TRABAJO ENCARGADO N° II DE COSTOS Y PRESUPUESTOS

UNIVERSIDAD ALAS PERUANAS

DOCENTE:

CESAR JOSE AVENDAÑO JIHUALLANGA

INTEGRANTES:

LUIS EDGARDOO GARCIA FERNANDEZ-2018114159-JAEN

HENRY JAIME CHAMBI OCHOA-2011182381-TACNA

FECHA:

07/07/2023

GERENCIA SUB REGIONAL DE CUTERVO


RESUMEN

DORMITORIO I

MEDIDAS
ITEM DESCRIPCION UND CANT. PARCIAL TOTAL
LARGO ANCHO ALTO
1 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES
01.01.01 ESCAVACIONES m3 9.04
01.02 CONCRETO SIMPLE
01.02.01 SOLADO C:H = 1:10 m2 0.50
01.02.02 CONCRETO 1:10 + 30%PG PARA CIMIENTOS CORRIDOS m3 2.86
01.02.03 CONCRETO 1:8 + 25%PM PARA SOBECIMIENTOS m3 0.60
01.03 OBRAS DE CONCRETO ARMADO
01.03.01 CONCRETO EN ZAPATAS F'C=210 Kg/cm2 m3 9.42
01.03.02 ACERO F'Y= 4200Kg/cm kg 853.98
ZAPATAS kg 50.67
COLUMNAS kg 573.15
VIGAS kg 188.34
LOSA ALIGERADA kg 41.82

GERENCIA SUB REGIONAL DE CUTERVO


RESUMEN

DORMITORIO I

MEDIDAS
ITEM DESCRIPCION UND CANT. PARCIAL TOTAL
LARGO ANCHO ALTO
1 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES
01.01.01 ESCAVACIONES m3 9.04
ZAPATAS m3 5.46
Z-1 1.00 1.00 1.00 1.10 1.10
Z-2 1.00 1.20 0.80 1.10 1.06
Z-3 1.00 1.20 1.00 1.10 1.32
Z-5 1.00 1.80 1.00 1.10 1.98

CIMIENTOS CORRIDOS m3 3.58


A-A 1.00 2.50 0.45 1.00 1.13
B-B 1.00 2.73 0.50 1.00 1.37
6-6 1.00 1.33 0.45 1.00 0.60
5-5 1.00 0.98 0.50 1.00 0.49

01.02 CONCRETO SIMPLE


01.02.01 SOLADO C:H = 1:10 m2 0.50
ZAPATAS m2
Z-1 1.00 1.00 1.00 0.10 0.10
Z-2 1.00 1.20 0.80 0.10 0.10
Z-3 1.00 1.20 1.00 0.10 0.12
Z-5 1.00 1.80 1.00 0.10 0.18

01.02.02 CONCRETO 1:10 + 30%PG PARA CIMIENTOS CORRIDOS m3 2.86


CIMIENTOS CORRIDOS m3
A-A 1.00 2.50 0.45 0.80 0.90
B-B 1.00 2.73 0.50 0.80 1.09
6-6 1.00 1.33 0.45 0.80 0.48
5-5 1.00 0.98 0.50 0.80 0.39

01.02.03 CONCRETO 1:8 + 25%PM PARA SOBECIMIENTOS m3 0.60


CIMIENTOS CORRIDOS m3
A-A 1.00 3.50 0.15 0.40 0.21
B-B 1.00 2.45 0.15 0.40 0.15
6-6 1.00 2.15 0.15 0.40 0.13
5-5 1.00 1.95 0.15 0.40 0.12

01.03 OBRAS DE CONCRETO ARMADO


01.03.01 CONCRETO EN ZAPATAS F'C=210 Kg/cm2 m3 9.42

ZAPATAS m3 2.98
Z-1 1.00 1.00 1.00 0.60 0.60
Z-2 1.00 1.20 0.80 0.60 0.58
Z-3 1.00 1.20 1.00 0.60 0.72
Z-5 1.00 1.80 1.00 0.60 1.08

COLUMNAS PISO 1 Y 2 m3 3.14


C-2 1.00 0.40 0.150 6.25 0.38
C-4 2.00 AREA 0.098 6.25 1.22
C-5 1.00 0.65 0.150 6.25 0.61
C-6 1.00 AREA 0.150 6.25 0.94

VIGAS m3 1.36
PRIMER PISO m3 0.68

GERENCIA SUB REGIONAL DE CUTERVO


RESUMEN

DORMITORIO I

MEDIDAS
ITEM DESCRIPCION UND CANT. PARCIAL TOTAL
LARGO ANCHO ALTO
A-A 1.00 3.50 0.15 0.40 0.21
B-B 1.00 3.75 0.15 0.40 0.23
6-6 1.00 2.15 0.15 0.40 0.13
5-5 1.00 1.95 0.15 0.40 0.12
PRIMER PISO m3 0.68
A-A 1.00 3.50 0.15 0.40 0.21
B-B 1.00 3.75 0.15 0.40 0.23
6-6 1.00 2.15 0.15 0.40 0.13
5-5 1.00 1.95 0.15 0.40 0.12

