESCOBAS und 6.00 S/. 16.00 S/. 96.00 S/. 96.00 100.00% S/. - S/. - S/. 96.00
01.03.07.02.02.02. RECOGEDORES und 6.00 S/. 15.00 S/. 90.00 S/. 90.00 100.00% S/. - S/. - S/. 90.00
01.03.07.02.02.02. PAÑOS MULTIUSOS und 60.00 S/. 1.00 S/. 60.00 S/. 60.00 100.00% S/. - S/. - S/. 60.00
01.03.07.02.02.02. BOLSAS PLASTICAS GRANDES PARA BASURA,COLOR ROJO DE 60X100 CM pqt 4.00 S/. 15.50 S/. 62.00 S/. 62.00 100.00% S/. - S/. - S/. 62.00
01.03.07.02.02.02. BOLSAS PLASTICAS GRANDES PARA BASURA,COLOR NEGRO DE 60X100 CM pqt 4.00 S/. 15.50 S/. 62.00 S/. 62.00 100.00% S/. - S/. - S/. 62.00
01.03.07.02.02.02. BOLSAS PLASTICAS MEDIANAS PARA BASURA,COLOR NEGRO DE 40X70 CM pqt 9.00 S/. 12.71 S/. 114.39 S/. 114.39 100.00% S/. - S/. - S/. 114.39
01.03.07.02.02.02. BALDE DE 20 LT und 6.00 S/. 10.00 S/. 60.00 S/. 60.00 100.00% S/. - S/. - S/. 60.00
01.03.07.02.02.02. TACHO PARA BASURA DE PEDAL CON TAPA, COLOR NEGRO DE 30X60 CM und 11.00 S/. 45.00 S/. 495.00 S/. 495.00 100.00% S/. - S/. - S/. 495.00
01.03.07.02.02.02. CILINDROS DE METAL X55 GLN und 4.00 S/. 84.75 S/. 339.00 S/. 339.00 100.00% S/. - S/. - S/. 339.00
01.03.07.02.03.01 MOCHILA MOTO FUMIGADORA und 1.00 S/. 2,000.00 S/. 2,000.00 S/. 2,000.00 100.00% S/. - S/. - S/. 2,000.00
01.03.07.02.04.01 MESA REDONDA PARA COMEDOR D=83 cm und 8.00 S/. 59.24 S/. 473.92 S/. 473.92 100.00% S/. - S/. - S/. 473.92
01.03.07.02.04.02 BANCO DE PLASTICO und 16.00 S/. 15.30 S/. 244.80 S/. 244.80 100.00% S/. - S/. - S/. 244.80
02 BOCATOMA
02.01.01 TRAZO, NIVELACION Y REPLANTEO m2 176.86 S/. 1.16 S/. 205.16 S/. 205.16 100.00% S/. - S/. - S/. 205.16
02.01.02 DESVIO PROVISIONAL DE CAUCE DEL RIO m3 202.50 S/. 4.38 S/. 886.95 S/. 886.95 100.00% S/. - S/. - S/. 886.95
02.02.01 EXCAVACION EN MATERIAL CONGLOMERADO SATURADO PARA ESTRUCTURAS m3 814.08 S/. 4.38 S/. 3,565.67 S/. 3,565.67 100.00% S/. - S/. - S/. 3,565.67
02.02.02 EXCAVACION DE MATERIAL SUELTO A MANO m3 20.29 S/. 15.00 S/. 304.35 S/. 304.35 100.00% S/. - S/. - S/. 304.35
02.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO m3 28.05 S/. 10.00 S/. 280.50 S/. 280.50 100.00% S/. - S/. - S/. 280.50
02.02.04 ENROCADO ACOMODADO Ø 1.10 A 1.50 m m3 153.45 S/. 76.59 S/. 11,752.74 S/. 11,752.74 100.00% S/. - S/. - S/. 11,752.74
02.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 886.94 S/. 7.39 S/. 6,554.49 S/. 6,554.49 100.00% S/. - S/. - S/. 6,554.49
02.03.01 CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 128.97 S/. 14.91 S/. 1,922.94 S/. 1,922.94 100.00% S/. - S/. - S/. 1,922.94
02.03.02 CONCRETO CICLOPEO f'c=210 kg/cm2 + 70% P.G. m3 148.80 S/. 113.03 S/. 16,818.86 S/. 3,363.77 20.00% S/. 13,455.09 80.00% S/. - S/. 16,818.86
02.03.03 CONCRETO ARMADO f'c=210 kg/cm2 PARA ESTRUCTURAS m3 159.03 S/. 336.09 S/. 53,448.39 S/. 10,689.68 20.00% S/. 42,758.71 80.00% S/. - S/. 53,448.39
02.03.04 ENCOFRADO Y DESENCOFRADO PLANO VERTICAL CARAVISTA m2 525.85 S/. 61.33 S/. 32,250.38 S/. 32,250.38 100.00% S/. - S/. - S/. 32,250.38
