Planeamiento Muro Anclado
Planeamiento Muro Anclado
Planeamiento Muro Anclado
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13 12 11 10 9 8
36 37 38 39 40 41 42
7 6 5 4 3 2 1
19.6 19.6 19.6 19.6 19.6 19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
PERFILAD
19.6 19.6 19.6 19.6 19.6 19.6
1317.120
19.6 19.6 19.6 19.6 19.6 19.6
PERFILADO
19.6 650 650 650
650
650
650
650
650
650
650
650
650
650
650
650
650
650
650
650
ACERO
650 650 19.6 19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
19.6
ENCOFRADO
19.6 19.6 19.6 7.84
7.84
7.84
7.84
7.84
7.84
7.84
7.84
7.84
7.84
7.84
7.84
7.84
7.84
7.84
7.84
7.84
CONCRETO
7.84 7.84 7.84 7.84
7.84 7.84 7.84 7.84
Partida 01.05.03
Rendimiento m2/DIA MO. 20.0000 EQ.
Materiales
0207070001 AGUA PUESTA EN OBRA
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg)
Equipos
0301010006 HERRAMIENTAS MANUALES
0301340001 ANDAMIO METALICO
Partida 01.07.01.04
Rendimiento kg/DIA MO. 350.0000 EQ.
Materiales
02040100020001 ALAMBRE NEGRO N° 16
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60
Equipos
0301010006 HERRAMIENTAS MANUALES
03013300020002 CIZALLA ELECTRICA DE FIERRO
0301340001 ANDAMIO METALICO
Materiales
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8
0204120001 CLAVOS PARA MADERA CON CABEZA
02221400010010 DESMOLDANTE PARA ENCOFRADO
Equipos
0301010006 HERRAMIENTAS MANUALES
0301030044 ENCOFRADO DE MUROS PANTALLA
Materiales
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg)
0219010016 CONCRETO PREMEZCLADO T.I f'c=350 kg/cm2
02190500010001 SERVICIO DE BOMBA PARA CONCRETO PREMEZCLADO
0231010001 MADERA TORNILLO
Equipos
0301010006 HERRAMIENTAS MANUALES
03012900010002 VIBRADOR DE CONCRETO 4 HP 1.25"
0301340001 ANDAMIO METALICO
Desquinchado y pañeteo de taludes
20.0000 Costo unitario directo por : m2 14.38
Materiales
AGUA PUESTA EN OBRA m3
CEMENTO PORTLAND TIPO I (42.5 kg) bol
Equipos
HERRAMIENTAS MANUALES %mo
ANDAMIO METALICO día
Materiales
02040100020001 ALAMBRE NEGRO N° 16
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60
Equipos
0301010006 HERRAMIENTAS MANUALES
03013300020002 CIZALLA ELECTRICA DE FIERRO
0301340001 ANDAMIO METALICO
Materiales
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8
0204120001 CLAVOS PARA MADERA CON CABEZA
02221400010010 DESMOLDANTE PARA ENCOFRADO
Equipos
0301010006 HERRAMIENTAS MANUALES
0301030044 ENCOFRADO DE MUROS PANTALLA
Materiales
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg)
0219010016 CONCRETO PREMEZCLADO T.I f'c=350 kg/cm2
02190500010001 SERVICIO DE BOMBA PARA CONCRETO PREMEZCLADO
0231010001 MADERA TORNILLO
Equipos
0301010006 HERRAMIENTAS MANUALES
03012900010002 VIBRADOR DE CONCRETO 4 HP 1.25"
0301340001 ANDAMIO METALICO
ado y pañeteo de taludes
Costo unitario directo por : m2 8.56
S/ 98,890.46
Área Capacidad
Terreno 3911.04 m2 Volquetes 15
17:15
TOTAL
60 Volumen Eliminado (m3) 45 345 m3
TOTAL REAL
276 m3
Área Capacidad
Terreno 3911.04 m2 Volquetes 15
140
2do ciclo 3er ciclo
Descrip Inicio Fin Descrip Inicio Fin
1er volq 9:20 10:40 1er volq 10:40 12:00
2do volq 9:40 11:00 2do volq 11:00 12:20
3er volq 10:00 11:20 3er volq 11:20 12:40
4to volq 10:20 11:40 4to volq 11:40 13:00
13-11 9-7 5
15-13 11-9 7-5
17-15 13-11 9-7 5
19-17 15-13 11-9 7-5
31-29 27-25 23-21 19-17 15-13 11-9 7-5
39 40 41 42 43 44 45 46 47
AN 2 AN 2 AN 2 AN 2 AN 2 AN 2 AN 2 AN 2 AN 2
42-41-40-39 38-37-36-35 34-33-32-31 30-29-28-27-26
48 49 50 51 52 53 54 55
AN 2 AN 2 AN 2 AN 2 AN 2 AN 2 AN 2 AN 2
25-24-23-22 21-20-19-18 17-16-15-14 13-12-11-10 9-8-7-6 5-4-3-2 1
42-38 34-30 26-22 18-14 10-6 40-36 32-28
42 38-34 30-26 22-18 14-10 6-40 36-32
42-38 34-30 26-22 18-14 10-6 40-36
42 38-34 30-26 22-18 14-10 6-40
42 38-34 30-26
56 57 58 59 60 61 62
AN 2 AN 2 AN 2 AN 2 AN 2 AN 2 AN 2
AN 2 AN 2 AN 2 AN 2 AN 2 AN 2 AN 3 AN 3
AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3
42-41-40-39
38-37-36-35
34-33-32-31
30-29-28-27-26
25-24-23-22
21-20-19-18
17-16-15-14
13-12-11-10
42-38 34-30 26-22
42 38-34 30-26
42-38 34-30
42 38-34
11-9 7-5
85 86 87 88 89 90 91 92
AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3
9-8-7-6 5-4-3-2 1
18-14 10-6 40-36 32-28 24-20 16-12 8-4 41-39
22-18 14-10 6-40 36-32 28-24 20-16 12-8 4-41
26-22 18-14 10-6 40-36 32-28 24-20 16-12 8-4
30-26 22-18 14-10 6-40 36-32 28-24 20-16 12-8
42 38-34 30-26 22-18 14-10 6-40 36-32
93 94 95 96 97 98 99 100 101 102 103 104 105
AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3 AN 3
34-33-32-31
30-29-28-27-26
25-24-23-22
21-20-19-18
17-16-15-14
13-12-11-10
9-8-7-65-4-3-2 1
42-38 34-30 26-22 18-14 10-6 40-36 32-28 24-20 16-12 8-4 41-39 37-35 33-31
42 38-34 30-26 22-18 14-10 6-40 36-32 28-24 20-16 12-8 4-41 39-37 35-33
42-38 34-30 26-22 18-14 10-6 40-36 32-28 24-20 16-12 8-4 41-39 37-35
42 38-34 30-26 22-18 14-10 6-40 36-32 28-24 20-16 12-8 4-41 39-37
42 38-34 30-26 22-18 14-10 6-40 36-32 28-24 20-16
138 139 140 141 142 143 144 145 146 147 148 149 150
AN 4 AN 4 AN 4 AN 4 AN 4 AN 4 AN 4 AN 4 AN 4 AN 4 AN 4 AN 4
Objetivo:
Se realizará la excavación
masiva de 04 sótanos y a su vez
la estabilización de los taludes
de los 04 sótanos mediante
anclajes temporales (muros
anclados)
Descripción:
Datos:
Excavación: Excavación de
material 54,754.00 m3 (volúmen
banco)
Perfilado: 3292.8 m2
Acero: 109,200.00 kg
Encofrado: 3,292.80 m2
Concreto: 1,317.12 m3
Restricciones: Planta de Excavación: La excavación avanzará en senti
1 Equipos: exteriormente des
Desperfecto mecánico de equipos
de excavación
2 Otros:
Encuentro de vicios ocultos
durante la excavación
Recursos Iniciales:
1. Equipos: 2.Mano de Obra
-Excavadora 320 ( 02) -Operador Exc. ( 02 )
-Volquetes 18m3 ( 09 ) -Chofer Volquete ( 09 )
- Vigías (02)
- Controlador de Volq (01)
-Vibrador de concreto ( 3 ) - Perfiladores (03)
-Martillo demoledor ( 3 ) - Fierreros (06)
-Estacion Total ( 1 ) - Carpinteros (06)
-Nivel Automático ( 1 ) - ConcreterosPeón ( 4 )
- Bomba Telescópica (42 m) - Topografo (02)
- Bomba Estacionaria - Operador de Bomba (01)
3. Materiales
-Escaleras de 3 y 12 m ( 04 c7u )
-Moldes p/probetas ( 10 )
-Winchas de 8m y 50m ( 03 c/u)
-Mangueras 3/4" de 100 m ( 02 c/u)
Plan
-Chute p/concreto ( 02 c/u )
-Cilindros 55 gln ( 10 c/u)
-Buguis ( 06 )
-Picos, Lampas, Barretas, Cinceles ( 06 c/u)
Diagrama de Gantt-Base :
O DE TIERRAS Y ESTABILIZACIÓN DE TALUDES 04 SÓTANOS
xcavación avanzará en sentido SUR a NORTE, donde la eliminación será con rampa de 18% de inclinación que partirá
exteriormente desde el Nivel -4.00 m. hasta el nivel de terreno natural.
Planta de Techo Típico : Sectorización de Techo Típico (05 Sectores)
Planeamiento de Excavación:
Eliminación con rampa de 18% por fuera del terreno
Avance de Verticales: Se
iniciara por el Sector S1, en sectores de 8 columnas diarias; se tendrán las siguientes
consideraciones: -
Encofrado completo a doble alturas con un máximo de 3 usos. - Uso
vibradores externos acoplados en la parte baja de los verticales.
Avance de Horizontales: Se
iniciara por el Sector S1, en sectores de 150 m2 de fondo aprox; se tendrán las siguientes
consideraciones: - Uso de
paneles fenólicos con un máximo de 3 usos. - Uso de cinta
SIKA CHAPDUR NON para junta entre fenólico y fenólico. - Modelado y
presentación de fenolicos en techo conservando el remate en misma zona y el
alineamiento coincidente en todos los niveles. - Para el caso de resanes
estructurales en los elementos se procederá a usar el aditivo PLANITOP, que como acabado
tiene un color muy semejante al concreto.
Item Descripcion Junio Julio Agosto
1 Movimiento de Tierras
2 Anillo 1 35d
3 Anillo 2 33d
4 Anillo 3 43d
5 Anillo 4 38d
6 Cuña 13d
Setiembre Octubre