LOSA DE TECHO m3 1.94


PRIMER PISO m3 1.01
AREA
LOSA 1.00 TECHO 12.08 0.05 0.60
VIGUETAS 9.00 3.00 0.10 0.15 0.41

PRIMER PISO m3 0.93


AREA
LOSA 1.00 TECHO 12.08 0.05 0.60
VIGUETAS 9.00 3.00 0.10 0.12 0.32

01.03.02 ACERO F'Y= 4200Kg/cm kg 853.98


1/2"
ZAPATAS kg 50.67
kg cant. N° Vec. Long.(m) kg/m TOTAL 50.67
Z-1 6.00 0.86 5.16 0.99 5.11
6.00 0.86 5.16 0.99 5.11

Z-2 7.00 0.66 4.62 0.99 4.57


5.00 1.06 5.30 0.99 5.25

Z-3 7.00 0.86 6.02 0.99 5.96


6.00 1.06 6.36 0.99 6.30

Z-5 10.00 0.86 8.60 0.99 8.51


6.00 1.66 9.96 0.99 9.86

COLUMNAS kg 573.15
COLUMNA 02 Cant. N° Vec. Long.(m) kg/m 91.48
Acero vertical (4 de 5/8") 1.00 4.00 7.45 1.56 46.49
Acero vertical (2 de 1/2") 1.00 2.00 7.45 0.99 14.75
Estribos (3/8": 1 @ 0.05 ,[email protected], R @ 0.20) 50.00 1.00 1.08 0.56 30.24

COLUMNA 04 Cant. N° Vec. Long.(m) kg/m 178.49


Acero vertical (8 de 1/2") 2.00 8.00 7.45 0.99 118.01
Estribos (3/8": 1 @ 0.05 ,[email protected], R @ 0.20) 50.00 1.00 1.08 0.56 30.24
50.00 1.00 1.08 0.56 30.24

COLUMNA 05 Cant. N° Vec. Long.(m) kg/m 148.23


Acero vertical (4 de 5/8") 1.00 4.00 7.45 1.56 46.49
Acero vertical (4 de 1/2") 1.00 4.00 7.45 0.99 29.50
Estribos (3/8": 1 @ 0.05 ,[email protected], R @ 0.20) 50.00 1.00 1.62 0.56 45.36
50.00 1.00 0.96 0.56 26.88

COLUMNA 06 Cant. N° Vec. Long.(m) kg/m 154.96


Acero vertical (10 de 1/2") 1.00 10.00 7.45 0.99 73.76

GERENCIA SUB REGIONAL DE CUTERVO


RESUMEN

DORMITORIO I

MEDIDAS
ITEM DESCRIPCION UND CANT. PARCIAL TOTAL
LARGO ANCHO ALTO
Estribos (3/8": 1 @ 0.05 ,[email protected], R @ 0.20) 50.00 1.00 1.82 0.56 50.96
50.00 1.00 1.08 0.56 30.24

VIGAS kg 188.34
Eje A-A /V-P Cant. N° Vec. Long.(m) kg/m 54.87
Acero vertical (8 de 1/2") 1.00 8.00 3.50 0.99 27.72
Estribos (3/8": 1 @ 0.05 ,[email protected], R @ 0.20) 24.00 1.00 1.08 0.56 14.52
24.00 1.00 0.94 0.56 12.63

Eje 5-5 /V-P Cant. N° Vec. Long.(m) kg/m 30.15


Acero vertical (8 de 1/2") 1.00 8.00 1.95 0.99 15.44
Estribos (3/8": 1 @ 0.05 ,[email protected], R @ 0.20) 13.00 1.00 1.08 0.56 7.86
13.00 1.00 0.94 0.56 6.84

Eje 6-6 /V-P Cant. N° Vec. Long.(m) kg/m 34.00


Acero vertical (8 de 1/2") 1.00 8.00 2.15 0.99 17.03
Estribos (3/8": 1 @ 0.05 ,[email protected], R @ 0.20) 15.00 1.00 1.08 0.56 9.07
15.00 1.00 0.94 0.56 7.90

Eje B-B /V-P2 Cant. N° Vec. Long.(m) kg/m 69.33


Acero vertical (4 de 5/8") 1.00 4.00 3.75 1.56 23.40
Acero vertical (4 de 1/2") 1.00 4.00 3.75 0.99 14.85
Estribos (3/8": 1 @ 0.05 ,[email protected], R @ 0.20) 25.00 1.00 1.08 0.56 15.12
25.00 1.00 1.14 0.56 15.96

LOSA ALIGERADA kg 41.82


Eje A-A /V-P Cant. N° Vec. Long.(m) kg/m 41.82
Acero vertical (8 de 1/2") 1.00 9.00 3.20 0.99 28.51
Estribos (3/8": 1 @ 0.05 ,[email protected], R @ 0.20) 22.00 1.00 1.08 0.56 13.31

GERENCIA SUB REGIONAL DE CUTERVO