02.03.05 ENCOFRADO Y DESENCOFRADO PLANO HORIZONTAL CARAVISTA m2 23.76 S/. 66.59 S/. 1,582.18 S/. 1,582.18 100.00% S/. - S/. - S/. 1,582.18
02.03.06 ENCOFRADO Y DESENCOFRADO SIMPLE m2 18.00 S/. 30.95 S/. 557.10 S/. 557.10 100.00% S/. - S/. - S/. 557.10
02.03.07 ENCOFRADO Y DESENCOFRADO CURVO m2 23.46 S/. 29.52 S/. 692.54 S/. 692.54 100.00% S/. - S/. - S/. 692.54
02.03.08 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 14,242.19 S/. 5.17 S/. 73,632.12 S/. 58,905.70 80.00% S/. 14,726.42 20.00% S/. - S/. 73,632.12
ALBAÑILERIA DE PIEDRA ASENTADA Y EMBOQUILLADO CON CONCRETO f'c=175 KG/CM2,
02.03.09 m2 109.16 S/. 356.69 S/. 38,936.28 S/. 19,468.14 50.00% S/. 19,468.14 50.00% S/. - S/. 38,936.28
e=0.25m
02.04 JUNTAS Y SELLOS S/. -
02.04.01 JUNTA DE WATER STOP DE 6" m 4.00 S/. 30.02 S/. 120.08 S/. - S/. 120.08 100.00% S/. - S/. 120.08
02.04.02 JUNTA DE WATER STOP DE 9" m 33.60 S/. 34.55 S/. 1,160.88 S/. - S/. 1,160.88 100.00% S/. - S/. 1,160.88
02.04.03 SELLADO DE JUNTAS CON MATERIAL ELASTOMERICO DE POLIURETANO m 37.60 S/. 38.91 S/. 1,463.02 S/. - S/. 1,463.02 100.00% S/. - S/. 1,463.02
02.05.01 COMPUERTA RADIAL OWERFLOW 3.60 x 1.55m MOD. 400 ARMCO INC. MEC. IZAJE und 2.00 S/. 55,550.84 S/. 111,101.68 S/. - S/. 16,665.25 15.00% S/. 94,436.43 85.00% S/. 111,101.68
02.05.02 COMPUERTA PLANA DESLIZANTE 0.60 x 0.75m TIPO ARMCO MEC. IZAJE und 1.00 S/. 3,220.34 S/. 3,220.34 S/. - S/. 483.05 15.00% S/. 2,737.29 85.00% S/. 3,220.34
02.05.03 BARANDA METALICA DE F°G° DIAMETRO 2" m 28.30 S/. 113.09 S/. 3,200.45 S/. - S/. - S/. 3,200.45 100.00% S/. 3,200.45
02.05.04 ESCALERA DE GATO DE FIERRO GALVANIZADO 3/4" SIMPLE m 31.20 S/. 29.89 S/. 932.57 S/. - S/. - S/. 932.57 100.00% S/. 932.57
02.05.05 RANURA PARA ATAGUIA (Pln. Metalica 1/4", Anclaje 1/2") m 17.80 S/. 65.37 S/. 1,163.59 S/. - S/. - S/. 1,163.59 100.00% S/. 1,163.59
03 BARRAJE FIJO
03.01.01 TRAZO, NIVELACION Y REPLANTEO m2 1,120.98 S/. 1.16 S/. 1,300.34 S/. 1,300.34 100.00% S/. - S/. - S/. 1,300.34
03.01.02 DESVIO PROVISIONAL DE CAUCE DEL RIO m3 337.50 S/. 4.38 S/. 1,478.25 S/. 1,478.25 100.00% S/. - S/. - S/. 1,478.25
03.01.03 LIMPIEZA Y DESBROCE DE TERRENO NATURAL m2 1,120.98 S/. 4.73 S/. 5,302.24 S/. 5,302.24 100.00% S/. - S/. - S/. 5,302.24
03.02.01 EXCAVACION DE MATERIAL SUELTO A MAQUINARIA PARA ESTRUCTURAS m3 9,359.29 S/. 4.35 S/. 40,712.91 S/. 22,392.10 55.00% S/. 18,320.81 45.00% S/. - S/. 40,712.91
03.02.02 EXCAVACION DE MATERIAL SUELTO A MANO m3 100.67 S/. 15.00 S/. 1,510.05 S/. 830.53 55.00% S/. 679.52 45.00% S/. - S/. 1,510.05
CRONOGRAMA VALORIZADO PROGRAMADO - COMPROM.
REHABILITACION DE LA BOCATOMA QUIRIHUAC II, QUIRIHUAC, DISTRITO DE LAREDO, PROVINCIA DE TRUJILLO, DEPARTAMENTO LA LIBERTAD
PLAZO DE EJECUCION : 3 MESES
COSTO DIRECTO : S/. 1,006,477.20
PRESUPUESTO MES 01 % MES 02 % MES 03 %
ITEM DESCRIPCION TOTAL
UND. METRADO P. UNIT. MONTO MONTO PROGRAM. MONTO PROGRAM. MONTO PROGRAM.
03.02.03 OVER SIDE 6"-8", e=0.40m m3 398.41 S/. 30.91 S/. 12,314.85 S/. 9,851.88 80.00% S/. 2,462.97 20.00% S/. - S/. 12,314.85
03.02.04 ENROCADO ACOMODADO Ø 1.10 A 1.50 m m3 1,892.10 S/. 65.80 S/. 124,500.18 S/. - 0.00% S/. 49,800.07 40.00% S/. 74,700.11 60.00% S/. 124,500.18
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 10,405.96 S/. 4.62 S/. 48,075.54 S/. 26,441.55 55.00% S/. 21,633.99 45.00% S/. - S/. 48,075.54
03.03.01 CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 142.80 S/. 14.91 S/. 2,129.15 S/. 2,129.15 100.00% S/. - S/. - S/. 2,129.15
03.03.02 CONCRETO CICLOPEO f'c=210 kg/cm2 + 70% P.G. m3 1,993.50 S/. 113.03 S/. 225,325.31 S/. 67,597.59 30.00% S/. 157,727.72 70.00% S/. - S/. 225,325.31
03.03.03 ENCOFRADO Y DESENCOFRADO m2 371.28 S/. 28.19 S/. 10,466.38 S/. 3,139.91 30.00% S/. 7,326.47 70.00% S/. - S/. 10,466.38
03.03.04 ENCOFRADO Y DESENCOFRADO CURVO m2 340.58 S/. 29.52 S/. 10,053.92 S/. 3,016.18 30.00% S/. 7,037.74 70.00% S/. - S/. 10,053.92
03.04.01 JUNTA DE WATER STOP DE 9" m 142.80 S/. 34.55 S/. 4,933.74 S/. 2,960.24 60.00% S/. 1,973.50 40.00% S/. - S/. 4,933.74
03.05 OTROS
03.05.01 TUBERIA DE DRENAJE (Lloradores) und 188.00 S/. 17.88 S/. 3,361.44 S/. - S/. 1,344.58 40.00% S/. 2,016.86 60.00% S/. 3,361.44
04 MUROS DE CONTENCION
04.01.01 TRAZO, NIVELACION Y REPLANTEO m2 118.63 S/. 1.16 S/. 137.61 S/. 137.61 100.00% S/. - S/. - S/. 137.61
04.01.02 LIMPIEZA Y DESBROCE DE TERRENO NATURAL m2 118.63 S/. 4.73 S/. 561.12 S/. 561.12 100.00% S/. - S/. - S/. 561.12
04.02.01 EXCAVACION EN MATERIAL CONGLOMERADO SATURADO PARA ESTRUCTURAS m3 283.84 S/. 4.38 S/. 1,243.22 S/. 1,243.22 100.00% S/. - S/. - S/. 1,243.22
04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 245.10 S/. 10.00 S/. 2,451.00 S/. 2,451.00 100.00% S/. - S/. - S/. 2,451.00
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 42.61 S/. 3.71 S/. 158.08 S/. 158.08 100.00% S/. - S/. - S/. 158.08
04.03.01 CONCRETO SIMPLE f´c = 100 kg/cm2 PARA SOLADOS e=10cm m2 43.84 S/. 14.87 S/. 651.90 S/. 651.90 100.00% S/. - S/. - S/. 651.90
04.03.02 CONCRETO ARMADO f'c=210 kg/cm2 PARA ESTRUCTURAS m3 60.15 S/. 336.09 S/. 20,215.81 S/. - S/. 20,215.81 100.00% S/. - S/. 20,215.81
04.03.03 ENCOFRADO Y DESENCOFRADO m2 156.28 S/. 28.19 S/. 4,405.53 S/. 3,524.42 80.00% S/. 881.11 20.00% S/. - S/. 4,405.53
04.03.04 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4,647.62 S/. 5.17 S/. 24,028.20 S/. - S/. 24,028.20 100.00% S/. - S/. 24,028.20
04.04.01 JUNTA DE WATER STOP DE 9" m 10.60 S/. 34.55 S/. 366.23 S/. - S/. 366.23 100.00% S/. - S/. 366.23
04.04.02 SELLADO DE JUNTAS CON MATERIAL ELASTOMERICO DE POLIURETANO m 10.60 S/. 38.91 S/. 412.45 S/. - S/. - S/. 412.45 100.00% S/. 412.45
04.05.01 DOWELS - ANCLAJE EN MUROS und 4.76 S/. 20.78 S/. 98.91 S/. - S/. 98.91 100.00% S/. - S/. 98.91
05 OTROS
05.01 MONITOREO DE PLAN DE MANEJO AMBIENTAL glb 1.00 S/. 8,998.86 S/. 8,998.86 S/. - S/. 4,499.43 50.00% S/. 4,499.43 50.00% S/. 8,998.86
COSTO DIRECTO S/. 1,006,477.20 S/. 377,337.79 S/. 441,058.90 S/. 188,080.51 S/. 1,006,477.20
GASTOS GENERALES #REF! #REF! #REF! #REF! #REF! #REF!
UTILIDAD 0.00% S/. - S/. - S/. - S/. - S/. -